# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: insure that ESRL receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: ESRL should be informed at the outset of the nature of this work. # comment: If the ESRL data are essential to the work, or if an important # comment: result or conclusion depends on the ESRL data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the ESRL data should be sent to ESRL # comment: for review before they are submitted for publication so we can # comment: insure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO2 CCGG (In Situ) # contact_name: Kirk W Thoning # contact_telephone: (303) 497-6078 # contact_email: Kirk.W.Thoning@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: National Science Foundation [NSF] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the ESRL data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: spo # description_project-abbr: ccg_obs # description_strategy-abbr: insitu # description_sample-constraints: date:1977 # description_average: hour # description_creation-time: 2013-05-28 14:53:04 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # comment: # data_fields: site year month day hour value unc n flag intake_ht inst SPO 1977 01 01 00 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 01 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 02 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 03 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 04 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 05 330.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 06 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 07 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 08 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 09 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 10 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 11 330.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 12 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 13 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 14 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 15 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 16 330.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 17 330.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 18 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 19 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 20 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 21 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 22 330.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 01 23 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 00 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 01 330.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 02 330.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 03 330.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 04 330.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 05 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 06 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 07 330.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 08 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 09 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 10 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 11 330.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 12 330.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 13 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 14 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 15 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 16 330.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 17 330.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 18 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 19 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 02 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 02 22 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 02 23 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 00 330.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 01 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 02 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 03 330.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 04 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 05 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 06 330.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 07 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 08 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 09 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 10 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 11 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 12 330.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 13 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 14 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 15 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 16 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 17 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 18 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 19 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 20 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 21 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 22 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 03 23 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 00 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 01 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 02 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 03 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 04 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 05 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 06 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 07 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 08 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 09 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 10 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 11 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 12 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 13 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 14 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 15 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 16 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 17 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 18 330.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 19 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 20 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 21 330.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 22 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 04 23 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 00 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 01 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 02 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 03 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 04 330.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 05 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 06 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 07 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 08 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 09 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 10 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 11 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 12 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 13 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 14 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 15 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 16 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 17 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 18 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 19 330.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 20 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 21 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 22 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 05 23 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 00 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 01 330.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 02 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 03 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 04 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 05 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 06 330.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 07 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 08 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 09 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 10 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 11 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 12 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 13 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 14 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 15 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 16 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 17 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 18 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 19 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 20 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 21 330.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 22 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 06 23 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 00 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 01 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 07 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 07 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 07 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 07 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 07 07 330.210 -99.990 1 .D. 0.00 UR2-1 SPO 1977 01 07 08 330.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 09 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 10 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 11 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 12 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 13 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 14 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 15 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 16 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 17 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 18 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 19 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 20 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 21 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 22 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 07 23 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 00 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 01 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 02 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 03 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 04 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 05 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 06 330.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 07 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 08 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 09 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 10 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 11 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 12 330.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 13 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 14 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 15 330.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 16 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 17 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 18 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 19 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 20 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 21 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 22 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 08 23 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 00 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 01 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 02 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 03 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 04 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 05 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 06 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 07 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 08 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 09 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 10 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 11 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 12 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 13 330.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 14 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 15 330.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 16 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 17 330.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 18 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 19 330.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 09 21 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 22 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 09 23 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 00 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 01 330.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 02 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 03 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 04 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 05 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 06 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 07 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 08 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 09 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 10 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 11 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 12 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 13 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 14 330.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 15 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 16 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 17 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 18 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 19 330.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 20 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 21 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 22 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 10 23 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 00 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 01 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 02 330.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 03 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 04 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 05 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 06 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 07 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 08 330.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 09 330.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 10 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 11 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 12 330.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 13 330.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 14 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 15 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 16 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 17 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 18 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 19 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 20 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 21 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 22 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 11 23 330.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 00 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 01 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 02 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 03 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 04 330.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 05 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 06 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 07 330.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 08 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 09 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 10 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 11 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 12 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 13 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 14 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 15 330.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 16 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 17 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 18 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 19 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 20 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 21 330.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 22 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 12 23 330.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 00 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 01 330.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 02 330.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 01 13 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 01 13 05 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 06 330.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 07 330.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 08 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 09 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 10 330.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 11 330.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 12 330.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 13 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 14 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 15 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 16 330.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 17 330.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 18 330.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 19 330.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 20 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 13 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 13 22 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 13 23 330.180 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 14 00 330.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 14 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 14 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 15 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 16 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 17 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 18 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 18 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 18 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 18 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 18 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 18 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 18 06 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 01 18 07 330.260 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 08 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 09 329.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 10 329.970 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 11 330.000 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 12 329.920 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 13 329.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 14 329.900 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 15 330.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 16 330.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 17 329.950 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 18 330.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 19 330.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 20 330.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 18 21 330.680 -99.990 1 .A* 0.00 UR2-1 SPO 1977 01 18 22 330.650 -99.990 1 .A* 0.00 UR2-1 SPO 1977 01 18 23 330.510 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 00 330.430 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 01 330.540 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 02 330.540 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 03 330.400 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 04 330.480 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 05 330.480 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 06 330.530 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 07 330.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 08 330.400 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 09 330.260 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 10 330.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 11 330.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 12 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 13 330.310 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 14 330.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 15 330.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 16 330.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 17 330.090 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 18 330.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 19 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 20 330.180 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 21 329.920 -99.990 1 .D* 0.00 UR2-1 SPO 1977 01 19 22 330.590 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 19 23 330.450 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 00 330.340 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 01 330.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 02 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 03 330.380 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 04 330.300 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 05 330.350 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 06 330.270 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 07 330.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 08 330.210 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 09 330.180 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 10 330.210 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 11 330.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 12 330.220 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 13 330.270 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 14 330.240 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 15 330.240 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 16 330.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 17 330.130 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 18 330.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 19 330.210 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 20 330.180 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 21 330.700 -99.990 1 .D* 0.00 UR2-1 SPO 1977 01 20 22 330.380 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 20 23 330.260 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 00 330.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 01 330.370 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 02 330.380 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 03 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 04 330.320 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 05 330.220 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 06 330.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 07 330.400 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 08 330.300 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 09 330.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 10 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 11 330.270 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 12 330.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 13 330.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 14 330.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 15 330.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 16 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 17 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 18 330.260 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 19 330.310 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 20 330.360 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 21 330.650 -99.990 1 .D* 0.00 UR2-1 SPO 1977 01 21 22 330.370 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 21 23 330.440 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 00 330.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 01 330.380 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 02 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 03 330.560 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 04 330.470 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 05 330.320 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 06 329.950 -99.990 1 .D* 0.00 UR2-1 SPO 1977 01 22 07 330.390 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 08 330.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 09 330.240 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 10 330.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 11 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 12 330.340 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 13 330.320 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 14 330.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 15 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 16 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 17 330.340 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 18 330.270 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 19 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 20 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 21 330.400 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 22 330.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 22 23 329.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 00 329.810 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 01 329.810 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 02 330.000 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 03 330.030 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 04 330.130 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 05 330.240 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 06 330.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 07 330.110 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 08 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 09 330.220 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 10 330.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 11 330.390 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 12 330.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 13 330.370 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 14 330.040 -99.990 1 .D* 0.00 UR2-1 SPO 1977 01 23 15 330.320 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 16 330.300 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 17 330.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 18 330.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 19 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 20 330.350 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 21 330.530 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 22 330.400 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 23 23 330.440 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 00 330.340 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 24 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 24 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 24 04 330.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 05 329.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 06 330.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 07 330.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 08 330.260 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 09 330.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 10 330.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 11 330.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 12 330.360 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 13 330.390 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 14 330.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 15 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 16 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 17 330.320 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 18 330.390 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 19 330.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 20 330.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 21 330.390 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 24 22 330.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 24 23 330.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 00 330.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 01 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 02 330.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 03 330.450 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 04 330.210 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 05 330.410 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 06 330.180 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 07 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 08 330.220 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 09 330.270 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 10 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 11 330.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 12 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 13 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 14 330.260 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 15 330.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 16 330.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 17 330.310 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 18 330.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 19 330.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 20 330.130 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 21 330.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 22 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 25 23 330.340 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 00 330.410 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 01 330.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 02 330.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 03 330.090 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 04 330.240 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 05 330.220 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 06 330.050 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 07 330.000 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 08 330.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 09 330.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 10 330.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 11 330.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 12 330.300 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 13 330.260 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 14 330.300 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 15 330.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 16 330.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 17 330.470 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 18 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 19 330.310 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 20 330.200 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 21 330.310 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 22 330.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 26 23 330.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 27 00 330.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 27 01 330.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 01 27 02 330.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 03 330.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 04 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 05 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 06 330.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 07 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 08 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 09 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 10 330.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 11 330.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 12 330.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 13 330.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 14 330.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 15 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 16 330.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 17 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 18 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 19 330.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 20 330.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 21 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 22 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 27 23 329.850 -99.990 1 .D. 0.00 UR2-1 SPO 1977 01 28 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 28 09 329.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 10 330.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 11 330.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 12 330.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 13 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 14 330.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 15 330.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 16 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 17 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 18 330.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 19 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 20 330.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 28 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 01 28 22 330.080 -99.990 1 .D. 0.00 UR2-1 SPO 1977 01 28 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 01 29 00 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 01 330.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 02 330.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 03 330.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 04 330.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 05 330.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 06 330.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 07 330.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 08 330.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 09 330.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 10 330.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 11 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 12 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 13 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 14 330.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 15 330.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 16 330.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 17 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 18 330.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 19 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 20 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 21 330.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 22 330.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 29 23 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 00 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 01 330.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 02 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 03 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 04 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 05 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 06 330.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 07 329.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 08 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 09 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 10 330.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 11 330.310 -99.990 1 .D. 0.00 UR2-1 SPO 1977 01 30 12 329.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 13 330.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 14 330.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 15 330.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 16 330.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 17 330.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 18 330.370 -99.990 1 .D. 0.00 UR2-1 SPO 1977 01 30 19 330.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 20 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 21 330.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 22 330.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 30 23 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 00 330.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 01 330.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 02 330.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 03 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 04 330.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 05 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 06 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 07 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 08 330.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 09 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 10 330.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 11 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 12 330.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 13 330.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 14 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 15 330.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 16 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 17 330.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 18 330.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 19 329.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 20 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 21 330.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 22 330.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 01 31 23 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 00 330.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 01 330.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 02 330.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 03 330.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 04 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 05 330.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 06 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 07 330.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 08 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 09 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 10 330.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 11 330.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 12 330.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 13 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 14 330.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 15 330.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 16 330.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 17 330.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 18 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 19 330.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 20 330.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 21 330.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 22 330.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 01 23 330.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 00 330.210 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 01 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 02 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 03 330.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 04 330.180 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 05 330.170 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 06 329.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 07 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 08 330.170 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 09 330.230 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 10 330.230 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 11 330.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 12 330.180 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 13 330.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 14 330.160 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 15 330.250 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 16 330.190 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 17 330.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 18 330.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 19 330.230 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 20 330.250 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 02 21 329.940 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 02 22 330.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 02 23 330.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 03 00 330.230 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 01 330.220 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 02 330.290 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 03 330.150 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 04 330.030 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 05 330.210 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 06 330.200 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 07 330.200 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 08 330.310 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 09 330.170 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 10 330.160 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 11 330.270 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 12 330.060 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 13 330.120 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 14 330.080 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 15 330.120 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 16 330.220 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 17 330.120 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 18 330.080 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 19 330.110 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 20 330.150 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 21 330.030 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 22 330.150 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 03 23 330.250 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 00 330.210 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 01 330.150 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 02 330.080 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 03 330.160 -99.990 1 .A* 0.00 UR2-1 SPO 1977 02 04 04 330.110 -99.990 1 .A* 0.00 UR2-1 SPO 1977 02 04 05 330.240 -99.990 1 .A* 0.00 UR2-1 SPO 1977 02 04 06 330.150 -99.990 1 .A* 0.00 UR2-1 SPO 1977 02 04 07 330.440 -99.990 1 .D* 0.00 UR2-1 SPO 1977 02 04 08 329.830 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 04 09 330.300 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 10 330.060 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 11 330.100 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 12 330.220 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 13 330.090 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 14 330.130 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 15 330.210 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 16 330.180 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 17 330.210 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 18 330.160 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 19 330.030 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 20 330.260 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 04 21 329.820 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 04 22 330.360 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 04 23 330.000 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 05 00 330.130 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 05 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 05 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 06 23 331.850 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 07 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 01 331.770 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 02 331.870 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 03 331.990 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 04 331.760 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 05 332.070 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 06 331.870 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 07 331.760 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 08 331.680 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 09 331.720 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 10 331.720 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 11 331.800 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 07 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 07 23 331.930 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 00 331.810 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 01 331.640 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 02 331.690 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 03 331.770 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 04 331.630 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 05 331.660 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 06 331.680 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 07 331.630 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 08 331.640 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 09 331.650 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 10 331.670 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 11 331.700 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 12 331.620 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 13 331.650 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 14 331.600 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 15 331.690 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 16 331.590 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 17 331.660 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 18 331.660 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 19 331.560 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 20 331.490 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 21 331.740 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 22 331.670 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 08 23 331.630 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 00 331.560 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 01 331.590 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 02 331.570 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 03 331.590 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 04 331.640 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 05 331.530 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 06 331.610 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 07 331.540 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 08 331.490 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 09 331.480 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 10 331.510 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 11 331.520 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 12 331.500 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 13 331.520 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 14 331.470 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 15 331.420 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 16 331.420 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 17 331.270 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 18 331.350 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 19 331.530 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 20 331.400 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 21 331.320 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 22 331.450 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 09 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 10 00 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 01 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 02 331.600 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 10 03 331.550 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 10 04 331.580 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 10 05 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 06 331.570 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 10 07 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 08 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 09 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 10 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 11 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 12 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 13 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 14 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 15 331.560 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 10 16 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 17 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 18 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 19 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 20 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 21 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 10 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 10 23 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 00 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 11 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 11 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 11 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 11 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 11 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 11 07 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 08 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 09 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 10 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 11 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 12 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 13 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 14 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 15 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 16 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 17 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 18 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 19 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 20 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 21 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 22 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 11 23 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 00 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 01 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 02 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 03 331.760 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 12 04 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 05 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 06 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 07 331.150 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 12 08 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 09 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 10 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 11 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 12 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 13 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 14 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 15 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 16 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 17 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 18 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 19 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 20 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 21 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 22 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 12 23 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 00 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 01 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 02 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 03 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 04 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 05 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 06 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 13 08 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 09 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 10 331.560 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 13 11 331.160 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 13 12 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 13 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 14 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 15 331.620 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 13 16 331.360 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 13 17 331.720 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 13 18 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 19 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 20 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 21 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 22 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 13 23 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 00 331.580 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 14 01 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 02 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 03 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 04 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 05 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 06 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 07 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 08 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 09 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 10 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 11 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 12 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 13 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 14 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 15 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 16 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 17 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 18 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 19 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 20 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 21 331.560 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 14 22 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 14 23 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 00 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 01 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 02 331.690 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 15 03 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 04 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 05 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 06 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 07 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 08 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 09 331.710 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 15 10 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 11 331.080 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 15 12 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 13 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 14 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 15 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 16 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 17 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 18 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 19 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 20 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 21 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 22 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 15 23 331.610 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 16 00 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 01 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 02 331.610 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 16 03 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 04 331.040 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 16 05 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 06 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 07 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 08 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 09 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 10 331.600 -99.990 1 .A. 0.00 UR2-1 SPO 1977 02 16 11 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 12 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 13 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 14 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 15 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 16 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 17 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 18 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 19 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 20 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 21 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 22 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 16 23 331.590 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 17 00 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 01 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 02 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 03 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 04 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 05 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 06 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 07 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 08 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 09 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 10 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 11 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 12 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 13 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 14 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 15 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 16 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 17 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 18 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 19 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 17 20 331.070 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 17 21 331.640 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 17 22 331.120 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 17 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 18 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 18 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 18 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 18 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 18 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 18 05 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 06 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 07 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 08 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 09 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 10 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 11 331.500 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 18 12 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 13 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 14 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 15 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 16 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 17 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 18 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 19 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 20 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 21 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 22 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 18 23 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 00 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 01 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 02 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 03 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 04 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 05 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 06 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 07 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 08 331.530 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 19 09 330.930 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 19 10 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 11 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 12 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 13 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 14 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 15 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 16 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 17 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 18 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 19 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 20 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 21 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 22 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 19 23 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 00 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 01 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 02 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 03 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 04 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 05 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 06 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 07 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 08 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 09 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 10 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 11 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 12 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 13 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 14 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 15 331.570 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 20 16 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 17 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 18 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 19 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 20 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 20 21 331.360 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 20 22 331.650 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 20 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 21 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 21 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 21 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 21 03 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 04 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 05 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 06 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 07 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 08 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 09 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 10 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 11 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 12 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 13 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 14 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 15 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 16 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 17 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 18 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 19 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 20 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 21 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 22 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 21 23 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 00 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 01 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 02 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 03 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 04 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 05 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 06 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 07 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 08 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 09 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 10 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 11 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 12 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 13 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 14 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 15 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 16 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 17 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 18 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 19 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 20 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 21 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 22 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 22 23 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 00 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 01 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 02 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 03 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 04 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 05 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 06 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 07 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 08 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 09 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 10 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 11 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 12 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 13 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 14 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 15 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 16 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 17 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 18 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 19 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 20 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 21 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 22 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 23 23 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 00 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 01 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 02 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 03 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 04 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 05 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 06 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 07 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 08 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 09 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 10 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 11 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 12 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 13 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 14 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 15 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 16 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 17 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 18 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 19 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 20 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 21 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 22 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 24 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 25 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 25 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 25 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 25 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 25 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 25 05 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 06 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 07 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 08 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 09 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 10 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 11 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 12 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 13 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 14 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 15 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 16 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 17 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 18 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 19 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 20 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 21 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 22 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 25 23 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 00 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 01 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 02 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 03 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 04 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 05 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 06 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 07 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 08 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 09 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 10 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 11 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 12 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 13 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 14 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 15 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 16 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 17 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 18 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 19 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 20 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 21 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 22 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 26 23 331.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 00 331.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 01 331.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 02 331.290 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 03 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 04 331.180 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 05 331.230 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 06 331.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 07 331.210 -99.990 1 ..* 0.00 UR2-1 SPO 1977 02 27 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 27 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 02 27 10 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 11 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 12 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 13 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 14 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 15 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 16 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 17 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 18 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 19 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 20 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 21 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 22 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 27 23 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 00 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 01 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 02 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 03 331.420 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 28 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 02 28 05 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 06 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 07 331.460 -99.990 1 .D. 0.00 UR2-1 SPO 1977 02 28 08 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 09 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 10 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 11 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 12 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 13 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 14 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 15 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 16 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 17 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 18 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 19 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 20 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 21 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 22 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 02 28 23 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 00 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 01 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 02 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 01 04 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 05 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 06 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 07 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 08 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 09 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 10 331.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 01 11 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 12 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 13 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 14 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 15 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 16 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 17 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 18 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 19 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 20 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 21 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 22 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 01 23 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 00 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 01 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 02 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 03 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 04 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 05 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 06 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 07 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 08 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 09 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 10 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 11 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 12 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 13 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 14 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 15 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 02 16 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 17 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 18 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 19 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 20 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 21 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 22 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 02 23 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 00 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 01 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 02 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 03 03 03 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 03 03 04 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 03 05 331.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 03 06 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 07 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 08 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 09 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 10 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 11 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 12 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 13 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 14 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 15 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 16 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 17 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 18 330.980 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 03 19 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 20 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 21 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 03 22 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 03 23 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 04 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 04 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 04 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 04 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 04 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 04 06 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 07 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 08 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 04 09 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 10 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 11 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 12 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 13 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 14 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 15 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 16 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 17 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 04 18 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 19 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 20 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 21 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 22 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 04 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 05 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 05 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 05 02 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 03 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 04 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 05 05 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 06 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 07 331.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 05 08 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 09 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 10 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 11 331.030 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 05 12 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 13 331.130 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 05 14 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 15 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 16 331.030 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 05 17 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 18 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 19 331.130 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 05 20 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 21 331.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 05 22 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 05 23 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 00 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 01 331.110 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 06 02 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 03 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 06 04 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 05 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 06 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 07 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 08 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 09 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 10 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 11 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 12 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 13 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 14 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 15 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 16 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 17 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 18 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 19 331.210 -99.990 1 .D. 0.00 UR2-1 SPO 1977 03 06 20 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 06 21 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 22 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 06 23 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 00 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 01 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 02 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 03 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 04 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 07 05 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 06 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 07 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 07 08 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 09 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 10 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 11 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 07 12 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 13 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 14 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 15 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 16 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 17 331.030 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 07 18 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 19 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 07 20 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 21 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 22 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 07 23 331.030 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 08 00 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 01 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 02 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 03 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 04 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 08 05 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 06 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 08 08 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 09 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 10 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 11 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 12 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 13 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 14 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 15 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 16 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 17 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 18 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 19 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 08 20 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 21 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 22 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 08 23 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 00 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 01 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 02 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 03 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 04 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 05 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 06 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 07 331.110 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 09 08 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 09 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 10 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 11 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 12 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 13 331.110 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 09 14 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 15 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 09 16 331.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 09 17 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 18 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 19 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 20 330.720 -99.990 1 .D. 0.00 UR2-1 SPO 1977 03 09 21 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 09 22 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 09 23 330.550 -99.990 1 .D. 0.00 UR2-1 SPO 1977 03 10 00 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 01 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 02 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 03 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 04 330.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 05 330.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 06 330.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 07 331.080 -99.990 1 .D. 0.00 UR2-1 SPO 1977 03 10 08 330.670 -99.990 1 .D. 0.00 UR2-1 SPO 1977 03 10 09 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 10 330.980 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 11 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 12 331.050 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 13 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 14 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 15 330.980 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 16 330.980 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 17 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 18 330.980 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 19 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 20 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 10 21 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 22 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 10 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 11 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 11 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 11 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 11 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 11 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 11 05 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 06 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 07 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 08 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 09 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 10 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 11 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 12 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 13 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 14 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 15 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 16 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 17 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 18 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 19 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 11 20 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 21 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 11 22 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 11 23 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 00 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 01 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 12 02 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 03 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 04 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 05 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 06 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 07 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 08 330.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 09 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 12 10 330.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 12 11 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 12 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 13 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 14 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 15 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 12 16 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 17 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 18 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 12 19 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 12 21 330.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 22 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 12 23 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 00 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 01 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 02 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 03 330.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 04 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 13 05 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 06 330.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 07 330.690 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 13 08 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 09 330.790 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 13 10 330.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 11 330.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 12 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 13 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 14 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 15 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 16 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 17 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 18 330.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 19 330.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 20 330.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 13 21 330.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 22 330.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 13 23 330.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 00 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 14 01 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 02 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 03 330.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 04 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 14 05 330.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 06 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 07 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 08 330.900 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 14 09 330.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 10 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 11 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 12 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 14 13 330.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 14 330.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 15 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 16 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 17 330.850 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 14 18 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 19 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 20 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 21 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 14 22 330.860 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 14 23 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 00 330.810 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 15 01 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 02 330.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 03 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 04 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 05 330.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 06 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 15 07 330.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 15 08 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 09 330.860 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 15 10 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 11 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 12 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 13 330.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 14 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 15 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 16 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 17 330.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 15 18 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 19 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 20 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 21 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 15 22 331.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 15 23 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 00 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 01 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 02 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 16 03 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 04 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 05 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 16 06 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 07 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 08 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 09 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 10 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 11 330.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 12 330.840 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 16 13 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 14 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 15 330.980 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 16 16 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 17 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 18 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 16 19 330.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 16 20 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 21 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 22 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 16 23 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 00 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 01 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 02 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 03 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 04 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 05 330.770 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 17 06 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 07 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 08 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 09 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 10 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 17 11 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 12 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 13 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 14 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 15 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 16 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 17 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 18 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 17 19 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 20 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 21 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 17 22 331.030 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 17 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 18 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 18 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 18 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 18 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 18 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 18 05 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 18 06 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 07 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 08 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 09 330.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 10 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 11 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 12 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 18 13 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 14 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 18 15 330.800 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 18 16 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 17 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 18 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 19 330.800 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 18 20 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 21 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 18 22 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 18 23 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 00 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 01 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 19 02 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 19 03 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 04 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 05 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 06 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 07 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 08 330.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 09 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 10 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 11 330.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 12 330.710 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 19 13 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 14 330.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 15 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 16 331.220 -99.990 1 .D. 0.00 UR2-1 SPO 1977 03 19 17 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 18 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 19 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 20 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 21 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 22 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 19 23 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 00 331.370 -99.990 1 .D* 0.00 UR2-1 SPO 1977 03 20 01 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 02 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 20 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 20 05 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 06 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 07 330.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 08 330.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 09 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 20 10 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 11 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 12 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 13 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 14 330.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 15 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 16 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 17 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 18 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 19 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 20 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 20 21 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 22 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 20 23 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 00 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 21 01 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 02 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 03 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 04 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 05 330.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 06 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 07 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 21 08 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 09 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 10 330.800 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 21 11 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 12 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 13 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 14 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 15 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 16 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 17 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 18 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 19 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 20 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 21 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 22 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 21 23 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 22 00 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 01 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 02 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 03 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 04 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 05 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 06 330.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 07 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 08 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 09 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 10 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 11 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 12 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 13 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 14 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 15 330.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 22 16 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 17 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 18 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 19 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 20 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 21 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 22 22 330.380 -99.990 1 .D* 0.00 UR2-1 SPO 1977 03 22 23 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 00 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 01 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 02 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 03 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 04 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 05 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 06 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 07 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 08 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 09 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 23 10 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 11 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 12 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 13 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 14 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 15 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 16 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 17 331.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 23 18 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 19 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 20 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 21 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 22 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 23 23 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 00 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 01 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 02 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 03 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 04 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 05 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 06 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 07 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 08 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 09 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 10 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 11 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 12 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 13 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 14 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 24 15 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 16 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 17 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 18 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 19 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 20 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 24 21 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 22 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 24 23 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 25 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 25 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 25 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 25 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 25 05 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 06 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 07 330.800 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 25 08 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 09 330.730 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 25 10 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 11 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 12 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 13 330.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 25 14 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 25 15 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 16 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 17 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 18 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 25 19 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 20 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 21 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 22 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 25 23 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 00 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 01 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 02 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 03 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 04 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 05 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 26 06 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 07 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 08 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 09 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 10 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 26 11 330.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 26 12 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 13 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 26 14 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 26 15 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 26 16 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 17 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 18 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 19 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 20 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 21 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 22 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 26 23 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 03 27 01 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 27 02 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 03 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 04 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 05 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 06 330.860 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 27 07 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 08 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 09 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 10 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 11 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 12 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 13 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 14 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 15 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 16 330.840 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 27 17 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 18 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 19 330.810 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 27 20 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 21 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 27 22 330.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 27 23 330.810 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 00 331.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 01 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 02 330.900 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 03 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 04 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 05 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 06 330.810 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 07 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 03 28 09 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 10 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 11 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 12 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 13 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 14 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 15 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 16 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 17 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 18 331.240 -99.990 1 .D* 0.00 UR2-1 SPO 1977 03 28 19 330.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 03 28 20 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 21 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 22 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 28 23 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 00 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 01 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 02 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 03 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 04 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 05 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 06 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 07 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 08 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 09 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 10 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 11 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 12 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 13 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 14 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 15 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 16 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 17 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 18 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 19 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 20 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 21 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 22 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 29 23 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 00 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 01 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 02 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 03 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 04 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 05 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 06 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 07 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 08 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 09 330.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 10 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 11 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 12 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 13 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 14 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 15 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 16 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 17 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 18 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 19 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 20 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 21 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 22 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 30 23 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 00 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 01 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 02 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 03 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 04 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 05 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 06 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 07 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 08 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 09 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 10 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 11 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 12 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 13 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 14 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 15 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 16 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 17 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 18 330.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 19 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 20 330.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 21 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 22 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 03 31 23 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 01 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 01 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 01 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 01 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 01 05 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 06 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 07 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 08 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 09 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 10 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 11 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 12 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 13 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 14 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 15 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 16 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 17 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 18 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 19 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 20 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 21 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 22 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 01 23 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 00 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 01 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 02 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 03 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 04 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 05 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 06 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 07 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 08 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 09 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 10 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 11 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 12 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 13 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 14 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 15 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 16 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 17 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 18 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 19 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 20 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 21 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 22 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 02 23 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 03 00 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 01 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 04 03 03 330.900 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 04 330.750 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 05 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 06 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 07 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 08 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 09 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 10 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 11 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 12 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 13 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 14 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 03 15 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 16 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 17 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 18 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 19 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 20 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 21 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 22 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 03 23 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 00 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 01 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 02 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 03 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 04 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 05 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 06 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 07 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 08 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 09 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 10 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 11 330.980 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 12 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 13 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 14 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 15 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 16 331.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 17 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 18 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 19 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 20 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 21 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 22 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 04 23 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 00 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 01 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 02 331.280 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 03 331.090 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 04 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 05 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 06 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 07 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 08 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 09 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 10 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 11 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 12 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 13 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 14 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 15 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 16 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 17 330.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 18 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 19 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 20 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 21 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 22 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 05 23 331.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 00 331.090 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 01 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 02 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 03 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 04 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 05 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 06 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 07 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 08 330.690 -99.990 1 .D* 0.00 UR2-1 SPO 1977 04 06 09 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 10 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 11 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 12 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 13 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 14 331.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 15 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 16 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 17 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 18 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 19 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 20 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 21 331.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 22 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 06 23 331.090 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 00 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 01 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 02 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 03 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 04 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 05 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 06 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 07 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 08 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 09 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 10 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 11 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 12 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 13 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 14 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 15 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 16 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 17 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 18 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 19 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 20 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 21 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 22 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 07 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 08 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 08 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 08 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 08 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 08 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 08 05 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 06 330.820 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 07 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 08 330.820 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 09 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 10 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 11 330.850 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 12 330.800 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 13 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 14 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 15 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 16 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 17 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 18 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 19 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 20 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 21 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 22 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 08 23 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 00 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 01 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 02 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 03 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 04 331.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 05 331.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 06 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 07 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 08 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 09 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 10 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 11 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 12 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 13 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 14 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 15 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 16 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 17 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 18 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 19 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 20 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 21 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 22 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 09 23 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 00 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 01 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 02 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 03 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 04 330.850 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 05 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 06 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 07 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 08 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 09 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 10 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 11 331.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 12 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 13 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 14 330.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 15 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 16 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 17 330.850 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 18 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 10 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 10 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 10 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 10 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 10 23 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 00 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 01 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 02 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 03 331.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 04 330.880 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 05 330.760 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 06 330.860 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 07 331.090 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 08 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 09 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 10 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 11 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 12 330.860 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 13 330.940 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 14 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 15 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 04 11 16 330.930 -99.990 1 .D* 0.00 UR2-1 SPO 1977 04 11 17 330.610 -99.990 1 .D* 0.00 UR2-1 SPO 1977 04 11 18 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 19 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 20 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 21 331.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 11 22 330.660 -99.990 1 .D* 0.00 UR2-1 SPO 1977 04 11 23 330.650 -99.990 1 .V* 0.00 UR2-1 SPO 1977 04 12 00 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 01 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 02 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 03 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 04 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 05 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 06 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 07 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 08 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 09 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 10 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 11 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 12 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 13 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 14 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 15 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 16 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 17 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 18 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 19 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 20 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 21 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 22 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 12 23 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 00 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 01 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 02 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 03 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 04 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 05 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 06 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 07 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 08 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 09 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 10 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 11 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 12 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 13 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 14 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 15 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 16 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 17 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 18 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 19 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 20 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 21 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 22 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 13 23 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 00 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 01 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 02 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 03 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 04 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 05 330.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 06 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 07 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 08 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 09 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 10 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 11 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 12 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 13 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 14 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 15 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 16 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 17 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 18 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 19 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 20 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 21 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 22 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 14 23 330.750 -99.990 1 .D* 0.00 UR2-1 SPO 1977 04 15 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 15 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 15 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 15 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 15 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 15 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 15 06 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 07 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 08 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 09 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 10 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 11 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 12 330.680 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 15 13 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 14 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 15 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 16 330.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 17 330.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 18 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 19 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 20 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 15 21 330.570 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 15 22 330.850 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 15 23 331.150 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 16 00 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 01 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 02 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 03 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 04 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 05 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 06 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 07 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 08 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 09 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 10 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 11 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 12 330.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 13 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 14 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 15 330.330 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 16 16 331.100 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 16 17 330.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 18 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 19 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 20 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 21 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 16 22 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 04 16 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 17 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 17 01 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 04 17 02 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 03 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 04 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 05 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 06 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 07 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 08 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 09 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 10 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 11 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 12 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 13 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 14 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 17 15 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 16 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 17 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 18 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 19 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 17 21 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 22 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 17 23 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 00 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 01 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 02 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 03 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 04 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 05 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 06 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 07 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 08 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 09 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 10 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 11 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 12 331.080 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 13 331.110 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 14 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 15 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 16 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 17 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 18 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 19 331.050 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 20 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 18 21 331.050 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 22 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 18 23 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 04 19 00 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 01 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 19 02 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 03 331.140 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 19 04 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 05 331.290 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 19 06 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 07 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 08 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 09 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 10 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 19 11 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 12 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 13 331.050 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 19 14 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 15 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 16 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 17 331.160 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 19 18 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 19 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 20 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 21 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 22 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 19 23 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 00 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 01 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 02 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 03 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 04 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 05 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 06 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 07 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 08 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 09 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 20 11 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 12 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 13 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 14 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 15 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 16 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 17 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 18 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 19 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 20 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 20 22 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 20 23 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 00 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 01 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 02 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 03 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 04 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 05 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 06 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 07 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 08 330.810 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 21 09 331.080 -99.990 1 .D. 0.00 UR2-1 SPO 1977 04 21 10 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 11 330.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 12 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 21 13 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 14 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 15 331.050 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 21 16 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 17 330.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 18 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 19 330.930 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 21 20 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 21 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 22 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 21 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 22 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 22 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 22 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 22 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 22 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 22 05 330.900 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 22 06 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 07 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 08 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 09 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 10 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 11 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 12 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 13 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 14 330.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 15 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 16 330.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 17 330.990 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 22 18 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 19 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 20 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 21 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 22 22 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 22 23 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 23 00 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 01 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 02 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 03 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 04 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 05 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 06 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 07 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 08 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 09 330.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 23 10 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 11 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 12 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 13 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 14 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 15 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 16 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 17 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 23 18 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 19 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 20 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 21 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 22 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 23 23 331.070 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 24 00 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 01 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 02 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 03 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 04 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 24 05 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 06 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 24 07 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 08 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 09 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 10 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 24 11 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 12 331.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 24 13 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 14 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 15 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 16 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 17 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 18 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 19 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 20 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 21 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 22 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 24 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 25 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 25 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 25 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 25 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 25 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 25 05 331.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 25 06 331.020 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 25 07 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 08 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 09 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 10 330.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 11 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 12 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 13 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 14 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 15 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 16 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 17 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 18 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 19 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 20 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 21 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 25 22 330.960 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 25 23 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 00 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 01 330.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 02 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 03 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 04 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 05 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 06 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 07 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 08 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 09 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 10 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 11 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 12 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 13 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 14 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 15 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 16 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 17 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 18 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 19 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 20 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 21 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 22 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 26 23 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 00 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 01 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 02 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 03 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 04 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 05 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 06 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 07 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 08 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 09 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 10 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 11 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 12 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 13 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 14 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 15 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 16 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 17 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 18 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 19 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 20 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 27 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 27 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 27 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 09 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 10 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 11 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 12 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 13 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 14 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 15 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 16 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 17 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 18 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 19 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 20 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 28 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 28 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 29 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 29 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 29 02 330.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 04 29 03 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 04 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 05 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 06 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 07 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 08 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 09 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 10 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 11 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 12 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 13 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 14 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 15 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 16 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 17 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 18 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 19 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 20 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 21 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 22 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 29 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 30 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 30 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 30 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 30 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 30 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 04 30 05 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 06 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 07 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 08 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 09 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 10 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 11 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 12 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 13 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 14 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 15 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 16 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 17 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 18 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 19 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 20 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 21 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 22 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 04 30 23 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 00 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 01 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 02 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 03 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 04 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 05 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 06 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 07 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 08 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 09 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 10 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 11 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 12 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 13 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 14 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 15 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 16 330.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 17 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 18 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 19 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 20 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 21 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 22 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 01 23 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 00 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 01 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 02 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 03 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 04 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 05 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 06 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 07 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 08 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 09 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 10 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 11 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 12 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 13 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 14 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 15 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 16 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 17 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 18 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 19 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 20 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 21 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 22 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 02 23 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 00 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 01 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 02 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 03 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 04 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 05 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 06 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 07 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 08 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 09 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 10 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 11 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 12 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 13 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 14 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 15 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 16 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 17 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 18 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 19 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 20 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 21 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 22 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 03 23 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 00 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 01 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 02 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 03 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 04 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 05 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 06 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 07 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 08 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 09 330.780 -99.990 1 .D. 0.00 UR2-1 SPO 1977 05 04 10 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 11 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 12 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 13 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 14 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 15 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 16 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 17 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 18 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 19 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 20 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 21 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 22 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 04 23 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 00 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 01 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 02 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 03 330.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 04 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 05 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 06 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 07 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 08 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 09 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 10 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 11 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 12 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 13 330.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 14 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 15 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 16 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 17 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 18 330.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 19 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 20 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 21 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 22 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 05 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 06 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 06 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 06 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 06 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 06 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 06 05 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 06 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 07 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 08 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 09 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 10 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 11 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 12 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 13 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 14 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 15 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 16 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 17 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 18 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 19 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 20 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 21 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 22 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 06 23 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 00 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 01 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 02 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 03 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 04 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 05 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 06 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 07 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 08 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 09 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 10 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 11 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 12 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 13 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 14 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 15 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 16 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 17 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 18 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 19 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 20 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 21 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 22 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 07 23 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 00 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 01 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 02 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 03 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 04 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 05 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 06 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 07 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 08 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 09 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 10 331.400 -99.990 1 .D. 0.00 UR2-1 SPO 1977 05 08 11 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 12 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 13 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 14 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 15 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 16 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 17 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 18 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 19 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 20 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 21 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 22 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 08 23 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 00 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 09 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 09 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 09 04 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 05 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 06 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 07 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 08 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 09 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 10 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 11 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 12 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 13 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 14 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 15 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 16 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 17 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 18 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 19 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 20 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 21 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 22 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 09 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 10 00 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 01 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 02 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 03 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 04 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 05 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 06 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 07 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 08 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 09 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 10 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 11 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 12 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 13 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 14 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 15 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 16 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 17 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 18 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 19 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 20 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 21 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 22 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 10 23 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 00 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 01 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 02 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 03 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 04 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 05 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 06 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 07 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 08 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 09 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 10 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 11 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 12 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 13 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 14 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 15 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 16 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 17 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 18 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 19 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 20 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 21 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 22 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 11 23 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 00 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 01 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 02 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 03 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 04 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 05 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 06 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 07 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 08 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 09 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 10 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 11 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 12 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 13 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 14 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 15 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 16 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 17 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 18 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 19 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 20 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 21 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 22 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 12 23 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 00 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 01 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 13 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 13 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 13 05 331.150 -99.990 1 ..* 0.00 UR2-1 SPO 1977 05 13 06 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 07 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 08 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 09 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 10 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 11 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 12 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 13 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 14 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 15 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 16 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 17 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 18 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 19 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 20 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 21 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 22 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 13 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 14 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 14 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 14 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 14 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 14 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 14 05 330.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 06 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 07 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 08 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 09 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 10 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 11 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 12 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 13 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 14 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 15 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 16 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 17 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 18 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 19 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 20 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 21 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 22 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 14 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 15 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 15 01 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 02 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 03 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 04 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 05 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 06 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 07 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 08 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 09 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 10 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 11 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 12 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 13 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 14 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 15 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 16 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 17 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 18 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 19 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 20 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 21 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 22 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 15 23 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 00 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 01 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 02 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 03 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 04 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 05 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 06 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 07 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 08 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 09 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 10 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 11 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 12 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 13 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 14 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 15 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 16 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 17 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 18 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 19 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 20 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 21 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 22 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 16 23 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 00 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 01 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 02 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 03 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 04 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 05 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 06 330.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 07 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 08 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 09 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 10 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 11 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 12 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 13 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 14 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 15 330.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 16 330.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 17 330.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 18 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 19 330.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 20 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 21 330.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 22 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 17 23 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 00 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 01 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 02 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 03 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 04 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 05 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 06 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 07 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 08 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 09 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 10 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 11 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 12 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 13 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 14 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 15 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 16 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 17 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 18 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 19 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 20 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 21 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 22 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 18 23 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 00 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 01 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 02 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 03 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 04 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 05 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 06 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 07 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 08 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 09 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 10 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 11 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 12 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 13 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 14 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 15 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 16 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 17 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 18 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 19 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 20 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 21 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 19 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 19 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 20 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 20 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 20 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 20 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 20 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 20 05 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 06 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 07 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 08 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 09 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 10 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 11 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 12 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 13 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 14 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 15 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 16 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 17 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 18 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 19 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 20 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 21 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 22 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 20 23 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 00 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 01 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 02 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 03 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 04 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 05 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 06 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 07 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 08 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 09 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 10 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 11 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 12 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 13 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 14 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 15 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 16 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 17 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 18 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 19 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 20 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 21 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 22 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 21 23 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 00 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 01 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 02 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 03 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 04 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 05 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 06 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 07 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 08 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 09 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 10 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 11 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 12 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 13 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 14 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 15 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 16 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 17 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 18 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 19 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 20 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 21 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 22 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 22 23 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 00 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 01 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 02 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 03 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 04 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 05 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 06 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 07 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 08 331.310 -99.990 1 .D. 0.00 UR2-1 SPO 1977 05 23 09 331.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 10 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 11 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 12 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 13 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 14 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 15 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 16 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 17 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 18 331.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 19 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 20 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 21 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 22 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 23 23 331.410 -99.990 1 .D. 0.00 UR2-1 SPO 1977 05 24 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 24 01 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 02 330.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 03 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 04 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 05 331.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 06 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 24 08 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 09 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 10 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 11 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 12 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 13 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 14 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 15 330.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 16 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 17 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 18 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 19 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 20 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 21 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 22 331.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 24 23 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 00 330.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 01 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 02 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 03 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 04 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 05 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 06 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 07 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 08 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 09 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 10 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 11 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 12 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 13 331.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 14 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 15 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 16 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 17 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 18 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 19 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 20 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 21 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 22 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 25 23 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 00 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 01 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 02 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 03 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 04 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 05 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 06 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 07 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 08 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 09 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 10 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 11 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 12 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 13 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 14 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 15 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 16 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 17 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 18 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 19 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 20 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 21 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 22 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 26 23 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 00 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 01 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 02 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 03 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 04 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 05 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 06 331.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 07 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 08 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 09 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 10 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 11 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 12 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 13 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 14 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 15 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 16 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 17 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 18 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 19 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 20 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 21 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 22 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 27 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 28 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 28 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 28 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 28 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 28 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 28 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 28 06 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 07 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 08 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 09 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 10 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 11 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 12 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 13 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 14 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 15 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 16 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 17 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 18 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 19 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 20 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 05 28 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 28 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 28 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 29 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 05 30 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 30 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 05 31 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 01 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 01 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 02 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 02 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 02 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 02 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 02 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 02 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 02 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 03 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 03 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 03 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 03 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 03 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 03 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 03 13 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 14 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 15 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 16 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 17 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 18 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 19 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 20 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 21 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 22 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 06 03 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 04 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 04 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 08 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 05 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 05 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 06 10 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 11 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 12 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 13 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 15 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 19 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 20 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 06 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 07 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 07 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 07 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 07 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 07 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 07 05 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 07 06 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 07 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 08 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 09 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 10 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 11 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 12 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 13 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 14 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 15 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 16 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 17 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 18 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 19 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 20 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 21 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 22 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 07 23 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 00 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 01 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 02 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 03 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 04 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 05 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 06 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 07 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 08 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 09 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 10 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 11 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 12 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 13 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 14 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 15 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 16 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 17 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 18 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 19 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 20 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 21 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 22 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 08 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 09 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 09 01 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 02 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 03 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 04 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 05 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 06 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 07 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 08 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 09 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 10 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 11 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 12 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 13 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 14 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 15 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 16 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 17 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 18 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 19 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 20 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 21 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 09 22 331.030 -99.990 1 .D. 0.00 UR2-1 SPO 1977 06 09 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 10 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 10 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 10 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 10 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 10 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 10 05 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 06 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 07 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 08 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 09 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 10 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 11 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 12 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 13 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 14 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 15 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 16 331.020 -99.990 1 .D. 0.00 UR2-1 SPO 1977 06 10 17 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 18 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 19 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 20 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 21 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 22 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 10 23 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 00 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 01 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 02 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 03 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 04 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 05 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 06 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 07 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 08 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 09 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 10 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 11 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 12 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 13 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 14 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 15 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 16 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 17 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 18 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 19 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 20 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 21 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 11 22 331.770 -99.990 1 .D. 0.00 UR2-1 SPO 1977 06 11 23 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 00 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 01 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 02 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 03 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 04 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 05 330.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 06 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 07 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 08 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 09 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 10 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 11 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 12 331.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 13 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 14 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 15 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 16 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 17 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 18 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 19 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 20 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 21 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 22 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 12 23 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 00 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 01 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 02 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 03 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 04 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 05 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 06 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 07 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 13 09 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 10 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 11 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 12 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 13 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 14 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 15 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 16 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 17 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 18 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 19 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 20 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 21 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 22 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 13 23 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 00 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 01 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 14 03 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 04 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 05 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 06 330.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 07 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 08 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 09 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 10 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 11 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 12 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 13 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 14 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 15 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 16 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 17 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 18 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 19 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 20 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 21 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 22 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 14 23 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 00 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 01 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 02 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 03 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 04 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 05 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 06 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 07 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 08 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 09 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 10 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 11 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 12 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 13 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 14 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 15 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 16 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 17 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 18 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 19 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 20 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 21 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 22 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 15 23 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 00 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 01 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 16 03 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 04 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 05 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 06 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 07 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 08 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 09 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 10 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 11 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 12 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 13 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 14 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 15 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 16 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 17 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 18 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 19 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 20 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 21 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 22 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 16 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 17 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 17 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 17 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 17 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 17 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 17 05 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 06 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 07 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 08 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 09 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 10 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 11 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 12 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 13 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 14 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 15 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 16 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 17 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 18 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 19 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 20 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 21 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 22 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 17 23 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 00 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 01 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 02 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 03 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 04 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 05 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 06 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 07 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 08 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 09 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 10 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 11 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 12 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 13 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 14 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 15 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 16 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 17 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 18 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 19 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 20 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 21 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 22 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 18 23 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 00 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 01 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 02 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 03 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 04 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 05 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 06 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 07 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 08 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 09 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 10 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 11 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 12 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 13 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 14 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 15 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 16 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 17 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 18 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 19 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 20 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 21 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 22 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 19 23 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 00 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 01 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 02 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 03 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 04 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 05 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 06 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 07 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 08 331.530 -99.990 1 .D. 0.00 UR2-1 SPO 1977 06 20 09 331.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 10 331.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 11 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 12 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 13 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 14 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 15 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 16 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 17 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 18 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 19 331.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 20 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 21 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 22 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 20 23 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 00 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 01 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 02 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 03 331.620 -99.990 1 .D. 0.00 UR2-1 SPO 1977 06 21 04 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 05 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 06 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 07 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 08 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 09 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 10 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 11 331.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 12 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 13 331.000 -99.990 1 .D. 0.00 UR2-1 SPO 1977 06 21 14 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 15 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 16 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 17 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 18 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 19 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 20 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 21 331.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 22 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 21 23 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 00 331.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 01 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 02 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 03 331.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 04 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 05 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 06 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 07 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 08 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 09 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 10 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 11 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 12 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 13 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 14 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 15 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 16 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 17 331.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 18 331.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 19 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 20 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 21 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 22 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 22 23 -999.990 -99.990 1 I.x 0.00 UR2-1 SPO 1977 06 23 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 23 01 331.580 -99.990 1 .D* 0.00 UR2-1 SPO 1977 06 23 02 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 03 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 04 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 05 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 06 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 07 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 08 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 09 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 10 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 11 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 12 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 13 331.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 14 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 15 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 16 331.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 17 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 18 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 19 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 20 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 21 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 23 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 23 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 06 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 07 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 24 09 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 10 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 11 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 12 331.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 13 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 14 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 15 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 16 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 17 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 18 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 19 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 20 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 21 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 22 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 24 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 25 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 25 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 25 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 25 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 25 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 06 25 05 331.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 06 331.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 07 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 08 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 09 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 10 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 11 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 12 331.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 13 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 14 331.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 15 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 16 331.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 17 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 18 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 19 331.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 20 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 21 331.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 22 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 25 23 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 00 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 01 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 02 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 03 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 04 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 05 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 06 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 07 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 08 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 09 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 10 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 11 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 12 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 13 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 14 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 15 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 16 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 17 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 18 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 19 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 20 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 21 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 22 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 26 23 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 00 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 01 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 02 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 03 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 04 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 05 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 06 27 07 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 08 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 09 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 10 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 11 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 12 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 13 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 14 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 15 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 16 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 17 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 18 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 19 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 20 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 21 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 22 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 27 23 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 00 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 01 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 02 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 03 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 04 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 05 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 06 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 07 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 08 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 09 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 10 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 11 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 12 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 13 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 14 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 15 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 16 331.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 17 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 18 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 19 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 20 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 21 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 22 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 28 23 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 00 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 01 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 02 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 03 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 04 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 05 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 06 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 07 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 08 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 09 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 10 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 11 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 12 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 13 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 14 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 15 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 16 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 17 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 18 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 19 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 20 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 21 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 22 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 29 23 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 00 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 01 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 02 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 03 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 04 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 05 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 06 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 07 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 08 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 09 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 10 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 11 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 12 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 13 331.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 14 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 15 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 16 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 17 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 18 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 19 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 20 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 21 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 22 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 06 30 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 01 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 01 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 01 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 01 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 01 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 01 05 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 06 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 07 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 08 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 09 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 10 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 11 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 12 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 13 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 14 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 15 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 16 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 17 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 18 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 19 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 20 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 21 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 22 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 01 23 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 00 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 01 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 02 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 03 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 04 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 05 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 06 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 07 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 08 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 09 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 10 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 11 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 12 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 13 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 14 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 15 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 16 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 17 331.610 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 02 18 331.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 19 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 20 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 21 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 22 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 02 23 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 00 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 01 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 02 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 03 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 04 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 05 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 06 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 07 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 08 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 09 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 10 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 11 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 12 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 13 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 14 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 15 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 16 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 17 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 18 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 19 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 20 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 21 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 22 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 03 23 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 00 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 01 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 02 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 03 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 04 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 05 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 06 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 07 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 08 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 09 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 10 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 11 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 12 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 13 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 14 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 15 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 16 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 17 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 18 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 19 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 20 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 21 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 04 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 04 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 05 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 05 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 05 02 331.910 -99.990 1 .D* 0.00 UR2-1 SPO 1977 07 05 03 332.260 -99.990 1 .A* 0.00 UR2-1 SPO 1977 07 05 04 332.260 -99.990 1 .A* 0.00 UR2-1 SPO 1977 07 05 05 332.060 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 05 06 332.030 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 05 07 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 08 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 09 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 10 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 11 331.520 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 05 12 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 13 331.390 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 05 14 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 15 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 16 331.520 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 05 17 331.570 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 05 18 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 19 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 20 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 21 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 22 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 05 23 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 00 331.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 06 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 06 02 331.950 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 06 03 331.970 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 06 04 331.900 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 06 05 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 06 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 07 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 08 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 09 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 10 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 11 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 12 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 13 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 14 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 15 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 16 331.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 17 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 18 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 19 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 20 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 06 22 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 06 23 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 00 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 01 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 02 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 03 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 04 331.960 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 07 05 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 06 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 07 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 08 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 09 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 10 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 11 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 12 331.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 13 331.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 14 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 15 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 16 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 17 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 18 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 19 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 20 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 21 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 22 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 07 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 08 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 08 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 08 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 08 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 08 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 08 05 331.300 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 08 06 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 07 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 08 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 09 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 10 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 11 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 12 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 13 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 14 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 15 331.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 16 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 17 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 18 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 19 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 20 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 21 331.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 22 331.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 08 23 331.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 00 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 01 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 02 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 03 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 04 331.760 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 09 05 331.330 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 09 06 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 07 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 08 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 09 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 10 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 11 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 12 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 13 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 14 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 15 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 16 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 17 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 18 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 19 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 20 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 21 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 22 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 09 23 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 00 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 01 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 02 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 03 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 04 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 05 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 06 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 07 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 08 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 09 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 10 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 11 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 12 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 13 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 14 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 15 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 16 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 17 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 18 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 19 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 20 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 21 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 22 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 10 23 331.700 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 11 00 331.430 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 11 01 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 02 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 03 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 04 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 05 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 06 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 07 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 08 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 09 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 10 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 11 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 12 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 13 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 14 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 15 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 16 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 17 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 18 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 19 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 20 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 21 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 22 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 11 23 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 00 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 01 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 02 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 03 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 04 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 05 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 06 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 07 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 08 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 09 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 10 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 11 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 12 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 13 331.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 14 331.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 15 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 16 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 17 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 18 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 19 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 20 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 21 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 22 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 12 23 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 00 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 01 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 02 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 03 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 04 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 05 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 06 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 07 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 08 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 09 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 10 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 11 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 12 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 13 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 14 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 15 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 16 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 17 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 18 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 19 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 20 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 21 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 22 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 13 23 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 00 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 01 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 02 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 03 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 04 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 05 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 06 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 07 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 08 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 09 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 10 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 11 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 12 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 13 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 14 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 15 331.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 16 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 17 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 18 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 19 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 20 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 21 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 22 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 14 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 15 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 15 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 15 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 15 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 15 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 15 05 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 06 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 07 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 08 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 09 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 10 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 11 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 12 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 13 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 14 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 15 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 16 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 17 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 18 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 19 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 20 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 21 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 22 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 15 23 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 00 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 01 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 02 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 03 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 04 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 05 331.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 06 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 07 331.880 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 16 08 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 09 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 10 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 11 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 12 331.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 13 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 14 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 15 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 16 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 17 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 18 331.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 19 331.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 20 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 21 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 22 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 16 23 331.870 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 17 00 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 01 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 02 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 03 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 04 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 05 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 06 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 07 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 08 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 09 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 10 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 11 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 12 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 13 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 14 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 15 331.290 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 17 16 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 17 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 18 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 19 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 20 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 21 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 22 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 17 23 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 00 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 01 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 02 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 03 331.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 04 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 05 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 06 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 07 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 08 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 09 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 10 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 11 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 12 331.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 13 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 14 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 15 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 16 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 17 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 18 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 19 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 20 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 21 331.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 22 331.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 18 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 19 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 19 01 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 02 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 03 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 04 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 05 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 06 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 07 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 08 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 09 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 10 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 11 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 12 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 13 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 14 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 15 331.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 16 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 17 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 18 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 19 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 20 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 19 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 19 22 331.540 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 19 23 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 00 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 01 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 02 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 03 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 04 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 05 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 06 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 07 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 08 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 09 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 10 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 11 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 12 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 13 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 14 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 15 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 16 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 17 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 18 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 19 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 20 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 21 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 22 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 20 23 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 00 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 01 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 02 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 03 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 04 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 05 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 06 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 07 331.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 08 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 09 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 10 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 11 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 12 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 13 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 14 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 15 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 16 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 17 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 18 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 19 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 20 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 21 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 22 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 21 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 22 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 22 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 22 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 22 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 22 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 22 05 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 06 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 07 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 08 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 09 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 10 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 11 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 12 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 13 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 14 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 15 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 16 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 17 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 18 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 19 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 20 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 21 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 22 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 22 23 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 00 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 01 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 02 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 03 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 04 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 05 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 06 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 07 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 08 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 09 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 10 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 11 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 12 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 13 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 14 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 15 331.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 16 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 17 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 18 331.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 19 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 20 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 21 331.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 22 331.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 23 23 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 00 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 01 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 02 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 03 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 04 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 05 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 06 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 07 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 08 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 09 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 10 331.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 11 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 12 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 13 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 14 331.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 15 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 16 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 17 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 18 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 19 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 20 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 21 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 22 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 24 23 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 00 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 01 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 02 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 03 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 04 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 05 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 06 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 07 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 08 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 09 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 10 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 11 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 12 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 13 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 14 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 15 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 16 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 17 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 18 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 19 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 20 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 21 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 22 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 25 23 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 00 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 01 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 02 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 03 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 04 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 05 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 06 331.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 07 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 08 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 09 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 10 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 11 331.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 12 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 13 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 14 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 15 331.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 16 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 17 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 18 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 19 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 20 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 21 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 22 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 26 23 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 00 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 01 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 02 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 03 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 04 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 05 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 06 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 07 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 08 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 09 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 10 331.520 -99.990 1 .D. 0.00 UR2-1 SPO 1977 07 27 11 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 12 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 13 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 14 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 15 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 16 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 17 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 18 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 19 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 20 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 21 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 22 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 27 23 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 00 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 01 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 02 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 03 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 04 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 28 06 331.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 07 28 07 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 08 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 09 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 10 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 11 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 12 331.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 13 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 14 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 15 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 16 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 17 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 18 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 19 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 20 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 21 331.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 22 331.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 28 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 29 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 29 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 29 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 29 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 29 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 07 29 05 331.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 06 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 07 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 08 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 09 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 10 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 11 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 12 331.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 13 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 14 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 15 331.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 16 331.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 17 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 18 331.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 19 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 20 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 21 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 22 331.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 29 23 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 00 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 01 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 02 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 03 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 04 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 05 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 06 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 07 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 08 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 09 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 10 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 11 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 12 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 13 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 14 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 15 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 16 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 17 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 18 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 19 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 20 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 21 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 22 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 30 23 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 00 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 01 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 02 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 03 331.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 04 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 05 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 06 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 07 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 08 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 09 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 10 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 11 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 12 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 13 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 14 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 15 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 16 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 17 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 18 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 19 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 20 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 21 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 22 331.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 07 31 23 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 00 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 01 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 02 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 03 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 04 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 05 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 06 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 07 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 08 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 09 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 10 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 11 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 12 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 13 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 14 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 15 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 16 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 17 331.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 18 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 19 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 20 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 21 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 22 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 01 23 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 00 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 01 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 02 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 03 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 04 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 05 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 06 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 07 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 08 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 09 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 10 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 11 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 12 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 13 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 14 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 15 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 16 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 17 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 18 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 19 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 20 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 21 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 22 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 02 23 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 00 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 01 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 02 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 03 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 04 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 05 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 06 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 07 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 08 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 09 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 10 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 11 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 12 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 13 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 14 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 15 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 16 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 17 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 18 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 19 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 20 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 21 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 22 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 03 23 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 00 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 01 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 02 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 03 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 04 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 05 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 06 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 07 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 08 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 09 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 10 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 11 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 12 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 13 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 14 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 15 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 16 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 17 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 18 331.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 19 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 20 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 21 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 22 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 04 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 05 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 05 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 05 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 05 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 05 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 05 05 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 06 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 07 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 08 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 09 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 10 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 11 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 12 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 13 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 14 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 15 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 16 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 17 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 18 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 19 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 20 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 21 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 22 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 05 23 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 00 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 01 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 02 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 03 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 04 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 05 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 06 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 07 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 08 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 09 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 10 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 11 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 12 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 13 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 14 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 15 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 16 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 17 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 18 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 19 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 20 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 21 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 22 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 06 23 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 00 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 01 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 02 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 03 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 04 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 05 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 06 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 07 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 08 331.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 09 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 10 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 11 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 12 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 13 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 14 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 15 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 16 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 17 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 18 331.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 19 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 20 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 21 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 22 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 07 23 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 00 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 01 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 02 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 03 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 04 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 05 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 06 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 07 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 08 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 09 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 10 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 11 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 12 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 13 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 14 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 15 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 16 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 17 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 18 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 19 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 20 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 21 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 22 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 08 23 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 00 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 01 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 02 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 03 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 04 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 05 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 06 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 07 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 08 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 09 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 10 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 11 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 12 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 13 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 14 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 15 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 16 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 17 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 18 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 19 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 20 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 21 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 22 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 09 23 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 00 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 01 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 02 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 10 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 10 05 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 06 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 07 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 08 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 09 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 10 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 11 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 12 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 13 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 14 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 15 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 16 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 17 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 18 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 19 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 20 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 21 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 22 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 10 23 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 00 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 08 11 02 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 03 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 04 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 05 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 06 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 07 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 08 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 09 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 10 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 11 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 12 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 13 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 14 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 15 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 16 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 17 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 18 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 19 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 20 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 21 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 22 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 11 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 12 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 12 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 12 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 12 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 12 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 12 05 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 06 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 07 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 08 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 09 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 10 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 11 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 12 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 13 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 14 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 15 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 16 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 17 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 18 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 19 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 20 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 21 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 22 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 12 23 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 00 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 01 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 02 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 03 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 04 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 05 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 06 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 07 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 08 13 08 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 09 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 10 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 11 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 12 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 13 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 14 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 15 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 16 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 17 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 18 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 19 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 20 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 21 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 22 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 13 23 331.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 00 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 01 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 02 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 03 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 04 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 05 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 06 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 07 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 08 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 09 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 10 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 11 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 12 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 13 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 14 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 15 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 16 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 17 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 18 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 19 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 20 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 21 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 22 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 14 23 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 00 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 01 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 02 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 03 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 04 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 05 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 06 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 07 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 08 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 09 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 10 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 11 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 12 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 13 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 14 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 15 331.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 16 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 17 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 18 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 19 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 20 331.660 -99.990 1 .D. 0.00 UR2-1 SPO 1977 08 15 21 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 22 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 15 23 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 00 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 01 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 02 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 03 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 04 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 05 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 06 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 07 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 08 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 09 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 10 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 11 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 12 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 13 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 14 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 15 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 16 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 17 331.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 18 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 19 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 20 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 21 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 22 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 16 23 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 00 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 01 331.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 08 17 03 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 04 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 05 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 06 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 07 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 08 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 09 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 10 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 11 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 12 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 13 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 14 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 15 331.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 16 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 17 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 18 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 19 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 20 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 21 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 22 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 17 23 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 00 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 01 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 02 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 03 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 04 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 05 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 06 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 07 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 08 331.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 09 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 10 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 11 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 12 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 13 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 14 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 15 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 16 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 17 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 18 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 19 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 20 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 21 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 22 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 18 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 19 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 19 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 19 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 19 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 19 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 19 05 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 06 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 07 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 08 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 09 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 10 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 11 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 12 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 13 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 14 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 15 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 16 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 17 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 18 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 19 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 20 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 21 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 22 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 19 23 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 00 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 01 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 02 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 03 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 04 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 05 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 06 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 07 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 08 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 09 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 10 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 11 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 12 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 13 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 14 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 15 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 16 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 17 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 18 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 19 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 20 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 21 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 22 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 20 23 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 00 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 01 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 02 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 03 331.680 -99.990 1 .D. 0.00 UR2-1 SPO 1977 08 21 04 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 05 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 06 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 07 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 08 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 09 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 10 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 11 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 12 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 13 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 14 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 15 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 16 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 17 331.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 18 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 19 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 20 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 21 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 22 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 21 23 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 00 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 01 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 02 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 03 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 04 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 05 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 06 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 07 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 08 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 09 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 10 331.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 11 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 12 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 13 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 14 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 15 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 16 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 17 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 18 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 19 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 20 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 21 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 22 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 22 23 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 00 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 01 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 02 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 03 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 04 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 05 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 06 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 07 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 08 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 09 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 10 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 11 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 12 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 13 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 14 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 15 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 16 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 17 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 18 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 19 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 20 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 21 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 22 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 23 23 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 00 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 01 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 02 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 03 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 04 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 05 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 06 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 07 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 08 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 09 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 10 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 11 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 12 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 13 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 14 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 15 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 16 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 17 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 18 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 19 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 20 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 21 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 22 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 24 23 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 00 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 01 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 02 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 03 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 04 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 05 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 06 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 07 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 08 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 09 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 10 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 11 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 12 331.900 -99.990 1 .D. 0.00 UR2-1 SPO 1977 08 25 13 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 14 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 15 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 16 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 17 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 18 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 19 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 20 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 21 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 25 22 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 08 25 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 26 08 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 08 26 09 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 10 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 11 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 12 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 13 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 14 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 15 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 16 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 17 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 18 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 19 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 20 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 21 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 22 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 26 23 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 00 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 01 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 02 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 03 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 04 331.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 05 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 06 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 07 332.460 -99.990 1 .D. 0.00 UR2-1 SPO 1977 08 27 08 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 09 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 10 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 11 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 12 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 13 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 14 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 15 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 16 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 17 331.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 18 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 19 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 20 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 21 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 22 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 27 23 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 00 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 01 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 02 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 03 331.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 04 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 05 331.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 06 331.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 07 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 08 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 09 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 10 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 11 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 12 331.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 13 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 14 331.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 15 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 16 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 17 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 18 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 19 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 20 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 21 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 22 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 28 23 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 00 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 01 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 02 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 03 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 04 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 05 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 06 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 07 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 08 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 09 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 10 331.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 11 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 12 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 13 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 14 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 15 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 16 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 17 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 18 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 19 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 20 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 21 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 22 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 29 23 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 00 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 01 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 02 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 03 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 04 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 05 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 06 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 07 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 08 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 09 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 10 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 11 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 12 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 13 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 14 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 15 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 16 331.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 17 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 18 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 19 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 20 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 21 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 22 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 30 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 08 31 00 332.040 -99.990 1 ..* 0.00 UR2-1 SPO 1977 08 31 01 332.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 08 31 02 332.010 -99.990 1 ..* 0.00 UR2-1 SPO 1977 08 31 03 331.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 04 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 05 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 06 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 07 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 08 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 09 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 10 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 11 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 12 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 13 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 14 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 15 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 16 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 17 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 18 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 19 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 20 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 21 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 22 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 08 31 23 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 00 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 01 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 09 01 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 09 01 04 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 05 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 06 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 07 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 08 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 09 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 10 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 11 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 12 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 13 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 14 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 15 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 16 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 17 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 18 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 19 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 20 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 21 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 22 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 01 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 02 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 02 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 02 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 02 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 02 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 02 05 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 06 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 07 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 08 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 09 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 10 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 11 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 12 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 13 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 14 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 15 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 16 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 17 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 18 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 19 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 20 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 21 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 22 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 02 23 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 00 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 01 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 02 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 03 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 04 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 05 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 06 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 07 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 08 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 09 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 10 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 11 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 12 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 13 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 14 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 15 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 16 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 17 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 18 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 19 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 20 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 21 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 22 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 03 23 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 00 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 01 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 02 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 03 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 04 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 05 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 06 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 07 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 08 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 09 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 10 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 11 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 12 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 13 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 14 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 15 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 16 331.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 17 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 18 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 19 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 20 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 21 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 22 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 04 23 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 00 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 01 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 02 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 03 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 04 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 05 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 06 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 07 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 08 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 09 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 10 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 11 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 12 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 13 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 14 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 15 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 16 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 17 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 18 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 19 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 20 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 21 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 22 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 05 23 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 00 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 01 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 02 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 03 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 04 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 05 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 06 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 07 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 08 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 09 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 10 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 11 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 12 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 13 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 14 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 15 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 16 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 17 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 18 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 19 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 20 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 21 331.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 22 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 06 23 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 00 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 01 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 02 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 03 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 04 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 05 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 06 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 07 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 08 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 09 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 10 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 11 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 12 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 13 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 14 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 15 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 16 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 17 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 18 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 19 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 20 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 21 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 22 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 07 23 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 00 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 01 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 02 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 03 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 04 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 05 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 06 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 07 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 08 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 09 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 10 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 11 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 12 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 13 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 14 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 15 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 16 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 17 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 18 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 19 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 20 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 21 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 22 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 08 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 09 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 09 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 09 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 09 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 09 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 09 05 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 06 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 07 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 08 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 09 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 10 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 11 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 12 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 13 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 14 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 15 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 16 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 17 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 18 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 19 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 20 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 21 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 22 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 09 23 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 00 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 01 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 02 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 03 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 04 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 05 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 06 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 07 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 08 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 09 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 10 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 11 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 12 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 13 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 14 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 15 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 16 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 17 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 18 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 19 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 20 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 21 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 22 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 10 23 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 00 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 01 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 02 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 03 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 04 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 05 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 06 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 07 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 08 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 09 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 10 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 11 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 12 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 13 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 14 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 15 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 16 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 17 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 18 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 19 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 20 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 21 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 22 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 11 23 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 00 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 01 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 02 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 03 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 04 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 05 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 06 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 07 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 08 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 09 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 10 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 11 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 12 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 13 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 14 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 15 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 16 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 17 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 18 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 19 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 20 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 21 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 22 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 12 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 09 13 00 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 01 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 02 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 03 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 04 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 05 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 06 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 07 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 08 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 09 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 10 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 11 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 12 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 13 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 14 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 15 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 16 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 17 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 18 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 19 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 20 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 21 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 22 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 13 23 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 00 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 01 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 02 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 03 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 04 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 05 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 06 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 07 332.590 -99.990 1 .D. 0.00 UR2-1 SPO 1977 09 14 08 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 09 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 10 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 11 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 12 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 13 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 14 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 15 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 16 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 17 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 18 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 19 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 20 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 21 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 22 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 14 23 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 00 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 01 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 02 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 03 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 04 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 05 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 06 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 07 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 08 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 09 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 10 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 11 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 12 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 13 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 14 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 15 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 16 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 17 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 18 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 19 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 20 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 21 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 22 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 15 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 16 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 16 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 16 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 16 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 16 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 16 05 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 06 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 07 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 08 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 09 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 10 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 11 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 12 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 13 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 14 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 15 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 16 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 17 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 18 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 19 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 20 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 21 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 22 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 16 23 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 00 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 01 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 02 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 03 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 04 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 06 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 07 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 08 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 09 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 10 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 11 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 12 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 13 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 14 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 15 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 16 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 17 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 18 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 19 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 20 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 21 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 22 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 17 23 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 00 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 01 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 02 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 03 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 04 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 05 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 06 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 07 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 08 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 09 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 10 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 11 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 12 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 13 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 14 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 15 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 16 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 17 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 18 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 19 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 20 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 21 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 22 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 18 23 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 00 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 01 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 02 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 03 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 04 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 05 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 06 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 07 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 08 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 09 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 10 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 11 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 12 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 13 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 14 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 15 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 16 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 17 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 18 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 19 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 20 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 21 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 22 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 19 23 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 00 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 01 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 02 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 03 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 04 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 05 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 06 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 07 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 08 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 09 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 10 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 11 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 12 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 13 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 14 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 15 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 16 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 17 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 18 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 19 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 20 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 21 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 22 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 20 23 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 00 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 01 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 02 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 03 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 04 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 06 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 07 332.740 -99.990 1 .D. 0.00 UR2-1 SPO 1977 09 21 08 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 09 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 10 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 11 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 12 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 13 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 14 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 15 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 16 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 17 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 18 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 19 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 20 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 21 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 22 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 21 23 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 00 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 09 22 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 09 22 03 332.570 -99.990 1 .D. 0.00 UR2-1 SPO 1977 09 22 04 332.950 -99.990 1 .D. 0.00 UR2-1 SPO 1977 09 22 05 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 06 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 07 332.600 -99.990 1 ..* 0.00 UR2-1 SPO 1977 09 22 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 22 09 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 09 22 10 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 11 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 12 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 13 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 14 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 15 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 16 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 17 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 18 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 19 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 20 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 21 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 22 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 22 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 23 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 23 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 23 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 23 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 23 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 23 05 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 06 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 07 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 08 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 09 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 10 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 11 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 12 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 13 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 14 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 15 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 16 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 17 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 18 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 19 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 20 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 21 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 22 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 23 23 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 00 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 01 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 02 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 03 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 04 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 05 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 06 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 07 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 08 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 09 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 10 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 11 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 12 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 13 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 14 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 15 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 16 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 17 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 18 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 19 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 20 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 21 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 22 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 24 23 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 00 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 01 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 02 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 03 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 04 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 05 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 06 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 07 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 08 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 09 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 10 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 11 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 12 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 13 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 14 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 15 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 16 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 17 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 18 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 19 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 20 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 21 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 22 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 25 23 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 00 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 01 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 02 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 03 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 04 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 05 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 06 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 07 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 08 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 09 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 10 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 11 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 12 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 13 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 14 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 15 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 16 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 17 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 18 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 19 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 20 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 21 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 22 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 26 23 332.640 -99.990 1 .D. 0.00 UR2-1 SPO 1977 09 27 00 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 01 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 02 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 03 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 04 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 05 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 06 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 07 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 08 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 09 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 10 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 11 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 12 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 13 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 14 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 15 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 16 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 17 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 18 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 19 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 20 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 21 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 22 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 27 23 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 00 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 01 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 02 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 03 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 04 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 05 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 06 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 07 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 08 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 09 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 10 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 11 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 12 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 13 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 14 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 15 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 16 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 17 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 18 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 19 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 20 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 21 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 22 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 28 23 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 00 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 01 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 02 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 03 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 04 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 05 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 06 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 07 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 08 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 09 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 10 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 11 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 12 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 13 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 14 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 15 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 16 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 17 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 18 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 19 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 20 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 21 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 22 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 29 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 30 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 30 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 30 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 30 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 30 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 09 30 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 06 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 07 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 08 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 09 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 10 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 11 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 12 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 13 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 14 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 15 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 16 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 17 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 18 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 19 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 20 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 21 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 22 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 09 30 23 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 00 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 01 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 02 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 03 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 04 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 06 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 07 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 08 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 09 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 10 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 11 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 12 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 13 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 14 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 15 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 16 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 17 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 18 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 19 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 20 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 21 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 22 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 01 23 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 00 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 01 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 02 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 03 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 04 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 05 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 06 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 07 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 08 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 09 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 10 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 11 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 12 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 13 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 14 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 15 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 16 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 17 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 18 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 19 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 20 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 21 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 22 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 02 23 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 00 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 01 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 02 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 03 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 04 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 05 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 06 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 07 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 08 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 09 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 10 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 11 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 12 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 13 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 14 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 15 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 16 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 17 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 18 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 19 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 20 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 21 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 22 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 03 23 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 00 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 01 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 02 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 03 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 04 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 05 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 06 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 07 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 08 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 09 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 10 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 11 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 12 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 13 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 14 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 15 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 16 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 17 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 18 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 19 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 20 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 21 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 04 22 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 10 04 23 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 00 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 01 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 02 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 03 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 04 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 05 332.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 06 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 07 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 08 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 09 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 10 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 11 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 12 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 13 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 14 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 15 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 16 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 17 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 18 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 19 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 20 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 21 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 22 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 05 23 332.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 00 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 01 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 02 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 10 06 04 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 05 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 06 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 07 332.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 08 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 09 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 10 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 11 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 12 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 13 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 14 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 15 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 16 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 17 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 18 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 19 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 20 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 21 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 22 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 06 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 05 332.230 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 07 06 332.490 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 07 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 07 10 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 11 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 12 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 13 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 14 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 15 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 16 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 17 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 18 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 19 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 20 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 21 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 22 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 07 23 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 00 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 01 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 02 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 03 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 04 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 05 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 06 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 07 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 08 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 09 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 10 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 11 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 12 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 13 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 14 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 15 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 16 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 17 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 18 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 19 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 20 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 21 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 22 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 08 23 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 00 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 01 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 02 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 03 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 04 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 05 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 06 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 07 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 08 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 09 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 10 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 11 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 12 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 13 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 14 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 15 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 16 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 17 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 18 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 19 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 20 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 21 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 22 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 09 23 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 00 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 01 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 02 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 03 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 04 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 06 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 07 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 08 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 09 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 10 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 11 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 12 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 13 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 14 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 15 332.910 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 10 16 332.200 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 10 17 332.550 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 10 18 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 19 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 20 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 21 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 22 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 10 23 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 10 11 01 332.900 -99.990 1 .D* 0.00 UR2-1 SPO 1977 10 11 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 11 03 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 10 11 04 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 05 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 06 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 07 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 08 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 09 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 10 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 11 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 12 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 13 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 14 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 15 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 16 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 17 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 18 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 19 332.240 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 11 20 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 21 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 22 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 11 23 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 00 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 01 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 02 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 03 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 04 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 05 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 06 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 07 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 08 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 09 332.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 10 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 11 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 12 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 13 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 14 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 15 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 16 332.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 17 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 18 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 19 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 20 332.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 21 332.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 22 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 12 23 332.930 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 00 333.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 01 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 02 332.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 03 332.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 04 333.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 05 333.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 06 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 07 332.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 08 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 09 333.170 -99.990 1 .D* 0.00 UR2-1 SPO 1977 10 13 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 13 11 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 10 13 12 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 13 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 14 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 15 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 16 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 17 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 18 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 19 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 20 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 21 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 22 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 13 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 14 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 14 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 14 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 14 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 14 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 14 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 06 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 07 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 08 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 09 332.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 10 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 11 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 12 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 13 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 14 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 15 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 16 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 17 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 18 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 19 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 20 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 21 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 22 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 14 23 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 00 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 01 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 02 332.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 03 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 04 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 05 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 06 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 07 332.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 08 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 09 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 10 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 11 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 12 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 13 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 14 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 15 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 16 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 17 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 18 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 19 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 20 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 21 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 22 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 15 23 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 00 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 01 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 02 332.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 03 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 04 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 05 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 06 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 07 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 08 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 09 332.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 10 333.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 11 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 12 332.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 13 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 14 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 15 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 16 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 17 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 18 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 19 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 20 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 21 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 22 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 16 23 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 00 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 01 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 02 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 03 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 04 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 05 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 06 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 07 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 08 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 09 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 10 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 11 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 12 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 13 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 14 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 15 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 16 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 17 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 18 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 19 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 20 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 21 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 22 332.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 17 23 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 00 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 01 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 02 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 03 332.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 04 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 05 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 06 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 07 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 08 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 09 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 10 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 11 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 12 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 13 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 14 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 15 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 16 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 17 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 18 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 19 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 20 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 21 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 22 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 18 23 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 00 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 10 19 01 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 02 332.970 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 03 333.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 04 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 05 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 06 332.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 07 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 08 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 09 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 10 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 11 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 12 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 13 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 14 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 15 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 16 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 17 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 18 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 19 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 20 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 21 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 19 22 333.060 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 19 23 332.660 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 20 00 332.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 01 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 02 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 03 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 04 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 05 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 06 332.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 07 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 08 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 09 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 10 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 11 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 12 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 13 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 14 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 15 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 16 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 17 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 18 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 19 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 20 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 21 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 22 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 20 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 21 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 21 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 21 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 21 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 21 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 21 05 332.460 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 21 06 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 07 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 08 332.980 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 21 09 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 10 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 11 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 12 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 13 333.160 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 21 14 332.630 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 21 15 333.050 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 21 16 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 17 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 18 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 19 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 20 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 21 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 21 22 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 10 21 23 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 00 332.990 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 01 332.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 02 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 03 332.550 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 22 04 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 05 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 06 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 07 332.950 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 22 08 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 09 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 10 332.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 11 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 12 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 13 332.420 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 22 14 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 15 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 16 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 17 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 18 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 19 332.930 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 22 20 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 21 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 22 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 22 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 10 23 00 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 01 332.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 02 331.870 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 23 03 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 04 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 05 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 06 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 07 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 08 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 09 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 10 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 11 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 12 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 13 332.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 14 332.910 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 15 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 16 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 17 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 18 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 19 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 20 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 21 332.130 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 23 22 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 23 23 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 00 332.940 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 24 01 332.350 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 24 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 24 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 24 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 24 05 332.530 -99.990 1 ..* 0.00 UR2-1 SPO 1977 10 24 06 332.710 -99.990 1 ..* 0.00 UR2-1 SPO 1977 10 24 07 332.690 -99.990 1 .V* 0.00 UR2-1 SPO 1977 10 24 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 24 09 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 10 24 10 332.700 -99.990 1 ..* 0.00 UR2-1 SPO 1977 10 24 11 332.850 -99.990 1 ..* 0.00 UR2-1 SPO 1977 10 24 12 332.840 -99.990 1 ..* 0.00 UR2-1 SPO 1977 10 24 13 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 14 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 15 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 16 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 17 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 18 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 19 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 20 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 21 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 22 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 24 23 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 00 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 01 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 02 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 03 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 04 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 05 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 06 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 07 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 08 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 09 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 10 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 11 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 12 332.350 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 25 13 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 14 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 15 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 16 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 17 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 18 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 19 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 20 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 21 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 22 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 25 23 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 00 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 01 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 02 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 03 332.830 -99.990 1 .D. 0.00 UR2-1 SPO 1977 10 26 04 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 05 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 06 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 07 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 08 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 09 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 10 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 11 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 12 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 13 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 14 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 15 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 16 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 17 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 18 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 19 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 20 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 21 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 22 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 26 23 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 00 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 01 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 02 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 03 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 04 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 05 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 06 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 07 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 08 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 09 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 10 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 11 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 12 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 13 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 14 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 15 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 16 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 17 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 18 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 19 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 20 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 21 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 22 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 27 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 28 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 28 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 28 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 28 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 28 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 28 05 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 06 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 07 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 08 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 09 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 10 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 11 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 12 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 13 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 14 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 15 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 16 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 17 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 18 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 19 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 20 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 21 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 22 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 28 23 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 00 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 01 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 02 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 03 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 29 05 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 06 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 07 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 08 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 09 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 10 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 11 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 12 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 13 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 14 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 15 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 16 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 17 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 18 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 19 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 20 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 21 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 22 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 29 23 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 00 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 01 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 02 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 03 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 04 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 05 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 06 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 07 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 08 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 09 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 10 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 11 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 12 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 13 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 14 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 15 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 16 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 17 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 18 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 19 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 20 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 21 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 22 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 30 23 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 00 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 01 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 02 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 03 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 04 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 05 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 06 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 07 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 08 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 09 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 10 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 11 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 12 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 13 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 14 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 15 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 16 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 10 31 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 10 31 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 31 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 31 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 31 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 31 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 10 31 23 333.260 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 01 00 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 01 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 02 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 03 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 04 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 05 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 06 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 07 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 08 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 09 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 10 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 11 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 12 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 13 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 14 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 15 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 16 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 17 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 18 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 19 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 20 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 21 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 22 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 01 23 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 00 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 01 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 02 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 03 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 04 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 05 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 06 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 07 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 08 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 09 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 10 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 11 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 12 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 13 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 14 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 15 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 16 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 17 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 18 332.860 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 19 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 20 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 21 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 22 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 02 23 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 00 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 01 332.420 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 03 02 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 03 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 04 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 05 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 06 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 07 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 08 332.880 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 09 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 10 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 11 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 12 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 13 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 14 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 15 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 16 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 17 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 18 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 19 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 20 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 03 21 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 03 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 03 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 04 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 04 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 04 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 04 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 04 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 04 05 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 06 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 07 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 08 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 09 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 10 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 11 333.060 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 04 12 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 13 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 14 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 15 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 16 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 17 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 18 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 19 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 20 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 21 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 22 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 04 23 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 00 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 01 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 02 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 05 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 05 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 05 06 332.310 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 05 07 332.660 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 05 08 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 09 332.640 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 05 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 05 11 332.770 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 05 12 332.510 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 05 13 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 14 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 15 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 16 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 17 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 18 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 19 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 20 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 21 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 22 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 05 23 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 06 00 332.780 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 01 332.410 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 02 332.590 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 03 332.840 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 04 332.630 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 05 332.590 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 06 332.470 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 07 332.540 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 08 332.710 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 09 332.740 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 10 332.780 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 11 332.590 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 12 332.600 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 13 332.590 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 14 332.590 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 15 332.560 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 16 332.550 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 17 332.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 18 332.780 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 19 332.900 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 06 20 332.420 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 06 21 332.810 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 06 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 06 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 07 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 07 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 07 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 07 03 332.770 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 04 332.780 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 05 332.660 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 06 332.770 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 07 332.140 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 07 08 333.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 09 332.890 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 10 332.640 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 11 332.790 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 12 332.730 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 13 332.670 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 14 332.790 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 15 332.780 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 16 332.720 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 17 332.850 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 18 332.720 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 19 332.910 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 20 332.720 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 21 332.840 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 22 332.590 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 07 23 332.710 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 00 332.710 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 01 332.840 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 02 332.700 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 03 332.650 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 04 332.700 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 05 332.720 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 06 332.710 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 07 332.650 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 08 332.790 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 09 332.520 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 08 10 332.830 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 08 11 332.460 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 12 332.660 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 13 332.770 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 14 332.660 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 15 332.670 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 16 332.660 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 17 332.610 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 18 332.670 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 19 332.660 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 20 332.720 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 21 332.660 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 22 332.550 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 08 23 332.110 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 09 00 332.520 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 09 01 332.920 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 02 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 03 332.840 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 04 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 05 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 06 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 07 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 08 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 09 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 10 332.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 09 12 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 13 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 14 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 15 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 16 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 17 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 18 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 19 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 20 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 21 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 22 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 09 23 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 00 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 01 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 02 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 03 332.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 04 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 05 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 06 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 07 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 08 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 09 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 10 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 11 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 12 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 13 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 14 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 15 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 16 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 17 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 18 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 19 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 20 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 10 21 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 11 10 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 10 23 332.800 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 11 00 332.950 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 11 01 332.820 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 11 02 332.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 11 03 332.830 -99.990 1 ..* 0.00 UR2-1 SPO 1977 11 11 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 11 05 332.830 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 11 06 332.350 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 11 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 11 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 11 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 11 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 11 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 11 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 11 13 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 14 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 15 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 16 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 17 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 18 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 19 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 20 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 21 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 22 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 11 23 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 00 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 01 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 02 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 03 332.930 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 12 04 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 05 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 06 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 07 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 08 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 09 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 12 10 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 11 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 12 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 13 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 14 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 15 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 16 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 17 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 18 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 19 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 20 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 21 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 22 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 12 23 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 00 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 13 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 13 03 332.590 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 13 04 332.870 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 05 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 06 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 07 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 08 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 09 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 10 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 11 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 12 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 13 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 14 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 15 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 16 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 17 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 18 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 19 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 20 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 21 333.120 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 13 22 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 13 23 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 00 332.820 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 01 332.520 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 14 02 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 03 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 04 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 05 332.940 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 06 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 07 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 08 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 09 332.930 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 14 10 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 11 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 12 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 13 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 14 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 15 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 16 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 17 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 14 18 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 11 14 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 14 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 14 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 14 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 14 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 15 00 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 01 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 02 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 03 333.120 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 15 04 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 05 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 06 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 07 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 08 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 09 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 10 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 11 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 12 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 13 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 14 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 15 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 16 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 17 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 18 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 19 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 20 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 21 332.740 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 22 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 15 23 332.970 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 16 00 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 01 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 02 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 03 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 04 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 05 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 06 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 07 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 08 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 09 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 13 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 14 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 15 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 16 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 17 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 16 20 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 21 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 22 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 16 23 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 00 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 01 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 17 02 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 03 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 04 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 05 332.780 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 06 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 07 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 08 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 09 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 10 332.780 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 17 11 332.480 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 17 12 332.850 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 13 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 14 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 15 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 16 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 17 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 18 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 19 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 17 20 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 11 17 21 332.560 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 17 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 17 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 18 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 18 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 18 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 18 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 18 04 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 05 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 06 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 07 332.790 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 08 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 09 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 10 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 11 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 12 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 13 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 14 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 15 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 16 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 17 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 18 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 19 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 20 332.770 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 18 21 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 22 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 18 23 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 00 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 01 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 02 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 03 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 04 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 05 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 06 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 07 332.730 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 08 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 09 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 10 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 11 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 12 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 13 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 14 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 15 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 16 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 17 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 18 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 19 332.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 20 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 21 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 22 332.710 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 19 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 20 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 20 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 20 02 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 03 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 04 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 05 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 06 332.920 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 20 07 332.370 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 20 08 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 09 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 10 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 11 332.780 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 20 12 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 13 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 14 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 15 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 16 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 17 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 18 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 19 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 20 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 21 332.680 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 20 22 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 20 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 21 00 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 01 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 02 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 21 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 21 05 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 06 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 07 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 08 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 09 332.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 10 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 11 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 12 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 13 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 14 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 15 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 16 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 17 332.120 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 21 18 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 19 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 20 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 21 21 333.150 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 21 22 332.640 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 21 23 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 00 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 01 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 02 332.910 -99.990 1 .V. 0.00 UR2-1 SPO 1977 11 22 03 332.680 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 22 04 332.300 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 22 05 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 06 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 07 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 08 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 09 332.770 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 10 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 11 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 12 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 13 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 14 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 15 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 16 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 17 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 18 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 19 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 20 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 21 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 22 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 22 23 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 00 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 01 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 02 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 03 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 04 332.830 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 05 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 06 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 07 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 08 332.620 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 09 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 10 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 11 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 12 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 13 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 14 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 15 332.700 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 16 332.340 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 23 17 332.740 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 23 18 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 19 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 20 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 23 22 332.720 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 23 23 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 00 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 01 332.160 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 24 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 09 332.950 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 24 10 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 11 24 11 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 12 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 13 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 14 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 15 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 16 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 24 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 24 18 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 19 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 20 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 24 23 332.680 -99.990 1 .D* 0.00 UR2-1 SPO 1977 11 25 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 25 01 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 02 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 03 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 04 332.740 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 25 05 332.340 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 25 06 332.650 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 25 07 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 08 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 09 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 10 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 11 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 12 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 13 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 14 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 15 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 16 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 17 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 18 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 19 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 20 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 21 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 22 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 25 23 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 26 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 26 01 332.390 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 26 02 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 26 03 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 26 04 332.650 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 26 05 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 06 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 07 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 08 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 09 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 10 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 11 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 12 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 13 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 14 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 15 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 16 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 17 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 18 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 19 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 20 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 21 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 22 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 26 23 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 00 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 01 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 02 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 03 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 04 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 27 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 27 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 27 08 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 09 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 10 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 11 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 12 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 13 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 14 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 15 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 16 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 17 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 18 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 19 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 20 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 21 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 22 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 27 23 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 00 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 01 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 02 332.610 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 03 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 04 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 05 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 06 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 07 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 08 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 09 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 10 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 11 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 12 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 13 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 14 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 15 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 16 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 17 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 18 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 11 28 19 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 20 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 21 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 22 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 28 23 332.630 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 00 332.530 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 29 10 332.670 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 29 11 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 12 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 13 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 14 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 15 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 16 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 17 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 18 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 19 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 20 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 21 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 22 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 29 23 332.180 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 30 00 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 01 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 02 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 03 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 04 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 05 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 06 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 07 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 11 30 09 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 10 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 11 332.170 -99.990 1 .D. 0.00 UR2-1 SPO 1977 11 30 12 332.750 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 13 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 14 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 15 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 16 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 17 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 18 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 19 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 20 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 21 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 22 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 11 30 23 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 00 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 01 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 02 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 03 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 04 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 05 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 06 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 07 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 08 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 09 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 10 332.650 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 01 11 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 12 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 13 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 14 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 15 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 16 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 17 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 18 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 19 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 20 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 01 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 01 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 01 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 02 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 02 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 02 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 02 03 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 04 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 05 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 06 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 07 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 08 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 09 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 10 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 11 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 12 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 13 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 14 332.580 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 15 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 16 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 17 332.690 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 18 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 19 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 20 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 21 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 22 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 02 23 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 00 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 01 332.770 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 03 02 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 03 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 04 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 05 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 06 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 07 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 08 332.040 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 03 09 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 10 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 11 332.060 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 03 12 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 13 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 14 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 15 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 16 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 17 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 18 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 19 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 20 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 21 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 22 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 03 23 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 00 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 01 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 02 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 03 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 04 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 05 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 06 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 07 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 08 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 09 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 10 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 11 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 12 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 13 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 14 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 15 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 16 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 17 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 18 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 19 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 20 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 21 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 22 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 04 23 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 00 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 05 02 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 03 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 04 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 05 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 06 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 07 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 08 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 09 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 10 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 11 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 12 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 13 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 14 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 15 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 16 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 17 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 18 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 19 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 20 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 21 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 22 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 05 23 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 00 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 01 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 02 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 03 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 12 06 04 332.390 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 06 05 332.800 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 06 332.670 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 07 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 08 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 09 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 10 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 11 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 12 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 13 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 14 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 15 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 16 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 17 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 18 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 06 19 332.710 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 06 20 332.280 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 06 21 332.710 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 06 22 332.170 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 06 23 332.710 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 07 00 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 01 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 02 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 03 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 04 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 05 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 06 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 07 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 08 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 09 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 10 332.700 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 07 11 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 12 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 13 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 14 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 15 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 16 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 17 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 18 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 19 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 20 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 21 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 07 22 332.130 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 07 23 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 00 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 01 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 02 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 03 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 04 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 05 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 06 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 07 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 08 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 09 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 10 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 11 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 12 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 13 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 14 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 15 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 16 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 17 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 18 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 19 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 20 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 21 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 08 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 08 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 09 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 09 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 09 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 09 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 09 04 332.230 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 09 05 332.780 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 09 06 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 07 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 08 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 09 10 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 11 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 12 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 13 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 14 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 15 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 16 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 17 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 18 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 19 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 20 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 21 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 22 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 09 23 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 00 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 01 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 02 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 03 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 10 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 10 06 332.590 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 07 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 08 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 09 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 10 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 11 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 12 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 13 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 14 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 15 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 16 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 17 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 18 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 19 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 20 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 21 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 22 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 10 23 332.160 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 11 00 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 01 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 02 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 03 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 04 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 06 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 07 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 08 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 09 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 10 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 11 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 12 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 13 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 14 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 15 332.500 -99.990 1 .V. 0.00 UR2-1 SPO 1977 12 11 16 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 17 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 18 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 19 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 20 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 21 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 22 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 11 23 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 00 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 01 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 02 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 03 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 04 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 05 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 06 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 07 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 08 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 09 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 10 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 11 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 12 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 13 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 14 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 15 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 16 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 17 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 18 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 19 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 20 332.710 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 12 21 -999.990 -99.990 1 I.* 0.00 UR2-1 SPO 1977 12 12 22 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 12 23 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 00 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 01 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 02 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 03 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 04 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 05 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 06 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 07 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 08 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 09 332.570 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 10 332.540 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 11 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 12 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 13 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 14 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 15 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 16 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 17 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 18 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 19 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 20 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 21 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 22 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 13 23 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 14 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 14 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 14 03 332.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 14 04 332.190 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 14 05 332.640 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 14 06 332.710 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 14 07 332.170 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 14 08 332.250 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 14 09 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 10 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 11 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 12 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 13 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 14 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 15 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 16 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 17 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 18 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 19 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 20 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 14 21 332.470 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 14 22 332.070 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 14 23 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 00 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 01 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 02 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 03 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 04 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 05 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 06 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 07 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 08 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 09 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 10 332.430 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 11 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 12 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 13 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 14 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 15 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 16 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 17 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 18 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 19 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 20 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 15 21 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 15 22 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 15 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 16 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 16 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 16 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 16 03 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 04 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 05 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 06 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 16 08 332.550 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 16 09 331.920 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 16 10 332.200 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 16 11 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 12 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 13 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 14 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 15 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 16 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 17 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 18 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 19 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 20 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 21 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 22 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 16 23 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 00 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 17 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 17 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 17 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 17 05 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 17 06 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 17 07 332.100 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 17 08 332.120 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 17 09 332.360 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 17 10 332.340 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 17 11 332.430 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 17 12 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 13 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 14 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 15 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 16 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 17 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 18 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 19 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 20 332.580 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 17 21 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 22 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 17 23 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 00 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 01 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 02 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 03 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 04 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 05 332.620 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 18 06 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 07 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 08 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 09 331.840 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 18 10 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 11 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 12 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 13 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 14 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 15 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 16 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 17 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 18 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 19 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 20 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 21 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 22 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 18 23 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 00 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 01 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 02 332.030 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 19 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 19 04 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 05 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 06 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 07 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 08 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 09 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 10 332.510 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 19 11 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 12 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 13 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 14 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 15 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 16 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 17 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 18 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 19 332.660 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 20 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 21 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 22 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 19 23 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 00 332.410 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 01 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 02 332.620 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 20 03 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 04 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 05 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 06 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 07 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 08 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 09 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 10 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 11 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 12 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 13 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 14 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 15 332.390 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 16 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 17 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 18 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 19 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 20 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 21 332.420 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 22 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 20 23 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 00 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 01 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 02 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 03 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 04 332.450 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 05 332.550 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 06 332.650 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 07 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 08 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 09 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 10 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 11 332.640 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 21 12 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 13 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 14 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 15 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 16 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 17 332.520 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 18 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 19 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 20 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 21 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 22 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 21 23 332.560 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 00 332.470 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 01 332.600 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 02 332.640 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 03 332.370 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 04 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 05 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 06 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 07 332.490 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 08 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 09 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 10 332.520 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 22 11 332.110 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 22 12 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 13 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 14 332.510 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 15 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 16 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 17 332.360 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 18 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 19 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 20 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 21 332.380 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 22 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 22 23 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 00 332.830 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 23 01 332.110 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 23 02 332.470 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 23 03 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 04 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 05 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 06 331.900 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 07 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 08 331.760 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 09 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 10 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 11 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 12 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 13 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 14 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 15 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 16 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 17 332.030 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 18 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 19 332.480 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 20 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 21 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 23 22 332.110 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 23 23 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 24 00 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 24 01 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 24 02 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 24 03 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 24 04 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 24 05 332.130 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 24 06 332.470 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 24 07 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 08 331.980 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 09 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 10 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 11 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 12 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 13 332.460 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 14 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 15 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 16 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 17 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 18 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 19 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 20 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 21 331.810 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 22 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 24 23 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 00 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 01 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 02 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 03 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 04 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 05 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 06 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 07 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 08 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 09 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 10 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 11 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 12 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 13 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 14 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 15 331.980 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 25 16 332.440 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 17 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 18 332.040 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 19 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 20 332.280 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 21 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 22 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 25 23 331.890 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 00 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 01 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 02 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 03 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 04 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 05 331.910 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 26 06 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 07 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 08 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 09 332.500 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 10 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 11 332.060 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 26 12 332.320 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 13 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 14 331.970 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 26 15 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 16 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 12 26 18 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 19 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 20 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 21 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 22 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 26 23 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 00 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 01 331.960 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 02 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 03 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 04 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 05 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 06 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 12 27 07 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 08 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 09 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 10 332.300 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 11 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 12 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 13 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 14 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 15 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 16 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 17 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 18 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 19 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 20 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 21 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 22 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 27 23 332.090 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 00 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 01 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 02 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 03 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 04 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 05 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 06 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 07 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 08 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 09 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 10 332.400 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 11 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 12 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 13 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 14 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 15 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 16 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 17 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 18 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 19 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 20 332.310 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 21 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 22 332.080 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 28 23 332.720 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 29 00 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 01 332.390 -99.990 1 ..* 0.00 UR2-1 SPO 1977 12 29 02 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 03 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 04 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 05 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 06 332.260 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 07 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 08 332.010 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 09 332.340 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 10 332.290 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 11 332.250 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 12 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 13 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 14 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 15 332.130 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 16 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 17 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 18 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 19 332.060 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 20 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 21 332.220 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 22 332.350 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 29 23 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 00 332.510 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 30 01 332.000 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 02 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 03 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 04 332.190 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 05 332.240 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 06 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 07 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 30 08 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 30 09 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 30 10 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 30 11 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 30 12 -999.990 -99.990 0 I.. 0.00 UR2-1 SPO 1977 12 30 13 332.180 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 30 14 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 12 30 15 332.070 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 30 16 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 12 30 17 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 12 30 18 332.070 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 19 332.110 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 20 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 21 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 22 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 30 23 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 00 332.160 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 01 331.950 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 02 332.210 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 03 332.100 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 04 -999.990 -99.990 1 I.. 0.00 UR2-1 SPO 1977 12 31 05 332.190 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 31 06 331.920 -99.990 1 .D. 0.00 UR2-1 SPO 1977 12 31 07 332.330 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 08 332.270 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 09 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 10 332.020 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 11 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 12 332.170 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 13 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 14 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 15 332.050 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 16 332.150 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 17 332.180 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 18 332.140 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 19 332.120 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 20 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 21 332.200 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 22 332.230 -99.990 1 ... 0.00 UR2-1 SPO 1977 12 31 23 332.220 -99.990 1 ..* 0.00 UR2-1