# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: insure that ESRL receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: ESRL should be informed at the outset of the nature of this work. # comment: If the ESRL data are essential to the work, or if an important # comment: result or conclusion depends on the ESRL data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the ESRL data should be sent to ESRL # comment: for review before they are submitted for publication so we can # comment: insure that the quality and limitations of the data are accurately # comment: represented. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO2 CCGG (In Situ) # contact_name: Kirk W Thoning # contact_telephone: (303) 497-6078 # contact_email: Kirk.W.Thoning@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: National Science Foundation [NSF] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the ESRL data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: spo # description_project-abbr: ccg_obs # description_strategy-abbr: insitu # description_sample-constraints: date:1900-01-01,2012-12-31 # description_average: day # description_creation-time: 2013-05-28 14:53:00 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # comment: # data_fields: site year month day value unc n flag SPO 1974 01 01 -999.990 -99.990 0 *.. SPO 1974 01 01 -999.990 -99.990 0 *.. SPO 1974 01 02 -999.990 -99.990 0 *.. SPO 1974 01 03 -999.990 -99.990 0 *.. SPO 1974 01 04 -999.990 -99.990 0 *.. SPO 1974 01 05 -999.990 -99.990 0 *.. SPO 1974 01 06 -999.990 -99.990 0 *.. SPO 1974 01 07 -999.990 -99.990 0 *.. SPO 1974 01 08 -999.990 -99.990 0 *.. SPO 1974 01 09 -999.990 -99.990 0 *.. SPO 1974 01 10 -999.990 -99.990 0 *.. SPO 1974 01 11 -999.990 -99.990 0 *.. SPO 1974 01 12 -999.990 -99.990 0 *.. SPO 1974 01 13 -999.990 -99.990 0 *.. SPO 1974 01 14 -999.990 -99.990 0 *.. SPO 1974 01 15 -999.990 -99.990 0 *.. SPO 1974 01 16 -999.990 -99.990 0 *.. SPO 1974 01 17 -999.990 -99.990 0 *.. SPO 1974 01 18 -999.990 -99.990 0 *.. SPO 1974 01 19 -999.990 -99.990 0 *.. SPO 1974 01 20 -999.990 -99.990 0 *.. SPO 1974 01 21 -999.990 -99.990 0 *.. SPO 1974 01 22 -999.990 -99.990 0 *.. SPO 1974 01 23 -999.990 -99.990 0 *.. SPO 1974 01 24 -999.990 -99.990 0 *.. SPO 1974 01 25 -999.990 -99.990 0 *.. SPO 1974 01 26 -999.990 -99.990 0 *.. SPO 1974 01 27 -999.990 -99.990 0 *.. SPO 1974 01 28 -999.990 -99.990 0 *.. SPO 1974 01 29 -999.990 -99.990 0 *.. SPO 1974 01 30 -999.990 -99.990 0 *.. SPO 1974 01 31 -999.990 -99.990 0 *.. SPO 1974 02 01 -999.990 -99.990 0 *.. SPO 1974 02 02 -999.990 -99.990 0 *.. SPO 1974 02 03 -999.990 -99.990 0 *.. SPO 1974 02 04 -999.990 -99.990 0 *.. SPO 1974 02 05 -999.990 -99.990 0 *.. SPO 1974 02 06 -999.990 -99.990 0 *.. SPO 1974 02 07 -999.990 -99.990 0 *.. SPO 1974 02 08 -999.990 -99.990 0 *.. SPO 1974 02 09 -999.990 -99.990 0 *.. SPO 1974 02 10 -999.990 -99.990 0 *.. SPO 1974 02 11 -999.990 -99.990 0 *.. SPO 1974 02 12 -999.990 -99.990 0 *.. SPO 1974 02 13 -999.990 -99.990 0 *.. SPO 1974 02 14 -999.990 -99.990 0 *.. SPO 1974 02 15 -999.990 -99.990 0 *.. SPO 1974 02 16 -999.990 -99.990 0 *.. SPO 1974 02 17 -999.990 -99.990 0 *.. SPO 1974 02 18 -999.990 -99.990 0 *.. SPO 1974 02 19 -999.990 -99.990 0 *.. SPO 1974 02 20 -999.990 -99.990 0 *.. SPO 1974 02 21 -999.990 -99.990 0 *.. SPO 1974 02 22 -999.990 -99.990 0 *.. SPO 1974 02 23 -999.990 -99.990 0 *.. SPO 1974 02 24 -999.990 -99.990 0 *.. SPO 1974 02 25 -999.990 -99.990 0 *.. SPO 1974 02 26 -999.990 -99.990 0 *.. SPO 1974 02 27 -999.990 -99.990 0 *.. SPO 1974 02 28 -999.990 -99.990 0 *.. SPO 1974 03 01 -999.990 -99.990 0 *.. SPO 1974 03 02 -999.990 -99.990 0 *.. SPO 1974 03 03 -999.990 -99.990 0 *.. SPO 1974 03 04 -999.990 -99.990 0 *.. SPO 1974 03 05 -999.990 -99.990 0 *.. SPO 1974 03 06 -999.990 -99.990 0 *.. SPO 1974 03 07 -999.990 -99.990 0 *.. SPO 1974 03 08 -999.990 -99.990 0 *.. SPO 1974 03 09 -999.990 -99.990 0 *.. SPO 1974 03 10 -999.990 -99.990 0 *.. SPO 1974 03 11 -999.990 -99.990 0 *.. SPO 1974 03 12 -999.990 -99.990 0 *.. SPO 1974 03 13 -999.990 -99.990 0 *.. SPO 1974 03 14 -999.990 -99.990 0 *.. SPO 1974 03 15 -999.990 -99.990 0 *.. SPO 1974 03 16 -999.990 -99.990 0 *.. SPO 1974 03 17 -999.990 -99.990 0 *.. SPO 1974 03 18 -999.990 -99.990 0 *.. SPO 1974 03 19 -999.990 -99.990 0 *.. SPO 1974 03 20 -999.990 -99.990 0 *.. SPO 1974 03 21 -999.990 -99.990 0 *.. SPO 1974 03 22 -999.990 -99.990 0 *.. SPO 1974 03 23 -999.990 -99.990 0 *.. SPO 1974 03 24 -999.990 -99.990 0 *.. SPO 1974 03 25 -999.990 -99.990 0 *.. SPO 1974 03 26 -999.990 -99.990 0 *.. SPO 1974 03 27 -999.990 -99.990 0 *.. SPO 1974 03 28 -999.990 -99.990 0 *.. SPO 1974 03 29 -999.990 -99.990 0 *.. SPO 1974 03 30 -999.990 -99.990 0 *.. SPO 1974 03 31 -999.990 -99.990 0 *.. SPO 1974 04 01 -999.990 -99.990 0 *.. SPO 1974 04 02 -999.990 -99.990 0 *.. SPO 1974 04 03 -999.990 -99.990 0 *.. SPO 1974 04 04 -999.990 -99.990 0 *.. SPO 1974 04 05 -999.990 -99.990 0 *.. SPO 1974 04 06 -999.990 -99.990 0 *.. SPO 1974 04 07 -999.990 -99.990 0 *.. SPO 1974 04 08 -999.990 -99.990 0 *.. SPO 1974 04 09 -999.990 -99.990 0 *.. SPO 1974 04 10 -999.990 -99.990 0 *.. SPO 1974 04 11 -999.990 -99.990 0 *.. SPO 1974 04 12 -999.990 -99.990 0 *.. SPO 1974 04 13 -999.990 -99.990 0 *.. SPO 1974 04 14 -999.990 -99.990 0 *.. SPO 1974 04 15 -999.990 -99.990 0 *.. SPO 1974 04 16 -999.990 -99.990 0 *.. SPO 1974 04 17 -999.990 -99.990 0 *.. SPO 1974 04 18 -999.990 -99.990 0 *.. SPO 1974 04 19 -999.990 -99.990 0 *.. SPO 1974 04 20 -999.990 -99.990 0 *.. SPO 1974 04 21 -999.990 -99.990 0 *.. SPO 1974 04 22 -999.990 -99.990 0 *.. SPO 1974 04 23 -999.990 -99.990 0 *.. SPO 1974 04 24 -999.990 -99.990 0 *.. SPO 1974 04 25 -999.990 -99.990 0 *.. SPO 1974 04 26 -999.990 -99.990 0 *.. SPO 1974 04 27 -999.990 -99.990 0 *.. SPO 1974 04 28 -999.990 -99.990 0 *.. SPO 1974 04 29 -999.990 -99.990 0 *.. SPO 1974 04 30 -999.990 -99.990 0 *.. SPO 1974 05 01 -999.990 -99.990 0 *.. SPO 1974 05 02 -999.990 -99.990 0 *.. SPO 1974 05 03 -999.990 -99.990 0 *.. SPO 1974 05 04 -999.990 -99.990 0 *.. SPO 1974 05 05 -999.990 -99.990 0 *.. SPO 1974 05 06 -999.990 -99.990 0 *.. SPO 1974 05 07 -999.990 -99.990 0 *.. SPO 1974 05 08 -999.990 -99.990 0 *.. SPO 1974 05 09 -999.990 -99.990 0 *.. SPO 1974 05 10 -999.990 -99.990 0 *.. SPO 1974 05 11 -999.990 -99.990 0 *.. SPO 1974 05 12 -999.990 -99.990 0 *.. SPO 1974 05 13 -999.990 -99.990 0 *.. SPO 1974 05 14 -999.990 -99.990 0 *.. SPO 1974 05 15 -999.990 -99.990 0 *.. SPO 1974 05 16 -999.990 -99.990 0 *.. SPO 1974 05 17 -999.990 -99.990 0 *.. SPO 1974 05 18 -999.990 -99.990 0 *.. SPO 1974 05 19 -999.990 -99.990 0 *.. SPO 1974 05 20 -999.990 -99.990 0 *.. SPO 1974 05 21 -999.990 -99.990 0 *.. SPO 1974 05 22 -999.990 -99.990 0 *.. SPO 1974 05 23 -999.990 -99.990 0 *.. SPO 1974 05 24 -999.990 -99.990 0 *.. SPO 1974 05 25 -999.990 -99.990 0 *.. SPO 1974 05 26 -999.990 -99.990 0 *.. SPO 1974 05 27 -999.990 -99.990 0 *.. SPO 1974 05 28 -999.990 -99.990 0 *.. SPO 1974 05 29 -999.990 -99.990 0 *.. SPO 1974 05 30 -999.990 -99.990 0 *.. SPO 1974 05 31 -999.990 -99.990 0 *.. SPO 1974 06 01 -999.990 -99.990 0 *.. SPO 1974 06 02 -999.990 -99.990 0 *.. SPO 1974 06 03 -999.990 -99.990 0 *.. SPO 1974 06 04 -999.990 -99.990 0 *.. SPO 1974 06 05 -999.990 -99.990 0 *.. SPO 1974 06 06 -999.990 -99.990 0 *.. SPO 1974 06 07 -999.990 -99.990 0 *.. SPO 1974 06 08 -999.990 -99.990 0 *.. SPO 1974 06 09 -999.990 -99.990 0 *.. SPO 1974 06 10 -999.990 -99.990 0 *.. SPO 1974 06 11 -999.990 -99.990 0 *.. SPO 1974 06 12 -999.990 -99.990 0 *.. SPO 1974 06 13 -999.990 -99.990 0 *.. SPO 1974 06 14 -999.990 -99.990 0 *.. SPO 1974 06 15 -999.990 -99.990 0 *.. SPO 1974 06 16 -999.990 -99.990 0 *.. SPO 1974 06 17 -999.990 -99.990 0 *.. SPO 1974 06 18 -999.990 -99.990 0 *.. SPO 1974 06 19 -999.990 -99.990 0 *.. SPO 1974 06 20 -999.990 -99.990 0 *.. SPO 1974 06 21 -999.990 -99.990 0 *.. SPO 1974 06 22 -999.990 -99.990 0 *.. SPO 1974 06 23 -999.990 -99.990 0 *.. SPO 1974 06 24 -999.990 -99.990 0 *.. SPO 1974 06 25 -999.990 -99.990 0 *.. SPO 1974 06 26 -999.990 -99.990 0 *.. SPO 1974 06 27 -999.990 -99.990 0 *.. SPO 1974 06 28 -999.990 -99.990 0 *.. SPO 1974 06 29 -999.990 -99.990 0 *.. SPO 1974 06 30 -999.990 -99.990 0 *.. SPO 1974 07 01 -999.990 -99.990 0 *.. SPO 1974 07 02 -999.990 -99.990 0 *.. SPO 1974 07 03 -999.990 -99.990 0 *.. SPO 1974 07 04 -999.990 -99.990 0 *.. SPO 1974 07 05 -999.990 -99.990 0 *.. SPO 1974 07 06 -999.990 -99.990 0 *.. SPO 1974 07 07 -999.990 -99.990 0 *.. SPO 1974 07 08 -999.990 -99.990 0 *.. SPO 1974 07 09 -999.990 -99.990 0 *.. SPO 1974 07 10 -999.990 -99.990 0 *.. SPO 1974 07 11 -999.990 -99.990 0 *.. SPO 1974 07 12 -999.990 -99.990 0 *.. SPO 1974 07 13 -999.990 -99.990 0 *.. SPO 1974 07 14 -999.990 -99.990 0 *.. SPO 1974 07 15 -999.990 -99.990 0 *.. SPO 1974 07 16 -999.990 -99.990 0 *.. SPO 1974 07 17 -999.990 -99.990 0 *.. SPO 1974 07 18 -999.990 -99.990 0 *.. SPO 1974 07 19 -999.990 -99.990 0 *.. SPO 1974 07 20 -999.990 -99.990 0 *.. SPO 1974 07 21 -999.990 -99.990 0 *.. SPO 1974 07 22 -999.990 -99.990 0 *.. SPO 1974 07 23 -999.990 -99.990 0 *.. SPO 1974 07 24 -999.990 -99.990 0 *.. SPO 1974 07 25 -999.990 -99.990 0 *.. SPO 1974 07 26 -999.990 -99.990 0 *.. SPO 1974 07 27 -999.990 -99.990 0 *.. SPO 1974 07 28 -999.990 -99.990 0 *.. SPO 1974 07 29 -999.990 -99.990 0 *.. SPO 1974 07 30 -999.990 -99.990 0 *.. SPO 1974 07 31 -999.990 -99.990 0 *.. SPO 1974 08 01 -999.990 -99.990 0 *.. SPO 1974 08 02 -999.990 -99.990 0 *.. SPO 1974 08 03 -999.990 -99.990 0 *.. SPO 1974 08 04 -999.990 -99.990 0 *.. SPO 1974 08 05 -999.990 -99.990 0 *.. SPO 1974 08 06 -999.990 -99.990 0 *.. SPO 1974 08 07 -999.990 -99.990 0 *.. SPO 1974 08 08 -999.990 -99.990 0 *.. SPO 1974 08 09 -999.990 -99.990 0 *.. SPO 1974 08 10 -999.990 -99.990 0 *.. SPO 1974 08 11 -999.990 -99.990 0 *.. SPO 1974 08 12 -999.990 -99.990 0 *.. SPO 1974 08 13 -999.990 -99.990 0 *.. SPO 1974 08 14 -999.990 -99.990 0 *.. SPO 1974 08 15 -999.990 -99.990 0 *.. SPO 1974 08 16 -999.990 -99.990 0 *.. SPO 1974 08 17 -999.990 -99.990 0 *.. SPO 1974 08 18 -999.990 -99.990 0 *.. SPO 1974 08 19 -999.990 -99.990 0 *.. SPO 1974 08 20 -999.990 -99.990 0 *.. SPO 1974 08 21 -999.990 -99.990 0 *.. SPO 1974 08 22 -999.990 -99.990 0 *.. SPO 1974 08 23 -999.990 -99.990 0 *.. SPO 1974 08 24 -999.990 -99.990 0 *.. SPO 1974 08 25 -999.990 -99.990 0 *.. SPO 1974 08 26 -999.990 -99.990 0 *.. SPO 1974 08 27 -999.990 -99.990 0 *.. SPO 1974 08 28 -999.990 -99.990 0 *.. SPO 1974 08 29 -999.990 -99.990 0 *.. SPO 1974 08 30 -999.990 -99.990 0 *.. SPO 1974 08 31 -999.990 -99.990 0 *.. SPO 1974 09 01 -999.990 -99.990 0 *.. SPO 1974 09 02 -999.990 -99.990 0 *.. SPO 1974 09 03 -999.990 -99.990 0 *.. SPO 1974 09 04 -999.990 -99.990 0 *.. SPO 1974 09 05 -999.990 -99.990 0 *.. SPO 1974 09 06 -999.990 -99.990 0 *.. SPO 1974 09 07 -999.990 -99.990 0 *.. SPO 1974 09 08 -999.990 -99.990 0 *.. SPO 1974 09 09 -999.990 -99.990 0 *.. SPO 1974 09 10 -999.990 -99.990 0 *.. SPO 1974 09 11 -999.990 -99.990 0 *.. SPO 1974 09 12 -999.990 -99.990 0 *.. SPO 1974 09 13 -999.990 -99.990 0 *.. SPO 1974 09 14 -999.990 -99.990 0 *.. SPO 1974 09 15 -999.990 -99.990 0 *.. SPO 1974 09 16 -999.990 -99.990 0 *.. SPO 1974 09 17 -999.990 -99.990 0 *.. SPO 1974 09 18 -999.990 -99.990 0 *.. SPO 1974 09 19 -999.990 -99.990 0 *.. SPO 1974 09 20 -999.990 -99.990 0 *.. SPO 1974 09 21 -999.990 -99.990 0 *.. SPO 1974 09 22 -999.990 -99.990 0 *.. SPO 1974 09 23 -999.990 -99.990 0 *.. SPO 1974 09 24 -999.990 -99.990 0 *.. SPO 1974 09 25 -999.990 -99.990 0 *.. SPO 1974 09 26 -999.990 -99.990 0 *.. SPO 1974 09 27 -999.990 -99.990 0 *.. SPO 1974 09 28 -999.990 -99.990 0 *.. SPO 1974 09 29 -999.990 -99.990 0 *.. SPO 1974 09 30 -999.990 -99.990 0 *.. SPO 1974 10 01 -999.990 -99.990 0 *.. SPO 1974 10 02 -999.990 -99.990 0 *.. SPO 1974 10 03 -999.990 -99.990 0 *.. SPO 1974 10 04 -999.990 -99.990 0 *.. SPO 1974 10 05 -999.990 -99.990 0 *.. SPO 1974 10 06 -999.990 -99.990 0 *.. SPO 1974 10 07 -999.990 -99.990 0 *.. SPO 1974 10 08 -999.990 -99.990 0 *.. SPO 1974 10 09 -999.990 -99.990 0 *.. SPO 1974 10 10 -999.990 -99.990 0 *.. SPO 1974 10 11 -999.990 -99.990 0 *.. SPO 1974 10 12 -999.990 -99.990 0 *.. SPO 1974 10 13 -999.990 -99.990 0 *.. SPO 1974 10 14 -999.990 -99.990 0 *.. SPO 1974 10 15 -999.990 -99.990 0 *.. SPO 1974 10 16 -999.990 -99.990 0 *.. SPO 1974 10 17 -999.990 -99.990 0 *.. SPO 1974 10 18 -999.990 -99.990 0 *.. SPO 1974 10 19 -999.990 -99.990 0 *.. SPO 1974 10 20 -999.990 -99.990 0 *.. SPO 1974 10 21 -999.990 -99.990 0 *.. SPO 1974 10 22 -999.990 -99.990 0 *.. SPO 1974 10 23 -999.990 -99.990 0 *.. SPO 1974 10 24 -999.990 -99.990 0 *.. SPO 1974 10 25 -999.990 -99.990 0 *.. SPO 1974 10 26 -999.990 -99.990 0 *.. SPO 1974 10 27 -999.990 -99.990 0 *.. SPO 1974 10 28 -999.990 -99.990 0 *.. SPO 1974 10 29 -999.990 -99.990 0 *.. SPO 1974 10 30 -999.990 -99.990 0 *.. SPO 1974 10 31 -999.990 -99.990 0 *.. SPO 1974 11 01 -999.990 -99.990 0 *.. SPO 1974 11 02 -999.990 -99.990 0 *.. SPO 1974 11 03 -999.990 -99.990 0 *.. SPO 1974 11 04 -999.990 -99.990 0 *.. SPO 1974 11 05 -999.990 -99.990 0 *.. SPO 1974 11 06 -999.990 -99.990 0 *.. SPO 1974 11 07 -999.990 -99.990 0 *.. SPO 1974 11 08 -999.990 -99.990 0 *.. SPO 1974 11 09 -999.990 -99.990 0 *.. SPO 1974 11 10 -999.990 -99.990 0 *.. SPO 1974 11 11 -999.990 -99.990 0 *.. SPO 1974 11 12 -999.990 -99.990 0 *.. SPO 1974 11 13 -999.990 -99.990 0 *.. SPO 1974 11 14 -999.990 -99.990 0 *.. SPO 1974 11 15 -999.990 -99.990 0 *.. SPO 1974 11 16 -999.990 -99.990 0 *.. SPO 1974 11 17 -999.990 -99.990 0 *.. SPO 1974 11 18 -999.990 -99.990 0 *.. SPO 1974 11 19 -999.990 -99.990 0 *.. SPO 1974 11 20 -999.990 -99.990 0 *.. SPO 1974 11 21 -999.990 -99.990 0 *.. SPO 1974 11 22 -999.990 -99.990 0 *.. SPO 1974 11 23 -999.990 -99.990 0 *.. SPO 1974 11 24 -999.990 -99.990 0 *.. SPO 1974 11 25 -999.990 -99.990 0 *.. SPO 1974 11 26 -999.990 -99.990 0 *.. SPO 1974 11 27 -999.990 -99.990 0 *.. SPO 1974 11 28 -999.990 -99.990 0 *.. SPO 1974 11 29 -999.990 -99.990 0 *.. SPO 1974 11 30 -999.990 -99.990 0 *.. SPO 1974 12 01 -999.990 -99.990 0 *.. SPO 1974 12 02 -999.990 -99.990 0 *.. SPO 1974 12 03 -999.990 -99.990 0 *.. SPO 1974 12 04 -999.990 -99.990 0 *.. SPO 1974 12 05 -999.990 -99.990 0 *.. SPO 1974 12 06 -999.990 -99.990 0 *.. SPO 1974 12 07 -999.990 -99.990 0 *.. SPO 1974 12 08 -999.990 -99.990 0 *.. SPO 1974 12 09 -999.990 -99.990 0 *.. SPO 1974 12 10 -999.990 -99.990 0 *.. SPO 1974 12 11 -999.990 -99.990 0 *.. SPO 1974 12 12 -999.990 -99.990 0 *.. SPO 1974 12 13 -999.990 -99.990 0 *.. SPO 1974 12 14 -999.990 -99.990 0 *.. SPO 1974 12 15 -999.990 -99.990 0 *.. SPO 1974 12 16 -999.990 -99.990 0 *.. SPO 1974 12 17 -999.990 -99.990 0 *.. SPO 1974 12 18 -999.990 -99.990 0 *.. SPO 1974 12 19 -999.990 -99.990 0 *.. SPO 1974 12 20 -999.990 -99.990 0 *.. SPO 1974 12 21 -999.990 -99.990 0 *.. SPO 1974 12 22 -999.990 -99.990 0 *.. SPO 1974 12 23 -999.990 -99.990 0 *.. SPO 1974 12 24 -999.990 -99.990 0 *.. SPO 1974 12 25 -999.990 -99.990 0 *.. SPO 1974 12 26 -999.990 -99.990 0 *.. SPO 1974 12 27 -999.990 -99.990 0 *.. SPO 1974 12 28 -999.990 -99.990 0 *.. SPO 1974 12 29 -999.990 -99.990 0 *.. SPO 1974 12 30 -999.990 -99.990 0 *.. SPO 1974 12 31 -999.990 -99.990 0 *.. SPO 1975 01 01 -999.990 -99.990 0 *.. SPO 1975 01 02 -999.990 -99.990 0 *.. SPO 1975 01 03 -999.990 -99.990 0 *.. SPO 1975 01 04 -999.990 -99.990 0 *.. SPO 1975 01 05 -999.990 -99.990 0 *.. SPO 1975 01 06 -999.990 -99.990 0 *.. SPO 1975 01 07 -999.990 -99.990 0 *.. SPO 1975 01 08 -999.990 -99.990 0 *.. SPO 1975 01 09 -999.990 -99.990 0 *.. SPO 1975 01 10 -999.990 -99.990 0 *.. SPO 1975 01 11 -999.990 -99.990 0 *.. SPO 1975 01 12 -999.990 -99.990 0 *.. SPO 1975 01 13 -999.990 -99.990 0 *.. SPO 1975 01 14 -999.990 -99.990 0 *.. SPO 1975 01 15 -999.990 -99.990 0 *.. SPO 1975 01 16 -999.990 -99.990 0 *.. SPO 1975 01 17 -999.990 -99.990 0 *.. SPO 1975 01 18 -999.990 -99.990 0 *.. SPO 1975 01 19 -999.990 -99.990 0 *.. SPO 1975 01 20 -999.990 -99.990 0 *.. SPO 1975 01 21 -999.990 -99.990 0 *.. SPO 1975 01 22 -999.990 -99.990 0 *.. SPO 1975 01 23 -999.990 -99.990 0 *.. SPO 1975 01 24 -999.990 -99.990 0 *.. SPO 1975 01 25 -999.990 -99.990 0 *.. SPO 1975 01 26 -999.990 -99.990 0 *.. SPO 1975 01 27 -999.990 -99.990 0 *.. SPO 1975 01 28 -999.990 -99.990 0 *.. SPO 1975 01 29 -999.990 -99.990 0 *.. SPO 1975 01 30 -999.990 -99.990 0 *.. SPO 1975 01 31 -999.990 -99.990 0 *.. SPO 1975 02 01 -999.990 -99.990 0 *.. SPO 1975 02 02 -999.990 -99.990 0 *.. SPO 1975 02 03 -999.990 -99.990 0 *.. SPO 1975 02 04 -999.990 -99.990 0 *.. SPO 1975 02 05 -999.990 -99.990 0 *.. SPO 1975 02 06 -999.990 -99.990 0 *.. SPO 1975 02 07 -999.990 -99.990 0 *.. SPO 1975 02 08 -999.990 -99.990 0 *.. SPO 1975 02 09 -999.990 -99.990 0 *.. SPO 1975 02 10 -999.990 -99.990 0 *.. SPO 1975 02 11 -999.990 -99.990 0 *.. SPO 1975 02 12 -999.990 -99.990 0 *.. SPO 1975 02 13 -999.990 -99.990 0 *.. SPO 1975 02 14 -999.990 -99.990 0 *.. SPO 1975 02 15 -999.990 -99.990 0 *.. SPO 1975 02 16 -999.990 -99.990 0 *.. SPO 1975 02 17 -999.990 -99.990 0 *.. SPO 1975 02 18 -999.990 -99.990 0 *.. SPO 1975 02 19 -999.990 -99.990 0 *.. SPO 1975 02 20 -999.990 -99.990 0 *.. SPO 1975 02 21 -999.990 -99.990 0 *.. SPO 1975 02 22 -999.990 -99.990 0 *.. SPO 1975 02 23 -999.990 -99.990 0 *.. SPO 1975 02 24 -999.990 -99.990 0 *.. SPO 1975 02 25 -999.990 -99.990 0 *.. SPO 1975 02 26 -999.990 -99.990 0 *.. SPO 1975 02 27 -999.990 -99.990 0 *.. SPO 1975 02 28 -999.990 -99.990 0 *.. SPO 1975 03 01 -999.990 -99.990 0 *.. SPO 1975 03 02 -999.990 -99.990 0 *.. SPO 1975 03 03 -999.990 -99.990 0 *.. SPO 1975 03 04 -999.990 -99.990 0 *.. SPO 1975 03 05 -999.990 -99.990 0 *.. SPO 1975 03 06 -999.990 -99.990 0 *.. SPO 1975 03 07 -999.990 -99.990 0 *.. SPO 1975 03 08 -999.990 -99.990 0 *.. SPO 1975 03 09 -999.990 -99.990 0 *.. SPO 1975 03 10 -999.990 -99.990 0 *.. SPO 1975 03 11 -999.990 -99.990 0 *.. SPO 1975 03 12 -999.990 -99.990 0 *.. SPO 1975 03 13 -999.990 -99.990 0 *.. SPO 1975 03 14 -999.990 -99.990 0 *.. SPO 1975 03 15 -999.990 -99.990 0 *.. SPO 1975 03 16 -999.990 -99.990 0 *.. SPO 1975 03 17 -999.990 -99.990 0 *.. SPO 1975 03 18 -999.990 -99.990 0 *.. SPO 1975 03 19 -999.990 -99.990 0 *.. SPO 1975 03 20 -999.990 -99.990 0 *.. SPO 1975 03 21 -999.990 -99.990 0 *.. SPO 1975 03 22 -999.990 -99.990 0 *.. SPO 1975 03 23 -999.990 -99.990 0 *.. SPO 1975 03 24 -999.990 -99.990 0 *.. SPO 1975 03 25 -999.990 -99.990 0 *.. SPO 1975 03 26 -999.990 -99.990 0 *.. SPO 1975 03 27 -999.990 -99.990 0 *.. SPO 1975 03 28 -999.990 -99.990 0 *.. SPO 1975 03 29 -999.990 -99.990 0 *.. SPO 1975 03 30 -999.990 -99.990 0 *.. SPO 1975 03 31 -999.990 -99.990 0 *.. SPO 1975 04 01 -999.990 -99.990 0 *.. SPO 1975 04 02 -999.990 -99.990 0 *.. SPO 1975 04 03 -999.990 -99.990 0 *.. SPO 1975 04 04 -999.990 -99.990 0 *.. SPO 1975 04 05 -999.990 -99.990 0 *.. SPO 1975 04 06 -999.990 -99.990 0 *.. SPO 1975 04 07 -999.990 -99.990 0 *.. SPO 1975 04 08 -999.990 -99.990 0 *.. SPO 1975 04 09 -999.990 -99.990 0 *.. SPO 1975 04 10 -999.990 -99.990 0 *.. SPO 1975 04 11 -999.990 -99.990 0 *.. SPO 1975 04 12 -999.990 -99.990 0 *.. SPO 1975 04 13 -999.990 -99.990 0 *.. SPO 1975 04 14 -999.990 -99.990 0 *.. SPO 1975 04 15 -999.990 -99.990 0 *.. SPO 1975 04 16 -999.990 -99.990 0 *.. SPO 1975 04 17 -999.990 -99.990 0 *.. SPO 1975 04 18 -999.990 -99.990 0 *.. SPO 1975 04 19 -999.990 -99.990 0 *.. SPO 1975 04 20 -999.990 -99.990 0 *.. SPO 1975 04 21 -999.990 -99.990 0 *.. SPO 1975 04 22 -999.990 -99.990 0 *.. SPO 1975 04 23 -999.990 -99.990 0 *.. SPO 1975 04 24 -999.990 -99.990 0 *.. SPO 1975 04 25 -999.990 -99.990 0 *.. SPO 1975 04 26 -999.990 -99.990 0 *.. SPO 1975 04 27 -999.990 -99.990 0 *.. SPO 1975 04 28 -999.990 -99.990 0 *.. SPO 1975 04 29 -999.990 -99.990 0 *.. SPO 1975 04 30 -999.990 -99.990 0 *.. SPO 1975 05 01 -999.990 -99.990 0 *.. SPO 1975 05 02 -999.990 -99.990 0 *.. SPO 1975 05 03 -999.990 -99.990 0 *.. SPO 1975 05 04 -999.990 -99.990 0 *.. SPO 1975 05 05 -999.990 -99.990 0 *.. SPO 1975 05 06 -999.990 -99.990 0 *.. SPO 1975 05 07 -999.990 -99.990 0 *.. SPO 1975 05 08 -999.990 -99.990 0 *.. SPO 1975 05 09 -999.990 -99.990 0 *.. SPO 1975 05 10 -999.990 -99.990 0 *.. SPO 1975 05 11 -999.990 -99.990 0 *.. SPO 1975 05 12 -999.990 -99.990 0 *.. SPO 1975 05 13 -999.990 -99.990 0 *.. SPO 1975 05 14 -999.990 -99.990 0 *.. SPO 1975 05 15 -999.990 -99.990 0 *.. SPO 1975 05 16 -999.990 -99.990 0 *.. SPO 1975 05 17 -999.990 -99.990 0 *.. SPO 1975 05 18 -999.990 -99.990 0 *.. SPO 1975 05 19 -999.990 -99.990 0 *.. SPO 1975 05 20 -999.990 -99.990 0 *.. SPO 1975 05 21 -999.990 -99.990 0 *.. SPO 1975 05 22 -999.990 -99.990 0 *.. SPO 1975 05 23 -999.990 -99.990 0 *.. SPO 1975 05 24 -999.990 -99.990 0 *.. SPO 1975 05 25 -999.990 -99.990 0 *.. SPO 1975 05 26 -999.990 -99.990 0 *.. SPO 1975 05 27 -999.990 -99.990 0 *.. SPO 1975 05 28 -999.990 -99.990 0 *.. SPO 1975 05 29 -999.990 -99.990 0 *.. SPO 1975 05 30 -999.990 -99.990 0 *.. SPO 1975 05 31 -999.990 -99.990 0 *.. SPO 1975 06 01 -999.990 -99.990 0 *.. SPO 1975 06 02 -999.990 -99.990 0 *.. SPO 1975 06 03 -999.990 -99.990 0 *.. SPO 1975 06 04 -999.990 -99.990 0 *.. SPO 1975 06 05 -999.990 -99.990 0 *.. SPO 1975 06 06 -999.990 -99.990 0 *.. SPO 1975 06 07 -999.990 -99.990 0 *.. SPO 1975 06 08 -999.990 -99.990 0 *.. SPO 1975 06 09 -999.990 -99.990 0 *.. SPO 1975 06 10 -999.990 -99.990 0 *.. SPO 1975 06 11 -999.990 -99.990 0 *.. SPO 1975 06 12 -999.990 -99.990 0 *.. SPO 1975 06 13 -999.990 -99.990 0 *.. SPO 1975 06 14 -999.990 -99.990 0 *.. SPO 1975 06 15 -999.990 -99.990 0 *.. SPO 1975 06 16 -999.990 -99.990 0 *.. SPO 1975 06 17 -999.990 -99.990 0 *.. SPO 1975 06 18 -999.990 -99.990 0 *.. SPO 1975 06 19 -999.990 -99.990 0 *.. SPO 1975 06 20 -999.990 -99.990 0 *.. SPO 1975 06 21 -999.990 -99.990 0 *.. SPO 1975 06 22 -999.990 -99.990 0 *.. SPO 1975 06 23 -999.990 -99.990 0 *.. SPO 1975 06 24 -999.990 -99.990 0 *.. SPO 1975 06 25 -999.990 -99.990 0 *.. SPO 1975 06 26 -999.990 -99.990 0 *.. SPO 1975 06 27 -999.990 -99.990 0 *.. SPO 1975 06 28 -999.990 -99.990 0 *.. SPO 1975 06 29 -999.990 -99.990 0 *.. SPO 1975 06 30 -999.990 -99.990 0 *.. SPO 1975 07 01 -999.990 -99.990 0 *.. SPO 1975 07 02 -999.990 -99.990 0 *.. SPO 1975 07 03 -999.990 -99.990 0 *.. SPO 1975 07 04 -999.990 -99.990 0 *.. SPO 1975 07 05 -999.990 -99.990 0 *.. SPO 1975 07 06 -999.990 -99.990 0 *.. SPO 1975 07 07 -999.990 -99.990 0 *.. SPO 1975 07 08 -999.990 -99.990 0 *.. SPO 1975 07 09 -999.990 -99.990 0 *.. SPO 1975 07 10 -999.990 -99.990 0 *.. SPO 1975 07 11 -999.990 -99.990 0 *.. SPO 1975 07 12 -999.990 -99.990 0 *.. SPO 1975 07 13 -999.990 -99.990 0 *.. SPO 1975 07 14 -999.990 -99.990 0 *.. SPO 1975 07 15 -999.990 -99.990 0 *.. SPO 1975 07 16 -999.990 -99.990 0 *.. SPO 1975 07 17 -999.990 -99.990 0 *.. SPO 1975 07 18 -999.990 -99.990 0 *.. SPO 1975 07 19 -999.990 -99.990 0 *.. SPO 1975 07 20 -999.990 -99.990 0 *.. SPO 1975 07 21 -999.990 -99.990 0 *.. SPO 1975 07 22 -999.990 -99.990 0 *.. SPO 1975 07 23 -999.990 -99.990 0 *.. SPO 1975 07 24 -999.990 -99.990 0 *.. SPO 1975 07 25 -999.990 -99.990 0 *.. SPO 1975 07 26 -999.990 -99.990 0 *.. SPO 1975 07 27 -999.990 -99.990 0 *.. SPO 1975 07 28 -999.990 -99.990 0 *.. SPO 1975 07 29 -999.990 -99.990 0 *.. SPO 1975 07 30 -999.990 -99.990 0 *.. SPO 1975 07 31 -999.990 -99.990 0 *.. SPO 1975 08 01 -999.990 -99.990 0 *.. SPO 1975 08 02 -999.990 -99.990 0 *.. SPO 1975 08 03 -999.990 -99.990 0 *.. SPO 1975 08 04 -999.990 -99.990 0 *.. SPO 1975 08 05 -999.990 -99.990 0 *.. SPO 1975 08 06 -999.990 -99.990 0 *.. SPO 1975 08 07 -999.990 -99.990 0 *.. SPO 1975 08 08 -999.990 -99.990 0 *.. SPO 1975 08 09 -999.990 -99.990 0 *.. SPO 1975 08 10 -999.990 -99.990 0 *.. SPO 1975 08 11 -999.990 -99.990 0 *.. SPO 1975 08 12 -999.990 -99.990 0 *.. SPO 1975 08 13 -999.990 -99.990 0 *.. SPO 1975 08 14 -999.990 -99.990 0 *.. SPO 1975 08 15 -999.990 -99.990 0 *.. SPO 1975 08 16 -999.990 -99.990 0 *.. SPO 1975 08 17 -999.990 -99.990 0 *.. SPO 1975 08 18 -999.990 -99.990 0 *.. SPO 1975 08 19 -999.990 -99.990 0 *.. SPO 1975 08 20 -999.990 -99.990 0 *.. SPO 1975 08 21 -999.990 -99.990 0 *.. SPO 1975 08 22 -999.990 -99.990 0 *.. SPO 1975 08 23 -999.990 -99.990 0 *.. SPO 1975 08 24 -999.990 -99.990 0 *.. SPO 1975 08 25 -999.990 -99.990 0 *.. SPO 1975 08 26 -999.990 -99.990 0 *.. SPO 1975 08 27 -999.990 -99.990 0 *.. SPO 1975 08 28 -999.990 -99.990 0 *.. SPO 1975 08 29 -999.990 -99.990 0 *.. SPO 1975 08 30 -999.990 -99.990 0 *.. SPO 1975 08 31 -999.990 -99.990 0 *.. SPO 1975 09 01 -999.990 -99.990 0 *.. SPO 1975 09 02 -999.990 -99.990 0 *.. SPO 1975 09 03 -999.990 -99.990 0 *.. SPO 1975 09 04 -999.990 -99.990 0 *.. SPO 1975 09 05 -999.990 -99.990 0 *.. SPO 1975 09 06 -999.990 -99.990 0 *.. SPO 1975 09 07 -999.990 -99.990 0 *.. SPO 1975 09 08 -999.990 -99.990 0 *.. SPO 1975 09 09 -999.990 -99.990 0 *.. SPO 1975 09 10 -999.990 -99.990 0 *.. SPO 1975 09 11 -999.990 -99.990 0 *.. SPO 1975 09 12 -999.990 -99.990 0 *.. SPO 1975 09 13 -999.990 -99.990 0 *.. SPO 1975 09 14 -999.990 -99.990 0 *.. SPO 1975 09 15 -999.990 -99.990 0 *.. SPO 1975 09 16 -999.990 -99.990 0 *.. SPO 1975 09 17 -999.990 -99.990 0 *.. SPO 1975 09 18 -999.990 -99.990 0 *.. SPO 1975 09 19 -999.990 -99.990 0 *.. SPO 1975 09 20 -999.990 -99.990 0 *.. SPO 1975 09 21 -999.990 -99.990 0 *.. SPO 1975 09 22 -999.990 -99.990 0 *.. SPO 1975 09 23 -999.990 -99.990 0 *.. SPO 1975 09 24 -999.990 -99.990 0 *.. SPO 1975 09 25 -999.990 -99.990 0 *.. SPO 1975 09 26 -999.990 -99.990 0 *.. SPO 1975 09 27 -999.990 -99.990 0 *.. SPO 1975 09 28 -999.990 -99.990 0 *.. SPO 1975 09 29 -999.990 -99.990 0 *.. SPO 1975 09 30 -999.990 -99.990 0 *.. SPO 1975 10 01 -999.990 -99.990 0 *.. SPO 1975 10 02 -999.990 -99.990 0 *.. SPO 1975 10 03 -999.990 -99.990 0 *.. SPO 1975 10 04 -999.990 -99.990 0 *.. SPO 1975 10 05 -999.990 -99.990 0 *.. SPO 1975 10 06 -999.990 -99.990 0 *.. SPO 1975 10 07 -999.990 -99.990 0 *.. SPO 1975 10 08 -999.990 -99.990 0 *.. SPO 1975 10 09 -999.990 -99.990 0 *.. SPO 1975 10 10 -999.990 -99.990 0 *.. SPO 1975 10 11 -999.990 -99.990 0 *.. SPO 1975 10 12 -999.990 -99.990 0 *.. SPO 1975 10 13 -999.990 -99.990 0 *.. SPO 1975 10 14 -999.990 -99.990 0 *.. SPO 1975 10 15 -999.990 -99.990 0 *.. SPO 1975 10 16 -999.990 -99.990 0 *.. SPO 1975 10 17 -999.990 -99.990 0 *.. SPO 1975 10 18 -999.990 -99.990 0 *.. SPO 1975 10 19 -999.990 -99.990 0 *.. SPO 1975 10 20 -999.990 -99.990 0 *.. SPO 1975 10 21 -999.990 -99.990 0 *.. SPO 1975 10 22 -999.990 -99.990 0 *.. SPO 1975 10 23 -999.990 -99.990 0 *.. SPO 1975 10 24 -999.990 -99.990 0 *.. SPO 1975 10 25 -999.990 -99.990 0 *.. SPO 1975 10 26 -999.990 -99.990 0 *.. SPO 1975 10 27 -999.990 -99.990 0 *.. SPO 1975 10 28 -999.990 -99.990 0 *.. SPO 1975 10 29 -999.990 -99.990 0 *.. SPO 1975 10 30 -999.990 -99.990 0 *.. SPO 1975 10 31 -999.990 -99.990 0 *.. SPO 1975 11 01 -999.990 -99.990 0 *.. SPO 1975 11 02 -999.990 -99.990 0 *.. SPO 1975 11 03 -999.990 -99.990 0 *.. SPO 1975 11 04 -999.990 -99.990 0 *.. SPO 1975 11 05 -999.990 -99.990 0 *.. SPO 1975 11 06 -999.990 -99.990 0 *.. SPO 1975 11 07 -999.990 -99.990 0 *.. SPO 1975 11 08 -999.990 -99.990 0 *.. SPO 1975 11 09 -999.990 -99.990 0 *.. SPO 1975 11 10 -999.990 -99.990 0 *.. SPO 1975 11 11 -999.990 -99.990 0 *.. SPO 1975 11 12 -999.990 -99.990 0 *.. SPO 1975 11 13 -999.990 -99.990 0 *.. SPO 1975 11 14 -999.990 -99.990 0 *.. SPO 1975 11 15 -999.990 -99.990 0 *.. SPO 1975 11 16 -999.990 -99.990 0 *.. SPO 1975 11 17 -999.990 -99.990 0 *.. SPO 1975 11 18 -999.990 -99.990 0 *.. SPO 1975 11 19 -999.990 -99.990 0 *.. SPO 1975 11 20 -999.990 -99.990 0 *.. SPO 1975 11 21 -999.990 -99.990 0 *.. SPO 1975 11 22 -999.990 -99.990 0 *.. SPO 1975 11 23 -999.990 -99.990 0 *.. SPO 1975 11 24 -999.990 -99.990 0 *.. SPO 1975 11 25 330.059 0.080 11 ... SPO 1975 11 26 329.916 0.121 23 ... SPO 1975 11 27 329.856 0.078 24 ... SPO 1975 11 28 329.835 0.078 24 ... SPO 1975 11 29 329.873 0.165 19 ... SPO 1975 11 30 329.824 0.163 24 ... SPO 1975 12 01 329.948 0.150 24 ... SPO 1975 12 02 329.869 0.147 24 ... SPO 1975 12 03 329.855 0.126 24 ... SPO 1975 12 04 329.821 0.127 24 ... SPO 1975 12 05 329.753 0.106 24 ... SPO 1975 12 06 329.858 0.120 24 ... SPO 1975 12 07 329.783 0.133 24 ... SPO 1975 12 08 329.816 0.131 24 ... SPO 1975 12 09 329.775 0.141 24 ... SPO 1975 12 10 329.723 0.130 24 ... SPO 1975 12 11 329.776 0.145 24 ... SPO 1975 12 12 329.730 0.123 24 ... SPO 1975 12 13 329.692 0.080 24 ... SPO 1975 12 14 329.670 0.107 24 ... SPO 1975 12 15 329.633 0.121 24 ... SPO 1975 12 16 329.709 0.155 24 ... SPO 1975 12 17 329.684 0.114 24 ... SPO 1975 12 18 329.695 0.112 24 ... SPO 1975 12 19 329.724 0.093 24 ... SPO 1975 12 20 329.659 0.092 24 ... SPO 1975 12 21 329.637 0.080 24 ... SPO 1975 12 22 329.644 0.071 23 ... SPO 1975 12 23 329.779 0.104 10 ... SPO 1975 12 24 329.762 0.116 19 ... SPO 1975 12 25 329.681 0.058 24 ... SPO 1975 12 26 329.696 0.093 24 ... SPO 1975 12 27 329.684 0.129 24 ... SPO 1975 12 28 329.650 0.088 24 ... SPO 1975 12 29 329.755 0.175 22 ... SPO 1975 12 30 329.653 0.073 24 ... SPO 1975 12 31 329.543 0.113 24 ... SPO 1976 01 01 329.296 0.203 23 ... SPO 1976 01 02 329.165 0.051 22 ... SPO 1976 01 03 329.519 0.034 22 ... SPO 1976 01 04 329.549 0.080 21 ... SPO 1976 01 05 329.540 0.034 23 ... SPO 1976 01 06 329.494 0.027 24 ... SPO 1976 01 07 329.487 0.070 17 ... SPO 1976 01 08 329.561 0.033 23 ... SPO 1976 01 09 329.547 0.036 24 ... SPO 1976 01 10 329.537 0.030 24 ... SPO 1976 01 11 329.513 0.027 24 ... SPO 1976 01 12 329.462 0.031 24 ... SPO 1976 01 13 329.358 0.069 24 ... SPO 1976 01 14 329.383 0.033 19 ... SPO 1976 01 15 329.401 0.042 24 ... SPO 1976 01 16 329.447 0.044 24 ... SPO 1976 01 17 329.451 0.034 22 ... SPO 1976 01 18 329.504 0.082 22 ... SPO 1976 01 19 329.454 0.077 21 ... SPO 1976 01 20 329.434 0.034 24 ... SPO 1976 01 21 329.461 0.024 20 ... SPO 1976 01 22 329.470 0.027 23 ... SPO 1976 01 23 329.372 0.045 24 ... SPO 1976 01 24 329.367 0.027 24 ... SPO 1976 01 25 329.464 0.039 24 ... SPO 1976 01 26 329.434 0.029 24 ... SPO 1976 01 27 329.460 0.036 23 ... SPO 1976 01 28 329.437 0.038 20 ... SPO 1976 01 29 329.440 0.034 17 ... SPO 1976 01 30 329.350 0.058 5 ... SPO 1976 01 31 329.439 0.053 23 ... SPO 1976 02 01 329.377 0.052 24 ... SPO 1976 02 02 329.409 0.030 20 ... SPO 1976 02 03 329.420 0.055 23 ... SPO 1976 02 04 329.442 0.069 19 ... SPO 1976 02 05 329.178 0.145 24 ... SPO 1976 02 06 329.368 0.044 24 ... SPO 1976 02 07 329.305 0.058 24 ... SPO 1976 02 08 329.240 0.054 24 ... SPO 1976 02 09 329.276 0.039 24 ... SPO 1976 02 10 329.036 0.143 17 ... SPO 1976 02 11 328.893 0.092 20 ... SPO 1976 02 12 329.140 0.037 19 ... SPO 1976 02 13 329.047 0.087 24 ... SPO 1976 02 14 328.905 0.080 24 ... SPO 1976 02 15 329.083 0.184 23 ... SPO 1976 02 16 329.238 0.025 24 ... SPO 1976 02 17 329.272 0.034 24 ... SPO 1976 02 18 329.270 0.041 19 ... SPO 1976 02 19 329.213 0.024 24 ... SPO 1976 02 20 329.225 0.029 24 ... SPO 1976 02 21 329.189 0.028 24 ... SPO 1976 02 22 329.212 0.022 24 ... SPO 1976 02 23 329.211 0.030 24 ... SPO 1976 02 24 329.180 0.033 24 ... SPO 1976 02 25 329.146 0.021 19 ... SPO 1976 02 26 329.146 0.040 24 ... SPO 1976 02 27 329.193 0.037 24 ... SPO 1976 02 28 329.242 0.046 24 ... SPO 1976 02 29 329.268 0.076 24 ... SPO 1976 03 01 329.197 0.075 23 ... SPO 1976 03 02 329.171 0.068 23 ... SPO 1976 03 03 329.083 0.091 18 ... SPO 1976 03 04 329.010 0.044 24 ... SPO 1976 03 05 329.068 0.056 24 ... SPO 1976 03 06 329.070 0.054 24 ... SPO 1976 03 07 329.106 0.018 24 ... SPO 1976 03 08 329.108 0.036 24 ... SPO 1976 03 09 329.167 0.027 24 ... SPO 1976 03 10 329.164 0.022 19 ... SPO 1976 03 11 329.119 0.023 24 ... SPO 1976 03 12 329.096 0.023 24 ... SPO 1976 03 13 329.009 0.032 24 ... SPO 1976 03 14 329.111 0.063 24 ... SPO 1976 03 15 329.081 0.087 24 ... SPO 1976 03 16 329.096 0.066 23 ... SPO 1976 03 17 329.061 0.047 20 ... SPO 1976 03 18 329.081 0.025 24 ... SPO 1976 03 19 329.011 0.032 24 ... SPO 1976 03 20 328.966 0.021 24 ... SPO 1976 03 21 328.952 0.037 24 ... SPO 1976 03 22 328.908 0.028 24 ... SPO 1976 03 23 328.809 0.080 24 ... SPO 1976 03 24 328.581 0.096 17 ... SPO 1976 03 25 329.134 0.141 21 ... SPO 1976 03 26 329.203 0.022 24 ... SPO 1976 03 27 329.194 0.019 24 ... SPO 1976 03 28 329.175 0.024 24 ... SPO 1976 03 29 329.080 0.035 24 ... SPO 1976 03 30 329.043 0.026 24 ... SPO 1976 03 31 329.030 0.025 19 ... SPO 1976 04 01 329.021 0.023 23 ... SPO 1976 04 02 329.083 0.041 24 ... SPO 1976 04 03 329.121 0.027 24 ... SPO 1976 04 04 329.066 0.041 21 ... SPO 1976 04 05 329.036 0.030 22 ... SPO 1976 04 06 329.020 0.039 24 ... SPO 1976 04 07 329.005 0.017 20 ... SPO 1976 04 08 329.044 0.033 22 ... SPO 1976 04 09 329.044 0.026 24 ... SPO 1976 04 10 329.020 0.026 24 ... SPO 1976 04 11 329.005 0.029 24 ... SPO 1976 04 12 329.013 0.020 24 ... SPO 1976 04 13 329.043 0.020 24 ... SPO 1976 04 14 329.040 0.027 24 ... SPO 1976 04 15 329.013 0.022 20 ... SPO 1976 04 16 329.033 0.025 23 ... SPO 1976 04 17 329.016 0.024 24 ... SPO 1976 04 18 328.978 0.029 24 ... SPO 1976 04 19 328.990 0.018 24 ... SPO 1976 04 20 328.997 0.011 23 ... SPO 1976 04 21 328.993 0.029 24 ... SPO 1976 04 22 329.018 0.029 20 ... SPO 1976 04 23 329.010 0.033 24 ... SPO 1976 04 24 329.038 0.018 24 ... SPO 1976 04 25 329.074 0.045 24 ... SPO 1976 04 26 329.032 0.035 24 ... SPO 1976 04 27 329.073 0.053 24 ... SPO 1976 04 28 329.173 0.028 24 ... SPO 1976 04 29 329.057 0.048 20 ... SPO 1976 04 30 329.098 0.060 24 ... SPO 1976 05 01 329.167 0.036 24 ... SPO 1976 05 02 329.118 0.023 24 ... SPO 1976 05 03 329.051 0.066 24 ... SPO 1976 05 04 329.019 0.042 22 ... SPO 1976 05 05 329.034 0.023 24 ... SPO 1976 05 06 329.121 0.046 20 ... SPO 1976 05 07 329.139 0.029 24 ... SPO 1976 05 08 329.013 0.054 18 ... SPO 1976 05 09 329.090 0.058 24 ... SPO 1976 05 10 329.141 0.027 24 ... SPO 1976 05 11 329.136 0.024 24 ... SPO 1976 05 12 329.108 0.023 24 ... SPO 1976 05 13 329.099 0.027 20 ... SPO 1976 05 14 329.096 0.031 24 ... SPO 1976 05 15 329.048 0.027 24 ... SPO 1976 05 16 329.053 0.024 24 ... SPO 1976 05 17 329.073 0.029 24 ... SPO 1976 05 18 329.008 0.026 24 ... SPO 1976 05 19 329.023 0.038 24 ... SPO 1976 05 20 329.046 0.027 20 ... SPO 1976 05 21 329.061 0.029 24 ... SPO 1976 05 22 329.081 0.039 24 ... SPO 1976 05 23 329.126 0.026 24 ... SPO 1976 05 24 329.133 0.020 24 ... SPO 1976 05 25 329.135 0.035 24 ... SPO 1976 05 26 329.190 0.031 21 ... SPO 1976 05 27 329.173 0.039 19 ... SPO 1976 05 28 329.111 0.028 24 ... SPO 1976 05 29 329.113 0.068 24 ... SPO 1976 05 30 329.208 0.053 24 ... SPO 1976 05 31 329.135 0.028 24 ... SPO 1976 06 01 329.144 0.023 24 ... SPO 1976 06 02 329.156 0.025 24 ... SPO 1976 06 03 329.218 0.045 20 ... SPO 1976 06 04 329.263 0.031 24 ... SPO 1976 06 05 329.247 0.047 24 ... SPO 1976 06 06 329.194 0.027 24 ... SPO 1976 06 07 329.385 0.031 24 ... SPO 1976 06 08 329.349 0.022 24 ... SPO 1976 06 09 329.394 0.020 23 ... SPO 1976 06 10 329.294 0.054 20 ... SPO 1976 06 11 329.401 0.033 21 ... SPO 1976 06 12 329.315 0.037 24 ... SPO 1976 06 13 329.308 0.063 24 ... SPO 1976 06 14 329.223 0.020 24 ... SPO 1976 06 15 329.260 0.042 21 ... SPO 1976 06 16 329.275 0.027 23 ... SPO 1976 06 17 329.264 0.038 20 ... SPO 1976 06 18 329.280 0.019 24 ... SPO 1976 06 19 329.270 0.015 24 ... SPO 1976 06 20 329.232 0.024 24 ... SPO 1976 06 21 329.217 0.036 24 ... SPO 1976 06 22 329.199 0.036 24 ... SPO 1976 06 23 329.410 0.087 22 ... SPO 1976 06 24 329.539 0.029 19 ... SPO 1976 06 25 329.495 0.054 24 ... SPO 1976 06 26 329.483 0.070 24 ... SPO 1976 06 27 329.501 0.024 24 ... SPO 1976 06 28 329.561 0.039 24 ... SPO 1976 06 29 329.554 0.043 24 ... SPO 1976 06 30 329.414 0.069 24 ... SPO 1976 07 01 329.512 0.021 19 ... SPO 1976 07 02 329.491 0.028 24 ... SPO 1976 07 03 329.582 0.043 24 ... SPO 1976 07 04 329.578 0.027 24 ... SPO 1976 07 05 329.612 0.035 24 ... SPO 1976 07 06 329.648 0.032 23 ... SPO 1976 07 07 329.628 0.044 24 ... SPO 1976 07 08 329.602 0.024 19 ... SPO 1976 07 09 329.557 0.025 24 ... SPO 1976 07 10 329.576 0.021 24 ... SPO 1976 07 11 329.624 0.056 24 ... SPO 1976 07 12 329.639 0.021 23 ... SPO 1976 07 13 329.662 0.019 24 ... SPO 1976 07 14 329.665 0.021 24 ... SPO 1976 07 15 329.695 0.045 19 ... SPO 1976 07 16 329.747 0.034 24 ... SPO 1976 07 17 329.731 0.027 24 ... SPO 1976 07 18 329.744 0.024 24 ... SPO 1976 07 19 329.744 0.033 24 ... SPO 1976 07 20 329.689 0.048 24 ... SPO 1976 07 21 329.658 0.019 24 ... SPO 1976 07 22 329.719 0.034 19 ... SPO 1976 07 23 329.749 0.038 24 ... SPO 1976 07 24 329.715 0.039 24 ... SPO 1976 07 25 329.731 0.050 24 ... SPO 1976 07 26 329.775 0.022 24 ... SPO 1976 07 27 329.769 0.019 24 ... SPO 1976 07 28 329.788 0.019 24 ... SPO 1976 07 29 329.881 0.029 19 ... SPO 1976 07 30 329.891 0.094 24 ... SPO 1976 07 31 330.033 0.031 24 ... SPO 1976 08 01 330.082 0.023 24 ... SPO 1976 08 02 330.005 0.048 24 ... SPO 1976 08 03 329.933 0.077 24 ... SPO 1976 08 04 330.032 0.044 24 ... SPO 1976 08 05 330.017 0.060 16 ... SPO 1976 08 06 329.948 0.049 24 ... SPO 1976 08 07 329.890 0.019 20 ... SPO 1976 08 08 329.952 0.073 24 ... SPO 1976 08 09 330.025 0.085 24 ... SPO 1976 08 10 330.068 0.042 23 ... SPO 1976 08 11 330.070 0.045 24 ... SPO 1976 08 12 330.347 0.042 19 ... SPO 1976 08 13 330.227 0.048 24 ... SPO 1976 08 14 330.231 0.032 24 ... SPO 1976 08 15 330.168 0.033 24 ... SPO 1976 08 16 330.146 0.022 24 ... SPO 1976 08 17 330.121 0.024 21 ... SPO 1976 08 18 330.045 0.028 24 ... SPO 1976 08 19 330.054 0.037 19 ... SPO 1976 08 20 330.081 0.018 24 ... SPO 1976 08 21 330.129 0.054 24 ... SPO 1976 08 22 330.322 0.043 24 ... SPO 1976 08 23 330.291 0.054 24 ... SPO 1976 08 24 330.119 0.033 24 ... SPO 1976 08 25 330.176 0.053 24 ... SPO 1976 08 26 330.171 0.016 19 ... SPO 1976 08 27 330.187 0.025 24 ... SPO 1976 08 28 330.175 0.049 24 ... SPO 1976 08 29 330.294 0.035 20 ... SPO 1976 08 30 330.349 0.032 24 ... SPO 1976 08 31 330.398 0.045 24 ... SPO 1976 09 01 330.415 0.082 24 ... SPO 1976 09 02 330.552 0.042 18 ... SPO 1976 09 03 330.534 0.067 16 ... SPO 1976 09 04 330.531 0.076 24 ... SPO 1976 09 05 330.612 0.076 24 ... SPO 1976 09 06 330.597 0.140 23 ... SPO 1976 09 07 330.614 0.106 23 ... SPO 1976 09 08 330.542 0.089 23 ... SPO 1976 09 09 330.398 0.046 19 ... SPO 1976 09 10 330.380 0.069 24 ... SPO 1976 09 11 330.343 0.080 24 ... SPO 1976 09 12 330.353 0.080 24 ... SPO 1976 09 13 330.388 0.094 24 ... SPO 1976 09 14 330.364 0.057 24 ... SPO 1976 09 15 330.345 0.050 24 ... SPO 1976 09 16 330.371 0.045 19 ... SPO 1976 09 17 330.440 0.064 23 ... SPO 1976 09 18 330.618 0.110 24 ... SPO 1976 09 19 330.671 0.063 24 ... SPO 1976 09 20 330.601 0.053 24 ... SPO 1976 09 21 330.566 0.074 22 ... SPO 1976 09 22 330.669 0.111 24 ... SPO 1976 09 23 330.537 0.065 20 ... SPO 1976 09 24 330.483 0.101 24 ... SPO 1976 09 25 330.440 0.064 23 ... SPO 1976 09 26 330.380 0.073 24 ... SPO 1976 09 27 330.460 0.066 24 ... SPO 1976 09 28 330.435 0.089 24 ... SPO 1976 09 29 330.502 0.068 24 ... SPO 1976 09 30 330.429 0.065 20 ... SPO 1976 10 01 330.577 0.052 24 ... SPO 1976 10 02 330.495 0.073 24 ... SPO 1976 10 03 330.455 0.084 20 ... SPO 1976 10 04 330.489 0.094 24 ... SPO 1976 10 05 330.548 0.070 24 ... SPO 1976 10 06 330.575 0.053 24 ... SPO 1976 10 07 330.592 0.073 20 ... SPO 1976 10 08 330.545 0.057 24 ... SPO 1976 10 09 330.539 0.079 24 ... SPO 1976 10 10 330.521 0.051 21 ... SPO 1976 10 11 330.530 0.060 23 ... SPO 1976 10 12 330.465 0.082 24 ... SPO 1976 10 13 330.487 0.094 24 ... SPO 1976 10 14 330.541 0.038 20 ... SPO 1976 10 15 330.591 0.030 24 ... SPO 1976 10 16 330.593 0.064 24 ... SPO 1976 10 17 330.621 0.057 24 ... SPO 1976 10 18 330.601 0.067 24 ... SPO 1976 10 19 330.473 0.041 24 ... SPO 1976 10 20 330.474 0.069 24 ... SPO 1976 10 21 330.545 0.075 17 ... SPO 1976 10 22 330.577 0.046 24 ... SPO 1976 10 23 330.473 0.034 24 ... SPO 1976 10 24 330.554 0.074 24 ... SPO 1976 10 25 330.586 0.069 22 ... SPO 1976 10 26 330.426 0.059 24 ... SPO 1976 10 27 330.336 0.050 24 ... SPO 1976 10 28 330.381 0.050 20 ... SPO 1976 10 29 330.446 0.054 24 ... SPO 1976 10 30 330.518 0.034 22 ... SPO 1976 10 31 330.518 0.049 24 ... SPO 1976 11 01 330.447 0.034 21 ... SPO 1976 11 02 330.499 0.055 22 ... SPO 1976 11 03 330.580 0.119 22 ... SPO 1976 11 04 330.593 0.085 20 ... SPO 1976 11 05 330.596 0.068 18 ... SPO 1976 11 06 330.587 0.109 15 ... SPO 1976 11 07 330.505 0.088 23 ... SPO 1976 11 08 330.468 0.109 17 ... SPO 1976 11 09 330.505 0.086 22 ... SPO 1976 11 10 330.530 0.039 24 ... SPO 1976 11 11 330.569 0.038 17 ... SPO 1976 11 12 330.555 0.068 24 ... SPO 1976 11 13 330.578 0.038 24 ... SPO 1976 11 14 330.494 0.061 16 ... SPO 1976 11 15 330.405 0.079 12 ... SPO 1976 11 16 330.355 0.069 19 ... SPO 1976 11 17 330.452 0.044 23 ... SPO 1976 11 18 330.443 0.078 22 ... SPO 1976 11 19 330.485 0.062 13 ... SPO 1976 11 20 330.472 0.145 19 ... SPO 1976 11 21 330.451 0.091 21 ... SPO 1976 11 22 330.382 0.116 23 ... SPO 1976 11 23 330.495 0.056 11 ... SPO 1976 11 24 -999.990 -99.990 0 *.. SPO 1976 11 25 331.163 0.132 15 ... SPO 1976 11 26 331.191 0.078 24 ... SPO 1976 11 27 331.107 0.087 24 ... SPO 1976 11 28 331.026 0.165 19 ... SPO 1976 11 29 330.924 0.209 20 ... SPO 1976 11 30 330.828 0.078 24 ... SPO 1976 12 01 330.752 0.064 24 ... SPO 1976 12 02 330.753 0.109 17 ... SPO 1976 12 03 330.759 0.077 19 ... SPO 1976 12 04 330.706 0.071 5 ... SPO 1976 12 05 330.766 0.091 11 ... SPO 1976 12 06 330.771 0.135 19 ... SPO 1976 12 07 -999.990 -99.990 0 *.. SPO 1976 12 08 330.713 0.133 11 ... SPO 1976 12 09 330.770 0.028 2 ... SPO 1976 12 10 -999.990 -99.990 0 *.. SPO 1976 12 11 -999.990 -99.990 0 *.. SPO 1976 12 12 -999.990 -99.990 0 *.. SPO 1976 12 13 -999.990 -99.990 0 *.. SPO 1976 12 14 -999.990 -99.990 0 *.. SPO 1976 12 15 -999.990 -99.990 0 *.. SPO 1976 12 16 330.680 0.071 2 ... SPO 1976 12 17 330.639 0.069 17 ... SPO 1976 12 18 330.719 0.134 14 ... SPO 1976 12 19 330.746 0.208 19 ... SPO 1976 12 20 -999.990 -99.990 0 *.. SPO 1976 12 21 330.544 0.043 9 ... SPO 1976 12 22 330.529 0.058 20 ... SPO 1976 12 23 330.582 0.147 20 ... SPO 1976 12 24 330.513 0.056 19 ... SPO 1976 12 25 330.553 0.091 21 ... SPO 1976 12 26 330.631 0.102 13 ... SPO 1976 12 27 330.586 0.055 23 ... SPO 1976 12 28 330.596 0.088 15 ... SPO 1976 12 29 330.463 0.074 22 ... SPO 1976 12 30 330.557 0.257 19 ... SPO 1976 12 31 330.416 0.069 17 ... SPO 1977 01 01 330.405 0.080 24 ... SPO 1977 01 02 330.438 0.065 22 ... SPO 1977 01 03 330.433 0.060 24 ... SPO 1977 01 04 330.414 0.061 24 ... SPO 1977 01 05 330.401 0.054 24 ... SPO 1977 01 06 330.415 0.063 24 ... SPO 1977 01 07 330.439 0.043 18 ... SPO 1977 01 08 330.407 0.056 24 ... SPO 1977 01 09 330.424 0.053 23 ... SPO 1977 01 10 330.411 0.061 24 ... SPO 1977 01 11 330.387 0.058 24 ... SPO 1977 01 12 330.345 0.047 24 ... SPO 1977 01 13 330.189 0.079 21 ... SPO 1977 01 14 330.060 0.000 1 ... SPO 1977 01 15 -999.990 -99.990 0 *.. SPO 1977 01 16 -999.990 -99.990 0 *.. SPO 1977 01 17 -999.990 -99.990 0 *.. SPO 1977 01 18 330.081 0.179 15 ... SPO 1977 01 19 330.324 0.161 23 ... SPO 1977 01 20 330.232 0.077 23 ... SPO 1977 01 21 330.262 0.099 23 ... SPO 1977 01 22 330.275 0.133 23 ... SPO 1977 01 23 330.196 0.187 23 ... SPO 1977 01 24 330.243 0.124 21 ... SPO 1977 01 25 330.227 0.089 24 ... SPO 1977 01 26 330.215 0.113 24 ... SPO 1977 01 27 330.202 0.062 23 ... SPO 1977 01 28 330.125 0.095 12 ... SPO 1977 01 29 330.202 0.085 24 ... SPO 1977 01 30 330.147 0.120 22 ... SPO 1977 01 31 330.170 0.106 24 ... SPO 1977 02 01 330.161 0.057 24 ... SPO 1977 02 02 330.148 0.091 11 ... SPO 1977 02 03 -999.990 -99.990 0 *.. SPO 1977 02 04 -999.990 -99.990 0 *.. SPO 1977 02 05 -999.990 -99.990 0 *.. SPO 1977 02 06 -999.990 -99.990 0 *.. SPO 1977 02 07 -999.990 -99.990 0 *.. SPO 1977 02 08 -999.990 -99.990 0 *.. SPO 1977 02 09 -999.990 -99.990 0 *.. SPO 1977 02 10 331.408 0.081 18 ... SPO 1977 02 11 331.352 0.078 18 ... SPO 1977 02 12 331.364 0.066 22 ... SPO 1977 02 13 331.311 0.113 18 ... SPO 1977 02 14 331.400 0.084 22 ... SPO 1977 02 15 331.322 0.133 20 ... SPO 1977 02 16 331.282 0.126 20 ... SPO 1977 02 17 331.243 0.118 20 ... SPO 1977 02 18 331.239 0.099 18 ... SPO 1977 02 19 331.287 0.108 22 ... SPO 1977 02 20 331.176 0.147 20 ... SPO 1977 02 21 331.224 0.057 21 ... SPO 1977 02 22 331.145 0.121 24 ... SPO 1977 02 23 331.126 0.073 24 ... SPO 1977 02 24 331.122 0.071 23 ... SPO 1977 02 25 331.131 0.094 19 ... SPO 1977 02 26 331.158 0.076 24 ... SPO 1977 02 27 331.112 0.092 22 ... SPO 1977 02 28 330.935 0.069 21 ... SPO 1977 03 01 331.064 0.059 23 ... SPO 1977 03 02 331.042 0.060 24 ... SPO 1977 03 03 330.936 0.066 22 ... SPO 1977 03 04 331.065 0.055 17 ... SPO 1977 03 05 331.073 0.057 22 ... SPO 1977 03 06 331.048 0.072 23 ... SPO 1977 03 07 331.027 0.088 24 ... SPO 1977 03 08 330.969 0.070 23 ... SPO 1977 03 09 330.978 0.093 22 ... SPO 1977 03 10 330.929 0.141 21 ... SPO 1977 03 11 330.983 0.066 19 ... SPO 1977 03 12 330.897 0.083 23 ... SPO 1977 03 13 330.808 0.073 24 ... SPO 1977 03 14 330.842 0.094 24 ... SPO 1977 03 15 330.905 0.095 24 ... SPO 1977 03 16 330.943 0.068 24 ... SPO 1977 03 17 330.950 0.060 23 ... SPO 1977 03 18 330.935 0.081 19 ... SPO 1977 03 19 330.865 0.128 23 ... SPO 1977 03 20 330.895 0.109 21 ... SPO 1977 03 21 330.928 0.080 24 ... SPO 1977 03 22 330.903 0.075 23 ... SPO 1977 03 23 330.959 0.077 24 ... SPO 1977 03 24 330.923 0.068 24 ... SPO 1977 03 25 330.901 0.072 19 ... SPO 1977 03 26 330.918 0.075 24 ... SPO 1977 03 27 330.873 0.049 23 ... SPO 1977 03 28 330.912 0.059 22 ... SPO 1977 03 29 330.970 0.089 24 ... SPO 1977 03 30 330.988 0.109 24 ... SPO 1977 03 31 330.939 0.111 24 ... SPO 1977 04 01 330.989 0.056 19 ... SPO 1977 04 02 331.043 0.059 24 ... SPO 1977 04 03 330.968 0.064 23 ... SPO 1977 04 04 330.965 0.064 24 ... SPO 1977 04 05 330.988 0.088 24 ... SPO 1977 04 06 331.033 0.057 23 ... SPO 1977 04 07 330.991 0.048 23 ... SPO 1977 04 08 330.929 0.068 19 ... SPO 1977 04 09 331.015 0.056 24 ... SPO 1977 04 10 330.947 0.064 20 ... SPO 1977 04 11 330.954 0.088 19 ... SPO 1977 04 12 330.987 0.103 24 ... SPO 1977 04 13 331.042 0.068 24 ... SPO 1977 04 14 330.943 0.099 23 ... SPO 1977 04 15 331.025 0.157 14 ... SPO 1977 04 16 330.993 0.175 20 ... SPO 1977 04 17 331.010 0.045 21 ... SPO 1977 04 18 331.026 0.067 23 ... SPO 1977 04 19 331.026 0.084 23 ... SPO 1977 04 20 331.033 0.071 22 ... SPO 1977 04 21 330.982 0.095 21 ... SPO 1977 04 22 330.977 0.078 19 ... SPO 1977 04 23 330.996 0.083 24 ... SPO 1977 04 24 331.019 0.072 23 ... SPO 1977 04 25 330.975 0.083 19 ... SPO 1977 04 26 331.017 0.086 24 ... SPO 1977 04 27 331.151 0.163 21 ... SPO 1977 04 28 331.142 0.103 12 ... SPO 1977 04 29 331.011 0.094 21 ... SPO 1977 04 30 330.995 0.058 19 ... SPO 1977 05 01 331.024 0.086 24 ... SPO 1977 05 02 330.985 0.045 24 ... SPO 1977 05 03 331.022 0.072 24 ... SPO 1977 05 04 331.012 0.085 23 ... SPO 1977 05 05 330.962 0.058 23 ... SPO 1977 05 06 331.036 0.060 19 ... SPO 1977 05 07 331.060 0.067 24 ... SPO 1977 05 08 331.075 0.079 23 ... SPO 1977 05 09 331.161 0.083 20 ... SPO 1977 05 10 331.196 0.050 24 ... SPO 1977 05 11 331.224 0.065 24 ... SPO 1977 05 12 331.168 0.078 24 ... SPO 1977 05 13 331.171 0.054 20 ... SPO 1977 05 14 331.092 0.123 18 ... SPO 1977 05 15 331.201 0.062 23 ... SPO 1977 05 16 331.183 0.070 24 ... SPO 1977 05 17 331.022 0.075 24 ... SPO 1977 05 18 331.158 0.082 24 ... SPO 1977 05 19 331.131 0.031 22 ... SPO 1977 05 20 331.152 0.059 19 ... SPO 1977 05 21 331.216 0.071 24 ... SPO 1977 05 22 331.253 0.089 24 ... SPO 1977 05 23 331.100 0.044 22 ... SPO 1977 05 24 331.062 0.113 22 ... SPO 1977 05 25 331.141 0.110 24 ... SPO 1977 05 26 331.189 0.086 24 ... SPO 1977 05 27 331.156 0.096 23 ... SPO 1977 05 28 331.377 0.113 15 ... SPO 1977 05 29 -999.990 -99.990 0 *.. SPO 1977 05 30 -999.990 -99.990 0 *.. SPO 1977 05 31 -999.990 -99.990 0 *.. SPO 1977 06 01 -999.990 -99.990 0 *.. SPO 1977 06 02 -999.990 -99.990 0 *.. SPO 1977 06 03 -999.990 -99.990 0 *.. SPO 1977 06 04 -999.990 -99.990 0 *.. SPO 1977 06 05 -999.990 -99.990 0 *.. SPO 1977 06 06 -999.990 -99.990 0 *.. SPO 1977 06 07 331.488 0.115 18 ... SPO 1977 06 08 331.392 0.091 23 ... SPO 1977 06 09 331.338 0.094 21 ... SPO 1977 06 10 331.371 0.060 18 ... SPO 1977 06 11 331.393 0.149 23 ... SPO 1977 06 12 331.235 0.140 24 ... SPO 1977 06 13 331.307 0.095 23 ... SPO 1977 06 14 331.294 0.106 23 ... SPO 1977 06 15 331.340 0.116 24 ... SPO 1977 06 16 331.307 0.121 22 ... SPO 1977 06 17 331.325 0.114 19 ... SPO 1977 06 18 331.323 0.069 24 ... SPO 1977 06 19 331.275 0.068 24 ... SPO 1977 06 20 331.248 0.083 23 ... SPO 1977 06 21 331.271 0.105 22 ... SPO 1977 06 22 331.290 0.117 23 ... SPO 1977 06 23 331.388 0.195 20 ... SPO 1977 06 24 331.338 0.082 16 ... SPO 1977 06 25 331.300 0.090 19 ... SPO 1977 06 26 331.402 0.068 24 ... SPO 1977 06 27 331.510 0.152 23 ... SPO 1977 06 28 331.505 0.125 24 ... SPO 1977 06 29 331.491 0.108 24 ... SPO 1977 06 30 331.405 0.055 23 ... SPO 1977 07 01 331.481 0.085 19 ... SPO 1977 07 02 331.473 0.107 23 ... SPO 1977 07 03 331.549 0.151 24 ... SPO 1977 07 04 331.542 0.106 22 ... SPO 1977 07 05 331.557 0.220 19 ... SPO 1977 07 06 331.573 0.183 22 ... SPO 1977 07 07 331.515 0.094 22 ... SPO 1977 07 08 331.519 0.135 18 ... SPO 1977 07 09 331.557 0.077 22 ... SPO 1977 07 10 331.627 0.114 23 ... SPO 1977 07 11 331.639 0.135 23 ... SPO 1977 07 12 331.585 0.127 24 ... SPO 1977 07 13 331.698 0.114 24 ... SPO 1977 07 14 331.613 0.102 23 ... SPO 1977 07 15 331.563 0.068 19 ... SPO 1977 07 16 331.567 0.106 22 ... SPO 1977 07 17 331.636 0.060 23 ... SPO 1977 07 18 331.603 0.114 23 ... SPO 1977 07 19 331.625 0.079 21 ... SPO 1977 07 20 331.685 0.086 24 ... SPO 1977 07 21 331.615 0.060 23 ... SPO 1977 07 22 331.694 0.055 19 ... SPO 1977 07 23 331.592 0.104 24 ... SPO 1977 07 24 331.629 0.071 24 ... SPO 1977 07 25 331.705 0.069 24 ... SPO 1977 07 26 331.663 0.068 24 ... SPO 1977 07 27 331.849 0.072 23 ... SPO 1977 07 28 331.723 0.110 22 ... SPO 1977 07 29 331.705 0.079 19 ... SPO 1977 07 30 331.827 0.079 24 ... SPO 1977 07 31 331.784 0.084 24 ... SPO 1977 08 01 331.865 0.113 24 ... SPO 1977 08 02 331.860 0.074 24 ... SPO 1977 08 03 331.885 0.100 24 ... SPO 1977 08 04 331.889 0.095 23 ... SPO 1977 08 05 331.995 0.104 19 ... SPO 1977 08 06 331.912 0.095 24 ... SPO 1977 08 07 331.939 0.113 24 ... SPO 1977 08 08 331.951 0.115 24 ... SPO 1977 08 09 332.081 0.170 24 ... SPO 1977 08 10 331.993 0.156 22 ... SPO 1977 08 11 331.958 0.085 22 ... SPO 1977 08 12 331.875 0.099 19 ... SPO 1977 08 13 331.955 0.086 23 ... SPO 1977 08 14 331.950 0.084 24 ... SPO 1977 08 15 331.945 0.099 23 ... SPO 1977 08 16 331.978 0.134 24 ... SPO 1977 08 17 331.913 0.104 23 ... SPO 1977 08 18 331.942 0.094 23 ... SPO 1977 08 19 331.947 0.084 19 ... SPO 1977 08 20 331.995 0.092 24 ... SPO 1977 08 21 331.998 0.111 23 ... SPO 1977 08 22 331.968 0.066 24 ... SPO 1977 08 23 332.001 0.078 24 ... SPO 1977 08 24 332.104 0.098 24 ... SPO 1977 08 25 332.120 0.087 21 ... SPO 1977 08 26 332.032 0.102 15 ... SPO 1977 08 27 331.986 0.095 23 ... SPO 1977 08 28 332.017 0.102 24 ... SPO 1977 08 29 332.072 0.060 24 ... SPO 1977 08 30 332.100 0.086 23 ... SPO 1977 08 31 332.146 0.103 24 ... SPO 1977 09 01 332.146 0.079 21 ... SPO 1977 09 02 332.161 0.060 19 ... SPO 1977 09 03 332.145 0.077 24 ... SPO 1977 09 04 332.159 0.108 24 ... SPO 1977 09 05 332.212 0.096 24 ... SPO 1977 09 06 332.168 0.077 24 ... SPO 1977 09 07 332.241 0.075 24 ... SPO 1977 09 08 332.259 0.071 23 ... SPO 1977 09 09 332.274 0.064 19 ... SPO 1977 09 10 332.317 0.060 24 ... SPO 1977 09 11 332.323 0.057 24 ... SPO 1977 09 12 332.365 0.090 23 ... SPO 1977 09 13 332.348 0.093 24 ... SPO 1977 09 14 332.376 0.072 23 ... SPO 1977 09 15 332.392 0.056 23 ... SPO 1977 09 16 332.458 0.090 19 ... SPO 1977 09 17 332.458 0.057 24 ... SPO 1977 09 18 332.442 0.068 24 ... SPO 1977 09 19 332.422 0.107 24 ... SPO 1977 09 20 332.400 0.080 24 ... SPO 1977 09 21 332.483 0.093 23 ... SPO 1977 09 22 332.378 0.086 17 ... SPO 1977 09 23 332.326 0.109 19 ... SPO 1977 09 24 332.326 0.057 24 ... SPO 1977 09 25 332.337 0.073 24 ... SPO 1977 09 26 332.297 0.074 23 ... SPO 1977 09 27 332.338 0.080 24 ... SPO 1977 09 28 332.465 0.083 24 ... SPO 1977 09 29 332.450 0.129 23 ... SPO 1977 09 30 332.373 0.082 19 ... SPO 1977 10 01 332.409 0.063 24 ... SPO 1977 10 02 332.440 0.104 24 ... SPO 1977 10 03 332.518 0.068 24 ... SPO 1977 10 04 332.545 0.067 23 ... SPO 1977 10 05 332.662 0.145 24 ... SPO 1977 10 06 332.556 0.175 22 ... SPO 1977 10 07 332.369 0.123 14 ... SPO 1977 10 08 332.450 0.085 24 ... SPO 1977 10 09 332.469 0.073 24 ... SPO 1977 10 10 332.474 0.124 21 ... SPO 1977 10 11 332.579 0.127 19 ... SPO 1977 10 12 332.725 0.156 24 ... SPO 1977 10 13 332.778 0.184 20 ... SPO 1977 10 14 332.669 0.119 19 ... SPO 1977 10 15 332.795 0.060 24 ... SPO 1977 10 16 332.773 0.128 24 ... SPO 1977 10 17 332.649 0.110 24 ... SPO 1977 10 18 332.768 0.076 24 ... SPO 1977 10 19 332.787 0.108 21 ... SPO 1977 10 20 332.773 0.092 23 ... SPO 1977 10 21 332.689 0.092 13 ... SPO 1977 10 22 332.738 0.142 19 ... SPO 1977 10 23 332.685 0.138 22 ... SPO 1977 10 24 332.706 0.102 16 ... SPO 1977 10 25 332.650 0.074 23 ... SPO 1977 10 26 332.561 0.096 23 ... SPO 1977 10 27 332.623 0.067 23 ... SPO 1977 10 28 332.624 0.090 19 ... SPO 1977 10 29 332.726 0.051 23 ... SPO 1977 10 30 332.646 0.084 24 ... SPO 1977 10 31 332.594 0.047 17 ... SPO 1977 11 01 332.647 0.070 24 ... SPO 1977 11 02 332.649 0.094 24 ... SPO 1977 11 03 332.628 0.116 20 ... SPO 1977 11 04 332.569 0.120 18 ... SPO 1977 11 05 332.601 0.140 17 ... SPO 1977 11 06 332.658 0.139 20 ... SPO 1977 11 07 332.772 0.112 20 ... SPO 1977 11 08 332.677 0.079 21 ... SPO 1977 11 09 332.735 0.079 22 ... SPO 1977 11 10 332.708 0.086 22 ... SPO 1977 11 11 332.763 0.084 15 ... SPO 1977 11 12 332.692 0.057 22 ... SPO 1977 11 13 332.667 0.096 20 ... SPO 1977 11 14 332.686 0.097 16 ... SPO 1977 11 15 332.608 0.110 22 ... SPO 1977 11 16 332.626 0.105 14 ... SPO 1977 11 17 332.701 0.098 17 ... SPO 1977 11 18 332.546 0.127 19 ... SPO 1977 11 19 332.574 0.138 23 ... SPO 1977 11 20 332.572 0.122 17 ... SPO 1977 11 21 332.503 0.159 19 ... SPO 1977 11 22 332.542 0.115 21 ... SPO 1977 11 23 332.589 0.143 21 ... SPO 1977 11 24 332.469 0.119 7 ... SPO 1977 11 25 332.435 0.139 19 ... SPO 1977 11 26 332.475 0.082 19 ... SPO 1977 11 27 332.437 0.133 21 ... SPO 1977 11 28 332.417 0.149 23 ... SPO 1977 11 29 332.432 0.101 13 ... SPO 1977 11 30 332.471 0.166 22 ... SPO 1977 12 01 332.364 0.111 20 ... SPO 1977 12 02 332.441 0.131 21 ... SPO 1977 12 03 332.387 0.098 21 ... SPO 1977 12 04 332.368 0.081 24 ... SPO 1977 12 05 332.422 0.132 23 ... SPO 1977 12 06 332.417 0.155 17 ... SPO 1977 12 07 332.378 0.079 22 ... SPO 1977 12 08 332.436 0.082 22 ... SPO 1977 12 09 332.355 0.057 17 ... SPO 1977 12 10 332.412 0.080 21 ... SPO 1977 12 11 332.427 0.062 23 ... SPO 1977 12 12 332.375 0.064 22 ... SPO 1977 12 13 332.365 0.126 24 ... SPO 1977 12 14 332.348 0.146 19 ... SPO 1977 12 15 332.302 0.113 21 ... SPO 1977 12 16 332.271 0.120 17 ... SPO 1977 12 17 332.261 0.081 17 ... SPO 1977 12 18 332.295 0.084 22 ... SPO 1977 12 19 332.277 0.124 21 ... SPO 1977 12 20 332.248 0.124 23 ... SPO 1977 12 21 332.317 0.177 23 ... SPO 1977 12 22 332.333 0.164 22 ... SPO 1977 12 23 332.145 0.197 19 ... SPO 1977 12 24 332.169 0.148 17 ... SPO 1977 12 25 332.213 0.136 23 ... SPO 1977 12 26 332.222 0.104 20 ... SPO 1977 12 27 332.160 0.090 23 ... SPO 1977 12 28 332.176 0.083 23 ... SPO 1977 12 29 332.205 0.105 24 ... SPO 1977 12 30 332.133 0.062 12 ... SPO 1977 12 31 332.150 0.087 21 ... SPO 1978 01 01 332.128 0.106 24 ... SPO 1978 01 02 332.121 0.073 24 ... SPO 1978 01 03 332.125 0.066 19 ... SPO 1978 01 04 332.140 0.111 23 ... SPO 1978 01 05 332.141 0.072 24 ... SPO 1978 01 06 332.059 0.098 22 ... SPO 1978 01 07 332.096 0.157 22 ... SPO 1978 01 08 332.162 0.087 20 ... SPO 1978 01 09 332.073 0.149 21 ... SPO 1978 01 10 332.199 0.124 14 ... SPO 1978 01 11 332.057 0.115 20 ... SPO 1978 01 12 332.062 0.134 18 ... SPO 1978 01 13 332.094 0.113 21 ... SPO 1978 01 14 332.093 0.195 16 ... SPO 1978 01 15 331.973 0.115 20 ... SPO 1978 01 16 332.059 0.128 22 ... SPO 1978 01 17 332.067 0.105 22 ... SPO 1978 01 18 332.119 0.084 23 ... SPO 1978 01 19 332.062 0.148 19 ... SPO 1978 01 20 331.963 0.135 13 ... SPO 1978 01 21 331.892 0.102 23 ... SPO 1978 01 22 332.065 0.112 24 ... SPO 1978 01 23 332.014 0.117 23 ... SPO 1978 01 24 331.935 0.153 22 ... SPO 1978 01 25 332.080 0.136 22 ... SPO 1978 01 26 332.003 0.093 17 ... SPO 1978 01 27 332.031 0.065 19 ... SPO 1978 01 28 332.042 0.131 24 ... SPO 1978 01 29 331.969 0.098 15 ... SPO 1978 01 30 331.989 0.128 21 ... SPO 1978 01 31 332.001 0.164 14 ... SPO 1978 02 01 332.004 0.130 16 ... SPO 1978 02 02 331.974 0.163 22 ... SPO 1978 02 03 332.054 0.117 17 ... SPO 1978 02 04 332.077 0.120 15 ... SPO 1978 02 05 331.986 0.136 22 ... SPO 1978 02 06 331.984 0.138 22 ... SPO 1978 02 07 331.953 0.081 24 ... SPO 1978 02 08 332.003 0.115 24 ... SPO 1978 02 09 331.947 0.116 17 ... SPO 1978 02 10 331.783 0.158 20 ... SPO 1978 02 11 332.022 0.093 18 ... SPO 1978 02 12 331.910 0.110 21 ... SPO 1978 02 13 331.706 0.149 21 ... SPO 1978 02 14 331.875 0.110 22 ... SPO 1978 02 15 331.954 0.115 18 ... SPO 1978 02 16 331.913 0.123 19 ... SPO 1978 02 17 331.836 0.107 18 ... SPO 1978 02 18 331.832 0.117 22 ... SPO 1978 02 19 331.882 0.150 19 ... SPO 1978 02 20 331.900 0.108 21 ... SPO 1978 02 21 332.011 0.145 19 ... SPO 1978 02 22 331.930 0.090 20 ... SPO 1978 02 23 331.877 0.167 23 ... SPO 1978 02 24 331.839 0.134 21 ... SPO 1978 02 25 331.865 0.113 15 ... SPO 1978 02 26 331.848 0.133 21 ... SPO 1978 02 27 331.917 0.147 20 ... SPO 1978 02 28 331.928 0.148 22 ... SPO 1978 03 01 331.855 0.139 23 ... SPO 1978 03 02 331.670 0.132 21 ... SPO 1978 03 03 331.749 0.116 17 ... SPO 1978 03 04 331.825 0.114 20 ... SPO 1978 03 05 331.821 0.096 23 ... SPO 1978 03 06 331.879 0.163 21 ... SPO 1978 03 07 331.815 0.163 24 ... SPO 1978 03 08 331.925 0.128 20 ... SPO 1978 03 09 331.935 0.089 24 ... SPO 1978 03 10 331.864 0.104 24 ... SPO 1978 03 11 331.835 0.101 23 ... SPO 1978 03 12 331.756 0.167 17 ... SPO 1978 03 13 331.851 0.113 19 ... SPO 1978 03 14 331.934 0.120 24 ... SPO 1978 03 15 331.914 0.125 22 ... SPO 1978 03 16 332.227 0.064 11 ... SPO 1978 03 17 331.955 0.115 21 ... SPO 1978 03 18 331.998 0.152 23 ... SPO 1978 03 19 332.066 0.068 19 ... SPO 1978 03 20 332.051 0.077 24 ... SPO 1978 03 21 332.060 0.086 24 ... SPO 1978 03 22 332.020 0.117 22 ... SPO 1978 03 23 332.016 0.111 23 ... SPO 1978 03 24 332.019 0.102 17 ... SPO 1978 03 25 332.053 0.102 24 ... SPO 1978 03 26 332.026 0.158 21 ... SPO 1978 03 27 332.056 0.182 17 ... SPO 1978 03 28 331.950 0.068 24 ... SPO 1978 03 29 331.970 0.070 22 ... SPO 1978 03 30 332.031 0.052 24 ... SPO 1978 03 31 331.975 0.112 22 ... SPO 1978 04 01 332.032 0.098 22 ... SPO 1978 04 02 332.041 0.112 22 ... SPO 1978 04 03 332.122 0.091 23 ... SPO 1978 04 04 332.163 0.090 24 ... SPO 1978 04 05 332.152 0.070 24 ... SPO 1978 04 06 332.174 0.074 24 ... SPO 1978 04 07 332.213 0.109 15 ... SPO 1978 04 08 332.126 0.131 23 ... SPO 1978 04 09 332.188 0.116 21 ... SPO 1978 04 10 332.179 0.117 22 ... SPO 1978 04 11 332.209 0.067 24 ... SPO 1978 04 12 332.155 0.131 22 ... SPO 1978 04 13 332.221 0.105 19 ... SPO 1978 04 14 332.238 0.062 12 ... SPO 1978 04 15 332.268 0.099 20 ... SPO 1978 04 16 332.250 0.107 24 ... SPO 1978 04 17 332.302 0.112 23 ... SPO 1978 04 18 332.324 0.089 24 ... SPO 1978 04 19 332.413 0.078 22 ... SPO 1978 04 20 332.410 0.055 23 ... SPO 1978 04 21 332.372 0.113 17 ... SPO 1978 04 22 332.372 0.088 24 ... SPO 1978 04 23 332.379 0.082 21 ... SPO 1978 04 24 332.416 0.116 23 ... SPO 1978 04 25 332.438 0.074 24 ... SPO 1978 04 26 332.500 0.091 22 ... SPO 1978 04 27 332.561 0.110 17 ... SPO 1978 04 28 332.517 0.069 23 ... SPO 1978 04 29 332.651 0.075 17 ... SPO 1978 04 30 332.629 0.086 24 ... SPO 1978 05 01 332.522 0.111 23 ... SPO 1978 05 02 332.583 0.098 23 ... SPO 1978 05 03 332.623 0.115 24 ... SPO 1978 05 04 332.687 0.096 23 ... SPO 1978 05 05 332.704 0.086 18 ... SPO 1978 05 06 332.768 0.070 24 ... SPO 1978 05 07 332.686 0.107 5 ... SPO 1978 05 08 332.726 0.100 24 ... SPO 1978 05 09 332.758 0.090 24 ... SPO 1978 05 10 332.727 0.094 24 ... SPO 1978 05 11 332.805 0.175 22 ... SPO 1978 05 12 332.783 0.090 23 ... SPO 1978 05 13 332.873 0.074 18 ... SPO 1978 05 14 332.812 0.077 24 ... SPO 1978 05 15 332.828 0.086 23 ... SPO 1978 05 16 332.884 0.139 22 ... SPO 1978 05 17 332.863 0.125 23 ... SPO 1978 05 18 332.773 0.121 10 ... SPO 1978 05 19 332.839 0.090 19 ... SPO 1978 05 20 332.860 0.107 24 ... SPO 1978 05 21 332.952 0.085 24 ... SPO 1978 05 22 332.993 0.112 21 ... SPO 1978 05 23 332.994 0.102 23 ... SPO 1978 05 24 333.010 0.123 24 ... SPO 1978 05 25 332.994 0.125 23 ... SPO 1978 05 26 332.977 0.097 22 ... SPO 1978 05 27 332.959 0.114 22 ... SPO 1978 05 28 333.027 0.117 22 ... SPO 1978 05 29 333.073 0.118 22 ... SPO 1978 05 30 333.081 0.114 15 ... SPO 1978 05 31 333.098 0.102 23 ... SPO 1978 06 01 333.049 0.119 23 ... SPO 1978 06 02 333.205 0.143 17 ... SPO 1978 06 03 333.144 0.146 20 ... SPO 1978 06 04 333.205 0.078 24 ... SPO 1978 06 05 333.207 0.090 23 ... SPO 1978 06 06 333.284 0.108 24 ... SPO 1978 06 07 333.274 0.171 18 ... SPO 1978 06 08 333.454 0.121 22 ... SPO 1978 06 09 333.553 0.103 23 ... SPO 1978 06 10 333.374 0.163 16 ... SPO 1978 06 11 333.361 0.089 21 ... SPO 1978 06 12 333.337 0.090 23 ... SPO 1978 06 13 333.372 0.096 24 ... SPO 1978 06 14 333.392 0.088 24 ... SPO 1978 06 15 333.498 0.113 21 ... SPO 1978 06 16 333.427 0.103 18 ... SPO 1978 06 17 333.477 0.095 23 ... SPO 1978 06 18 333.440 0.132 20 ... SPO 1978 06 19 333.483 0.095 20 ... SPO 1978 06 20 333.509 0.087 22 ... SPO 1978 06 21 333.464 0.116 24 ... SPO 1978 06 22 333.456 0.120 23 ... SPO 1978 06 23 333.423 0.116 23 ... SPO 1978 06 24 333.506 0.122 18 ... SPO 1978 06 25 333.472 0.082 24 ... SPO 1978 06 26 333.524 0.132 24 ... SPO 1978 06 27 333.535 0.120 22 ... SPO 1978 06 28 333.604 0.127 22 ... SPO 1978 06 29 333.637 0.095 21 ... SPO 1978 06 30 333.664 0.101 19 ... SPO 1978 07 01 333.648 0.114 23 ... SPO 1978 07 02 333.619 0.077 23 ... SPO 1978 07 03 333.636 0.087 21 ... SPO 1978 07 04 333.657 0.097 24 ... SPO 1978 07 05 333.698 0.088 23 ... SPO 1978 07 06 333.719 0.108 23 ... SPO 1978 07 07 333.743 0.085 23 ... SPO 1978 07 08 333.707 0.102 19 ... SPO 1978 07 09 333.700 0.134 24 ... SPO 1978 07 10 333.709 0.171 21 ... SPO 1978 07 11 333.815 0.141 21 ... SPO 1978 07 12 333.822 0.134 23 ... SPO 1978 07 13 333.883 0.101 21 ... SPO 1978 07 14 333.853 0.107 14 ... SPO 1978 07 15 333.796 0.142 22 ... SPO 1978 07 16 333.709 0.160 17 ... SPO 1978 07 17 333.825 0.120 23 ... SPO 1978 07 18 333.792 0.147 23 ... SPO 1978 07 19 333.795 0.091 22 ... SPO 1978 07 20 333.825 0.119 22 ... SPO 1978 07 21 333.857 0.115 20 ... SPO 1978 07 22 333.813 0.094 19 ... SPO 1978 07 23 333.823 0.129 20 ... SPO 1978 07 24 333.918 0.165 23 ... SPO 1978 07 25 333.889 0.097 24 ... SPO 1978 07 26 333.946 0.159 21 ... SPO 1978 07 27 334.005 0.110 16 ... SPO 1978 07 28 333.946 0.118 14 ... SPO 1978 07 29 333.915 0.149 21 ... SPO 1978 07 30 334.073 0.097 23 ... SPO 1978 07 31 334.055 0.125 23 ... SPO 1978 08 01 334.100 0.131 22 ... SPO 1978 08 02 334.169 0.124 19 ... SPO 1978 08 03 334.158 0.133 19 ... SPO 1978 08 04 334.158 0.106 19 ... SPO 1978 08 05 334.501 0.109 9 ... SPO 1978 08 06 334.419 0.173 19 ... SPO 1978 08 07 334.402 0.170 17 ... SPO 1978 08 08 334.300 0.187 24 ... SPO 1978 08 09 334.306 0.115 23 ... SPO 1978 08 10 334.161 0.122 22 ... SPO 1978 08 11 334.138 0.136 19 ... SPO 1978 08 12 334.312 0.132 19 ... SPO 1978 08 13 334.275 0.177 23 ... SPO 1978 08 14 334.202 0.126 22 ... SPO 1978 08 15 334.373 0.235 22 ... SPO 1978 08 16 334.441 0.175 18 ... SPO 1978 08 17 334.492 0.206 5 ... SPO 1978 08 18 334.287 0.170 13 ... SPO 1978 08 19 334.159 0.125 16 ... SPO 1978 08 20 334.243 0.136 22 ... SPO 1978 08 21 334.240 0.156 18 ... SPO 1978 08 22 334.354 0.212 14 ... SPO 1978 08 23 334.706 0.137 14 ... SPO 1978 08 24 334.627 0.132 18 ... SPO 1978 08 25 334.777 0.134 13 ... SPO 1978 08 26 334.586 0.183 14 ... SPO 1978 08 27 334.609 0.163 18 ... SPO 1978 08 28 334.692 0.141 9 ... SPO 1978 08 29 334.670 0.112 7 ... SPO 1978 08 30 334.825 0.088 11 ... SPO 1978 08 31 334.680 0.000 1 ... SPO 1978 09 01 334.834 0.160 18 ... SPO 1978 09 02 334.896 0.184 18 ... SPO 1978 09 03 334.789 0.188 19 ... SPO 1978 09 04 334.801 0.190 21 ... SPO 1978 09 05 334.665 0.177 22 ... SPO 1978 09 06 334.703 0.113 19 ... SPO 1978 09 07 334.667 0.127 20 ... SPO 1978 09 08 334.733 0.104 20 ... SPO 1978 09 09 334.608 0.173 24 ... SPO 1978 09 10 334.623 0.073 23 ... SPO 1978 09 11 334.718 0.118 24 ... SPO 1978 09 12 334.681 0.105 24 ... SPO 1978 09 13 334.673 0.127 24 ... SPO 1978 09 14 334.734 0.121 24 ... SPO 1978 09 15 334.718 0.112 21 ... SPO 1978 09 16 334.628 0.119 16 ... SPO 1978 09 17 334.634 0.097 21 ... SPO 1978 09 18 334.622 0.092 24 ... SPO 1978 09 19 334.609 0.071 23 ... SPO 1978 09 20 334.700 0.151 22 ... SPO 1978 09 21 334.647 0.110 23 ... SPO 1978 09 22 334.677 0.121 18 ... SPO 1978 09 23 334.687 0.156 20 ... SPO 1978 09 24 334.614 0.112 23 ... SPO 1978 09 25 334.675 0.131 23 ... SPO 1978 09 26 334.755 0.111 23 ... SPO 1978 09 27 334.720 0.093 24 ... SPO 1978 09 28 334.705 0.099 24 ... SPO 1978 09 29 334.717 0.188 16 ... SPO 1978 09 30 334.638 0.084 21 ... SPO 1978 10 01 334.729 0.150 21 ... SPO 1978 10 02 334.680 0.060 23 ... SPO 1978 10 03 334.755 0.102 23 ... SPO 1978 10 04 334.685 0.179 20 ... SPO 1978 10 05 334.666 0.122 21 ... SPO 1978 10 06 334.765 0.119 17 ... SPO 1978 10 07 334.820 0.117 22 ... SPO 1978 10 08 334.628 0.092 23 ... SPO 1978 10 09 334.641 0.093 22 ... SPO 1978 10 10 334.791 0.119 24 ... SPO 1978 10 11 334.839 0.124 20 ... SPO 1978 10 12 334.772 0.137 24 ... SPO 1978 10 13 334.773 0.093 18 ... SPO 1978 10 14 334.832 0.119 20 ... SPO 1978 10 15 334.763 0.118 21 ... SPO 1978 10 16 334.734 0.096 24 ... SPO 1978 10 17 334.794 0.108 22 ... SPO 1978 10 18 334.717 0.129 21 ... SPO 1978 10 19 334.714 0.102 16 ... SPO 1978 10 20 334.695 0.122 19 ... SPO 1978 10 21 334.663 0.131 23 ... SPO 1978 10 22 334.733 0.118 19 ... SPO 1978 10 23 334.645 0.112 20 ... SPO 1978 10 24 334.594 0.135 22 ... SPO 1978 10 25 334.600 0.105 22 ... SPO 1978 10 26 334.563 0.120 22 ... SPO 1978 10 27 334.562 0.133 20 ... SPO 1978 10 28 334.613 0.135 19 ... SPO 1978 10 29 334.780 0.117 23 ... SPO 1978 10 30 334.637 0.083 21 ... SPO 1978 10 31 334.589 0.125 23 ... SPO 1978 11 01 334.654 0.100 23 ... SPO 1978 11 02 334.619 0.111 23 ... SPO 1978 11 03 334.588 0.144 19 ... SPO 1978 11 04 334.542 0.087 21 ... SPO 1978 11 05 334.506 0.088 19 ... SPO 1978 11 06 334.497 0.103 21 ... SPO 1978 11 07 334.445 0.096 21 ... SPO 1978 11 08 334.410 0.126 15 ... SPO 1978 11 09 334.544 0.176 21 ... SPO 1978 11 10 334.628 0.110 21 ... SPO 1978 11 11 334.645 0.133 22 ... SPO 1978 11 12 334.591 0.112 19 ... SPO 1978 11 13 334.573 0.092 24 ... SPO 1978 11 14 334.485 0.108 23 ... SPO 1978 11 15 334.438 0.128 23 ... SPO 1978 11 16 334.538 0.139 24 ... SPO 1978 11 17 334.490 0.134 22 ... SPO 1978 11 18 334.423 0.083 24 ... SPO 1978 11 19 334.481 0.060 7 ... SPO 1978 11 20 -999.990 -99.990 0 *.. SPO 1978 11 21 -999.990 -99.990 0 *.. SPO 1978 11 22 -999.990 -99.990 0 *.. SPO 1978 11 23 -999.990 -99.990 0 *.. SPO 1978 11 24 -999.990 -99.990 0 *.. SPO 1978 11 25 -999.990 -99.990 0 *.. SPO 1978 11 26 -999.990 -99.990 0 *.. SPO 1978 11 27 -999.990 -99.990 0 *.. SPO 1978 11 28 -999.990 -99.990 0 *.. SPO 1978 11 29 -999.990 -99.990 0 *.. SPO 1978 11 30 -999.990 -99.990 0 *.. SPO 1978 12 01 -999.990 -99.990 0 *.. SPO 1978 12 02 -999.990 -99.990 0 *.. SPO 1978 12 03 -999.990 -99.990 0 *.. SPO 1978 12 04 -999.990 -99.990 0 *.. SPO 1978 12 05 -999.990 -99.990 0 *.. SPO 1978 12 06 -999.990 -99.990 0 *.. SPO 1978 12 07 -999.990 -99.990 0 *.. SPO 1978 12 08 -999.990 -99.990 0 *.. SPO 1978 12 09 -999.990 -99.990 0 *.. SPO 1978 12 10 -999.990 -99.990 0 *.. SPO 1978 12 11 -999.990 -99.990 0 *.. SPO 1978 12 12 -999.990 -99.990 0 *.. SPO 1978 12 13 -999.990 -99.990 0 *.. SPO 1978 12 14 -999.990 -99.990 0 *.. SPO 1978 12 15 -999.990 -99.990 0 *.. SPO 1978 12 16 -999.990 -99.990 0 *.. SPO 1978 12 17 -999.990 -99.990 0 *.. SPO 1978 12 18 -999.990 -99.990 0 *.. SPO 1978 12 19 -999.990 -99.990 0 *.. SPO 1978 12 20 -999.990 -99.990 0 *.. SPO 1978 12 21 -999.990 -99.990 0 *.. SPO 1978 12 22 -999.990 -99.990 0 *.. SPO 1978 12 23 -999.990 -99.990 0 *.. SPO 1978 12 24 -999.990 -99.990 0 *.. SPO 1978 12 25 -999.990 -99.990 0 *.. SPO 1978 12 26 -999.990 -99.990 0 *.. SPO 1978 12 27 -999.990 -99.990 0 *.. SPO 1978 12 28 -999.990 -99.990 0 *.. SPO 1978 12 29 -999.990 -99.990 0 *.. SPO 1978 12 30 -999.990 -99.990 0 *.. SPO 1978 12 31 -999.990 -99.990 0 *.. SPO 1979 01 01 -999.990 -99.990 0 *.. SPO 1979 01 02 -999.990 -99.990 0 *.. SPO 1979 01 03 -999.990 -99.990 0 *.. SPO 1979 01 04 -999.990 -99.990 0 *.. SPO 1979 01 05 -999.990 -99.990 0 *.. SPO 1979 01 06 -999.990 -99.990 0 *.. SPO 1979 01 07 -999.990 -99.990 0 *.. SPO 1979 01 08 -999.990 -99.990 0 *.. SPO 1979 01 09 -999.990 -99.990 0 *.. SPO 1979 01 10 -999.990 -99.990 0 *.. SPO 1979 01 11 -999.990 -99.990 0 *.. SPO 1979 01 12 -999.990 -99.990 0 *.. SPO 1979 01 13 -999.990 -99.990 0 *.. SPO 1979 01 14 -999.990 -99.990 0 *.. SPO 1979 01 15 -999.990 -99.990 0 *.. SPO 1979 01 16 -999.990 -99.990 0 *.. SPO 1979 01 17 -999.990 -99.990 0 *.. SPO 1979 01 18 -999.990 -99.990 0 *.. SPO 1979 01 19 -999.990 -99.990 0 *.. SPO 1979 01 20 -999.990 -99.990 0 *.. SPO 1979 01 21 -999.990 -99.990 0 *.. SPO 1979 01 22 -999.990 -99.990 0 *.. SPO 1979 01 23 -999.990 -99.990 0 *.. SPO 1979 01 24 -999.990 -99.990 0 *.. SPO 1979 01 25 -999.990 -99.990 0 *.. SPO 1979 01 26 -999.990 -99.990 0 *.. SPO 1979 01 27 -999.990 -99.990 0 *.. SPO 1979 01 28 -999.990 -99.990 0 *.. SPO 1979 01 29 -999.990 -99.990 0 *.. SPO 1979 01 30 -999.990 -99.990 0 *.. SPO 1979 01 31 -999.990 -99.990 0 *.. SPO 1979 02 01 -999.990 -99.990 0 *.. SPO 1979 02 02 -999.990 -99.990 0 *.. SPO 1979 02 03 -999.990 -99.990 0 *.. SPO 1979 02 04 -999.990 -99.990 0 *.. SPO 1979 02 05 -999.990 -99.990 0 *.. SPO 1979 02 06 -999.990 -99.990 0 *.. SPO 1979 02 07 -999.990 -99.990 0 *.. SPO 1979 02 08 -999.990 -99.990 0 *.. SPO 1979 02 09 -999.990 -99.990 0 *.. SPO 1979 02 10 -999.990 -99.990 0 *.. SPO 1979 02 11 -999.990 -99.990 0 *.. SPO 1979 02 12 -999.990 -99.990 0 *.. SPO 1979 02 13 -999.990 -99.990 0 *.. SPO 1979 02 14 -999.990 -99.990 0 *.. SPO 1979 02 15 -999.990 -99.990 0 *.. SPO 1979 02 16 -999.990 -99.990 0 *.. SPO 1979 02 17 -999.990 -99.990 0 *.. SPO 1979 02 18 -999.990 -99.990 0 *.. SPO 1979 02 19 -999.990 -99.990 0 *.. SPO 1979 02 20 -999.990 -99.990 0 *.. SPO 1979 02 21 -999.990 -99.990 0 *.. SPO 1979 02 22 -999.990 -99.990 0 *.. SPO 1979 02 23 -999.990 -99.990 0 *.. SPO 1979 02 24 -999.990 -99.990 0 *.. SPO 1979 02 25 -999.990 -99.990 0 *.. SPO 1979 02 26 -999.990 -99.990 0 *.. SPO 1979 02 27 -999.990 -99.990 0 *.. SPO 1979 02 28 -999.990 -99.990 0 *.. SPO 1979 03 01 -999.990 -99.990 0 *.. SPO 1979 03 02 -999.990 -99.990 0 *.. SPO 1979 03 03 -999.990 -99.990 0 *.. SPO 1979 03 04 -999.990 -99.990 0 *.. SPO 1979 03 05 -999.990 -99.990 0 *.. SPO 1979 03 06 -999.990 -99.990 0 *.. SPO 1979 03 07 -999.990 -99.990 0 *.. SPO 1979 03 08 -999.990 -99.990 0 *.. SPO 1979 03 09 -999.990 -99.990 0 *.. SPO 1979 03 10 -999.990 -99.990 0 *.. SPO 1979 03 11 -999.990 -99.990 0 *.. SPO 1979 03 12 -999.990 -99.990 0 *.. SPO 1979 03 13 -999.990 -99.990 0 *.. SPO 1979 03 14 -999.990 -99.990 0 *.. SPO 1979 03 15 -999.990 -99.990 0 *.. SPO 1979 03 16 -999.990 -99.990 0 *.. SPO 1979 03 17 -999.990 -99.990 0 *.. SPO 1979 03 18 -999.990 -99.990 0 *.. SPO 1979 03 19 -999.990 -99.990 0 *.. SPO 1979 03 20 -999.990 -99.990 0 *.. SPO 1979 03 21 -999.990 -99.990 0 *.. SPO 1979 03 22 -999.990 -99.990 0 *.. SPO 1979 03 23 -999.990 -99.990 0 *.. SPO 1979 03 24 -999.990 -99.990 0 *.. SPO 1979 03 25 -999.990 -99.990 0 *.. SPO 1979 03 26 -999.990 -99.990 0 *.. SPO 1979 03 27 -999.990 -99.990 0 *.. SPO 1979 03 28 -999.990 -99.990 0 *.. SPO 1979 03 29 -999.990 -99.990 0 *.. SPO 1979 03 30 -999.990 -99.990 0 *.. SPO 1979 03 31 -999.990 -99.990 0 *.. SPO 1979 04 01 -999.990 -99.990 0 *.. SPO 1979 04 02 -999.990 -99.990 0 *.. SPO 1979 04 03 -999.990 -99.990 0 *.. SPO 1979 04 04 -999.990 -99.990 0 *.. SPO 1979 04 05 -999.990 -99.990 0 *.. SPO 1979 04 06 -999.990 -99.990 0 *.. SPO 1979 04 07 -999.990 -99.990 0 *.. SPO 1979 04 08 -999.990 -99.990 0 *.. SPO 1979 04 09 -999.990 -99.990 0 *.. SPO 1979 04 10 -999.990 -99.990 0 *.. SPO 1979 04 11 -999.990 -99.990 0 *.. SPO 1979 04 12 -999.990 -99.990 0 *.. SPO 1979 04 13 -999.990 -99.990 0 *.. SPO 1979 04 14 -999.990 -99.990 0 *.. SPO 1979 04 15 -999.990 -99.990 0 *.. SPO 1979 04 16 -999.990 -99.990 0 *.. SPO 1979 04 17 -999.990 -99.990 0 *.. SPO 1979 04 18 -999.990 -99.990 0 *.. SPO 1979 04 19 -999.990 -99.990 0 *.. SPO 1979 04 20 -999.990 -99.990 0 *.. SPO 1979 04 21 -999.990 -99.990 0 *.. SPO 1979 04 22 -999.990 -99.990 0 *.. SPO 1979 04 23 -999.990 -99.990 0 *.. SPO 1979 04 24 -999.990 -99.990 0 *.. SPO 1979 04 25 -999.990 -99.990 0 *.. SPO 1979 04 26 -999.990 -99.990 0 *.. SPO 1979 04 27 -999.990 -99.990 0 *.. SPO 1979 04 28 -999.990 -99.990 0 *.. SPO 1979 04 29 -999.990 -99.990 0 *.. SPO 1979 04 30 -999.990 -99.990 0 *.. SPO 1979 05 01 -999.990 -99.990 0 *.. SPO 1979 05 02 -999.990 -99.990 0 *.. SPO 1979 05 03 -999.990 -99.990 0 *.. SPO 1979 05 04 -999.990 -99.990 0 *.. SPO 1979 05 05 -999.990 -99.990 0 *.. SPO 1979 05 06 -999.990 -99.990 0 *.. SPO 1979 05 07 -999.990 -99.990 0 *.. SPO 1979 05 08 -999.990 -99.990 0 *.. SPO 1979 05 09 -999.990 -99.990 0 *.. SPO 1979 05 10 -999.990 -99.990 0 *.. SPO 1979 05 11 -999.990 -99.990 0 *.. SPO 1979 05 12 -999.990 -99.990 0 *.. SPO 1979 05 13 -999.990 -99.990 0 *.. SPO 1979 05 14 -999.990 -99.990 0 *.. SPO 1979 05 15 -999.990 -99.990 0 *.. SPO 1979 05 16 -999.990 -99.990 0 *.. SPO 1979 05 17 -999.990 -99.990 0 *.. SPO 1979 05 18 -999.990 -99.990 0 *.. SPO 1979 05 19 -999.990 -99.990 0 *.. SPO 1979 05 20 -999.990 -99.990 0 *.. SPO 1979 05 21 -999.990 -99.990 0 *.. SPO 1979 05 22 -999.990 -99.990 0 *.. SPO 1979 05 23 -999.990 -99.990 0 *.. SPO 1979 05 24 -999.990 -99.990 0 *.. SPO 1979 05 25 -999.990 -99.990 0 *.. SPO 1979 05 26 -999.990 -99.990 0 *.. SPO 1979 05 27 -999.990 -99.990 0 *.. SPO 1979 05 28 -999.990 -99.990 0 *.. SPO 1979 05 29 -999.990 -99.990 0 *.. SPO 1979 05 30 -999.990 -99.990 0 *.. SPO 1979 05 31 -999.990 -99.990 0 *.. SPO 1979 06 01 -999.990 -99.990 0 *.. SPO 1979 06 02 -999.990 -99.990 0 *.. SPO 1979 06 03 -999.990 -99.990 0 *.. SPO 1979 06 04 -999.990 -99.990 0 *.. SPO 1979 06 05 -999.990 -99.990 0 *.. SPO 1979 06 06 -999.990 -99.990 0 *.. SPO 1979 06 07 -999.990 -99.990 0 *.. SPO 1979 06 08 -999.990 -99.990 0 *.. SPO 1979 06 09 -999.990 -99.990 0 *.. SPO 1979 06 10 -999.990 -99.990 0 *.. SPO 1979 06 11 -999.990 -99.990 0 *.. SPO 1979 06 12 -999.990 -99.990 0 *.. SPO 1979 06 13 -999.990 -99.990 0 *.. SPO 1979 06 14 -999.990 -99.990 0 *.. SPO 1979 06 15 -999.990 -99.990 0 *.. SPO 1979 06 16 -999.990 -99.990 0 *.. SPO 1979 06 17 -999.990 -99.990 0 *.. SPO 1979 06 18 -999.990 -99.990 0 *.. SPO 1979 06 19 -999.990 -99.990 0 *.. SPO 1979 06 20 -999.990 -99.990 0 *.. SPO 1979 06 21 -999.990 -99.990 0 *.. SPO 1979 06 22 -999.990 -99.990 0 *.. SPO 1979 06 23 -999.990 -99.990 0 *.. SPO 1979 06 24 -999.990 -99.990 0 *.. SPO 1979 06 25 -999.990 -99.990 0 *.. SPO 1979 06 26 -999.990 -99.990 0 *.. SPO 1979 06 27 -999.990 -99.990 0 *.. SPO 1979 06 28 -999.990 -99.990 0 *.. SPO 1979 06 29 -999.990 -99.990 0 *.. SPO 1979 06 30 -999.990 -99.990 0 *.. SPO 1979 07 01 -999.990 -99.990 0 *.. SPO 1979 07 02 -999.990 -99.990 0 *.. SPO 1979 07 03 -999.990 -99.990 0 *.. SPO 1979 07 04 -999.990 -99.990 0 *.. SPO 1979 07 05 -999.990 -99.990 0 *.. SPO 1979 07 06 -999.990 -99.990 0 *.. SPO 1979 07 07 -999.990 -99.990 0 *.. SPO 1979 07 08 -999.990 -99.990 0 *.. SPO 1979 07 09 -999.990 -99.990 0 *.. SPO 1979 07 10 -999.990 -99.990 0 *.. SPO 1979 07 11 -999.990 -99.990 0 *.. SPO 1979 07 12 -999.990 -99.990 0 *.. SPO 1979 07 13 -999.990 -99.990 0 *.. SPO 1979 07 14 -999.990 -99.990 0 *.. SPO 1979 07 15 -999.990 -99.990 0 *.. SPO 1979 07 16 -999.990 -99.990 0 *.. SPO 1979 07 17 -999.990 -99.990 0 *.. SPO 1979 07 18 -999.990 -99.990 0 *.. SPO 1979 07 19 -999.990 -99.990 0 *.. SPO 1979 07 20 -999.990 -99.990 0 *.. SPO 1979 07 21 -999.990 -99.990 0 *.. SPO 1979 07 22 -999.990 -99.990 0 *.. SPO 1979 07 23 -999.990 -99.990 0 *.. SPO 1979 07 24 -999.990 -99.990 0 *.. SPO 1979 07 25 -999.990 -99.990 0 *.. SPO 1979 07 26 -999.990 -99.990 0 *.. SPO 1979 07 27 -999.990 -99.990 0 *.. SPO 1979 07 28 -999.990 -99.990 0 *.. SPO 1979 07 29 -999.990 -99.990 0 *.. SPO 1979 07 30 -999.990 -99.990 0 *.. SPO 1979 07 31 -999.990 -99.990 0 *.. SPO 1979 08 01 -999.990 -99.990 0 *.. SPO 1979 08 02 -999.990 -99.990 0 *.. SPO 1979 08 03 -999.990 -99.990 0 *.. SPO 1979 08 04 -999.990 -99.990 0 *.. SPO 1979 08 05 -999.990 -99.990 0 *.. SPO 1979 08 06 -999.990 -99.990 0 *.. SPO 1979 08 07 -999.990 -99.990 0 *.. SPO 1979 08 08 -999.990 -99.990 0 *.. SPO 1979 08 09 -999.990 -99.990 0 *.. SPO 1979 08 10 -999.990 -99.990 0 *.. SPO 1979 08 11 -999.990 -99.990 0 *.. SPO 1979 08 12 -999.990 -99.990 0 *.. SPO 1979 08 13 -999.990 -99.990 0 *.. SPO 1979 08 14 -999.990 -99.990 0 *.. SPO 1979 08 15 -999.990 -99.990 0 *.. SPO 1979 08 16 -999.990 -99.990 0 *.. SPO 1979 08 17 -999.990 -99.990 0 *.. SPO 1979 08 18 -999.990 -99.990 0 *.. SPO 1979 08 19 -999.990 -99.990 0 *.. SPO 1979 08 20 -999.990 -99.990 0 *.. SPO 1979 08 21 -999.990 -99.990 0 *.. SPO 1979 08 22 -999.990 -99.990 0 *.. SPO 1979 08 23 -999.990 -99.990 0 *.. SPO 1979 08 24 -999.990 -99.990 0 *.. SPO 1979 08 25 -999.990 -99.990 0 *.. SPO 1979 08 26 -999.990 -99.990 0 *.. SPO 1979 08 27 -999.990 -99.990 0 *.. SPO 1979 08 28 -999.990 -99.990 0 *.. SPO 1979 08 29 -999.990 -99.990 0 *.. SPO 1979 08 30 -999.990 -99.990 0 *.. SPO 1979 08 31 -999.990 -99.990 0 *.. SPO 1979 09 01 -999.990 -99.990 0 *.. SPO 1979 09 02 -999.990 -99.990 0 *.. SPO 1979 09 03 -999.990 -99.990 0 *.. SPO 1979 09 04 -999.990 -99.990 0 *.. SPO 1979 09 05 -999.990 -99.990 0 *.. SPO 1979 09 06 -999.990 -99.990 0 *.. SPO 1979 09 07 -999.990 -99.990 0 *.. SPO 1979 09 08 -999.990 -99.990 0 *.. SPO 1979 09 09 -999.990 -99.990 0 *.. SPO 1979 09 10 -999.990 -99.990 0 *.. SPO 1979 09 11 -999.990 -99.990 0 *.. SPO 1979 09 12 -999.990 -99.990 0 *.. SPO 1979 09 13 -999.990 -99.990 0 *.. SPO 1979 09 14 -999.990 -99.990 0 *.. SPO 1979 09 15 -999.990 -99.990 0 *.. SPO 1979 09 16 -999.990 -99.990 0 *.. SPO 1979 09 17 -999.990 -99.990 0 *.. SPO 1979 09 18 -999.990 -99.990 0 *.. SPO 1979 09 19 -999.990 -99.990 0 *.. SPO 1979 09 20 -999.990 -99.990 0 *.. SPO 1979 09 21 -999.990 -99.990 0 *.. SPO 1979 09 22 -999.990 -99.990 0 *.. SPO 1979 09 23 -999.990 -99.990 0 *.. SPO 1979 09 24 -999.990 -99.990 0 *.. SPO 1979 09 25 -999.990 -99.990 0 *.. SPO 1979 09 26 -999.990 -99.990 0 *.. SPO 1979 09 27 -999.990 -99.990 0 *.. SPO 1979 09 28 -999.990 -99.990 0 *.. SPO 1979 09 29 -999.990 -99.990 0 *.. SPO 1979 09 30 -999.990 -99.990 0 *.. SPO 1979 10 01 -999.990 -99.990 0 *.. SPO 1979 10 02 -999.990 -99.990 0 *.. SPO 1979 10 03 -999.990 -99.990 0 *.. SPO 1979 10 04 -999.990 -99.990 0 *.. SPO 1979 10 05 -999.990 -99.990 0 *.. SPO 1979 10 06 -999.990 -99.990 0 *.. SPO 1979 10 07 -999.990 -99.990 0 *.. SPO 1979 10 08 -999.990 -99.990 0 *.. SPO 1979 10 09 -999.990 -99.990 0 *.. SPO 1979 10 10 -999.990 -99.990 0 *.. SPO 1979 10 11 -999.990 -99.990 0 *.. SPO 1979 10 12 -999.990 -99.990 0 *.. SPO 1979 10 13 -999.990 -99.990 0 *.. SPO 1979 10 14 -999.990 -99.990 0 *.. SPO 1979 10 15 -999.990 -99.990 0 *.. SPO 1979 10 16 -999.990 -99.990 0 *.. SPO 1979 10 17 -999.990 -99.990 0 *.. SPO 1979 10 18 -999.990 -99.990 0 *.. SPO 1979 10 19 -999.990 -99.990 0 *.. SPO 1979 10 20 -999.990 -99.990 0 *.. SPO 1979 10 21 -999.990 -99.990 0 *.. SPO 1979 10 22 -999.990 -99.990 0 *.. SPO 1979 10 23 -999.990 -99.990 0 *.. SPO 1979 10 24 -999.990 -99.990 0 *.. SPO 1979 10 25 -999.990 -99.990 0 *.. SPO 1979 10 26 -999.990 -99.990 0 *.. SPO 1979 10 27 -999.990 -99.990 0 *.. SPO 1979 10 28 -999.990 -99.990 0 *.. SPO 1979 10 29 -999.990 -99.990 0 *.. SPO 1979 10 30 -999.990 -99.990 0 *.. SPO 1979 10 31 -999.990 -99.990 0 *.. SPO 1979 11 01 -999.990 -99.990 0 *.. SPO 1979 11 02 -999.990 -99.990 0 *.. SPO 1979 11 03 -999.990 -99.990 0 *.. SPO 1979 11 04 -999.990 -99.990 0 *.. SPO 1979 11 05 -999.990 -99.990 0 *.. SPO 1979 11 06 -999.990 -99.990 0 *.. SPO 1979 11 07 -999.990 -99.990 0 *.. SPO 1979 11 08 -999.990 -99.990 0 *.. SPO 1979 11 09 -999.990 -99.990 0 *.. SPO 1979 11 10 -999.990 -99.990 0 *.. SPO 1979 11 11 -999.990 -99.990 0 *.. SPO 1979 11 12 -999.990 -99.990 0 *.. SPO 1979 11 13 -999.990 -99.990 0 *.. SPO 1979 11 14 -999.990 -99.990 0 *.. SPO 1979 11 15 -999.990 -99.990 0 *.. SPO 1979 11 16 -999.990 -99.990 0 *.. SPO 1979 11 17 -999.990 -99.990 0 *.. SPO 1979 11 18 -999.990 -99.990 0 *.. SPO 1979 11 19 -999.990 -99.990 0 *.. SPO 1979 11 20 -999.990 -99.990 0 *.. SPO 1979 11 21 -999.990 -99.990 0 *.. SPO 1979 11 22 -999.990 -99.990 0 *.. SPO 1979 11 23 -999.990 -99.990 0 *.. SPO 1979 11 24 -999.990 -99.990 0 *.. SPO 1979 11 25 -999.990 -99.990 0 *.. SPO 1979 11 26 -999.990 -99.990 0 *.. SPO 1979 11 27 -999.990 -99.990 0 *.. SPO 1979 11 28 -999.990 -99.990 0 *.. SPO 1979 11 29 -999.990 -99.990 0 *.. SPO 1979 11 30 -999.990 -99.990 0 *.. SPO 1979 12 01 -999.990 -99.990 0 *.. SPO 1979 12 02 -999.990 -99.990 0 *.. SPO 1979 12 03 -999.990 -99.990 0 *.. SPO 1979 12 04 -999.990 -99.990 0 *.. SPO 1979 12 05 -999.990 -99.990 0 *.. SPO 1979 12 06 -999.990 -99.990 0 *.. SPO 1979 12 07 -999.990 -99.990 0 *.. SPO 1979 12 08 -999.990 -99.990 0 *.. SPO 1979 12 09 -999.990 -99.990 0 *.. SPO 1979 12 10 -999.990 -99.990 0 *.. SPO 1979 12 11 -999.990 -99.990 0 *.. SPO 1979 12 12 -999.990 -99.990 0 *.. SPO 1979 12 13 -999.990 -99.990 0 *.. SPO 1979 12 14 -999.990 -99.990 0 *.. SPO 1979 12 15 -999.990 -99.990 0 *.. SPO 1979 12 16 -999.990 -99.990 0 *.. SPO 1979 12 17 -999.990 -99.990 0 *.. SPO 1979 12 18 -999.990 -99.990 0 *.. SPO 1979 12 19 -999.990 -99.990 0 *.. SPO 1979 12 20 -999.990 -99.990 0 *.. SPO 1979 12 21 -999.990 -99.990 0 *.. SPO 1979 12 22 -999.990 -99.990 0 *.. SPO 1979 12 23 -999.990 -99.990 0 *.. SPO 1979 12 24 -999.990 -99.990 0 *.. SPO 1979 12 25 -999.990 -99.990 0 *.. SPO 1979 12 26 -999.990 -99.990 0 *.. SPO 1979 12 27 -999.990 -99.990 0 *.. SPO 1979 12 28 -999.990 -99.990 0 *.. SPO 1979 12 29 -999.990 -99.990 0 *.. SPO 1979 12 30 -999.990 -99.990 0 *.. SPO 1979 12 31 -999.990 -99.990 0 *.. SPO 1980 01 01 336.297 0.073 23 ... SPO 1980 01 02 336.273 0.079 23 ... SPO 1980 01 03 336.228 0.085 22 ... SPO 1980 01 04 336.188 0.075 22 ... SPO 1980 01 05 336.217 0.082 15 ... SPO 1980 01 06 336.139 0.079 21 ... SPO 1980 01 07 336.005 0.038 24 ... SPO 1980 01 08 336.156 0.035 20 ... SPO 1980 01 09 336.178 0.026 23 ... SPO 1980 01 10 336.165 0.046 24 ... SPO 1980 01 11 336.178 0.025 20 ... SPO 1980 01 12 336.162 0.061 15 ... SPO 1980 01 13 336.099 0.052 10 ... SPO 1980 01 14 336.088 0.057 24 ... SPO 1980 01 15 335.880 0.102 24 ... SPO 1980 01 16 335.993 0.069 24 ... SPO 1980 01 17 335.985 0.066 15 ... SPO 1980 01 18 335.935 0.099 17 ... SPO 1980 01 19 336.257 0.048 24 ... SPO 1980 01 20 336.267 0.035 19 ... SPO 1980 01 21 336.140 0.046 19 ... SPO 1980 01 22 336.175 0.075 22 ... SPO 1980 01 23 336.163 0.096 24 ... SPO 1980 01 24 336.175 0.030 22 ... SPO 1980 01 25 336.203 0.039 24 ... SPO 1980 01 26 336.197 0.031 19 ... SPO 1980 01 27 336.181 0.031 14 ... SPO 1980 01 28 336.133 0.037 23 ... SPO 1980 01 29 336.095 0.044 13 ... SPO 1980 01 30 336.077 0.039 24 ... SPO 1980 01 31 336.083 0.043 21 ... SPO 1980 02 01 335.959 0.044 22 ... SPO 1980 02 02 336.024 0.039 18 ... SPO 1980 02 03 336.021 0.030 21 ... SPO 1980 02 04 336.008 0.032 17 ... SPO 1980 02 05 336.045 0.039 24 ... SPO 1980 02 06 336.070 0.029 24 ... SPO 1980 02 07 335.938 0.043 20 ... SPO 1980 02 08 335.988 0.100 18 ... SPO 1980 02 09 335.898 0.040 12 ... SPO 1980 02 10 335.808 0.028 6 ... SPO 1980 02 11 335.953 0.058 17 ... SPO 1980 02 12 335.938 0.069 24 ... SPO 1980 02 13 335.978 0.043 24 ... SPO 1980 02 14 336.031 0.030 19 ... SPO 1980 02 15 336.070 0.034 23 ... SPO 1980 02 16 336.054 0.030 14 ... SPO 1980 02 17 336.043 0.047 23 ... SPO 1980 02 18 336.065 0.029 19 ... SPO 1980 02 19 335.927 0.040 21 ... SPO 1980 02 20 335.897 0.077 24 ... SPO 1980 02 21 335.761 0.147 23 ... SPO 1980 02 22 335.601 0.062 24 ... SPO 1980 02 23 335.847 0.133 18 ... SPO 1980 02 24 335.937 0.034 24 ... SPO 1980 02 25 335.960 0.059 21 ... SPO 1980 02 26 335.884 0.061 24 ... SPO 1980 02 27 335.948 0.045 21 ... SPO 1980 02 28 336.004 0.043 22 ... SPO 1980 02 29 336.007 0.066 17 ... SPO 1980 03 01 336.043 0.026 15 ... SPO 1980 03 02 335.993 0.061 22 ... SPO 1980 03 03 335.985 0.073 11 ... SPO 1980 03 04 335.951 0.084 13 ... SPO 1980 03 05 336.053 0.069 22 ... SPO 1980 03 06 336.079 0.071 22 ... SPO 1980 03 07 335.993 0.056 24 ... SPO 1980 03 08 335.989 0.080 17 ... SPO 1980 03 09 336.036 0.064 24 ... SPO 1980 03 10 336.053 0.053 24 ... SPO 1980 03 11 336.043 0.049 18 ... SPO 1980 03 12 336.040 0.084 24 ... SPO 1980 03 13 336.015 0.064 22 ... SPO 1980 03 14 336.048 0.055 23 ... SPO 1980 03 15 336.095 0.053 17 ... SPO 1980 03 16 336.050 0.076 21 ... SPO 1980 03 17 336.038 0.033 18 ... SPO 1980 03 18 336.050 0.087 24 ... SPO 1980 03 19 335.935 0.090 24 ... SPO 1980 03 20 335.838 0.074 24 ... SPO 1980 03 21 335.854 0.055 19 ... SPO 1980 03 22 335.881 0.065 17 ... SPO 1980 03 23 335.930 0.067 22 ... SPO 1980 03 24 336.050 0.125 24 ... SPO 1980 03 25 336.102 0.088 24 ... SPO 1980 03 26 335.921 0.083 24 ... SPO 1980 03 27 336.086 0.077 22 ... SPO 1980 03 28 336.090 0.058 22 ... SPO 1980 03 29 336.117 0.065 17 ... SPO 1980 03 30 336.072 0.057 23 ... SPO 1980 03 31 336.131 0.080 24 ... SPO 1980 04 01 336.154 0.060 15 ... SPO 1980 04 02 336.125 0.095 24 ... SPO 1980 04 03 336.129 0.089 24 ... SPO 1980 04 04 336.140 0.053 23 ... SPO 1980 04 05 336.216 0.101 16 ... SPO 1980 04 06 336.219 0.065 22 ... SPO 1980 04 07 336.231 0.062 24 ... SPO 1980 04 08 336.280 0.065 20 ... SPO 1980 04 09 336.366 0.098 11 ... SPO 1980 04 10 336.251 0.084 15 ... SPO 1980 04 11 336.233 0.093 22 ... SPO 1980 04 12 336.192 0.059 15 ... SPO 1980 04 13 336.213 0.075 21 ... SPO 1980 04 14 336.203 0.061 10 ... SPO 1980 04 15 336.258 0.039 23 ... SPO 1980 04 16 336.150 0.063 22 ... SPO 1980 04 17 336.221 0.053 22 ... SPO 1980 04 18 336.082 0.053 24 ... SPO 1980 04 19 336.095 0.048 17 ... SPO 1980 04 20 336.050 0.080 21 ... SPO 1980 04 21 336.080 0.054 24 ... SPO 1980 04 22 336.195 0.061 19 ... SPO 1980 04 23 336.160 0.041 24 ... SPO 1980 04 24 336.195 0.060 24 ... SPO 1980 04 25 336.314 0.054 24 ... SPO 1980 04 26 336.278 0.052 18 ... SPO 1980 04 27 336.347 0.057 24 ... SPO 1980 04 28 336.391 0.051 24 ... SPO 1980 04 29 336.382 0.032 22 ... SPO 1980 04 30 336.351 0.036 24 ... SPO 1980 05 01 336.432 0.046 24 ... SPO 1980 05 02 336.432 0.054 24 ... SPO 1980 05 03 336.425 0.021 2 ... SPO 1980 05 04 336.479 0.048 19 ... SPO 1980 05 05 336.581 0.038 24 ... SPO 1980 05 06 336.518 0.036 21 ... SPO 1980 05 07 336.527 0.042 24 ... SPO 1980 05 08 336.526 0.056 24 ... SPO 1980 05 09 336.553 0.039 24 ... SPO 1980 05 10 336.528 0.046 18 ... SPO 1980 05 11 336.569 0.061 19 ... SPO 1980 05 12 336.608 0.092 24 ... SPO 1980 05 13 336.631 0.036 18 ... SPO 1980 05 14 336.631 0.040 21 ... SPO 1980 05 15 336.610 0.041 21 ... SPO 1980 05 16 336.622 0.051 23 ... SPO 1980 05 17 336.609 0.050 18 ... SPO 1980 05 18 336.654 0.058 24 ... SPO 1980 05 19 336.671 0.061 24 ... SPO 1980 05 20 336.666 0.064 24 ... SPO 1980 05 21 336.636 0.050 24 ... SPO 1980 05 22 336.666 0.049 23 ... SPO 1980 05 23 336.619 0.045 24 ... SPO 1980 05 24 336.542 0.044 11 ... SPO 1980 05 25 336.584 0.054 22 ... SPO 1980 05 26 336.733 0.062 21 ... SPO 1980 05 27 336.642 0.049 22 ... SPO 1980 05 28 336.651 0.052 24 ... SPO 1980 05 29 336.629 0.066 23 ... SPO 1980 05 30 336.540 0.058 24 ... SPO 1980 05 31 336.602 0.073 18 ... SPO 1980 06 01 336.550 0.054 23 ... SPO 1980 06 02 336.475 0.053 24 ... SPO 1980 06 03 336.552 0.066 21 ... SPO 1980 06 04 336.566 0.044 24 ... SPO 1980 06 05 336.573 0.042 22 ... SPO 1980 06 06 336.607 0.059 22 ... SPO 1980 06 07 336.767 0.053 16 ... SPO 1980 06 08 336.739 0.073 24 ... SPO 1980 06 09 336.795 0.085 24 ... SPO 1980 06 10 336.866 0.066 23 ... SPO 1980 06 11 336.945 0.060 23 ... SPO 1980 06 12 336.993 0.053 22 ... SPO 1980 06 13 337.083 0.070 23 ... SPO 1980 06 14 337.111 0.053 18 ... SPO 1980 06 15 336.975 0.062 23 ... SPO 1980 06 16 336.875 0.061 21 ... SPO 1980 06 17 336.903 0.077 24 ... SPO 1980 06 18 337.055 0.043 19 ... SPO 1980 06 19 337.061 0.048 23 ... SPO 1980 06 20 337.034 0.059 24 ... SPO 1980 06 21 336.936 0.059 10 ... SPO 1980 06 22 337.021 0.068 23 ... SPO 1980 06 23 337.037 0.047 24 ... SPO 1980 06 24 337.068 0.045 24 ... SPO 1980 06 25 337.063 0.045 21 ... SPO 1980 06 26 337.146 0.085 23 ... SPO 1980 06 27 337.245 0.061 24 ... SPO 1980 06 28 337.276 0.047 18 ... SPO 1980 06 29 337.224 0.039 24 ... SPO 1980 06 30 337.195 0.051 24 ... SPO 1980 07 01 337.216 0.046 24 ... SPO 1980 07 02 337.259 0.073 24 ... SPO 1980 07 03 337.283 0.042 24 ... SPO 1980 07 04 337.311 0.054 20 ... SPO 1980 07 05 337.339 0.049 18 ... SPO 1980 07 06 337.408 0.104 23 ... SPO 1980 07 07 337.467 0.040 23 ... SPO 1980 07 08 337.463 0.057 24 ... SPO 1980 07 09 337.468 0.063 22 ... SPO 1980 07 10 337.451 0.057 22 ... SPO 1980 07 11 337.455 0.059 24 ... SPO 1980 07 12 337.443 0.049 15 ... SPO 1980 07 13 337.394 0.052 24 ... SPO 1980 07 14 337.368 0.046 24 ... SPO 1980 07 15 337.375 0.053 24 ... SPO 1980 07 16 337.390 0.039 22 ... SPO 1980 07 17 337.405 0.036 24 ... SPO 1980 07 18 337.372 0.033 18 ... SPO 1980 07 19 337.247 0.043 17 ... SPO 1980 07 20 337.360 0.047 24 ... SPO 1980 07 21 337.357 0.043 19 ... SPO 1980 07 22 337.335 0.030 24 ... SPO 1980 07 23 337.309 0.032 21 ... SPO 1980 07 24 337.300 0.058 21 ... SPO 1980 07 25 337.373 0.057 23 ... SPO 1980 07 26 337.365 0.028 17 ... SPO 1980 07 27 337.356 0.031 24 ... SPO 1980 07 28 337.338 0.028 24 ... SPO 1980 07 29 337.405 0.036 24 ... SPO 1980 07 30 337.344 0.032 24 ... SPO 1980 07 31 337.363 0.025 24 ... SPO 1980 08 01 337.533 0.105 24 ... SPO 1980 08 02 337.547 0.069 18 ... SPO 1980 08 03 337.620 0.063 24 ... SPO 1980 08 04 337.647 0.081 15 ... SPO 1980 08 05 337.735 0.068 18 ... SPO 1980 08 06 337.677 0.035 24 ... SPO 1980 08 07 337.677 0.029 24 ... SPO 1980 08 08 337.620 0.050 21 ... SPO 1980 08 09 337.526 0.041 18 ... SPO 1980 08 10 337.516 0.040 24 ... SPO 1980 08 11 337.523 0.051 24 ... SPO 1980 08 12 337.601 0.041 24 ... SPO 1980 08 13 337.586 0.044 24 ... SPO 1980 08 14 337.517 0.025 24 ... SPO 1980 08 15 337.591 0.035 24 ... SPO 1980 08 16 337.590 0.071 19 ... SPO 1980 08 17 337.614 0.068 17 ... SPO 1980 08 18 337.633 0.071 24 ... SPO 1980 08 19 337.670 0.067 23 ... SPO 1980 08 20 337.723 0.079 20 ... SPO 1980 08 21 337.752 0.079 21 ... SPO 1980 08 22 337.758 0.070 24 ... SPO 1980 08 23 337.822 0.070 17 ... SPO 1980 08 24 337.769 0.066 23 ... SPO 1980 08 25 337.772 0.062 24 ... SPO 1980 08 26 337.730 0.055 24 ... SPO 1980 08 27 337.750 0.058 24 ... SPO 1980 08 28 337.727 0.074 24 ... SPO 1980 08 29 337.695 0.025 24 ... SPO 1980 08 30 337.649 0.050 18 ... SPO 1980 08 31 337.648 0.046 24 ... SPO 1980 09 01 337.713 0.051 24 ... SPO 1980 09 02 337.744 0.030 17 ... SPO 1980 09 03 337.691 0.058 23 ... SPO 1980 09 04 337.802 0.057 24 ... SPO 1980 09 05 337.829 0.043 24 ... SPO 1980 09 06 337.903 0.065 18 ... SPO 1980 09 07 337.907 0.048 24 ... SPO 1980 09 08 337.969 0.080 22 ... SPO 1980 09 09 337.972 0.077 23 ... SPO 1980 09 10 337.895 0.046 23 ... SPO 1980 09 11 337.881 0.027 21 ... SPO 1980 09 12 337.850 0.034 24 ... SPO 1980 09 13 337.842 0.054 17 ... SPO 1980 09 14 337.949 0.036 24 ... SPO 1980 09 15 337.979 0.031 23 ... SPO 1980 09 16 337.943 0.052 24 ... SPO 1980 09 17 338.012 0.048 24 ... SPO 1980 09 18 337.968 0.071 24 ... SPO 1980 09 19 337.926 0.059 24 ... SPO 1980 09 20 337.811 0.040 17 ... SPO 1980 09 21 337.868 0.038 23 ... SPO 1980 09 22 337.852 0.033 15 ... SPO 1980 09 23 337.861 0.031 24 ... SPO 1980 09 24 337.878 0.029 23 ... SPO 1980 09 25 337.933 0.045 21 ... SPO 1980 09 26 337.982 0.051 17 ... SPO 1980 09 27 337.955 0.032 18 ... SPO 1980 09 28 337.911 0.031 24 ... SPO 1980 09 29 337.878 0.040 23 ... SPO 1980 09 30 337.887 0.034 24 ... SPO 1980 10 01 337.917 0.033 23 ... SPO 1980 10 02 337.947 0.030 21 ... SPO 1980 10 03 337.982 0.036 23 ... SPO 1980 10 04 338.156 0.039 17 ... SPO 1980 10 05 338.101 0.027 24 ... SPO 1980 10 06 338.093 0.022 24 ... SPO 1980 10 07 338.063 0.026 23 ... SPO 1980 10 08 338.071 0.041 24 ... SPO 1980 10 09 338.105 0.041 24 ... SPO 1980 10 10 338.143 0.046 23 ... SPO 1980 10 11 338.085 0.033 18 ... SPO 1980 10 12 338.103 0.035 24 ... SPO 1980 10 13 338.086 0.040 24 ... SPO 1980 10 14 338.091 0.042 22 ... SPO 1980 10 15 338.087 0.049 23 ... SPO 1980 10 16 338.079 0.039 24 ... SPO 1980 10 17 338.067 0.043 22 ... SPO 1980 10 18 338.048 0.033 18 ... SPO 1980 10 19 338.058 0.049 24 ... SPO 1980 10 20 338.094 0.053 23 ... SPO 1980 10 21 338.132 0.046 23 ... SPO 1980 10 22 338.138 0.067 17 ... SPO 1980 10 23 338.200 0.049 22 ... SPO 1980 10 24 338.144 0.029 18 ... SPO 1980 10 25 338.131 0.039 16 ... SPO 1980 10 26 338.146 0.043 23 ... SPO 1980 10 27 338.073 0.032 24 ... SPO 1980 10 28 338.111 0.038 23 ... SPO 1980 10 29 338.049 0.038 24 ... SPO 1980 10 30 338.027 0.019 24 ... SPO 1980 10 31 338.024 0.030 24 ... SPO 1980 11 01 337.999 0.028 22 ... SPO 1980 11 02 338.035 0.029 16 ... SPO 1980 11 03 338.032 0.033 23 ... SPO 1980 11 04 338.092 0.034 24 ... SPO 1980 11 05 338.070 0.026 24 ... SPO 1980 11 06 338.076 0.023 23 ... SPO 1980 11 07 338.145 0.033 23 ... SPO 1980 11 08 338.052 0.039 17 ... SPO 1980 11 09 338.023 0.039 24 ... SPO 1980 11 10 338.170 0.045 24 ... SPO 1980 11 11 338.179 0.035 20 ... SPO 1980 11 12 338.006 0.045 24 ... SPO 1980 11 13 338.031 0.060 23 ... SPO 1980 11 14 338.046 0.087 23 ... SPO 1980 11 15 337.956 0.051 19 ... SPO 1980 11 16 337.957 0.049 24 ... SPO 1980 11 17 337.980 0.048 22 ... SPO 1980 11 18 338.030 0.038 24 ... SPO 1980 11 19 337.987 0.065 24 ... SPO 1980 11 20 338.032 0.037 24 ... SPO 1980 11 21 337.982 0.053 21 ... SPO 1980 11 22 338.049 0.039 19 ... SPO 1980 11 23 337.986 0.039 23 ... SPO 1980 11 24 337.963 0.042 24 ... SPO 1980 11 25 338.010 0.053 23 ... SPO 1980 11 26 337.959 0.048 23 ... SPO 1980 11 27 337.958 0.040 24 ... SPO 1980 11 28 338.007 0.034 20 ... SPO 1980 11 29 337.992 0.041 19 ... SPO 1980 11 30 337.931 0.038 22 ... SPO 1980 12 01 338.037 0.044 24 ... SPO 1980 12 02 338.039 0.040 10 ... SPO 1980 12 03 338.019 0.045 8 ... SPO 1980 12 04 -999.990 -99.990 0 *.. SPO 1980 12 05 338.368 0.041 8 ... SPO 1980 12 06 338.253 0.108 15 ... SPO 1980 12 07 338.170 0.038 20 ... SPO 1980 12 08 338.175 0.040 21 ... SPO 1980 12 09 338.164 0.075 23 ... SPO 1980 12 10 338.152 0.023 19 ... SPO 1980 12 11 338.114 0.030 23 ... SPO 1980 12 12 338.127 0.029 22 ... SPO 1980 12 13 338.133 0.016 18 ... SPO 1980 12 14 338.137 0.029 24 ... SPO 1980 12 15 338.127 0.030 22 ... SPO 1980 12 16 338.046 0.040 18 ... SPO 1980 12 17 338.056 0.035 23 ... SPO 1980 12 18 338.072 0.035 23 ... SPO 1980 12 19 338.084 0.029 22 ... SPO 1980 12 20 338.025 0.030 17 ... SPO 1980 12 21 338.042 0.036 24 ... SPO 1980 12 22 338.040 0.025 23 ... SPO 1980 12 23 338.053 0.040 8 ... SPO 1980 12 24 -999.990 -99.990 0 *.. SPO 1980 12 25 -999.990 -99.990 0 *.. SPO 1980 12 26 -999.990 -99.990 0 *.. SPO 1980 12 27 -999.990 -99.990 0 *.. SPO 1980 12 28 338.066 0.028 9 ... SPO 1980 12 29 337.993 0.031 22 ... SPO 1980 12 30 338.013 0.035 20 ... SPO 1980 12 31 337.969 0.047 17 ... SPO 1981 01 01 338.030 0.070 20 ... SPO 1981 01 02 338.070 0.070 23 ... SPO 1981 01 03 338.120 0.030 19 ... SPO 1981 01 04 338.060 0.030 24 ... SPO 1981 01 05 338.050 0.040 24 ... SPO 1981 01 06 338.040 0.050 24 ... SPO 1981 01 07 338.140 0.150 24 ... SPO 1981 01 08 337.940 0.050 23 ... SPO 1981 01 09 337.970 0.030 24 ... SPO 1981 01 10 337.960 0.040 18 ... SPO 1981 01 11 337.990 0.040 24 ... SPO 1981 01 12 338.020 0.030 24 ... SPO 1981 01 13 338.010 0.030 24 ... SPO 1981 01 14 338.020 0.060 24 ... SPO 1981 01 15 337.860 0.070 24 ... SPO 1981 01 16 337.870 0.080 23 ... SPO 1981 01 17 337.970 0.040 17 ... SPO 1981 01 18 337.470 0.150 24 ... SPO 1981 01 19 337.530 0.120 24 ... SPO 1981 01 20 337.520 0.060 24 ... SPO 1981 01 21 337.600 0.060 20 ... SPO 1981 01 22 337.660 0.090 21 ... SPO 1981 01 23 337.610 0.040 19 ... SPO 1981 01 24 337.630 0.130 11 ... SPO 1981 01 25 337.800 0.060 24 ... SPO 1981 01 26 337.720 0.060 23 ... SPO 1981 01 27 337.630 0.060 24 ... SPO 1981 01 28 337.620 0.070 24 ... SPO 1981 01 29 337.860 0.050 24 ... SPO 1981 01 30 337.860 0.040 16 ... SPO 1981 01 31 337.810 0.030 17 ... SPO 1981 02 01 337.750 0.030 24 ... SPO 1981 02 02 337.700 0.030 24 ... SPO 1981 02 03 337.670 0.050 24 ... SPO 1981 02 04 337.720 0.040 24 ... SPO 1981 02 05 337.700 0.030 24 ... SPO 1981 02 06 337.700 0.050 24 ... SPO 1981 02 07 337.760 0.060 15 ... SPO 1981 02 08 337.760 0.060 24 ... SPO 1981 02 09 337.780 0.050 23 ... SPO 1981 02 10 337.760 0.030 10 ... SPO 1981 02 11 338.030 0.170 2 ... SPO 1981 02 12 337.960 0.050 23 ... SPO 1981 02 13 337.890 0.060 24 ... SPO 1981 02 14 337.790 0.080 24 ... SPO 1981 02 15 337.770 0.030 24 ... SPO 1981 02 16 337.840 0.030 24 ... SPO 1981 02 17 337.700 0.080 24 ... SPO 1981 02 18 337.770 0.050 17 ... SPO 1981 02 19 337.790 0.050 24 ... SPO 1981 02 20 337.840 0.040 24 ... SPO 1981 02 21 337.990 0.060 24 ... SPO 1981 02 22 337.840 0.080 24 ... SPO 1981 02 23 337.920 0.040 24 ... SPO 1981 02 24 337.830 0.060 24 ... SPO 1981 02 25 337.760 0.020 17 ... SPO 1981 02 26 337.880 0.060 24 ... SPO 1981 02 27 337.830 0.040 23 ... SPO 1981 02 28 337.820 0.040 24 ... SPO 1981 03 01 337.770 0.060 23 ... SPO 1981 03 02 337.750 0.040 24 ... SPO 1981 03 03 337.760 0.040 23 ... SPO 1981 03 04 337.810 0.040 18 ... SPO 1981 03 05 337.790 0.030 14 ... SPO 1981 03 06 337.890 0.050 24 ... SPO 1981 03 07 337.850 0.060 24 ... SPO 1981 03 08 337.940 0.050 24 ... SPO 1981 03 09 337.930 0.020 24 ... SPO 1981 03 10 337.920 0.040 23 ... SPO 1981 03 11 337.940 0.040 18 ... SPO 1981 03 12 337.890 0.040 23 ... SPO 1981 03 13 337.890 0.030 23 ... SPO 1981 03 14 337.920 0.060 24 ... SPO 1981 03 15 337.980 0.060 23 ... SPO 1981 03 16 337.970 0.040 24 ... SPO 1981 03 17 337.950 0.050 23 ... SPO 1981 03 18 337.940 0.030 15 ... SPO 1981 03 19 337.920 0.050 23 ... SPO 1981 03 20 337.960 0.050 24 ... SPO 1981 03 21 337.910 0.040 23 ... SPO 1981 03 22 337.870 0.050 24 ... SPO 1981 03 23 337.900 0.040 23 ... SPO 1981 03 24 337.910 0.060 20 ... SPO 1981 03 25 337.920 0.050 16 ... SPO 1981 03 26 337.890 0.050 24 ... SPO 1981 03 27 337.900 0.040 24 ... SPO 1981 03 28 337.870 0.040 24 ... SPO 1981 03 29 337.880 0.050 21 ... SPO 1981 03 30 337.880 0.050 24 ... SPO 1981 03 31 337.880 0.050 23 ... SPO 1981 04 01 337.810 0.050 11 ... SPO 1981 04 02 337.840 0.050 24 ... SPO 1981 04 03 337.900 0.060 24 ... SPO 1981 04 04 337.890 0.040 24 ... SPO 1981 04 05 337.900 0.030 24 ... SPO 1981 04 06 337.880 0.040 24 ... SPO 1981 04 07 337.860 0.040 24 ... SPO 1981 04 08 337.890 0.050 16 ... SPO 1981 04 09 337.880 0.050 22 ... SPO 1981 04 10 337.890 0.050 24 ... SPO 1981 04 11 337.930 0.070 24 ... SPO 1981 04 12 337.890 0.040 24 ... SPO 1981 04 13 337.970 0.050 21 ... SPO 1981 04 14 338.000 0.040 21 ... SPO 1981 04 15 337.950 0.060 20 ... SPO 1981 04 16 338.000 0.040 24 ... SPO 1981 04 17 337.940 0.050 24 ... SPO 1981 04 18 337.900 0.030 24 ... SPO 1981 04 19 337.880 0.050 24 ... SPO 1981 04 20 337.930 0.040 24 ... SPO 1981 04 21 337.900 0.030 20 ... SPO 1981 04 22 337.900 0.050 20 ... SPO 1981 04 23 337.920 0.050 13 ... SPO 1981 04 24 337.910 0.080 24 ... SPO 1981 04 25 337.930 0.040 22 ... SPO 1981 04 26 337.870 0.030 24 ... SPO 1981 04 27 337.910 0.050 24 ... SPO 1981 04 28 337.900 0.060 21 ... SPO 1981 04 29 337.920 0.020 20 ... SPO 1981 04 30 337.920 0.030 24 ... SPO 1981 05 01 337.910 0.040 19 ... SPO 1981 05 02 337.910 0.040 23 ... SPO 1981 05 03 337.940 0.020 23 ... SPO 1981 05 04 337.960 0.050 24 ... SPO 1981 05 05 337.960 0.090 4 ... SPO 1981 05 06 338.010 0.040 17 ... SPO 1981 05 07 338.000 0.070 21 ... SPO 1981 05 08 338.010 0.050 23 ... SPO 1981 05 09 337.990 0.040 22 ... SPO 1981 05 10 338.070 0.050 13 ... SPO 1981 05 11 338.110 0.060 20 ... SPO 1981 05 12 338.100 0.060 21 ... SPO 1981 05 13 338.060 0.060 16 ... SPO 1981 05 14 338.030 0.050 20 ... SPO 1981 05 15 338.040 0.040 5 ... SPO 1981 05 16 338.130 0.060 11 ... SPO 1981 05 17 338.150 0.050 16 ... SPO 1981 05 18 338.180 0.050 21 ... SPO 1981 05 19 338.140 0.060 24 ... SPO 1981 05 20 338.050 0.060 17 ... SPO 1981 05 21 338.080 0.040 23 ... SPO 1981 05 22 338.040 0.050 24 ... SPO 1981 05 23 338.090 0.060 24 ... SPO 1981 05 24 338.090 0.070 23 ... SPO 1981 05 25 338.070 0.040 24 ... SPO 1981 05 26 338.110 0.040 23 ... SPO 1981 05 27 338.080 0.050 18 ... SPO 1981 05 28 338.100 0.070 24 ... SPO 1981 05 29 338.050 0.070 24 ... SPO 1981 05 30 338.160 0.070 24 ... SPO 1981 05 31 338.250 0.090 23 ... SPO 1981 06 01 338.350 0.110 23 ... SPO 1981 06 02 338.270 0.120 20 ... SPO 1981 06 03 338.160 0.090 16 ... SPO 1981 06 04 338.180 0.100 24 ... SPO 1981 06 05 338.210 0.100 23 ... SPO 1981 06 06 338.190 0.070 24 ... SPO 1981 06 07 338.290 0.130 24 ... SPO 1981 06 08 338.240 0.110 24 ... SPO 1981 06 09 338.170 0.060 22 ... SPO 1981 06 10 338.130 0.080 19 ... SPO 1981 06 11 338.220 0.100 24 ... SPO 1981 06 12 338.330 0.100 23 ... SPO 1981 06 13 338.240 0.120 24 ... SPO 1981 06 14 338.320 0.100 23 ... SPO 1981 06 15 338.350 0.150 24 ... SPO 1981 06 16 338.380 0.200 24 ... SPO 1981 06 17 338.590 0.130 17 ... SPO 1981 06 18 338.320 0.110 17 ... SPO 1981 06 19 338.400 0.110 23 ... SPO 1981 06 20 338.410 0.070 24 ... SPO 1981 06 21 338.430 0.100 24 ... SPO 1981 06 22 338.410 0.070 24 ... SPO 1981 06 23 338.410 0.080 22 ... SPO 1981 06 24 338.370 0.070 18 ... SPO 1981 06 25 338.340 0.050 23 ... SPO 1981 06 26 338.470 0.120 24 ... SPO 1981 06 27 338.400 0.050 24 ... SPO 1981 06 28 338.470 0.070 24 ... SPO 1981 06 29 338.480 0.060 24 ... SPO 1981 06 30 338.530 0.120 22 ... SPO 1981 07 01 338.520 0.090 17 ... SPO 1981 07 02 338.500 0.070 22 ... SPO 1981 07 03 338.510 0.090 24 ... SPO 1981 07 04 338.520 0.040 24 ... SPO 1981 07 05 338.620 0.080 22 ... SPO 1981 07 06 338.600 0.090 24 ... SPO 1981 07 07 338.580 0.080 23 ... SPO 1981 07 08 338.670 0.200 12 ... SPO 1981 07 09 338.700 0.120 14 ... SPO 1981 07 10 338.720 0.140 24 ... SPO 1981 07 11 338.600 0.070 18 ... SPO 1981 07 12 338.650 0.050 12 ... SPO 1981 07 13 338.750 0.130 24 ... SPO 1981 07 14 338.860 0.150 24 ... SPO 1981 07 15 338.870 0.160 16 ... SPO 1981 07 16 338.890 0.200 24 ... SPO 1981 07 17 338.880 0.110 24 ... SPO 1981 07 18 338.750 0.100 24 ... SPO 1981 07 19 338.810 0.120 23 ... SPO 1981 07 20 338.860 0.110 24 ... SPO 1981 07 21 338.770 0.060 24 ... SPO 1981 07 22 338.870 0.110 17 ... SPO 1981 07 23 338.850 0.170 24 ... SPO 1981 07 24 338.830 0.120 23 ... SPO 1981 07 25 338.900 0.120 23 ... SPO 1981 07 26 338.800 0.090 24 ... SPO 1981 07 27 338.830 0.150 22 ... SPO 1981 07 28 338.740 0.070 23 ... SPO 1981 07 29 338.930 0.170 17 ... SPO 1981 07 30 338.890 0.160 24 ... SPO 1981 07 31 338.970 0.220 23 ... SPO 1981 08 01 338.960 0.140 17 ... SPO 1981 08 02 338.890 0.060 11 ... SPO 1981 08 03 338.910 0.080 24 ... SPO 1981 08 04 338.920 0.100 23 ... SPO 1981 08 05 339.030 0.150 18 ... SPO 1981 08 06 339.080 0.160 22 ... SPO 1981 08 07 338.990 0.150 24 ... SPO 1981 08 08 338.890 0.070 23 ... SPO 1981 08 09 339.130 0.140 22 ... SPO 1981 08 10 338.880 0.090 24 ... SPO 1981 08 11 338.870 0.070 24 ... SPO 1981 08 12 338.940 0.110 17 ... SPO 1981 08 13 338.900 0.100 24 ... SPO 1981 08 14 338.840 0.130 24 ... SPO 1981 08 15 338.930 0.090 24 ... SPO 1981 08 16 338.990 0.120 21 ... SPO 1981 08 17 338.890 0.130 24 ... SPO 1981 08 18 338.890 0.090 23 ... SPO 1981 08 19 338.900 0.100 18 ... SPO 1981 08 20 338.850 0.060 24 ... SPO 1981 08 21 338.910 0.100 24 ... SPO 1981 08 22 338.950 0.090 23 ... SPO 1981 08 23 338.940 0.110 22 ... SPO 1981 08 24 338.930 0.080 23 ... SPO 1981 08 25 338.950 0.100 18 ... SPO 1981 08 26 338.870 0.040 4 ... SPO 1981 08 27 338.980 0.150 20 ... SPO 1981 08 28 339.110 0.160 24 ... SPO 1981 08 29 339.040 0.100 24 ... SPO 1981 08 30 339.160 0.160 22 ... SPO 1981 08 31 339.080 0.100 14 ... SPO 1981 09 01 339.060 0.190 24 ... SPO 1981 09 02 339.070 0.220 15 ... SPO 1981 09 03 339.070 0.130 24 ... SPO 1981 09 04 339.050 0.110 24 ... SPO 1981 09 05 339.220 0.160 23 ... SPO 1981 09 06 339.220 0.180 24 ... SPO 1981 09 07 339.150 0.140 24 ... SPO 1981 09 08 339.310 0.220 22 ... SPO 1981 09 09 339.130 0.200 7 ... SPO 1981 09 10 338.980 0.080 22 ... SPO 1981 09 11 339.140 0.140 23 ... SPO 1981 09 12 339.080 0.110 23 ... SPO 1981 09 13 339.130 0.120 24 ... SPO 1981 09 14 339.260 0.160 23 ... SPO 1981 09 15 339.240 0.180 14 ... SPO 1981 09 16 339.350 0.200 16 ... SPO 1981 09 17 339.210 0.150 24 ... SPO 1981 09 18 339.340 0.180 14 ... SPO 1981 09 19 339.270 0.130 17 ... SPO 1981 09 20 339.230 0.240 23 ... SPO 1981 09 21 339.120 0.210 24 ... SPO 1981 09 22 339.160 0.100 24 ... SPO 1981 09 23 339.340 0.140 16 ... SPO 1981 09 24 339.150 0.160 21 ... SPO 1981 09 25 339.390 0.160 19 ... SPO 1981 09 26 339.290 0.110 22 ... SPO 1981 09 27 339.470 0.160 19 ... SPO 1981 09 28 339.220 0.140 22 ... SPO 1981 09 29 339.200 0.100 24 ... SPO 1981 09 30 339.220 0.130 17 ... SPO 1981 10 01 339.180 0.030 4 ... SPO 1981 10 02 339.200 0.170 23 ... SPO 1981 10 03 339.140 0.170 22 ... SPO 1981 10 04 339.240 0.160 24 ... SPO 1981 10 05 339.190 0.110 24 ... SPO 1981 10 06 339.140 0.110 23 ... SPO 1981 10 07 339.230 0.130 18 ... SPO 1981 10 08 339.200 0.140 22 ... SPO 1981 10 09 339.310 0.210 21 ... SPO 1981 10 10 339.200 0.170 22 ... SPO 1981 10 11 -999.990 -99.990 0 *.. SPO 1981 10 12 -999.990 -99.990 0 *.. SPO 1981 10 13 -999.990 -99.990 0 *.. SPO 1981 10 14 339.090 0.070 19 ... SPO 1981 10 15 339.100 0.090 24 ... SPO 1981 10 16 339.170 0.120 23 ... SPO 1981 10 17 339.090 0.050 24 ... SPO 1981 10 18 339.040 0.040 24 ... SPO 1981 10 19 339.010 0.030 24 ... SPO 1981 10 20 339.040 0.060 23 ... SPO 1981 10 21 339.050 0.040 18 ... SPO 1981 10 22 339.050 0.040 20 ... SPO 1981 10 23 339.010 0.100 18 ... SPO 1981 10 24 338.990 0.100 24 ... SPO 1981 10 25 338.990 0.080 24 ... SPO 1981 10 26 339.050 0.110 19 ... SPO 1981 10 27 339.070 0.040 20 ... SPO 1981 10 28 338.980 0.050 19 ... SPO 1981 10 29 339.010 0.080 24 ... SPO 1981 10 30 338.960 0.060 24 ... SPO 1981 10 31 338.980 0.070 24 ... SPO 1981 11 01 339.030 0.090 23 ... SPO 1981 11 02 338.980 0.080 23 ... SPO 1981 11 03 338.960 0.060 21 ... SPO 1981 11 04 338.940 0.160 18 ... SPO 1981 11 05 338.890 0.050 24 ... SPO 1981 11 06 338.900 0.050 22 ... SPO 1981 11 07 338.970 0.070 18 ... SPO 1981 11 08 338.920 0.080 24 ... SPO 1981 11 09 338.950 0.080 23 ... SPO 1981 11 10 338.910 0.050 24 ... SPO 1981 11 11 338.850 0.120 21 ... SPO 1981 11 12 338.850 0.190 24 ... SPO 1981 11 13 338.870 0.100 21 ... SPO 1981 11 14 338.820 0.060 21 ... SPO 1981 11 15 338.780 0.060 24 ... SPO 1981 11 16 338.770 0.140 18 ... SPO 1981 11 17 339.000 0.190 9 ... SPO 1981 11 18 339.040 0.040 17 ... SPO 1981 11 19 338.900 0.100 22 ... SPO 1981 11 20 338.800 0.090 19 ... SPO 1981 11 21 338.860 0.090 21 ... SPO 1981 11 22 338.920 0.080 23 ... SPO 1981 11 23 338.970 0.060 23 ... SPO 1981 11 24 338.920 0.060 20 ... SPO 1981 11 25 338.960 0.170 18 ... SPO 1981 11 26 338.970 0.070 14 ... SPO 1981 11 27 338.940 0.070 20 ... SPO 1981 11 28 338.850 0.100 7 ... SPO 1981 11 29 -999.990 -99.990 0 *.. SPO 1981 11 30 -999.990 -99.990 0 *.. SPO 1981 12 01 -999.990 -99.990 0 *.. SPO 1981 12 02 -999.990 -99.990 0 *.. SPO 1981 12 03 338.580 0.110 8 ... SPO 1981 12 04 -999.990 -99.990 0 *.. SPO 1981 12 05 -999.990 -99.990 0 *.. SPO 1981 12 06 -999.990 -99.990 0 *.. SPO 1981 12 07 -999.990 -99.990 0 *.. SPO 1981 12 08 -999.990 -99.990 0 *.. SPO 1981 12 09 338.550 0.030 10 ... SPO 1981 12 10 338.540 0.040 13 ... SPO 1981 12 11 338.530 0.040 24 ... SPO 1981 12 12 338.370 0.050 24 ... SPO 1981 12 13 338.330 0.060 23 ... SPO 1981 12 14 338.520 0.090 23 ... SPO 1981 12 15 338.540 0.040 20 ... SPO 1981 12 16 338.360 0.080 19 ... SPO 1981 12 17 338.390 0.060 24 ... SPO 1981 12 18 338.340 0.050 23 ... SPO 1981 12 19 338.380 0.040 23 ... SPO 1981 12 20 338.390 0.120 11 ... SPO 1981 12 21 338.500 0.040 7 ... SPO 1981 12 22 338.920 0.030 14 ... SPO 1981 12 23 338.930 0.060 21 ... SPO 1981 12 24 338.960 0.040 24 ... SPO 1981 12 25 338.870 0.070 24 ... SPO 1981 12 26 338.740 0.080 21 ... SPO 1981 12 27 338.900 0.060 23 ... SPO 1981 12 28 338.740 0.130 8 ... SPO 1981 12 29 339.040 0.110 15 ... SPO 1981 12 30 -999.990 -99.990 0 *.. SPO 1981 12 31 -999.990 -99.990 0 *.. SPO 1982 01 01 -999.990 -99.990 0 *.. SPO 1982 01 02 -999.990 -99.990 0 *.. SPO 1982 01 03 -999.990 -99.990 0 *.. SPO 1982 01 04 -999.990 -99.990 0 *.. SPO 1982 01 05 -999.990 -99.990 0 *.. SPO 1982 01 06 -999.990 -99.990 0 *.. SPO 1982 01 07 -999.990 -99.990 0 *.. SPO 1982 01 08 -999.990 -99.990 0 *.. SPO 1982 01 09 -999.990 -99.990 0 *.. SPO 1982 01 10 -999.990 -99.990 0 *.. SPO 1982 01 11 -999.990 -99.990 0 *.. SPO 1982 01 12 -999.990 -99.990 0 *.. SPO 1982 01 13 -999.990 -99.990 0 *.. SPO 1982 01 14 -999.990 -99.990 0 *.. SPO 1982 01 15 -999.990 -99.990 0 *.. SPO 1982 01 16 -999.990 -99.990 0 *.. SPO 1982 01 17 -999.990 -99.990 0 *.. SPO 1982 01 18 -999.990 -99.990 0 *.. SPO 1982 01 19 339.240 0.050 17 ... SPO 1982 01 20 339.190 0.060 23 ... SPO 1982 01 21 339.270 0.110 23 ... SPO 1982 01 22 339.210 0.050 24 ... SPO 1982 01 23 339.220 0.060 23 ... SPO 1982 01 24 339.120 0.050 24 ... SPO 1982 01 25 339.120 0.060 21 ... SPO 1982 01 26 339.180 0.030 15 ... SPO 1982 01 27 339.210 0.040 23 ... SPO 1982 01 28 339.270 0.090 24 ... SPO 1982 01 29 339.210 0.020 24 ... SPO 1982 01 30 339.250 0.040 24 ... SPO 1982 01 31 339.200 0.060 21 ... SPO 1982 02 01 339.230 0.050 21 ... SPO 1982 02 02 339.150 0.100 21 ... SPO 1982 02 03 339.060 0.120 24 ... SPO 1982 02 04 339.180 0.030 24 ... SPO 1982 02 05 339.140 0.030 24 ... SPO 1982 02 06 339.120 0.020 24 ... SPO 1982 02 07 339.170 0.030 20 ... SPO 1982 02 08 339.190 0.030 22 ... SPO 1982 02 09 339.160 0.020 24 ... SPO 1982 02 10 339.140 0.030 24 ... SPO 1982 02 11 339.150 0.030 24 ... SPO 1982 02 12 339.180 0.030 24 ... SPO 1982 02 13 339.210 0.030 24 ... SPO 1982 02 14 339.240 0.030 22 ... SPO 1982 02 15 339.200 0.040 20 ... SPO 1982 02 16 339.220 0.020 24 ... SPO 1982 02 17 339.130 0.060 24 ... SPO 1982 02 18 339.090 0.050 24 ... SPO 1982 02 19 339.160 0.040 21 ... SPO 1982 02 20 339.190 0.060 21 ... SPO 1982 02 21 339.200 0.040 20 ... SPO 1982 02 22 339.210 0.040 21 ... SPO 1982 02 23 339.230 0.040 24 ... SPO 1982 02 24 339.140 0.030 24 ... SPO 1982 02 25 339.220 0.030 24 ... SPO 1982 02 26 339.210 0.040 24 ... SPO 1982 02 27 339.210 0.040 24 ... SPO 1982 02 28 339.140 0.050 22 ... SPO 1982 03 01 339.060 0.050 20 ... SPO 1982 03 02 339.080 0.050 24 ... SPO 1982 03 03 339.160 0.040 24 ... SPO 1982 03 04 339.060 0.030 24 ... SPO 1982 03 05 339.100 0.040 24 ... SPO 1982 03 06 339.110 0.030 24 ... SPO 1982 03 07 339.090 0.030 21 ... SPO 1982 03 08 339.160 0.050 20 ... SPO 1982 03 09 339.230 0.050 24 ... SPO 1982 03 10 339.170 0.030 24 ... SPO 1982 03 11 339.110 0.050 24 ... SPO 1982 03 12 339.080 0.030 24 ... SPO 1982 03 13 339.100 0.030 24 ... SPO 1982 03 14 339.090 0.020 22 ... SPO 1982 03 15 339.140 0.040 20 ... SPO 1982 03 16 339.110 0.040 24 ... SPO 1982 03 17 339.110 0.050 24 ... SPO 1982 03 18 339.090 0.030 24 ... SPO 1982 03 19 339.090 0.030 24 ... SPO 1982 03 20 339.120 0.030 24 ... SPO 1982 03 21 339.140 0.040 21 ... SPO 1982 03 22 339.090 0.020 21 ... SPO 1982 03 23 339.090 0.060 24 ... SPO 1982 03 24 339.110 0.050 24 ... SPO 1982 03 25 339.120 0.030 23 ... SPO 1982 03 26 339.110 0.020 24 ... SPO 1982 03 27 339.110 0.030 24 ... SPO 1982 03 28 339.160 0.030 21 ... SPO 1982 03 29 339.200 0.050 20 ... SPO 1982 03 30 339.270 0.050 24 ... SPO 1982 03 31 339.210 0.040 24 ... SPO 1982 04 01 339.180 0.040 24 ... SPO 1982 04 02 339.200 0.050 24 ... SPO 1982 04 03 339.180 0.050 24 ... SPO 1982 04 04 339.170 0.030 21 ... SPO 1982 04 05 339.180 0.040 21 ... SPO 1982 04 06 339.190 0.030 24 ... SPO 1982 04 07 339.210 0.040 24 ... SPO 1982 04 08 339.240 0.040 24 ... SPO 1982 04 09 339.250 0.030 24 ... SPO 1982 04 10 339.290 0.030 24 ... SPO 1982 04 11 339.280 0.030 21 ... SPO 1982 04 12 339.310 0.050 21 ... SPO 1982 04 13 339.290 0.030 24 ... SPO 1982 04 14 339.300 0.030 24 ... SPO 1982 04 15 339.310 0.040 24 ... SPO 1982 04 16 339.270 0.030 24 ... SPO 1982 04 17 339.290 0.030 24 ... SPO 1982 04 18 339.280 0.040 22 ... SPO 1982 04 19 339.320 0.030 20 ... SPO 1982 04 20 339.350 0.020 24 ... SPO 1982 04 21 339.350 0.040 24 ... SPO 1982 04 22 339.350 0.040 24 ... SPO 1982 04 23 339.390 0.030 24 ... SPO 1982 04 24 339.370 0.040 24 ... SPO 1982 04 25 339.410 0.040 22 ... SPO 1982 04 26 339.420 0.030 20 ... SPO 1982 04 27 339.460 0.040 24 ... SPO 1982 04 28 339.450 0.030 24 ... SPO 1982 04 29 339.480 0.030 24 ... SPO 1982 04 30 339.480 0.040 24 ... SPO 1982 05 01 339.490 0.060 24 ... SPO 1982 05 02 339.450 0.070 22 ... SPO 1982 05 03 339.440 0.030 19 ... SPO 1982 05 04 339.540 0.070 24 ... SPO 1982 05 05 339.540 0.040 24 ... SPO 1982 05 06 339.590 0.070 24 ... SPO 1982 05 07 339.660 0.090 24 ... SPO 1982 05 08 339.590 0.040 21 ... SPO 1982 05 09 339.610 0.040 21 ... SPO 1982 05 10 339.720 0.050 21 ... SPO 1982 05 11 339.660 0.050 24 ... SPO 1982 05 12 339.630 0.040 24 ... SPO 1982 05 13 339.640 0.040 24 ... SPO 1982 05 14 339.630 0.030 23 ... SPO 1982 05 15 339.640 0.030 24 ... SPO 1982 05 16 339.620 0.050 22 ... SPO 1982 05 17 339.540 0.040 20 ... SPO 1982 05 18 339.600 0.030 24 ... SPO 1982 05 19 339.630 0.030 23 ... SPO 1982 05 20 339.630 0.050 24 ... SPO 1982 05 21 339.620 0.040 24 ... SPO 1982 05 22 339.650 0.050 24 ... SPO 1982 05 23 339.740 0.050 22 ... SPO 1982 05 24 339.660 0.030 20 ... SPO 1982 05 25 339.660 0.030 24 ... SPO 1982 05 26 339.690 0.050 24 ... SPO 1982 05 27 339.690 0.060 24 ... SPO 1982 05 28 339.700 0.030 24 ... SPO 1982 05 29 339.690 0.070 24 ... SPO 1982 05 30 339.700 0.050 21 ... SPO 1982 05 31 339.690 0.040 21 ... SPO 1982 06 01 339.690 0.050 24 ... SPO 1982 06 02 339.630 0.040 24 ... SPO 1982 06 03 339.590 0.080 24 ... SPO 1982 06 04 339.520 0.030 24 ... SPO 1982 06 05 339.600 0.050 24 ... SPO 1982 06 06 339.660 0.030 21 ... SPO 1982 06 07 339.680 0.050 21 ... SPO 1982 06 08 339.650 0.040 24 ... SPO 1982 06 09 339.710 0.030 24 ... SPO 1982 06 10 339.700 0.050 22 ... SPO 1982 06 11 339.640 0.040 24 ... SPO 1982 06 12 339.720 0.050 24 ... SPO 1982 06 13 339.690 0.040 21 ... SPO 1982 06 14 339.630 0.060 21 ... SPO 1982 06 15 339.660 0.040 24 ... SPO 1982 06 16 339.680 0.050 24 ... SPO 1982 06 17 339.620 0.040 24 ... SPO 1982 06 18 339.600 0.040 24 ... SPO 1982 06 19 339.620 0.040 24 ... SPO 1982 06 20 339.690 0.030 21 ... SPO 1982 06 21 339.720 0.060 21 ... SPO 1982 06 22 339.680 0.040 24 ... SPO 1982 06 23 -999.990 -99.990 0 *.. SPO 1982 06 24 -999.990 -99.990 0 *.. SPO 1982 06 25 -999.990 -99.990 0 *.. SPO 1982 06 26 -999.990 -99.990 0 *.. SPO 1982 06 27 -999.990 -99.990 0 *.. SPO 1982 06 28 -999.990 -99.990 0 *.. SPO 1982 06 29 -999.990 -99.990 0 *.. SPO 1982 06 30 -999.990 -99.990 0 *.. SPO 1982 07 01 -999.990 -99.990 0 *.. SPO 1982 07 02 -999.990 -99.990 0 *.. SPO 1982 07 03 -999.990 -99.990 0 *.. SPO 1982 07 04 -999.990 -99.990 0 *.. SPO 1982 07 05 -999.990 -99.990 0 *.. SPO 1982 07 06 -999.990 -99.990 0 *.. SPO 1982 07 07 -999.990 -99.990 0 *.. SPO 1982 07 08 -999.990 -99.990 0 *.. SPO 1982 07 09 -999.990 -99.990 0 *.. SPO 1982 07 10 -999.990 -99.990 0 *.. SPO 1982 07 11 -999.990 -99.990 0 *.. SPO 1982 07 12 -999.990 -99.990 0 *.. SPO 1982 07 13 -999.990 -99.990 0 *.. SPO 1982 07 14 -999.990 -99.990 0 *.. SPO 1982 07 15 -999.990 -99.990 0 *.. SPO 1982 07 16 -999.990 -99.990 0 *.. SPO 1982 07 17 -999.990 -99.990 0 *.. SPO 1982 07 18 -999.990 -99.990 0 *.. SPO 1982 07 19 -999.990 -99.990 0 *.. SPO 1982 07 20 -999.990 -99.990 0 *.. SPO 1982 07 21 340.030 0.040 16 ... SPO 1982 07 22 340.030 0.030 24 ... SPO 1982 07 23 340.000 0.030 24 ... SPO 1982 07 24 339.970 0.040 24 ... SPO 1982 07 25 339.960 0.040 21 ... SPO 1982 07 26 339.990 0.040 21 ... SPO 1982 07 27 340.010 0.050 24 ... SPO 1982 07 28 340.050 0.030 24 ... SPO 1982 07 29 340.040 0.050 24 ... SPO 1982 07 30 340.190 0.070 24 ... SPO 1982 07 31 340.190 0.040 24 ... SPO 1982 08 01 340.150 0.040 21 ... SPO 1982 08 02 340.160 0.030 18 ... SPO 1982 08 03 340.210 0.040 24 ... SPO 1982 08 04 340.200 0.040 24 ... SPO 1982 08 05 340.210 0.040 23 ... SPO 1982 08 06 340.220 0.070 24 ... SPO 1982 08 07 340.300 0.030 24 ... SPO 1982 08 08 340.330 0.030 21 ... SPO 1982 08 09 340.350 0.050 19 ... SPO 1982 08 10 340.300 0.060 24 ... SPO 1982 08 11 340.250 0.060 23 ... SPO 1982 08 12 340.030 0.100 24 ... SPO 1982 08 13 340.410 0.040 24 ... SPO 1982 08 14 340.400 0.040 24 ... SPO 1982 08 15 340.400 0.030 21 ... SPO 1982 08 16 340.340 0.020 20 ... SPO 1982 08 17 340.340 0.030 24 ... SPO 1982 08 18 340.350 0.030 24 ... SPO 1982 08 19 340.340 0.050 24 ... SPO 1982 08 20 340.400 0.040 24 ... SPO 1982 08 21 340.420 0.030 24 ... SPO 1982 08 22 340.410 0.040 21 ... SPO 1982 08 23 340.400 0.060 20 ... SPO 1982 08 24 340.410 0.040 21 ... SPO 1982 08 25 340.450 0.050 20 ... SPO 1982 08 26 340.540 0.040 24 ... SPO 1982 08 27 340.640 0.060 24 ... SPO 1982 08 28 340.570 0.030 24 ... SPO 1982 08 29 340.580 0.020 21 ... SPO 1982 08 30 340.570 0.040 20 ... SPO 1982 08 31 340.630 0.040 24 ... SPO 1982 09 01 340.540 0.050 24 ... SPO 1982 09 02 340.530 0.040 24 ... SPO 1982 09 03 340.560 0.030 24 ... SPO 1982 09 04 340.560 0.030 24 ... SPO 1982 09 05 340.590 0.040 22 ... SPO 1982 09 06 340.670 0.030 20 ... SPO 1982 09 07 340.660 0.030 24 ... SPO 1982 09 08 340.690 0.020 24 ... SPO 1982 09 09 340.650 0.020 24 ... SPO 1982 09 10 340.670 0.030 24 ... SPO 1982 09 11 340.670 0.030 24 ... SPO 1982 09 12 340.630 0.030 21 ... SPO 1982 09 13 340.680 0.030 20 ... SPO 1982 09 14 340.680 0.040 24 ... SPO 1982 09 15 340.690 0.030 24 ... SPO 1982 09 16 340.680 0.030 24 ... SPO 1982 09 17 340.620 0.030 24 ... SPO 1982 09 18 340.630 0.040 24 ... SPO 1982 09 19 340.690 0.030 21 ... SPO 1982 09 20 340.690 0.030 20 ... SPO 1982 09 21 340.670 0.050 24 ... SPO 1982 09 22 340.720 0.030 24 ... SPO 1982 09 23 340.720 0.040 24 ... SPO 1982 09 24 340.670 0.030 24 ... SPO 1982 09 25 340.670 0.040 24 ... SPO 1982 09 26 340.700 0.060 21 ... SPO 1982 09 27 340.680 0.040 18 ... SPO 1982 09 28 340.710 0.080 21 ... SPO 1982 09 29 340.750 0.050 24 ... SPO 1982 09 30 340.710 0.030 24 ... SPO 1982 10 01 340.630 0.070 24 ... SPO 1982 10 02 340.720 0.060 24 ... SPO 1982 10 03 340.690 0.040 22 ... SPO 1982 10 04 340.550 0.030 19 ... SPO 1982 10 05 -999.990 -99.990 0 *.. SPO 1982 10 06 340.400 0.080 18 ... SPO 1982 10 07 340.580 0.060 22 ... SPO 1982 10 08 340.470 0.040 24 ... SPO 1982 10 09 340.480 0.070 24 ... SPO 1982 10 10 340.670 0.020 21 ... SPO 1982 10 11 340.600 0.040 21 ... SPO 1982 10 12 340.570 0.040 24 ... SPO 1982 10 13 340.620 0.070 24 ... SPO 1982 10 14 340.650 0.050 24 ... SPO 1982 10 15 340.660 0.050 24 ... SPO 1982 10 16 340.580 0.120 24 ... SPO 1982 10 17 340.520 0.060 21 ... SPO 1982 10 18 340.640 0.030 21 ... SPO 1982 10 19 340.670 0.060 24 ... SPO 1982 10 20 340.640 0.060 24 ... SPO 1982 10 21 340.700 0.050 24 ... SPO 1982 10 22 340.700 0.050 24 ... SPO 1982 10 23 340.680 0.060 24 ... SPO 1982 10 24 340.590 0.090 21 ... SPO 1982 10 25 340.550 0.070 20 ... SPO 1982 10 26 340.610 0.060 24 ... SPO 1982 10 27 340.710 0.100 23 ... SPO 1982 10 28 340.700 0.070 24 ... SPO 1982 10 29 340.690 0.060 24 ... SPO 1982 10 30 340.820 0.080 24 ... SPO 1982 10 31 340.690 0.050 12 ... SPO 1982 11 01 340.660 0.110 21 ... SPO 1982 11 02 340.660 0.110 24 ... SPO 1982 11 03 340.530 0.070 24 ... SPO 1982 11 04 340.520 0.060 24 ... SPO 1982 11 05 340.490 0.050 24 ... SPO 1982 11 06 340.530 0.060 24 ... SPO 1982 11 07 340.570 0.040 20 ... SPO 1982 11 08 340.490 0.090 22 ... SPO 1982 11 09 340.440 0.050 24 ... SPO 1982 11 10 340.410 0.110 24 ... SPO 1982 11 11 340.300 0.100 24 ... SPO 1982 11 12 340.330 0.070 24 ... SPO 1982 11 13 340.270 0.070 24 ... SPO 1982 11 14 340.260 0.070 21 ... SPO 1982 11 15 340.270 0.080 21 ... SPO 1982 11 16 340.420 0.080 24 ... SPO 1982 11 17 340.380 0.080 24 ... SPO 1982 11 18 340.440 0.060 24 ... SPO 1982 11 19 340.460 0.060 23 ... SPO 1982 11 20 340.460 0.040 21 ... SPO 1982 11 21 340.480 0.050 16 ... SPO 1982 11 22 340.520 0.050 12 ... SPO 1982 11 23 340.500 0.060 15 ... SPO 1982 11 24 340.510 0.110 6 ... SPO 1982 11 25 340.360 0.070 17 ... SPO 1982 11 26 340.250 0.050 11 ... SPO 1982 11 27 340.270 0.030 12 ... SPO 1982 11 28 340.310 0.050 19 ... SPO 1982 11 29 340.260 0.070 22 ... SPO 1982 11 30 340.220 0.050 22 ... SPO 1982 12 01 340.270 0.040 24 ... SPO 1982 12 02 340.340 0.050 24 ... SPO 1982 12 03 340.350 0.030 24 ... SPO 1982 12 04 340.350 0.050 24 ... SPO 1982 12 05 340.340 0.040 21 ... SPO 1982 12 06 340.310 0.060 21 ... SPO 1982 12 07 340.320 0.030 24 ... SPO 1982 12 08 340.340 0.060 24 ... SPO 1982 12 09 340.150 0.040 24 ... SPO 1982 12 10 340.130 0.070 24 ... SPO 1982 12 11 340.100 0.060 22 ... SPO 1982 12 12 340.100 0.050 23 ... SPO 1982 12 13 339.920 0.050 13 ... SPO 1982 12 14 339.910 0.040 20 ... SPO 1982 12 15 339.890 0.060 23 ... SPO 1982 12 16 339.940 0.040 24 ... SPO 1982 12 17 339.910 0.040 24 ... SPO 1982 12 18 339.940 0.040 24 ... SPO 1982 12 19 339.890 0.050 21 ... SPO 1982 12 20 339.890 0.060 13 ... SPO 1982 12 21 340.000 0.060 20 ... SPO 1982 12 22 339.970 0.060 22 ... SPO 1982 12 23 339.960 0.030 24 ... SPO 1982 12 24 339.910 0.030 24 ... SPO 1982 12 25 339.870 0.040 24 ... SPO 1982 12 26 339.930 0.040 21 ... SPO 1982 12 27 339.900 0.040 20 ... SPO 1982 12 28 339.870 0.030 24 ... SPO 1982 12 29 339.790 0.040 24 ... SPO 1982 12 30 339.840 0.050 24 ... SPO 1982 12 31 339.840 0.060 15 ... SPO 1983 01 01 339.840 0.030 24 ... SPO 1983 01 02 339.840 0.040 21 ... SPO 1983 01 03 339.880 0.050 19 ... SPO 1983 01 04 339.830 0.050 24 ... SPO 1983 01 05 339.790 0.030 24 ... SPO 1983 01 06 339.770 0.060 22 ... SPO 1983 01 07 339.630 0.070 24 ... SPO 1983 01 08 339.780 0.030 24 ... SPO 1983 01 09 339.740 0.050 21 ... SPO 1983 01 10 339.670 0.030 19 ... SPO 1983 01 11 339.740 0.040 24 ... SPO 1983 01 12 339.800 0.030 24 ... SPO 1983 01 13 339.790 0.030 24 ... SPO 1983 01 14 339.760 0.040 24 ... SPO 1983 01 15 339.740 0.040 24 ... SPO 1983 01 16 339.670 0.050 23 ... SPO 1983 01 17 339.760 0.040 19 ... SPO 1983 01 18 339.770 0.040 23 ... SPO 1983 01 19 339.790 0.050 24 ... SPO 1983 01 20 339.790 0.060 24 ... SPO 1983 01 21 339.700 0.050 24 ... SPO 1983 01 22 339.740 0.060 24 ... SPO 1983 01 23 339.870 0.030 21 ... SPO 1983 01 24 339.880 0.030 21 ... SPO 1983 01 25 339.820 0.050 24 ... SPO 1983 01 26 339.760 0.040 24 ... SPO 1983 01 27 339.800 0.030 24 ... SPO 1983 01 28 339.800 0.040 24 ... SPO 1983 01 29 339.860 0.050 23 ... SPO 1983 01 30 339.830 0.040 20 ... SPO 1983 01 31 339.820 0.040 21 ... SPO 1983 02 01 339.720 0.060 24 ... SPO 1983 02 02 339.750 0.030 24 ... SPO 1983 02 03 339.780 0.060 22 ... SPO 1983 02 04 339.790 0.060 24 ... SPO 1983 02 05 339.770 0.050 23 ... SPO 1983 02 06 339.720 0.030 22 ... SPO 1983 02 07 339.740 0.030 18 ... SPO 1983 02 08 339.690 0.030 23 ... SPO 1983 02 09 339.720 0.020 24 ... SPO 1983 02 10 339.700 0.060 24 ... SPO 1983 02 11 339.700 0.060 24 ... SPO 1983 02 12 339.790 0.060 24 ... SPO 1983 02 13 339.700 0.060 21 ... SPO 1983 02 14 339.750 0.050 22 ... SPO 1983 02 15 339.710 0.030 24 ... SPO 1983 02 16 339.720 0.030 24 ... SPO 1983 02 17 339.650 0.040 24 ... SPO 1983 02 18 339.700 0.060 24 ... SPO 1983 02 19 339.740 0.020 24 ... SPO 1983 02 20 339.760 0.070 20 ... SPO 1983 02 21 339.740 0.030 21 ... SPO 1983 02 22 339.740 0.040 24 ... SPO 1983 02 23 339.690 0.050 24 ... SPO 1983 02 24 339.670 0.030 24 ... SPO 1983 02 25 339.690 0.040 24 ... SPO 1983 02 26 339.650 0.050 24 ... SPO 1983 02 27 339.570 0.060 22 ... SPO 1983 02 28 339.540 0.040 20 ... SPO 1983 03 01 339.630 0.060 24 ... SPO 1983 03 02 339.760 0.060 23 ... SPO 1983 03 03 339.790 0.060 21 ... SPO 1983 03 04 339.690 0.070 24 ... SPO 1983 03 05 339.700 0.040 24 ... SPO 1983 03 06 339.690 0.050 22 ... SPO 1983 03 07 339.820 0.040 18 ... SPO 1983 03 08 339.740 0.100 23 ... SPO 1983 03 09 339.750 0.030 24 ... SPO 1983 03 10 339.740 0.020 24 ... SPO 1983 03 11 339.780 0.040 21 ... SPO 1983 03 12 339.740 0.030 24 ... SPO 1983 03 13 339.780 0.030 22 ... SPO 1983 03 14 339.820 0.050 20 ... SPO 1983 03 15 339.780 0.070 24 ... SPO 1983 03 16 339.850 0.040 24 ... SPO 1983 03 17 339.810 0.040 24 ... SPO 1983 03 18 339.770 0.030 24 ... SPO 1983 03 19 339.800 0.020 24 ... SPO 1983 03 20 339.850 0.030 23 ... SPO 1983 03 21 339.840 0.040 19 ... SPO 1983 03 22 339.860 0.020 24 ... SPO 1983 03 23 339.830 0.040 24 ... SPO 1983 03 24 339.770 0.020 24 ... SPO 1983 03 25 339.780 0.040 24 ... SPO 1983 03 26 339.800 0.030 24 ... SPO 1983 03 27 339.850 0.020 23 ... SPO 1983 03 28 339.800 0.030 19 ... SPO 1983 03 29 339.860 0.040 24 ... SPO 1983 03 30 339.850 0.030 24 ... SPO 1983 03 31 339.870 0.020 24 ... SPO 1983 04 01 339.910 0.050 24 ... SPO 1983 04 02 339.940 0.020 24 ... SPO 1983 04 03 339.960 0.020 22 ... SPO 1983 04 04 340.010 0.030 19 ... SPO 1983 04 05 340.010 0.030 24 ... SPO 1983 04 06 340.070 0.030 24 ... SPO 1983 04 07 340.080 0.020 24 ... SPO 1983 04 08 340.100 0.020 24 ... SPO 1983 04 09 340.140 0.030 24 ... SPO 1983 04 10 340.140 0.060 24 ... SPO 1983 04 11 340.140 0.020 18 ... SPO 1983 04 12 340.190 0.060 24 ... SPO 1983 04 13 340.170 0.070 18 ... SPO 1983 04 14 340.030 0.050 24 ... SPO 1983 04 15 340.150 0.040 24 ... SPO 1983 04 16 340.200 0.050 23 ... SPO 1983 04 17 340.210 0.030 24 ... SPO 1983 04 18 340.240 0.020 3 ... SPO 1983 04 19 340.250 0.060 22 ... SPO 1983 04 20 340.250 0.070 24 ... SPO 1983 04 21 340.330 0.060 24 ... SPO 1983 04 22 340.290 0.040 24 ... SPO 1983 04 23 340.230 0.030 24 ... SPO 1983 04 24 340.220 0.040 23 ... SPO 1983 04 25 340.230 0.040 19 ... SPO 1983 04 26 340.280 0.030 24 ... SPO 1983 04 27 340.330 0.040 24 ... SPO 1983 04 28 340.380 0.060 24 ... SPO 1983 04 29 -999.990 -99.990 0 *.. SPO 1983 04 30 -999.990 -99.990 0 *.. SPO 1983 05 01 -999.990 -99.990 0 *.. SPO 1983 05 02 -999.990 -99.990 0 *.. SPO 1983 05 03 -999.990 -99.990 0 *.. SPO 1983 05 04 -999.990 -99.990 0 *.. SPO 1983 05 05 -999.990 -99.990 0 *.. SPO 1983 05 06 -999.990 -99.990 0 *.. SPO 1983 05 07 -999.990 -99.990 0 *.. SPO 1983 05 08 -999.990 -99.990 0 *.. SPO 1983 05 09 -999.990 -99.990 0 *.. SPO 1983 05 10 -999.990 -99.990 0 *.. SPO 1983 05 11 -999.990 -99.990 0 *.. SPO 1983 05 12 -999.990 -99.990 0 *.. SPO 1983 05 13 -999.990 -99.990 0 *.. SPO 1983 05 14 -999.990 -99.990 0 *.. SPO 1983 05 15 -999.990 -99.990 0 *.. SPO 1983 05 16 -999.990 -99.990 0 *.. SPO 1983 05 17 -999.990 -99.990 0 *.. SPO 1983 05 18 -999.990 -99.990 0 *.. SPO 1983 05 19 -999.990 -99.990 0 *.. SPO 1983 05 20 -999.990 -99.990 0 *.. SPO 1983 05 21 -999.990 -99.990 0 *.. SPO 1983 05 22 -999.990 -99.990 0 *.. SPO 1983 05 23 -999.990 -99.990 0 *.. SPO 1983 05 24 -999.990 -99.990 0 *.. SPO 1983 05 25 -999.990 -99.990 0 *.. SPO 1983 05 26 -999.990 -99.990 0 *.. SPO 1983 05 27 -999.990 -99.990 0 *.. SPO 1983 05 28 -999.990 -99.990 0 *.. SPO 1983 05 29 -999.990 -99.990 0 *.. SPO 1983 05 30 -999.990 -99.990 0 *.. SPO 1983 05 31 -999.990 -99.990 0 *.. SPO 1983 06 01 -999.990 -99.990 0 *.. SPO 1983 06 02 -999.990 -99.990 0 *.. SPO 1983 06 03 -999.990 -99.990 0 *.. SPO 1983 06 04 -999.990 -99.990 0 *.. SPO 1983 06 05 -999.990 -99.990 0 *.. SPO 1983 06 06 -999.990 -99.990 0 *.. SPO 1983 06 07 -999.990 -99.990 0 *.. SPO 1983 06 08 -999.990 -99.990 0 *.. SPO 1983 06 09 -999.990 -99.990 0 *.. SPO 1983 06 10 -999.990 -99.990 0 *.. SPO 1983 06 11 -999.990 -99.990 0 *.. SPO 1983 06 12 -999.990 -99.990 0 *.. SPO 1983 06 13 -999.990 -99.990 0 *.. SPO 1983 06 14 -999.990 -99.990 0 *.. SPO 1983 06 15 -999.990 -99.990 0 *.. SPO 1983 06 16 -999.990 -99.990 0 *.. SPO 1983 06 17 -999.990 -99.990 0 *.. SPO 1983 06 18 340.920 0.030 18 ... SPO 1983 06 19 340.960 0.030 24 ... SPO 1983 06 20 340.960 0.070 19 ... SPO 1983 06 21 341.050 0.020 24 ... SPO 1983 06 22 341.030 0.030 24 ... SPO 1983 06 23 341.060 0.020 24 ... SPO 1983 06 24 341.070 0.050 24 ... SPO 1983 06 25 341.080 0.040 23 ... SPO 1983 06 26 341.040 0.060 23 ... SPO 1983 06 27 341.090 0.050 15 ... SPO 1983 06 28 341.040 0.030 23 ... SPO 1983 06 29 341.070 0.020 19 ... SPO 1983 06 30 341.060 0.020 24 ... SPO 1983 07 01 341.070 0.030 24 ... SPO 1983 07 02 341.130 0.020 24 ... SPO 1983 07 03 341.080 0.030 21 ... SPO 1983 07 04 341.060 0.040 19 ... SPO 1983 07 05 341.050 0.040 24 ... SPO 1983 07 06 341.130 0.080 24 ... SPO 1983 07 07 341.200 0.030 24 ... SPO 1983 07 08 341.180 0.030 24 ... SPO 1983 07 09 341.180 0.030 24 ... SPO 1983 07 10 341.200 0.020 21 ... SPO 1983 07 11 341.160 0.020 19 ... SPO 1983 07 12 341.140 0.020 24 ... SPO 1983 07 13 341.180 0.030 24 ... SPO 1983 07 14 341.230 0.030 24 ... SPO 1983 07 15 341.220 0.020 24 ... SPO 1983 07 16 341.250 0.020 24 ... SPO 1983 07 17 341.270 0.030 24 ... SPO 1983 07 18 341.460 0.100 10 ... SPO 1983 07 19 341.290 0.040 24 ... SPO 1983 07 20 341.320 0.030 23 ... SPO 1983 07 21 341.340 0.020 24 ... SPO 1983 07 22 341.390 0.070 24 ... SPO 1983 07 23 341.430 0.070 24 ... SPO 1983 07 24 341.410 0.050 20 ... SPO 1983 07 25 341.350 0.020 11 ... SPO 1983 07 26 341.340 0.060 20 ... SPO 1983 07 27 341.390 0.010 16 ... SPO 1983 07 28 341.400 0.030 22 ... SPO 1983 07 29 341.510 0.020 16 ... SPO 1983 07 30 341.570 0.030 20 ... SPO 1983 07 31 341.670 0.040 24 ... SPO 1983 08 01 341.720 0.010 16 ... SPO 1983 08 02 341.690 0.030 24 ... SPO 1983 08 03 341.700 0.050 24 ... SPO 1983 08 04 341.720 0.040 24 ... SPO 1983 08 05 341.680 0.020 24 ... SPO 1983 08 06 341.770 0.040 24 ... SPO 1983 08 07 341.810 0.020 23 ... SPO 1983 08 08 341.790 0.030 19 ... SPO 1983 08 09 341.800 0.030 24 ... SPO 1983 08 10 341.810 0.060 24 ... SPO 1983 08 11 341.860 0.020 21 ... SPO 1983 08 12 341.880 0.030 17 ... SPO 1983 08 13 341.910 0.030 24 ... SPO 1983 08 14 341.900 0.020 23 ... SPO 1983 08 15 341.940 0.030 17 ... SPO 1983 08 16 342.040 0.030 24 ... SPO 1983 08 17 342.110 0.070 24 ... SPO 1983 08 18 342.090 0.080 21 ... SPO 1983 08 19 342.120 0.030 24 ... SPO 1983 08 20 342.110 0.030 23 ... SPO 1983 08 21 342.140 0.060 20 ... SPO 1983 08 22 342.100 0.030 18 ... SPO 1983 08 23 342.090 0.080 24 ... SPO 1983 08 24 342.010 0.030 24 ... SPO 1983 08 25 342.030 0.030 24 ... SPO 1983 08 26 342.020 0.050 24 ... SPO 1983 08 27 342.130 0.040 24 ... SPO 1983 08 28 342.100 0.040 21 ... SPO 1983 08 29 342.110 0.060 17 ... SPO 1983 08 30 342.150 0.040 7 ... SPO 1983 08 31 342.120 0.040 24 ... SPO 1983 09 01 342.060 0.020 24 ... SPO 1983 09 02 342.130 0.020 24 ... SPO 1983 09 03 342.120 0.020 24 ... SPO 1983 09 04 342.080 0.040 23 ... SPO 1983 09 05 342.090 0.040 12 ... SPO 1983 09 06 342.190 0.160 16 ... SPO 1983 09 07 342.120 0.030 23 ... SPO 1983 09 08 342.250 0.050 24 ... SPO 1983 09 09 342.310 0.070 24 ... SPO 1983 09 10 342.140 0.020 24 ... SPO 1983 09 11 342.150 0.030 21 ... SPO 1983 09 12 342.140 0.040 18 ... SPO 1983 09 13 341.990 0.080 24 ... SPO 1983 09 14 342.130 0.070 19 ... SPO 1983 09 15 342.150 0.050 24 ... SPO 1983 09 16 342.140 0.040 24 ... SPO 1983 09 17 342.110 0.030 20 ... SPO 1983 09 18 342.090 0.030 24 ... SPO 1983 09 19 342.070 0.030 12 ... SPO 1983 09 20 342.050 0.040 24 ... SPO 1983 09 21 342.070 0.020 24 ... SPO 1983 09 22 342.100 0.060 24 ... SPO 1983 09 23 342.120 0.020 24 ... SPO 1983 09 24 342.140 0.030 24 ... SPO 1983 09 25 342.110 0.030 22 ... SPO 1983 09 26 342.080 0.040 16 ... SPO 1983 09 27 342.060 0.030 24 ... SPO 1983 09 28 342.100 0.030 24 ... SPO 1983 09 29 342.190 0.030 24 ... SPO 1983 09 30 342.100 0.030 24 ... SPO 1983 10 01 342.170 0.030 24 ... SPO 1983 10 02 342.150 0.030 24 ... SPO 1983 10 03 342.210 0.010 12 ... SPO 1983 10 04 342.170 0.030 24 ... SPO 1983 10 05 342.120 0.040 23 ... SPO 1983 10 06 342.090 0.030 24 ... SPO 1983 10 07 342.080 0.030 24 ... SPO 1983 10 08 342.190 0.030 21 ... SPO 1983 10 09 342.170 0.040 20 ... SPO 1983 10 10 342.250 0.060 15 ... SPO 1983 10 11 342.310 0.030 24 ... SPO 1983 10 12 342.280 0.030 23 ... SPO 1983 10 13 342.300 0.060 24 ... SPO 1983 10 14 342.220 0.040 24 ... SPO 1983 10 15 342.230 0.040 23 ... SPO 1983 10 16 342.260 0.020 23 ... SPO 1983 10 17 342.250 0.040 16 ... SPO 1983 10 18 342.270 0.030 24 ... SPO 1983 10 19 342.220 0.020 24 ... SPO 1983 10 20 342.220 0.030 23 ... SPO 1983 10 21 342.170 0.030 24 ... SPO 1983 10 22 342.200 0.040 24 ... SPO 1983 10 23 342.270 0.080 23 ... SPO 1983 10 24 342.330 0.020 14 ... SPO 1983 10 25 342.330 0.030 24 ... SPO 1983 10 26 342.340 0.070 24 ... SPO 1983 10 27 342.330 0.040 23 ... SPO 1983 10 28 342.320 0.030 24 ... SPO 1983 10 29 342.260 0.040 24 ... SPO 1983 10 30 342.330 0.030 24 ... SPO 1983 10 31 342.370 0.030 24 ... SPO 1983 11 01 342.400 0.030 22 ... SPO 1983 11 02 342.440 0.030 11 ... SPO 1983 11 03 342.400 0.040 24 ... SPO 1983 11 04 342.420 0.040 24 ... SPO 1983 11 05 342.370 0.060 23 ... SPO 1983 11 06 342.360 0.060 22 ... SPO 1983 11 07 342.250 0.050 18 ... SPO 1983 11 08 342.300 0.040 24 ... SPO 1983 11 09 342.320 0.020 24 ... SPO 1983 11 10 342.310 0.020 24 ... SPO 1983 11 11 342.320 0.030 24 ... SPO 1983 11 12 342.310 0.020 24 ... SPO 1983 11 13 342.350 0.030 23 ... SPO 1983 11 14 342.350 0.030 17 ... SPO 1983 11 15 342.350 0.040 23 ... SPO 1983 11 16 342.380 0.030 20 ... SPO 1983 11 17 342.310 0.040 24 ... SPO 1983 11 18 342.200 0.050 21 ... SPO 1983 11 19 342.260 0.040 24 ... SPO 1983 11 20 342.240 0.030 22 ... SPO 1983 11 21 342.280 0.040 19 ... SPO 1983 11 22 342.270 0.030 24 ... SPO 1983 11 23 342.260 0.050 22 ... SPO 1983 11 24 342.270 0.050 23 ... SPO 1983 11 25 342.280 0.020 24 ... SPO 1983 11 26 342.260 0.020 24 ... SPO 1983 11 27 342.290 0.030 22 ... SPO 1983 11 28 342.320 0.030 19 ... SPO 1983 11 29 342.290 0.030 24 ... SPO 1983 11 30 342.240 0.040 24 ... SPO 1983 12 01 342.220 0.020 23 ... SPO 1983 12 02 342.220 0.030 24 ... SPO 1983 12 03 342.260 0.040 24 ... SPO 1983 12 04 342.220 0.040 20 ... SPO 1983 12 05 -999.990 -99.990 0 *.. SPO 1983 12 06 -999.990 -99.990 0 *.. SPO 1983 12 07 -999.990 -99.990 0 *.. SPO 1983 12 08 -999.990 -99.990 0 *.. SPO 1983 12 09 342.250 0.020 14 ... SPO 1983 12 10 342.290 0.050 19 ... SPO 1983 12 11 342.220 0.030 22 ... SPO 1983 12 12 342.330 0.080 3 ... SPO 1983 12 13 342.230 0.030 24 ... SPO 1983 12 14 342.240 0.040 23 ... SPO 1983 12 15 342.280 0.070 24 ... SPO 1983 12 16 342.290 0.080 24 ... SPO 1983 12 17 342.280 0.050 22 ... SPO 1983 12 18 342.260 0.060 22 ... SPO 1983 12 19 342.210 0.050 19 ... SPO 1983 12 20 342.260 0.040 21 ... SPO 1983 12 21 342.200 0.050 17 ... SPO 1983 12 22 342.220 0.060 17 ... SPO 1983 12 23 342.160 0.020 9 ... SPO 1983 12 24 342.130 0.030 19 ... SPO 1983 12 25 342.100 0.020 22 ... SPO 1983 12 26 342.130 0.020 20 ... SPO 1983 12 27 342.150 0.020 16 ... SPO 1983 12 28 342.090 0.040 16 ... SPO 1983 12 29 -999.990 -99.990 0 *.. SPO 1983 12 30 342.090 0.020 10 ... SPO 1983 12 31 342.080 0.030 18 ... SPO 1984 01 01 342.070 0.030 21 ... SPO 1984 01 02 342.150 0.080 18 ... SPO 1984 01 03 342.170 0.030 22 ... SPO 1984 01 04 342.170 0.060 24 ... SPO 1984 01 05 342.190 0.050 24 ... SPO 1984 01 06 342.190 0.020 24 ... SPO 1984 01 07 342.200 0.020 15 ... SPO 1984 01 08 342.180 0.020 22 ... SPO 1984 01 09 342.180 0.020 19 ... SPO 1984 01 10 342.170 0.020 24 ... SPO 1984 01 11 342.150 0.050 12 ... SPO 1984 01 12 342.110 0.040 24 ... SPO 1984 01 13 342.140 0.030 24 ... SPO 1984 01 14 341.870 0.110 24 ... SPO 1984 01 15 341.720 0.100 21 ... SPO 1984 01 16 341.680 0.130 17 ... SPO 1984 01 17 341.970 0.050 23 ... SPO 1984 01 18 342.030 0.030 22 ... SPO 1984 01 19 342.050 0.040 24 ... SPO 1984 01 20 342.020 0.030 24 ... SPO 1984 01 21 342.040 0.020 24 ... SPO 1984 01 22 342.010 0.050 23 ... SPO 1984 01 23 341.970 0.030 18 ... SPO 1984 01 24 341.970 0.050 24 ... SPO 1984 01 25 341.950 0.080 24 ... SPO 1984 01 26 342.000 0.040 24 ... SPO 1984 01 27 -999.990 -99.990 0 *.. SPO 1984 01 28 -999.990 -99.990 0 *.. SPO 1984 01 29 341.990 0.030 18 ... SPO 1984 01 30 342.020 0.060 20 ... SPO 1984 01 31 341.960 0.040 24 ... SPO 1984 02 01 342.030 0.030 24 ... SPO 1984 02 02 342.000 0.030 24 ... SPO 1984 02 03 341.980 0.040 24 ... SPO 1984 02 04 342.000 0.030 24 ... SPO 1984 02 05 342.060 0.020 21 ... SPO 1984 02 06 342.060 0.030 18 ... SPO 1984 02 07 342.040 0.020 24 ... SPO 1984 02 08 342.030 0.030 24 ... SPO 1984 02 09 342.020 0.020 24 ... SPO 1984 02 10 342.020 0.030 24 ... SPO 1984 02 11 342.020 0.040 23 ... SPO 1984 02 12 342.000 0.020 21 ... SPO 1984 02 13 341.990 0.040 19 ... SPO 1984 02 14 341.910 0.060 22 ... SPO 1984 02 15 342.010 0.050 23 ... SPO 1984 02 16 342.090 0.040 24 ... SPO 1984 02 17 342.050 0.030 24 ... SPO 1984 02 18 341.970 0.030 23 ... SPO 1984 02 19 341.950 0.020 20 ... SPO 1984 02 20 341.960 0.020 20 ... SPO 1984 02 21 341.980 0.030 24 ... SPO 1984 02 22 342.020 0.050 22 ... SPO 1984 02 23 342.030 0.040 24 ... SPO 1984 02 24 342.130 0.060 24 ... SPO 1984 02 25 342.050 0.080 23 ... SPO 1984 02 26 341.980 0.050 22 ... SPO 1984 02 27 341.820 0.020 19 ... SPO 1984 02 28 341.880 0.040 24 ... SPO 1984 02 29 341.940 0.020 24 ... SPO 1984 03 01 341.960 0.030 24 ... SPO 1984 03 02 341.910 0.050 19 ... SPO 1984 03 03 341.730 0.050 24 ... SPO 1984 03 04 341.620 0.040 22 ... SPO 1984 03 05 341.710 0.020 19 ... SPO 1984 03 06 341.650 0.030 20 ... SPO 1984 03 07 341.750 0.030 24 ... SPO 1984 03 08 341.810 0.070 24 ... SPO 1984 03 09 341.820 0.100 24 ... SPO 1984 03 10 341.530 0.040 24 ... SPO 1984 03 11 341.550 0.040 22 ... SPO 1984 03 12 341.580 0.040 19 ... SPO 1984 03 13 341.610 0.060 24 ... SPO 1984 03 14 341.790 0.060 24 ... SPO 1984 03 15 341.860 0.030 24 ... SPO 1984 03 16 341.900 0.030 24 ... SPO 1984 03 17 341.870 0.020 24 ... SPO 1984 03 18 341.840 0.010 21 ... SPO 1984 03 19 341.850 0.040 20 ... SPO 1984 03 20 341.860 0.020 24 ... SPO 1984 03 21 341.880 0.030 20 ... SPO 1984 03 22 341.860 0.020 21 ... SPO 1984 03 23 341.850 0.030 24 ... SPO 1984 03 24 341.850 0.020 24 ... SPO 1984 03 25 341.850 0.020 21 ... SPO 1984 03 26 341.800 0.020 19 ... SPO 1984 03 27 341.800 0.020 24 ... SPO 1984 03 28 341.800 0.020 24 ... SPO 1984 03 29 341.810 0.020 24 ... SPO 1984 03 30 341.850 0.020 24 ... SPO 1984 03 31 341.850 0.020 24 ... SPO 1984 04 01 341.850 0.010 21 ... SPO 1984 04 02 341.800 0.010 20 ... SPO 1984 04 03 341.840 0.050 24 ... SPO 1984 04 04 341.790 0.030 24 ... SPO 1984 04 05 341.800 0.020 24 ... SPO 1984 04 06 341.800 0.030 24 ... SPO 1984 04 07 341.890 0.020 24 ... SPO 1984 04 08 341.870 0.020 22 ... SPO 1984 04 09 341.900 0.040 19 ... SPO 1984 04 10 341.870 0.040 23 ... SPO 1984 04 11 341.740 0.030 17 ... SPO 1984 04 12 341.700 0.040 18 ... SPO 1984 04 13 341.810 0.040 23 ... SPO 1984 04 14 341.890 0.020 18 ... SPO 1984 04 15 341.880 0.020 21 ... SPO 1984 04 16 341.850 0.030 19 ... SPO 1984 04 17 341.880 0.020 24 ... SPO 1984 04 18 341.810 0.040 19 ... SPO 1984 04 19 341.830 0.020 20 ... SPO 1984 04 20 341.820 0.030 19 ... SPO 1984 04 21 341.880 0.030 24 ... SPO 1984 04 22 341.890 0.010 22 ... SPO 1984 04 23 341.990 0.040 15 ... SPO 1984 04 24 342.000 0.030 18 ... SPO 1984 04 25 341.980 0.030 20 ... SPO 1984 04 26 341.950 0.030 20 ... SPO 1984 04 27 341.950 0.040 24 ... SPO 1984 04 28 341.940 0.020 24 ... SPO 1984 04 29 341.990 0.030 22 ... SPO 1984 04 30 341.930 0.020 18 ... SPO 1984 05 01 341.930 0.020 16 ... SPO 1984 05 02 341.940 0.030 12 ... SPO 1984 05 03 341.930 0.020 12 ... SPO 1984 05 04 341.900 0.030 16 ... SPO 1984 05 05 341.990 0.020 20 ... SPO 1984 05 06 342.010 0.010 12 ... SPO 1984 05 07 341.940 0.030 13 ... SPO 1984 05 08 341.970 0.040 13 ... SPO 1984 05 09 342.010 0.060 18 ... SPO 1984 05 10 342.030 0.030 19 ... SPO 1984 05 11 342.010 0.020 20 ... SPO 1984 05 12 341.990 0.030 16 ... SPO 1984 05 13 342.080 0.010 19 ... SPO 1984 05 14 342.020 0.030 13 ... SPO 1984 05 15 342.020 0.020 11 ... SPO 1984 05 16 342.060 0.030 9 ... SPO 1984 05 17 342.040 0.020 16 ... SPO 1984 05 18 342.070 0.020 15 ... SPO 1984 05 19 342.090 0.020 12 ... SPO 1984 05 20 342.040 0.030 11 ... SPO 1984 05 21 342.060 0.020 14 ... SPO 1984 05 22 342.090 0.020 12 ... SPO 1984 05 23 342.110 0.010 17 ... SPO 1984 05 24 342.100 0.020 15 ... SPO 1984 05 25 342.080 0.030 10 ... SPO 1984 05 26 342.070 0.020 16 ... SPO 1984 05 27 342.080 0.010 21 ... SPO 1984 05 28 342.100 0.030 14 ... SPO 1984 05 29 342.090 0.030 12 ... SPO 1984 05 30 342.080 0.010 15 ... SPO 1984 05 31 342.070 0.030 15 ... SPO 1984 06 01 342.090 0.020 4 ... SPO 1984 06 02 342.200 0.030 6 ... SPO 1984 06 03 342.080 0.030 17 ... SPO 1984 06 04 342.160 0.020 13 ... SPO 1984 06 05 342.160 0.050 13 ... SPO 1984 06 06 342.130 0.030 15 ... SPO 1984 06 07 342.190 0.030 10 ... SPO 1984 06 08 -999.990 -99.990 0 *.. SPO 1984 06 09 342.160 0.010 17 ... SPO 1984 06 10 342.260 0.010 3 ... SPO 1984 06 11 342.180 0.030 16 ... SPO 1984 06 12 342.210 0.040 3 ... SPO 1984 06 13 342.290 0.020 5 ... SPO 1984 06 14 -999.990 -99.990 0 *.. SPO 1984 06 15 342.240 0.020 23 ... SPO 1984 06 16 342.230 0.030 24 ... SPO 1984 06 17 342.240 0.030 20 ... SPO 1984 06 18 342.220 0.060 16 ... SPO 1984 06 19 342.240 0.030 24 ... SPO 1984 06 20 342.200 0.020 23 ... SPO 1984 06 21 342.210 0.020 24 ... SPO 1984 06 22 342.280 0.030 24 ... SPO 1984 06 23 342.280 0.020 14 ... SPO 1984 06 24 342.300 0.020 17 ... SPO 1984 06 25 342.280 0.050 8 ... SPO 1984 06 26 342.280 0.030 15 ... SPO 1984 06 27 342.320 0.020 19 ... SPO 1984 06 28 342.320 0.030 19 ... SPO 1984 06 29 342.360 0.030 24 ... SPO 1984 06 30 342.420 0.020 24 ... SPO 1984 07 01 342.410 0.020 21 ... SPO 1984 07 02 342.400 0.030 21 ... SPO 1984 07 03 342.410 0.020 22 ... SPO 1984 07 04 342.420 0.020 24 ... SPO 1984 07 05 342.430 0.030 24 ... SPO 1984 07 06 342.430 0.030 23 ... SPO 1984 07 07 342.440 0.020 24 ... SPO 1984 07 08 342.510 0.020 22 ... SPO 1984 07 09 342.560 0.020 20 ... SPO 1984 07 10 342.590 0.020 24 ... SPO 1984 07 11 342.590 0.020 24 ... SPO 1984 07 12 342.600 0.020 24 ... SPO 1984 07 13 342.640 0.020 24 ... SPO 1984 07 14 342.640 0.030 24 ... SPO 1984 07 15 342.590 0.020 12 ... SPO 1984 07 16 342.580 0.020 20 ... SPO 1984 07 17 342.620 0.020 24 ... SPO 1984 07 18 342.640 0.030 24 ... SPO 1984 07 19 342.670 0.020 24 ... SPO 1984 07 20 342.690 0.020 24 ... SPO 1984 07 21 342.710 0.020 24 ... SPO 1984 07 22 342.750 0.020 22 ... SPO 1984 07 23 342.820 0.060 3 ... SPO 1984 07 24 342.830 0.030 24 ... SPO 1984 07 25 342.790 0.030 24 ... SPO 1984 07 26 342.860 0.030 23 ... SPO 1984 07 27 342.950 0.040 24 ... SPO 1984 07 28 342.960 0.040 24 ... SPO 1984 07 29 342.870 0.060 22 ... SPO 1984 07 30 342.930 0.040 20 ... SPO 1984 07 31 342.900 0.030 24 ... SPO 1984 08 01 342.990 0.030 24 ... SPO 1984 08 02 342.880 0.070 24 ... SPO 1984 08 03 342.880 0.030 24 ... SPO 1984 08 04 342.970 0.060 23 ... SPO 1984 08 05 343.030 0.020 22 ... SPO 1984 08 06 343.030 0.030 19 ... SPO 1984 08 07 343.040 0.030 24 ... SPO 1984 08 08 343.020 0.040 24 ... SPO 1984 08 09 343.000 0.020 24 ... SPO 1984 08 10 343.010 0.030 24 ... SPO 1984 08 11 343.060 0.050 24 ... SPO 1984 08 12 343.200 0.050 4 ... SPO 1984 08 13 343.190 0.020 20 ... SPO 1984 08 14 343.220 0.020 17 ... SPO 1984 08 15 343.210 0.020 24 ... SPO 1984 08 16 343.250 0.020 24 ... SPO 1984 08 17 343.260 0.030 24 ... SPO 1984 08 18 343.230 0.030 24 ... SPO 1984 08 19 343.270 0.020 23 ... SPO 1984 08 20 343.250 0.030 18 ... SPO 1984 08 21 343.240 0.020 24 ... SPO 1984 08 22 343.240 0.030 23 ... SPO 1984 08 23 343.250 0.020 24 ... SPO 1984 08 24 343.270 0.030 13 ... SPO 1984 08 25 343.330 0.070 24 ... SPO 1984 08 26 343.400 0.020 22 ... SPO 1984 08 27 343.420 0.010 18 ... SPO 1984 08 28 343.410 0.020 24 ... SPO 1984 08 29 343.370 0.040 24 ... SPO 1984 08 30 343.370 0.020 24 ... SPO 1984 08 31 343.480 0.040 24 ... SPO 1984 09 01 343.460 0.030 24 ... SPO 1984 09 02 343.400 0.020 22 ... SPO 1984 09 03 343.410 0.020 20 ... SPO 1984 09 04 343.460 0.040 24 ... SPO 1984 09 05 343.480 0.030 24 ... SPO 1984 09 06 343.470 0.020 24 ... SPO 1984 09 07 343.500 0.030 24 ... SPO 1984 09 08 343.480 0.030 24 ... SPO 1984 09 09 343.460 0.020 22 ... SPO 1984 09 10 343.440 0.060 20 ... SPO 1984 09 11 343.490 0.090 24 ... SPO 1984 09 12 343.500 0.020 24 ... SPO 1984 09 13 343.490 0.020 24 ... SPO 1984 09 14 343.480 0.030 24 ... SPO 1984 09 15 343.440 0.040 20 ... SPO 1984 09 16 343.520 0.050 23 ... SPO 1984 09 17 343.440 0.060 19 ... SPO 1984 09 18 343.420 0.030 24 ... SPO 1984 09 19 343.480 0.020 19 ... SPO 1984 09 20 343.560 0.060 17 ... SPO 1984 09 21 343.620 0.020 20 ... SPO 1984 09 22 343.590 0.020 24 ... SPO 1984 09 23 343.570 0.030 22 ... SPO 1984 09 24 343.470 0.010 20 ... SPO 1984 09 25 343.550 0.030 24 ... SPO 1984 09 26 343.610 0.020 24 ... SPO 1984 09 27 343.570 0.030 24 ... SPO 1984 09 28 343.580 0.020 24 ... SPO 1984 09 29 343.590 0.030 24 ... SPO 1984 09 30 343.530 0.020 22 ... SPO 1984 10 01 343.550 0.020 20 ... SPO 1984 10 02 343.550 0.040 24 ... SPO 1984 10 03 343.540 0.040 24 ... SPO 1984 10 04 343.620 0.060 24 ... SPO 1984 10 05 343.650 0.040 24 ... SPO 1984 10 06 343.670 0.040 24 ... SPO 1984 10 07 343.620 0.040 22 ... SPO 1984 10 08 343.680 0.030 20 ... SPO 1984 10 09 343.700 0.020 24 ... SPO 1984 10 10 343.680 0.070 19 ... SPO 1984 10 11 343.660 0.060 24 ... SPO 1984 10 12 343.700 0.030 24 ... SPO 1984 10 13 343.690 0.050 24 ... SPO 1984 10 14 343.720 0.030 22 ... SPO 1984 10 15 343.720 0.040 20 ... SPO 1984 10 16 343.740 0.050 24 ... SPO 1984 10 17 343.690 0.070 24 ... SPO 1984 10 18 343.640 0.050 24 ... SPO 1984 10 19 343.600 0.050 24 ... SPO 1984 10 20 343.590 0.030 24 ... SPO 1984 10 21 343.600 0.040 22 ... SPO 1984 10 22 343.690 0.040 19 ... SPO 1984 10 23 343.740 0.030 24 ... SPO 1984 10 24 343.690 0.060 20 ... SPO 1984 10 25 343.620 0.050 18 ... SPO 1984 10 26 343.650 0.080 14 ... SPO 1984 10 27 343.690 0.050 24 ... SPO 1984 10 28 343.670 0.030 22 ... SPO 1984 10 29 343.690 0.050 20 ... SPO 1984 10 30 343.720 0.040 24 ... SPO 1984 10 31 343.650 0.040 23 ... SPO 1984 11 01 343.630 0.190 24 ... SPO 1984 11 02 343.640 0.160 24 ... SPO 1984 11 03 343.660 0.130 18 ... SPO 1984 11 04 343.610 0.100 22 ... SPO 1984 11 05 343.540 0.110 23 ... SPO 1984 11 06 343.580 0.180 24 ... SPO 1984 11 07 343.550 0.160 24 ... SPO 1984 11 08 343.590 0.130 21 ... SPO 1984 11 09 343.660 0.170 24 ... SPO 1984 11 10 343.580 0.150 24 ... SPO 1984 11 11 343.580 0.160 22 ... SPO 1984 11 12 343.590 0.120 17 ... SPO 1984 11 13 -999.990 -99.990 0 *.. SPO 1984 11 14 -999.990 -99.990 0 *.. SPO 1984 11 15 -999.990 -99.990 0 *.. SPO 1984 11 16 -999.990 -99.990 0 *.. SPO 1984 11 17 343.340 0.050 12 ... SPO 1984 11 18 343.200 0.070 23 ... SPO 1984 11 19 343.380 0.050 24 ... SPO 1984 11 20 343.310 0.130 23 ... SPO 1984 11 21 343.400 0.110 21 ... SPO 1984 11 22 343.400 0.100 24 ... SPO 1984 11 23 343.390 0.070 23 ... SPO 1984 11 24 343.400 0.050 17 ... SPO 1984 11 25 343.430 0.090 22 ... SPO 1984 11 26 343.390 0.110 21 ... SPO 1984 11 27 343.500 0.120 24 ... SPO 1984 11 28 343.540 0.090 23 ... SPO 1984 11 29 343.540 0.030 4 ... SPO 1984 11 30 -999.990 -99.990 0 *.. SPO 1984 12 01 -999.990 -99.990 0 *.. SPO 1984 12 02 343.400 0.050 12 ... SPO 1984 12 03 343.270 0.090 18 ... SPO 1984 12 04 343.260 0.070 23 ... SPO 1984 12 05 343.130 0.070 24 ... SPO 1984 12 06 343.210 0.100 24 ... SPO 1984 12 07 343.380 0.090 15 ... SPO 1984 12 08 343.380 0.070 17 ... SPO 1984 12 09 343.330 0.110 23 ... SPO 1984 12 10 343.270 0.070 17 ... SPO 1984 12 11 343.290 0.100 24 ... SPO 1984 12 12 343.380 0.070 23 ... SPO 1984 12 13 343.310 0.080 24 ... SPO 1984 12 14 343.190 0.050 12 ... SPO 1984 12 15 343.070 0.030 4 ... SPO 1984 12 16 -999.990 -99.990 0 *.. SPO 1984 12 17 -999.990 -99.990 0 *.. SPO 1984 12 18 -999.990 -99.990 0 *.. SPO 1984 12 19 -999.990 -99.990 0 *.. SPO 1984 12 20 -999.990 -99.990 0 *.. SPO 1984 12 21 -999.990 -99.990 0 *.. SPO 1984 12 22 -999.990 -99.990 0 *.. SPO 1984 12 23 -999.990 -99.990 0 *.. SPO 1984 12 24 -999.990 -99.990 0 *.. SPO 1984 12 25 -999.990 -99.990 0 *.. SPO 1984 12 26 -999.990 -99.990 0 *.. SPO 1984 12 27 -999.990 -99.990 0 *.. SPO 1984 12 28 -999.990 -99.990 0 *.. SPO 1984 12 29 -999.990 -99.990 0 *.. SPO 1984 12 30 -999.990 -99.990 0 *.. SPO 1984 12 31 -999.990 -99.990 0 *.. SPO 1985 01 01 -999.990 -99.990 0 *.. SPO 1985 01 02 -999.990 -99.990 0 *.. SPO 1985 01 03 -999.990 -99.990 0 *.. SPO 1985 01 04 -999.990 -99.990 0 *.. SPO 1985 01 05 -999.990 -99.990 0 *.. SPO 1985 01 06 -999.990 -99.990 0 *.. SPO 1985 01 07 -999.990 -99.990 0 *.. SPO 1985 01 08 -999.990 -99.990 0 *.. SPO 1985 01 09 -999.990 -99.990 0 *.. SPO 1985 01 10 -999.990 -99.990 0 *.. SPO 1985 01 11 -999.990 -99.990 0 *.. SPO 1985 01 12 -999.990 -99.990 0 *.. SPO 1985 01 13 343.320 0.090 21 ... SPO 1985 01 14 343.190 0.150 6 ... SPO 1985 01 15 343.160 0.050 23 ... SPO 1985 01 16 343.150 0.090 24 ... SPO 1985 01 17 343.120 0.070 21 ... SPO 1985 01 18 343.250 0.070 23 ... SPO 1985 01 19 343.230 0.040 17 ... SPO 1985 01 20 343.230 0.050 24 ... SPO 1985 01 21 343.340 0.040 24 ... SPO 1985 01 22 343.210 0.060 24 ... SPO 1985 01 23 343.240 0.050 21 ... SPO 1985 01 24 343.150 0.060 24 ... SPO 1985 01 25 343.220 0.130 4 ... SPO 1985 01 26 343.190 0.060 19 ... SPO 1985 01 27 343.050 0.080 20 ... SPO 1985 01 28 343.050 0.100 23 ... SPO 1985 01 29 343.120 0.090 23 ... SPO 1985 01 30 343.050 0.080 21 ... SPO 1985 01 31 343.010 0.110 19 ... SPO 1985 02 01 343.070 0.060 20 ... SPO 1985 02 02 343.070 0.070 15 ... SPO 1985 02 03 343.070 0.110 18 ... SPO 1985 02 04 343.070 0.130 13 ... SPO 1985 02 05 343.120 0.140 23 ... SPO 1985 02 06 343.230 0.090 22 ... SPO 1985 02 07 343.280 0.120 19 ... SPO 1985 02 08 343.160 0.130 14 ... SPO 1985 02 09 343.120 0.060 17 ... SPO 1985 02 10 343.160 0.090 20 ... SPO 1985 02 11 343.090 0.060 19 ... SPO 1985 02 12 342.980 0.100 15 ... SPO 1985 02 13 342.950 0.170 20 ... SPO 1985 02 14 342.850 0.090 24 ... SPO 1985 02 15 342.800 0.120 20 ... SPO 1985 02 16 342.830 0.050 16 ... SPO 1985 02 17 342.830 0.100 24 ... SPO 1985 02 18 342.810 0.050 24 ... SPO 1985 02 19 342.920 0.060 24 ... SPO 1985 02 20 342.910 0.050 24 ... SPO 1985 02 21 342.920 0.070 16 ... SPO 1985 02 22 343.050 0.080 20 ... SPO 1985 02 23 343.010 0.020 13 ... SPO 1985 02 24 343.010 0.060 24 ... SPO 1985 02 25 342.980 0.100 22 ... SPO 1985 02 26 343.050 0.090 23 ... SPO 1985 02 27 342.970 0.050 23 ... SPO 1985 02 28 343.040 0.080 17 ... SPO 1985 03 01 343.040 0.110 13 ... SPO 1985 03 02 342.960 0.030 5 ... SPO 1985 03 03 342.830 0.080 24 ... SPO 1985 03 04 342.940 0.080 24 ... SPO 1985 03 05 342.890 0.110 18 ... SPO 1985 03 06 342.920 0.080 21 ... SPO 1985 03 07 342.980 0.030 13 ... SPO 1985 03 08 343.010 0.040 20 ... SPO 1985 03 09 343.010 0.050 18 ... SPO 1985 03 10 342.670 0.120 7 ... SPO 1985 03 11 342.910 0.050 20 ... SPO 1985 03 12 343.080 0.130 9 ... SPO 1985 03 13 342.870 0.040 24 ... SPO 1985 03 14 342.860 0.040 24 ... SPO 1985 03 15 342.820 0.060 17 ... SPO 1985 03 16 342.810 0.080 21 ... SPO 1985 03 17 342.860 0.050 24 ... SPO 1985 03 18 342.880 0.060 19 ... SPO 1985 03 19 342.860 0.070 24 ... SPO 1985 03 20 342.810 0.080 24 ... SPO 1985 03 21 342.840 0.060 23 ... SPO 1985 03 22 342.840 0.040 22 ... SPO 1985 03 23 342.840 0.040 20 ... SPO 1985 03 24 342.830 0.030 24 ... SPO 1985 03 25 342.850 0.060 24 ... SPO 1985 03 26 342.890 0.070 24 ... SPO 1985 03 27 342.880 0.040 21 ... SPO 1985 03 28 342.940 0.050 24 ... SPO 1985 03 29 342.880 0.050 23 ... SPO 1985 03 30 343.040 0.060 19 ... SPO 1985 03 31 342.880 0.060 23 ... SPO 1985 04 01 342.920 0.050 24 ... SPO 1985 04 02 342.860 0.070 18 ... SPO 1985 04 03 -999.990 -99.990 0 *.. SPO 1985 04 04 -999.990 -99.990 0 *.. SPO 1985 04 05 -999.990 -99.990 0 *.. SPO 1985 04 06 342.980 0.070 3 ... SPO 1985 04 07 342.900 0.080 15 ... SPO 1985 04 08 342.910 0.060 23 ... SPO 1985 04 09 343.010 0.030 23 ... SPO 1985 04 10 343.000 0.060 24 ... SPO 1985 04 11 342.960 0.030 24 ... SPO 1985 04 12 342.880 0.040 24 ... SPO 1985 04 13 342.960 0.060 18 ... SPO 1985 04 14 342.950 0.050 24 ... SPO 1985 04 15 342.950 0.030 23 ... SPO 1985 04 16 343.040 0.060 24 ... SPO 1985 04 17 342.970 0.040 24 ... SPO 1985 04 18 343.020 0.050 24 ... SPO 1985 04 19 343.100 0.030 21 ... SPO 1985 04 20 343.150 0.040 21 ... SPO 1985 04 21 343.140 0.040 24 ... SPO 1985 04 22 343.150 0.020 24 ... SPO 1985 04 23 343.160 0.050 23 ... SPO 1985 04 24 343.290 0.050 19 ... SPO 1985 04 25 343.200 0.040 24 ... SPO 1985 04 26 343.200 0.050 20 ... SPO 1985 04 27 343.130 0.070 19 ... SPO 1985 04 28 343.140 0.030 24 ... SPO 1985 04 29 343.180 0.050 24 ... SPO 1985 04 30 343.210 0.030 24 ... SPO 1985 05 01 343.310 0.060 23 ... SPO 1985 05 02 343.310 0.040 24 ... SPO 1985 05 03 343.270 0.020 18 ... SPO 1985 05 04 343.260 0.020 24 ... SPO 1985 05 05 343.290 0.040 24 ... SPO 1985 05 06 343.280 0.050 24 ... SPO 1985 05 07 343.320 0.030 24 ... SPO 1985 05 08 343.290 0.020 18 ... SPO 1985 05 09 343.300 0.030 16 ... SPO 1985 05 10 343.300 0.020 21 ... SPO 1985 05 11 343.270 0.040 20 ... SPO 1985 05 12 343.270 0.020 24 ... SPO 1985 05 13 343.360 0.050 24 ... SPO 1985 05 14 343.310 0.030 24 ... SPO 1985 05 15 343.290 0.040 24 ... SPO 1985 05 16 343.320 0.020 24 ... SPO 1985 05 17 343.380 0.030 21 ... SPO 1985 05 18 343.470 0.080 20 ... SPO 1985 05 19 343.330 0.040 24 ... SPO 1985 05 20 343.320 0.030 24 ... SPO 1985 05 21 343.330 0.040 24 ... SPO 1985 05 22 343.350 0.060 23 ... SPO 1985 05 23 343.320 0.040 23 ... SPO 1985 05 24 343.510 0.110 17 ... SPO 1985 05 25 343.570 0.050 19 ... SPO 1985 05 26 343.530 0.030 24 ... SPO 1985 05 27 343.570 0.030 24 ... SPO 1985 05 28 343.540 0.020 24 ... SPO 1985 05 29 343.520 0.030 24 ... SPO 1985 05 30 343.540 0.020 24 ... SPO 1985 05 31 343.580 0.040 18 ... SPO 1985 06 01 343.550 0.030 18 ... SPO 1985 06 02 343.570 0.040 21 ... SPO 1985 06 03 343.580 0.050 23 ... SPO 1985 06 04 343.560 0.020 24 ... SPO 1985 06 05 343.620 0.030 24 ... SPO 1985 06 06 343.660 0.040 23 ... SPO 1985 06 07 343.740 0.050 23 ... SPO 1985 06 08 343.610 0.030 15 ... SPO 1985 06 09 343.590 0.030 24 ... SPO 1985 06 10 343.610 0.030 24 ... SPO 1985 06 11 343.590 0.030 24 ... SPO 1985 06 12 343.580 0.020 24 ... SPO 1985 06 13 343.610 0.030 24 ... SPO 1985 06 14 343.800 0.200 10 ... SPO 1985 06 15 -999.990 -99.990 0 *.. SPO 1985 06 16 343.660 0.050 22 ... SPO 1985 06 17 343.710 0.040 23 ... SPO 1985 06 18 343.720 0.030 22 ... SPO 1985 06 19 343.720 0.020 23 ... SPO 1985 06 20 343.740 0.060 23 ... SPO 1985 06 21 343.750 0.030 22 ... SPO 1985 06 22 343.780 0.030 19 ... SPO 1985 06 23 343.860 0.040 24 ... SPO 1985 06 24 343.890 0.040 24 ... SPO 1985 06 25 343.850 0.030 24 ... SPO 1985 06 26 343.850 0.020 23 ... SPO 1985 06 27 343.880 0.040 24 ... SPO 1985 06 28 343.850 0.050 22 ... SPO 1985 06 29 343.880 0.040 18 ... SPO 1985 06 30 343.840 0.030 24 ... SPO 1985 07 01 343.910 0.050 23 ... SPO 1985 07 02 343.920 0.060 24 ... SPO 1985 07 03 343.930 0.030 24 ... SPO 1985 07 04 343.900 0.030 22 ... SPO 1985 07 05 343.960 0.050 22 ... SPO 1985 07 06 344.020 0.020 20 ... SPO 1985 07 07 344.000 0.060 23 ... SPO 1985 07 08 343.980 0.030 24 ... SPO 1985 07 09 344.030 0.050 24 ... SPO 1985 07 10 344.100 0.040 24 ... SPO 1985 07 11 344.030 0.060 19 ... SPO 1985 07 12 344.060 0.030 20 ... SPO 1985 07 13 344.140 0.040 18 ... SPO 1985 07 14 344.180 0.040 24 ... SPO 1985 07 15 344.220 0.040 23 ... SPO 1985 07 16 344.210 0.050 22 ... SPO 1985 07 17 344.180 0.050 22 ... SPO 1985 07 18 344.190 0.060 24 ... SPO 1985 07 19 344.220 0.060 22 ... SPO 1985 07 20 344.260 0.040 20 ... SPO 1985 07 21 344.290 0.060 24 ... SPO 1985 07 22 344.280 0.060 22 ... SPO 1985 07 23 344.420 0.050 23 ... SPO 1985 07 24 344.420 0.060 23 ... SPO 1985 07 25 344.410 0.090 23 ... SPO 1985 07 26 344.550 0.060 17 ... SPO 1985 07 27 344.390 0.030 22 ... SPO 1985 07 28 344.430 0.050 18 ... SPO 1985 07 29 344.490 0.030 22 ... SPO 1985 07 30 344.460 0.110 18 ... SPO 1985 07 31 344.510 0.040 18 ... SPO 1985 08 01 344.660 0.070 24 ... SPO 1985 08 02 344.770 0.040 22 ... SPO 1985 08 03 344.770 0.020 18 ... SPO 1985 08 04 344.720 0.050 24 ... SPO 1985 08 05 344.620 0.050 17 ... SPO 1985 08 06 344.680 0.110 10 ... SPO 1985 08 07 344.530 0.060 24 ... SPO 1985 08 08 344.620 0.150 24 ... SPO 1985 08 09 344.890 0.150 21 ... SPO 1985 08 10 344.550 0.020 20 ... SPO 1985 08 11 344.510 0.040 24 ... SPO 1985 08 12 344.480 0.020 24 ... SPO 1985 08 13 344.500 0.050 21 ... SPO 1985 08 14 344.670 0.040 20 ... SPO 1985 08 15 344.680 0.070 24 ... SPO 1985 08 16 344.650 0.070 19 ... SPO 1985 08 17 344.640 0.050 20 ... SPO 1985 08 18 344.640 0.090 23 ... SPO 1985 08 19 344.690 0.070 24 ... SPO 1985 08 20 344.670 0.060 22 ... SPO 1985 08 21 344.680 0.030 24 ... SPO 1985 08 22 344.680 0.060 24 ... SPO 1985 08 23 344.750 0.030 2 ... SPO 1985 08 24 344.860 0.060 17 ... SPO 1985 08 25 344.830 0.080 24 ... SPO 1985 08 26 344.770 0.070 24 ... SPO 1985 08 27 344.780 0.040 24 ... SPO 1985 08 28 344.800 0.040 24 ... SPO 1985 08 29 344.750 0.060 10 ... SPO 1985 08 30 344.690 0.020 21 ... SPO 1985 08 31 344.650 0.030 17 ... SPO 1985 09 01 344.930 0.070 22 ... SPO 1985 09 02 344.770 0.060 20 ... SPO 1985 09 03 344.680 0.070 20 ... SPO 1985 09 04 344.930 0.050 22 ... SPO 1985 09 05 344.820 0.040 20 ... SPO 1985 09 06 344.800 0.040 20 ... SPO 1985 09 07 344.860 0.060 21 ... SPO 1985 09 08 344.840 0.040 22 ... SPO 1985 09 09 344.880 0.050 24 ... SPO 1985 09 10 344.780 0.030 24 ... SPO 1985 09 11 344.870 0.040 24 ... SPO 1985 09 12 344.880 0.080 24 ... SPO 1985 09 13 344.820 0.070 19 ... SPO 1985 09 14 344.830 0.050 20 ... SPO 1985 09 15 344.840 0.020 24 ... SPO 1985 09 16 344.800 0.060 23 ... SPO 1985 09 17 344.920 0.060 19 ... SPO 1985 09 18 344.990 0.060 23 ... SPO 1985 09 19 344.950 0.080 23 ... SPO 1985 09 20 344.930 0.030 18 ... SPO 1985 09 21 344.990 0.030 20 ... SPO 1985 09 22 344.990 0.080 20 ... SPO 1985 09 23 345.130 0.120 19 ... SPO 1985 09 24 345.080 0.070 23 ... SPO 1985 09 25 345.040 0.110 23 ... SPO 1985 09 26 344.960 0.070 22 ... SPO 1985 09 27 345.030 0.020 20 ... SPO 1985 09 28 345.110 0.040 21 ... SPO 1985 09 29 345.070 0.070 24 ... SPO 1985 09 30 345.150 0.060 24 ... SPO 1985 10 01 345.130 0.070 24 ... SPO 1985 10 02 345.110 0.070 24 ... SPO 1985 10 03 345.060 0.070 23 ... SPO 1985 10 04 344.960 0.070 20 ... SPO 1985 10 05 344.990 0.110 19 ... SPO 1985 10 06 344.950 0.110 24 ... SPO 1985 10 07 344.990 0.050 23 ... SPO 1985 10 08 344.970 0.060 23 ... SPO 1985 10 09 345.040 0.080 24 ... SPO 1985 10 10 344.920 0.070 24 ... SPO 1985 10 11 344.850 0.050 22 ... SPO 1985 10 12 344.900 0.060 19 ... SPO 1985 10 13 344.820 0.080 22 ... SPO 1985 10 14 344.900 0.060 24 ... SPO 1985 10 15 344.920 0.040 24 ... SPO 1985 10 16 344.850 0.060 20 ... SPO 1985 10 17 344.970 0.050 23 ... SPO 1985 10 18 345.030 0.050 22 ... SPO 1985 10 19 344.980 0.040 18 ... SPO 1985 10 20 344.960 0.080 24 ... SPO 1985 10 21 345.080 0.080 24 ... SPO 1985 10 22 345.040 0.050 24 ... SPO 1985 10 23 345.120 0.060 24 ... SPO 1985 10 24 344.880 0.090 23 ... SPO 1985 10 25 344.900 0.080 21 ... SPO 1985 10 26 344.560 0.180 14 ... SPO 1985 10 27 344.810 0.120 24 ... SPO 1985 10 28 344.960 0.120 23 ... SPO 1985 10 29 345.000 0.090 23 ... SPO 1985 10 30 344.960 0.040 24 ... SPO 1985 10 31 344.770 0.080 23 ... SPO 1985 11 01 344.830 0.040 24 ... SPO 1985 11 02 344.870 0.030 14 ... SPO 1985 11 03 344.870 0.080 22 ... SPO 1985 11 04 345.040 0.080 24 ... SPO 1985 11 05 345.160 0.050 20 ... SPO 1985 11 06 345.060 0.070 22 ... SPO 1985 11 07 345.070 0.050 16 ... SPO 1985 11 08 345.030 0.100 23 ... SPO 1985 11 09 345.110 0.030 18 ... SPO 1985 11 10 345.100 0.070 23 ... SPO 1985 11 11 345.030 0.090 24 ... SPO 1985 11 12 344.910 0.070 24 ... SPO 1985 11 13 344.950 0.080 21 ... SPO 1985 11 14 344.950 0.070 24 ... SPO 1985 11 15 344.950 0.030 24 ... SPO 1985 11 16 345.050 0.090 5 ... SPO 1985 11 17 344.990 0.050 23 ... SPO 1985 11 18 344.940 0.030 24 ... SPO 1985 11 19 344.930 0.070 24 ... SPO 1985 11 20 344.880 0.050 23 ... SPO 1985 11 21 344.890 0.060 24 ... SPO 1985 11 22 344.930 0.040 21 ... SPO 1985 11 23 345.140 0.050 18 ... SPO 1985 11 24 345.150 0.030 22 ... SPO 1985 11 25 345.140 0.050 24 ... SPO 1985 11 26 345.120 0.040 19 ... SPO 1985 11 27 345.140 0.060 19 ... SPO 1985 11 28 345.090 0.070 24 ... SPO 1985 11 29 344.790 0.120 23 ... SPO 1985 11 30 344.770 0.020 16 ... SPO 1985 12 01 344.700 0.030 24 ... SPO 1985 12 02 344.710 0.040 23 ... SPO 1985 12 03 344.790 0.080 19 ... SPO 1985 12 04 344.720 0.050 24 ... SPO 1985 12 05 344.690 0.070 16 ... SPO 1985 12 06 344.690 0.040 22 ... SPO 1985 12 07 344.660 0.050 17 ... SPO 1985 12 08 344.740 0.060 22 ... SPO 1985 12 09 344.750 0.050 24 ... SPO 1985 12 10 344.700 0.040 23 ... SPO 1985 12 11 344.680 0.040 24 ... SPO 1985 12 12 344.670 0.080 23 ... SPO 1985 12 13 344.520 0.060 18 ... SPO 1985 12 14 344.550 0.040 7 ... SPO 1985 12 15 344.830 0.030 10 ... SPO 1985 12 16 344.870 0.050 9 ... SPO 1985 12 17 344.840 0.040 12 ... SPO 1985 12 18 344.860 0.020 24 ... SPO 1985 12 19 344.820 0.050 20 ... SPO 1985 12 20 344.870 0.090 4 ... SPO 1985 12 21 344.790 0.030 10 ... SPO 1985 12 22 344.770 0.030 24 ... SPO 1985 12 23 344.760 0.070 23 ... SPO 1985 12 24 344.750 0.020 23 ... SPO 1985 12 25 344.800 0.070 23 ... SPO 1985 12 26 344.900 0.090 22 ... SPO 1985 12 27 344.820 0.060 13 ... SPO 1985 12 28 344.770 0.020 14 ... SPO 1985 12 29 344.770 0.020 24 ... SPO 1985 12 30 344.770 0.060 22 ... SPO 1985 12 31 344.750 0.060 24 ... SPO 1986 01 01 344.640 0.060 24 ... SPO 1986 01 02 344.680 0.070 24 ... SPO 1986 01 03 344.720 0.040 21 ... SPO 1986 01 04 344.720 0.040 19 ... SPO 1986 01 05 344.700 0.060 22 ... SPO 1986 01 06 344.690 0.070 20 ... SPO 1986 01 07 344.720 0.060 19 ... SPO 1986 01 08 344.690 0.040 21 ... SPO 1986 01 09 344.720 0.070 22 ... SPO 1986 01 10 344.640 0.050 23 ... SPO 1986 01 11 344.690 0.050 18 ... SPO 1986 01 12 344.620 0.060 23 ... SPO 1986 01 13 344.670 0.040 20 ... SPO 1986 01 14 344.710 0.060 24 ... SPO 1986 01 15 344.760 0.050 24 ... SPO 1986 01 16 344.730 0.040 24 ... SPO 1986 01 17 344.730 0.040 22 ... SPO 1986 01 18 344.750 0.060 16 ... SPO 1986 01 19 344.760 0.040 13 ... SPO 1986 01 20 344.760 0.090 19 ... SPO 1986 01 21 344.690 0.030 21 ... SPO 1986 01 22 344.750 0.050 19 ... SPO 1986 01 23 344.840 0.180 10 ... SPO 1986 01 24 344.700 0.050 24 ... SPO 1986 01 25 344.740 0.050 18 ... SPO 1986 01 26 344.680 0.030 23 ... SPO 1986 01 27 344.710 0.060 24 ... SPO 1986 01 28 344.720 0.050 17 ... SPO 1986 01 29 344.700 0.070 24 ... SPO 1986 01 30 344.720 0.040 19 ... SPO 1986 01 31 344.700 0.060 21 ... SPO 1986 02 01 344.660 0.110 17 ... SPO 1986 02 02 344.620 0.050 22 ... SPO 1986 02 03 344.750 0.130 24 ... SPO 1986 02 04 344.610 0.080 23 ... SPO 1986 02 05 344.650 0.090 23 ... SPO 1986 02 06 344.640 0.050 24 ... SPO 1986 02 07 344.620 0.050 22 ... SPO 1986 02 08 344.610 0.060 15 ... SPO 1986 02 09 344.570 0.030 19 ... SPO 1986 02 10 344.650 0.050 24 ... SPO 1986 02 11 344.620 0.060 23 ... SPO 1986 02 12 344.580 0.060 23 ... SPO 1986 02 13 344.630 0.050 24 ... SPO 1986 02 14 344.610 0.050 24 ... SPO 1986 02 15 344.620 0.040 17 ... SPO 1986 02 16 344.640 0.050 24 ... SPO 1986 02 17 344.620 0.060 24 ... SPO 1986 02 18 344.600 0.060 24 ... SPO 1986 02 19 344.580 0.040 22 ... SPO 1986 02 20 344.550 0.040 21 ... SPO 1986 02 21 344.620 0.060 23 ... SPO 1986 02 22 344.380 0.100 17 ... SPO 1986 02 23 344.430 0.100 24 ... SPO 1986 02 24 344.660 0.080 24 ... SPO 1986 02 25 344.610 0.060 24 ... SPO 1986 02 26 344.600 0.030 24 ... SPO 1986 02 27 344.600 0.030 24 ... SPO 1986 02 28 344.650 0.070 23 ... SPO 1986 03 01 344.600 0.040 17 ... SPO 1986 03 02 344.600 0.070 24 ... SPO 1986 03 03 344.620 0.060 21 ... SPO 1986 03 04 344.530 0.090 7 ... SPO 1986 03 05 344.440 0.060 19 ... SPO 1986 03 06 344.620 0.060 24 ... SPO 1986 03 07 344.600 0.020 24 ... SPO 1986 03 08 344.560 0.030 16 ... SPO 1986 03 09 344.630 0.060 24 ... SPO 1986 03 10 344.660 0.080 24 ... SPO 1986 03 11 344.590 0.040 24 ... SPO 1986 03 12 344.490 0.050 20 ... SPO 1986 03 13 344.450 0.050 23 ... SPO 1986 03 14 344.620 0.100 24 ... SPO 1986 03 15 344.380 0.070 17 ... SPO 1986 03 16 344.490 0.060 24 ... SPO 1986 03 17 344.490 0.080 24 ... SPO 1986 03 18 344.380 0.050 16 ... SPO 1986 03 19 -999.990 -99.990 0 *.. SPO 1986 03 20 344.540 0.040 14 ... SPO 1986 03 21 344.560 0.030 24 ... SPO 1986 03 22 344.570 0.050 15 ... SPO 1986 03 23 344.600 0.050 24 ... SPO 1986 03 24 344.610 0.040 23 ... SPO 1986 03 25 344.550 0.050 21 ... SPO 1986 03 26 344.580 0.050 24 ... SPO 1986 03 27 344.520 0.060 24 ... SPO 1986 03 28 344.470 0.050 24 ... SPO 1986 03 29 344.480 0.040 17 ... SPO 1986 03 30 344.510 0.050 24 ... SPO 1986 03 31 344.530 0.040 24 ... SPO 1986 04 01 344.570 0.060 24 ... SPO 1986 04 02 344.560 0.020 24 ... SPO 1986 04 03 344.560 0.040 24 ... SPO 1986 04 04 344.560 0.030 24 ... SPO 1986 04 05 344.550 0.040 17 ... SPO 1986 04 06 344.510 0.040 24 ... SPO 1986 04 07 344.510 0.080 23 ... SPO 1986 04 08 344.550 0.050 24 ... SPO 1986 04 09 344.580 0.050 24 ... SPO 1986 04 10 344.620 0.070 24 ... SPO 1986 04 11 344.520 0.060 24 ... SPO 1986 04 12 344.520 0.030 17 ... SPO 1986 04 13 344.550 0.040 24 ... SPO 1986 04 14 344.540 0.030 24 ... SPO 1986 04 15 344.520 0.050 24 ... SPO 1986 04 16 344.490 0.030 24 ... SPO 1986 04 17 344.530 0.050 24 ... SPO 1986 04 18 344.560 0.040 24 ... SPO 1986 04 19 344.600 0.040 17 ... SPO 1986 04 20 344.560 0.050 24 ... SPO 1986 04 21 344.530 0.040 24 ... SPO 1986 04 22 344.530 0.040 24 ... SPO 1986 04 23 344.590 0.030 24 ... SPO 1986 04 24 344.550 0.040 24 ... SPO 1986 04 25 344.540 0.060 24 ... SPO 1986 04 26 344.730 0.090 8 ... SPO 1986 04 27 344.690 0.040 24 ... SPO 1986 04 28 344.760 0.070 24 ... SPO 1986 04 29 344.770 0.060 24 ... SPO 1986 04 30 344.710 0.080 24 ... SPO 1986 05 01 344.740 0.090 24 ... SPO 1986 05 02 344.730 0.050 24 ... SPO 1986 05 03 344.690 0.070 17 ... SPO 1986 05 04 344.680 0.050 24 ... SPO 1986 05 05 344.680 0.070 24 ... SPO 1986 05 06 344.670 0.060 24 ... SPO 1986 05 07 344.700 0.060 24 ... SPO 1986 05 08 344.690 0.050 24 ... SPO 1986 05 09 344.700 0.070 22 ... SPO 1986 05 10 344.780 0.050 17 ... SPO 1986 05 11 344.730 0.060 24 ... SPO 1986 05 12 344.740 0.060 24 ... SPO 1986 05 13 344.750 0.040 24 ... SPO 1986 05 14 344.750 0.070 24 ... SPO 1986 05 15 344.780 0.060 24 ... SPO 1986 05 16 344.780 0.050 24 ... SPO 1986 05 17 344.780 0.060 17 ... SPO 1986 05 18 344.710 0.050 24 ... SPO 1986 05 19 344.730 0.090 24 ... SPO 1986 05 20 344.860 0.090 24 ... SPO 1986 05 21 344.930 0.070 24 ... SPO 1986 05 22 344.940 0.080 23 ... SPO 1986 05 23 344.790 0.070 24 ... SPO 1986 05 24 344.880 0.080 17 ... SPO 1986 05 25 344.900 0.040 24 ... SPO 1986 05 26 344.880 0.030 24 ... SPO 1986 05 27 344.860 0.060 24 ... SPO 1986 05 28 344.830 0.070 24 ... SPO 1986 05 29 344.870 0.070 24 ... SPO 1986 05 30 344.880 0.070 24 ... SPO 1986 05 31 344.900 0.080 17 ... SPO 1986 06 01 344.960 0.070 24 ... SPO 1986 06 02 344.950 0.050 24 ... SPO 1986 06 03 344.890 0.040 24 ... SPO 1986 06 04 344.920 0.040 24 ... SPO 1986 06 05 344.900 0.050 24 ... SPO 1986 06 06 344.950 0.060 24 ... SPO 1986 06 07 344.850 0.040 17 ... SPO 1986 06 08 344.880 0.060 24 ... SPO 1986 06 09 344.910 0.030 24 ... SPO 1986 06 10 345.030 0.070 24 ... SPO 1986 06 11 345.070 0.050 24 ... SPO 1986 06 12 345.090 0.040 24 ... SPO 1986 06 13 345.070 0.030 24 ... SPO 1986 06 14 345.080 0.050 17 ... SPO 1986 06 15 345.070 0.050 24 ... SPO 1986 06 16 345.030 0.070 23 ... SPO 1986 06 17 345.090 0.110 24 ... SPO 1986 06 18 345.140 0.070 24 ... SPO 1986 06 19 345.160 0.050 24 ... SPO 1986 06 20 345.140 0.040 24 ... SPO 1986 06 21 345.130 0.030 24 ... SPO 1986 06 22 345.160 0.050 24 ... SPO 1986 06 23 345.160 0.050 17 ... SPO 1986 06 24 345.180 0.040 24 ... SPO 1986 06 25 345.150 0.030 24 ... SPO 1986 06 26 345.210 0.060 24 ... SPO 1986 06 27 345.250 0.080 24 ... SPO 1986 06 28 345.220 0.090 16 ... SPO 1986 06 29 345.180 0.070 24 ... SPO 1986 06 30 345.210 0.030 24 ... SPO 1986 07 01 345.220 0.060 23 ... SPO 1986 07 02 345.200 0.050 24 ... SPO 1986 07 03 345.220 0.050 24 ... SPO 1986 07 04 345.240 0.030 24 ... SPO 1986 07 05 345.290 0.010 2 ... SPO 1986 07 06 -999.990 -99.990 0 *.. SPO 1986 07 07 345.350 0.050 19 ... SPO 1986 07 08 345.410 0.070 24 ... SPO 1986 07 09 345.400 0.030 24 ... SPO 1986 07 10 345.410 0.040 24 ... SPO 1986 07 11 345.410 0.020 24 ... SPO 1986 07 12 345.500 0.050 17 ... SPO 1986 07 13 345.530 0.030 24 ... SPO 1986 07 14 345.490 0.040 24 ... SPO 1986 07 15 345.620 0.100 24 ... SPO 1986 07 16 345.730 0.040 24 ... SPO 1986 07 17 345.580 0.070 24 ... SPO 1986 07 18 345.680 0.080 24 ... SPO 1986 07 19 345.720 0.030 18 ... SPO 1986 07 20 345.650 0.050 24 ... SPO 1986 07 21 345.590 0.020 24 ... SPO 1986 07 22 345.620 0.030 24 ... SPO 1986 07 23 345.640 0.040 24 ... SPO 1986 07 24 345.640 0.040 24 ... SPO 1986 07 25 345.610 0.040 24 ... SPO 1986 07 26 345.620 0.030 18 ... SPO 1986 07 27 345.580 0.060 24 ... SPO 1986 07 28 345.640 0.030 24 ... SPO 1986 07 29 345.690 0.040 24 ... SPO 1986 07 30 345.690 0.030 24 ... SPO 1986 07 31 345.780 0.020 24 ... SPO 1986 08 01 345.800 0.030 24 ... SPO 1986 08 02 345.780 0.030 18 ... SPO 1986 08 03 345.820 0.020 24 ... SPO 1986 08 04 345.800 0.030 24 ... SPO 1986 08 05 345.770 0.030 24 ... SPO 1986 08 06 345.810 0.030 24 ... SPO 1986 08 07 345.860 0.030 24 ... SPO 1986 08 08 345.860 0.050 24 ... SPO 1986 08 09 345.920 0.030 18 ... SPO 1986 08 10 345.900 0.050 24 ... SPO 1986 08 11 345.910 0.040 24 ... SPO 1986 08 12 345.890 0.040 24 ... SPO 1986 08 13 345.900 0.030 24 ... SPO 1986 08 14 345.840 0.040 24 ... SPO 1986 08 15 345.890 0.050 24 ... SPO 1986 08 16 345.920 0.030 17 ... SPO 1986 08 17 345.950 0.020 24 ... SPO 1986 08 18 345.920 0.020 24 ... SPO 1986 08 19 345.970 0.020 24 ... SPO 1986 08 20 345.940 0.070 24 ... SPO 1986 08 21 345.930 0.030 24 ... SPO 1986 08 22 345.940 0.030 24 ... SPO 1986 08 23 345.920 0.030 18 ... SPO 1986 08 24 345.920 0.050 24 ... SPO 1986 08 25 345.970 0.040 24 ... SPO 1986 08 26 345.960 0.040 24 ... SPO 1986 08 27 346.040 0.070 24 ... SPO 1986 08 28 346.030 0.060 24 ... SPO 1986 08 29 345.980 0.020 24 ... SPO 1986 08 30 345.980 0.020 18 ... SPO 1986 08 31 345.970 0.020 24 ... SPO 1986 09 01 346.030 0.030 18 ... SPO 1986 09 02 346.030 0.030 24 ... SPO 1986 09 03 346.070 0.030 24 ... SPO 1986 09 04 346.050 0.040 24 ... SPO 1986 09 05 346.070 0.030 24 ... SPO 1986 09 06 346.060 0.030 18 ... SPO 1986 09 07 346.070 0.030 24 ... SPO 1986 09 08 346.150 0.070 24 ... SPO 1986 09 09 346.220 0.020 24 ... SPO 1986 09 10 346.250 0.060 24 ... SPO 1986 09 11 346.230 0.060 24 ... SPO 1986 09 12 346.310 0.030 24 ... SPO 1986 09 13 346.190 0.120 18 ... SPO 1986 09 14 346.180 0.050 24 ... SPO 1986 09 15 346.240 0.040 24 ... SPO 1986 09 16 346.250 0.040 24 ... SPO 1986 09 17 346.240 0.040 24 ... SPO 1986 09 18 346.220 0.040 24 ... SPO 1986 09 19 346.220 0.050 24 ... SPO 1986 09 20 346.280 0.070 17 ... SPO 1986 09 21 346.260 0.040 24 ... SPO 1986 09 22 346.280 0.040 24 ... SPO 1986 09 23 346.260 0.050 24 ... SPO 1986 09 24 346.270 0.040 24 ... SPO 1986 09 25 346.310 0.060 24 ... SPO 1986 09 26 346.320 0.050 24 ... SPO 1986 09 27 346.220 0.010 18 ... SPO 1986 09 28 346.210 0.010 24 ... SPO 1986 09 29 346.190 0.040 24 ... SPO 1986 09 30 346.150 0.020 23 ... SPO 1986 10 01 346.190 0.040 21 ... SPO 1986 10 02 346.230 0.020 24 ... SPO 1986 10 03 346.170 0.040 23 ... SPO 1986 10 04 346.220 0.050 17 ... SPO 1986 10 05 346.280 0.050 11 ... SPO 1986 10 06 346.340 0.040 24 ... SPO 1986 10 07 346.260 0.080 24 ... SPO 1986 10 08 346.340 0.050 24 ... SPO 1986 10 09 346.390 0.040 24 ... SPO 1986 10 10 346.390 0.030 24 ... SPO 1986 10 11 346.400 0.030 17 ... SPO 1986 10 12 346.390 0.020 24 ... SPO 1986 10 13 346.350 0.030 24 ... SPO 1986 10 14 346.320 0.040 24 ... SPO 1986 10 15 346.330 0.080 24 ... SPO 1986 10 16 346.390 0.070 24 ... SPO 1986 10 17 346.340 0.020 24 ... SPO 1986 10 18 346.400 0.050 17 ... SPO 1986 10 19 346.520 0.030 24 ... SPO 1986 10 20 346.500 0.030 24 ... SPO 1986 10 21 346.480 0.030 24 ... SPO 1986 10 22 346.430 0.030 19 ... SPO 1986 10 23 346.610 0.090 24 ... SPO 1986 10 24 346.670 0.030 24 ... SPO 1986 10 25 346.620 0.090 17 ... SPO 1986 10 26 346.700 0.050 24 ... SPO 1986 10 27 346.460 0.060 24 ... SPO 1986 10 28 346.490 0.050 24 ... SPO 1986 10 29 346.500 0.040 24 ... SPO 1986 10 30 346.440 0.040 24 ... SPO 1986 10 31 346.440 0.030 24 ... SPO 1986 11 01 346.360 0.050 17 ... SPO 1986 11 02 346.320 0.020 24 ... SPO 1986 11 03 346.270 0.090 24 ... SPO 1986 11 04 346.430 0.040 24 ... SPO 1986 11 05 346.400 0.030 24 ... SPO 1986 11 06 346.330 0.040 22 ... SPO 1986 11 07 346.280 0.080 23 ... SPO 1986 11 08 346.150 0.040 18 ... SPO 1986 11 09 346.190 0.050 24 ... SPO 1986 11 10 -999.990 -99.990 0 *.. SPO 1986 11 11 346.130 0.030 12 ... SPO 1986 11 12 346.160 0.010 12 ... SPO 1986 11 13 346.090 0.070 22 ... SPO 1986 11 14 346.140 0.040 24 ... SPO 1986 11 15 346.120 0.070 17 ... SPO 1986 11 16 346.110 0.040 24 ... SPO 1986 11 17 346.120 0.040 24 ... SPO 1986 11 18 346.020 0.040 24 ... SPO 1986 11 19 346.060 0.030 24 ... SPO 1986 11 20 346.040 0.050 24 ... SPO 1986 11 21 346.040 0.050 24 ... SPO 1986 11 22 346.050 0.060 10 ... SPO 1986 11 23 346.040 0.030 19 ... SPO 1986 11 24 346.080 0.070 22 ... SPO 1986 11 25 346.060 0.040 24 ... SPO 1986 11 26 345.990 0.060 2 ... SPO 1986 11 27 -999.990 -99.990 0 *.. SPO 1986 11 28 346.050 0.050 17 ... SPO 1986 11 29 346.090 0.030 18 ... SPO 1986 11 30 346.120 0.040 24 ... SPO 1986 12 01 346.060 0.050 14 ... SPO 1986 12 02 346.040 0.020 24 ... SPO 1986 12 03 346.010 0.040 20 ... SPO 1986 12 04 346.050 0.040 11 ... SPO 1986 12 05 346.030 0.060 16 ... SPO 1986 12 06 345.980 0.090 18 ... SPO 1986 12 07 345.920 0.060 17 ... SPO 1986 12 08 345.970 0.060 2 ... SPO 1986 12 09 -999.990 -99.990 0 *.. SPO 1986 12 10 346.080 0.050 16 ... SPO 1986 12 11 346.040 0.030 9 ... SPO 1986 12 12 346.070 0.050 14 ... SPO 1986 12 13 346.030 0.040 21 ... SPO 1986 12 14 345.990 0.040 21 ... SPO 1986 12 15 345.990 0.030 15 ... SPO 1986 12 16 345.970 0.050 14 ... SPO 1986 12 17 345.980 0.090 21 ... SPO 1986 12 18 345.830 0.080 23 ... SPO 1986 12 19 345.940 0.050 22 ... SPO 1986 12 20 345.910 0.050 24 ... SPO 1986 12 21 345.860 0.030 11 ... SPO 1986 12 22 345.880 0.040 18 ... SPO 1986 12 23 345.890 0.030 19 ... SPO 1986 12 24 345.920 0.040 22 ... SPO 1986 12 25 345.910 0.020 24 ... SPO 1986 12 26 345.890 0.040 23 ... SPO 1986 12 27 345.840 0.020 20 ... SPO 1986 12 28 345.840 0.030 21 ... SPO 1986 12 29 345.990 0.060 9 ... SPO 1986 12 30 345.930 0.030 24 ... SPO 1986 12 31 345.950 0.050 20 ... SPO 1987 01 01 345.960 0.050 22 ... SPO 1987 01 02 345.980 0.030 20 ... SPO 1987 01 03 345.970 0.060 20 ... SPO 1987 01 04 345.930 0.070 15 ... SPO 1987 01 05 345.950 0.090 20 ... SPO 1987 01 06 346.000 0.060 24 ... SPO 1987 01 07 345.970 0.060 20 ... SPO 1987 01 08 345.940 0.030 21 ... SPO 1987 01 09 345.920 0.030 15 ... SPO 1987 01 10 345.900 0.030 19 ... SPO 1987 01 11 345.890 0.080 15 ... SPO 1987 01 12 345.870 0.060 22 ... SPO 1987 01 13 345.900 0.020 24 ... SPO 1987 01 14 345.930 0.020 23 ... SPO 1987 01 15 345.880 0.040 23 ... SPO 1987 01 16 345.900 0.030 24 ... SPO 1987 01 17 345.890 0.030 23 ... SPO 1987 01 18 345.880 0.080 16 ... SPO 1987 01 19 345.950 0.070 19 ... SPO 1987 01 20 346.000 0.160 16 ... SPO 1987 01 21 345.950 0.100 22 ... SPO 1987 01 22 345.830 0.110 21 ... SPO 1987 01 23 345.750 0.090 22 ... SPO 1987 01 24 345.830 0.080 24 ... SPO 1987 01 25 345.760 0.100 17 ... SPO 1987 01 26 345.890 0.050 17 ... SPO 1987 01 27 345.860 0.030 24 ... SPO 1987 01 28 345.800 0.050 24 ... SPO 1987 01 29 345.820 0.030 24 ... SPO 1987 01 30 345.780 0.060 22 ... SPO 1987 01 31 345.730 0.110 20 ... SPO 1987 02 01 345.740 0.050 16 ... SPO 1987 02 02 345.780 0.060 24 ... SPO 1987 02 03 345.780 0.030 24 ... SPO 1987 02 04 345.810 0.060 24 ... SPO 1987 02 05 345.800 0.040 18 ... SPO 1987 02 06 345.790 0.070 24 ... SPO 1987 02 07 345.820 0.050 23 ... SPO 1987 02 08 345.830 0.030 18 ... SPO 1987 02 09 345.800 0.030 24 ... SPO 1987 02 10 345.800 0.030 24 ... SPO 1987 02 11 345.790 0.080 23 ... SPO 1987 02 12 345.810 0.040 23 ... SPO 1987 02 13 345.820 0.040 24 ... SPO 1987 02 14 345.790 0.040 23 ... SPO 1987 02 15 345.760 0.050 17 ... SPO 1987 02 16 345.750 0.040 23 ... SPO 1987 02 17 345.750 0.060 24 ... SPO 1987 02 18 345.740 0.060 24 ... SPO 1987 02 19 345.670 0.060 24 ... SPO 1987 02 20 345.670 0.040 24 ... SPO 1987 02 21 345.720 0.040 22 ... SPO 1987 02 22 345.760 0.030 19 ... SPO 1987 02 23 345.670 0.040 24 ... SPO 1987 02 24 345.650 0.040 24 ... SPO 1987 02 25 345.560 0.030 24 ... SPO 1987 02 26 345.500 0.050 24 ... SPO 1987 02 27 345.670 0.080 24 ... SPO 1987 02 28 345.790 0.050 23 ... SPO 1987 03 01 345.750 0.040 14 ... SPO 1987 03 02 345.660 0.030 24 ... SPO 1987 03 03 345.740 0.040 24 ... SPO 1987 03 04 345.740 0.050 19 ... SPO 1987 03 05 345.690 0.060 23 ... SPO 1987 03 06 345.750 0.030 24 ... SPO 1987 03 07 345.680 0.030 23 ... SPO 1987 03 08 345.680 0.040 18 ... SPO 1987 03 09 345.620 0.020 24 ... SPO 1987 03 10 345.670 0.050 24 ... SPO 1987 03 11 345.680 0.040 24 ... SPO 1987 03 12 345.640 0.030 24 ... SPO 1987 03 13 345.610 0.020 24 ... SPO 1987 03 14 345.720 0.050 24 ... SPO 1987 03 15 345.720 0.040 17 ... SPO 1987 03 16 345.700 0.060 24 ... SPO 1987 03 17 345.680 0.020 24 ... SPO 1987 03 18 345.670 0.030 24 ... SPO 1987 03 19 345.680 0.030 20 ... SPO 1987 03 20 345.690 0.040 24 ... SPO 1987 03 21 345.680 0.040 22 ... SPO 1987 03 22 345.690 0.050 17 ... SPO 1987 03 23 345.670 0.040 24 ... SPO 1987 03 24 345.710 0.040 24 ... SPO 1987 03 25 345.740 0.030 24 ... SPO 1987 03 26 345.750 0.060 24 ... SPO 1987 03 27 345.740 0.050 23 ... SPO 1987 03 28 345.820 0.070 23 ... SPO 1987 03 29 345.820 0.060 17 ... SPO 1987 03 30 345.850 0.060 22 ... SPO 1987 03 31 345.900 0.070 24 ... SPO 1987 04 01 346.080 0.030 24 ... SPO 1987 04 02 345.970 0.070 23 ... SPO 1987 04 03 346.060 0.150 24 ... SPO 1987 04 04 345.860 0.070 23 ... SPO 1987 04 05 345.780 0.060 17 ... SPO 1987 04 06 345.820 0.030 23 ... SPO 1987 04 07 345.840 0.040 23 ... SPO 1987 04 08 345.870 0.030 24 ... SPO 1987 04 09 345.810 0.020 24 ... SPO 1987 04 10 345.810 0.030 24 ... SPO 1987 04 11 345.840 0.040 23 ... SPO 1987 04 12 345.820 0.020 18 ... SPO 1987 04 13 345.900 0.040 23 ... SPO 1987 04 14 345.900 0.050 24 ... SPO 1987 04 15 345.860 0.020 24 ... SPO 1987 04 16 345.840 0.030 24 ... SPO 1987 04 17 345.820 0.020 24 ... SPO 1987 04 18 345.850 0.030 22 ... SPO 1987 04 19 345.870 0.070 19 ... SPO 1987 04 20 345.890 0.050 24 ... SPO 1987 04 21 345.840 0.040 24 ... SPO 1987 04 22 346.020 0.110 20 ... SPO 1987 04 23 345.880 0.040 24 ... SPO 1987 04 24 345.820 0.050 23 ... SPO 1987 04 25 345.850 0.030 22 ... SPO 1987 04 26 345.850 0.030 19 ... SPO 1987 04 27 345.840 0.050 24 ... SPO 1987 04 28 345.880 0.040 24 ... SPO 1987 04 29 345.880 0.040 24 ... SPO 1987 04 30 345.880 0.040 24 ... SPO 1987 05 01 345.890 0.040 22 ... SPO 1987 05 02 345.930 0.040 21 ... SPO 1987 05 03 345.890 0.040 19 ... SPO 1987 05 04 345.900 0.040 24 ... SPO 1987 05 05 345.890 0.040 23 ... SPO 1987 05 06 345.900 0.020 23 ... SPO 1987 05 07 345.850 0.040 24 ... SPO 1987 05 08 345.830 0.020 24 ... SPO 1987 05 09 345.880 0.060 22 ... SPO 1987 05 10 345.920 0.050 19 ... SPO 1987 05 11 345.990 0.110 22 ... SPO 1987 05 12 345.980 0.080 20 ... SPO 1987 05 13 345.960 0.100 21 ... SPO 1987 05 14 346.140 0.180 22 ... SPO 1987 05 15 345.890 0.060 22 ... SPO 1987 05 16 345.910 0.030 23 ... SPO 1987 05 17 346.170 0.020 17 ... SPO 1987 05 18 346.220 0.150 24 ... SPO 1987 05 19 346.340 0.100 23 ... SPO 1987 05 20 346.230 0.060 23 ... SPO 1987 05 21 346.250 0.050 24 ... SPO 1987 05 22 346.320 0.120 23 ... SPO 1987 05 23 346.240 0.050 23 ... SPO 1987 05 24 346.190 0.040 18 ... SPO 1987 05 25 346.190 0.030 24 ... SPO 1987 05 26 346.170 0.020 24 ... SPO 1987 05 27 346.240 0.080 23 ... SPO 1987 05 28 346.340 0.120 24 ... SPO 1987 05 29 346.250 0.040 24 ... SPO 1987 05 30 346.260 0.020 22 ... SPO 1987 05 31 346.280 0.060 19 ... SPO 1987 06 01 346.300 0.050 24 ... SPO 1987 06 02 346.320 0.050 24 ... SPO 1987 06 03 346.410 0.070 24 ... SPO 1987 06 04 346.390 0.040 24 ... SPO 1987 06 05 346.410 0.050 24 ... SPO 1987 06 06 346.430 0.090 21 ... SPO 1987 06 07 346.510 0.150 20 ... SPO 1987 06 08 346.510 0.060 24 ... SPO 1987 06 09 346.570 0.060 24 ... SPO 1987 06 10 346.510 0.120 24 ... SPO 1987 06 11 346.500 0.080 23 ... SPO 1987 06 12 346.550 0.060 24 ... SPO 1987 06 13 346.600 0.080 19 ... SPO 1987 06 14 346.630 0.070 20 ... SPO 1987 06 15 346.640 0.060 23 ... SPO 1987 06 16 346.530 0.070 22 ... SPO 1987 06 17 346.610 0.040 24 ... SPO 1987 06 18 346.620 0.040 24 ... SPO 1987 06 19 346.740 0.070 21 ... SPO 1987 06 20 346.790 0.100 20 ... SPO 1987 06 21 346.620 0.020 19 ... SPO 1987 06 22 346.630 0.070 23 ... SPO 1987 06 23 346.760 0.040 24 ... SPO 1987 06 24 346.780 0.020 24 ... SPO 1987 06 25 346.740 0.040 22 ... SPO 1987 06 26 346.870 0.040 24 ... SPO 1987 06 27 346.800 0.020 21 ... SPO 1987 06 28 346.820 0.050 19 ... SPO 1987 06 29 346.890 0.030 24 ... SPO 1987 06 30 346.960 0.020 13 ... SPO 1987 07 01 346.970 0.030 24 ... SPO 1987 07 02 347.030 0.110 24 ... SPO 1987 07 03 346.990 0.090 21 ... SPO 1987 07 04 346.960 0.060 22 ... SPO 1987 07 05 346.990 0.050 19 ... SPO 1987 07 06 347.030 0.090 24 ... SPO 1987 07 07 347.010 0.130 24 ... SPO 1987 07 08 347.140 0.110 23 ... SPO 1987 07 09 347.070 0.060 24 ... SPO 1987 07 10 347.040 0.030 24 ... SPO 1987 07 11 347.070 0.040 21 ... SPO 1987 07 12 347.160 0.120 19 ... SPO 1987 07 13 347.050 0.050 24 ... SPO 1987 07 14 347.010 0.030 24 ... SPO 1987 07 15 347.100 0.030 24 ... SPO 1987 07 16 347.100 0.050 24 ... SPO 1987 07 17 347.100 0.030 24 ... SPO 1987 07 18 347.130 0.010 21 ... SPO 1987 07 19 347.130 0.030 20 ... SPO 1987 07 20 347.100 0.030 24 ... SPO 1987 07 21 347.150 0.070 24 ... SPO 1987 07 22 347.110 0.020 24 ... SPO 1987 07 23 347.170 0.040 24 ... SPO 1987 07 24 347.110 0.030 24 ... SPO 1987 07 25 347.240 0.020 21 ... SPO 1987 07 26 347.190 0.040 20 ... SPO 1987 07 27 347.180 0.020 24 ... SPO 1987 07 28 347.170 0.020 22 ... SPO 1987 07 29 347.200 0.070 22 ... SPO 1987 07 30 347.200 0.060 24 ... SPO 1987 07 31 347.280 0.040 24 ... SPO 1987 08 01 347.270 0.020 20 ... SPO 1987 08 02 347.280 0.030 20 ... SPO 1987 08 03 347.280 0.030 24 ... SPO 1987 08 04 347.350 0.060 24 ... SPO 1987 08 05 347.580 0.100 20 ... SPO 1987 08 06 347.540 0.080 24 ... SPO 1987 08 07 347.420 0.040 24 ... SPO 1987 08 08 347.440 0.030 21 ... SPO 1987 08 09 347.460 0.030 19 ... SPO 1987 08 10 347.490 0.050 24 ... SPO 1987 08 11 347.500 0.050 21 ... SPO 1987 08 12 347.470 0.040 23 ... SPO 1987 08 13 347.510 0.050 24 ... SPO 1987 08 14 347.620 0.060 24 ... SPO 1987 08 15 347.660 0.030 21 ... SPO 1987 08 16 347.640 0.050 18 ... SPO 1987 08 17 347.670 0.040 24 ... SPO 1987 08 18 347.620 0.040 24 ... SPO 1987 08 19 347.670 0.100 24 ... SPO 1987 08 20 347.690 0.070 24 ... SPO 1987 08 21 347.770 0.060 24 ... SPO 1987 08 22 347.750 0.050 22 ... SPO 1987 08 23 347.790 0.080 19 ... SPO 1987 08 24 347.890 0.120 22 ... SPO 1987 08 25 347.830 0.160 24 ... SPO 1987 08 26 347.850 0.090 22 ... SPO 1987 08 27 347.860 0.190 13 ... SPO 1987 08 28 347.910 0.080 21 ... SPO 1987 08 29 347.850 0.110 21 ... SPO 1987 08 30 347.890 0.130 19 ... SPO 1987 08 31 347.980 0.240 7 ... SPO 1987 09 01 348.120 0.070 11 ... SPO 1987 09 02 348.180 0.160 15 ... SPO 1987 09 03 347.930 0.030 22 ... SPO 1987 09 04 347.930 0.080 24 ... SPO 1987 09 05 347.920 0.030 21 ... SPO 1987 09 06 347.940 0.040 18 ... SPO 1987 09 07 347.990 0.050 24 ... SPO 1987 09 08 348.070 0.040 24 ... SPO 1987 09 09 347.990 0.030 24 ... SPO 1987 09 10 348.000 0.040 24 ... SPO 1987 09 11 348.020 0.030 24 ... SPO 1987 09 12 348.020 0.030 21 ... SPO 1987 09 13 -999.990 -99.990 0 *.. SPO 1987 09 14 348.080 0.050 9 ... SPO 1987 09 15 348.040 0.060 24 ... SPO 1987 09 16 348.120 0.050 24 ... SPO 1987 09 17 348.090 0.050 24 ... SPO 1987 09 18 348.060 0.040 24 ... SPO 1987 09 19 348.030 0.030 21 ... SPO 1987 09 20 348.250 0.090 20 ... SPO 1987 09 21 348.170 0.150 24 ... SPO 1987 09 22 348.120 0.050 24 ... SPO 1987 09 23 348.190 0.050 24 ... SPO 1987 09 24 348.150 0.050 24 ... SPO 1987 09 25 348.170 0.060 24 ... SPO 1987 09 26 348.150 0.050 17 ... SPO 1987 09 27 348.270 0.060 24 ... SPO 1987 09 28 348.310 0.060 24 ... SPO 1987 09 29 348.150 0.050 24 ... SPO 1987 09 30 348.280 0.070 16 ... SPO 1987 10 01 348.150 0.080 17 ... SPO 1987 10 02 348.200 0.080 22 ... SPO 1987 10 03 348.270 0.080 18 ... SPO 1987 10 04 348.220 0.040 24 ... SPO 1987 10 05 348.180 0.060 24 ... SPO 1987 10 06 348.240 0.040 24 ... SPO 1987 10 07 348.370 0.040 24 ... SPO 1987 10 08 348.380 0.110 24 ... SPO 1987 10 09 348.290 0.090 24 ... SPO 1987 10 10 348.320 0.040 17 ... SPO 1987 10 11 348.340 0.070 24 ... SPO 1987 10 12 348.420 0.120 24 ... SPO 1987 10 13 348.300 0.090 24 ... SPO 1987 10 14 348.230 0.070 21 ... SPO 1987 10 15 348.310 0.060 24 ... SPO 1987 10 16 348.310 0.050 23 ... SPO 1987 10 17 348.230 0.050 17 ... SPO 1987 10 18 348.300 0.070 18 ... SPO 1987 10 19 348.290 0.050 24 ... SPO 1987 10 20 348.290 0.040 22 ... SPO 1987 10 21 348.320 0.050 22 ... SPO 1987 10 22 348.330 0.040 24 ... SPO 1987 10 23 348.290 0.030 24 ... SPO 1987 10 24 348.280 0.020 17 ... SPO 1987 10 25 348.410 0.070 15 ... SPO 1987 10 26 348.300 0.060 22 ... SPO 1987 10 27 348.300 0.030 24 ... SPO 1987 10 28 348.280 0.040 24 ... SPO 1987 10 29 348.300 0.060 24 ... SPO 1987 10 30 348.270 0.070 24 ... SPO 1987 10 31 348.240 0.080 24 ... SPO 1987 11 01 348.270 0.120 17 ... SPO 1987 11 02 348.390 0.080 22 ... SPO 1987 11 03 348.320 0.080 15 ... SPO 1987 11 04 348.370 0.050 22 ... SPO 1987 11 05 348.410 0.040 24 ... SPO 1987 11 06 348.400 0.050 20 ... SPO 1987 11 07 348.370 0.090 17 ... SPO 1987 11 08 -999.990 -99.990 0 *.. SPO 1987 11 09 348.320 0.080 23 ... SPO 1987 11 10 348.340 0.060 24 ... SPO 1987 11 11 348.290 0.030 24 ... SPO 1987 11 12 348.220 0.130 12 ... SPO 1987 11 13 348.280 0.080 24 ... SPO 1987 11 14 348.270 0.040 21 ... SPO 1987 11 15 348.260 0.050 19 ... SPO 1987 11 16 348.320 0.090 20 ... SPO 1987 11 17 -999.990 -99.990 0 *.. SPO 1987 11 18 348.410 0.050 18 ... SPO 1987 11 19 348.460 0.050 22 ... SPO 1987 11 20 348.410 0.050 21 ... SPO 1987 11 21 348.370 0.080 21 ... SPO 1987 11 22 -999.990 -99.990 0 *.. SPO 1987 11 23 348.350 0.050 13 ... SPO 1987 11 24 348.350 0.050 20 ... SPO 1987 11 25 348.340 0.040 20 ... SPO 1987 11 26 348.400 0.040 24 ... SPO 1987 11 27 348.380 0.030 24 ... SPO 1987 11 28 348.390 0.050 22 ... SPO 1987 11 29 348.420 0.050 18 ... SPO 1987 11 30 348.360 0.070 17 ... SPO 1987 12 01 348.380 0.070 20 ... SPO 1987 12 02 348.360 0.060 24 ... SPO 1987 12 03 348.350 0.050 24 ... SPO 1987 12 04 348.350 0.040 21 ... SPO 1987 12 05 348.340 0.070 17 ... SPO 1987 12 06 348.360 0.050 14 ... SPO 1987 12 07 348.360 0.040 20 ... SPO 1987 12 08 -999.990 -99.990 0 *.. SPO 1987 12 09 348.310 0.060 2 ... SPO 1987 12 10 -999.990 -99.990 0 *.. SPO 1987 12 11 348.420 0.010 4 ... SPO 1987 12 12 -999.990 -99.990 0 *.. SPO 1987 12 13 -999.990 -99.990 0 *.. SPO 1987 12 14 -999.990 -99.990 0 *.. SPO 1987 12 15 -999.990 -99.990 0 *.. SPO 1987 12 16 348.420 0.050 5 ... SPO 1987 12 17 -999.990 -99.990 0 *.. SPO 1987 12 18 -999.990 -99.990 0 *.. SPO 1987 12 19 348.250 0.030 4 ... SPO 1987 12 20 -999.990 -99.990 0 *.. SPO 1987 12 21 -999.990 -99.990 0 *.. SPO 1987 12 22 348.320 0.070 8 ... SPO 1987 12 23 348.290 0.090 7 ... SPO 1987 12 24 348.320 0.050 14 ... SPO 1987 12 25 -999.990 -99.990 0 *.. SPO 1987 12 26 -999.990 -99.990 0 *.. SPO 1987 12 27 348.280 0.070 5 ... SPO 1987 12 28 -999.990 -99.990 0 *.. SPO 1987 12 29 348.280 0.060 7 ... SPO 1987 12 30 348.240 0.050 5 ... SPO 1987 12 31 348.270 0.040 17 ... SPO 1988 01 01 348.340 0.120 10 ... SPO 1988 01 02 348.300 0.160 19 ... SPO 1988 01 03 348.240 0.090 7 ... SPO 1988 01 04 348.250 0.100 14 ... SPO 1988 01 05 -999.990 -99.990 0 *.. SPO 1988 01 06 348.200 0.050 3 ... SPO 1988 01 07 348.250 0.140 7 ... SPO 1988 01 08 348.220 0.160 11 ... SPO 1988 01 09 348.140 0.160 13 ... SPO 1988 01 10 348.180 0.150 6 ... SPO 1988 01 11 348.440 0.080 3 ... SPO 1988 01 12 348.320 0.050 4 ... SPO 1988 01 13 348.420 0.140 3 ... SPO 1988 01 14 348.240 0.090 15 ... SPO 1988 01 15 348.150 0.110 4 ... SPO 1988 01 16 348.100 0.100 12 ... SPO 1988 01 17 348.110 0.090 7 ... SPO 1988 01 18 348.080 0.090 13 ... SPO 1988 01 19 348.070 0.170 17 ... SPO 1988 01 20 348.110 0.100 21 ... SPO 1988 01 21 348.100 0.100 17 ... SPO 1988 01 22 348.040 0.090 17 ... SPO 1988 01 23 348.050 0.090 18 ... SPO 1988 01 24 348.100 0.100 16 ... SPO 1988 01 25 348.020 0.140 22 ... SPO 1988 01 26 348.050 0.100 16 ... SPO 1988 01 27 348.000 0.190 12 ... SPO 1988 01 28 347.870 0.110 21 ... SPO 1988 01 29 348.030 0.120 22 ... SPO 1988 01 30 347.990 0.100 20 ... SPO 1988 01 31 348.050 0.070 18 ... SPO 1988 02 01 348.110 0.080 8 ... SPO 1988 02 02 347.970 0.110 14 ... SPO 1988 02 03 348.060 0.090 14 ... SPO 1988 02 04 348.030 0.080 19 ... SPO 1988 02 05 348.090 0.060 13 ... SPO 1988 02 06 348.020 0.120 19 ... SPO 1988 02 07 347.940 0.110 4 ... SPO 1988 02 08 348.080 0.160 11 ... SPO 1988 02 09 347.990 0.150 13 ... SPO 1988 02 10 347.960 0.090 24 ... SPO 1988 02 11 347.950 0.080 23 ... SPO 1988 02 12 348.050 0.100 20 ... SPO 1988 02 13 -999.990 -99.990 0 *.. SPO 1988 02 14 348.260 0.120 3 ... SPO 1988 02 15 348.200 0.090 16 ... SPO 1988 02 16 348.130 0.160 15 ... SPO 1988 02 17 348.300 0.070 13 ... SPO 1988 02 18 348.260 0.130 14 ... SPO 1988 02 19 348.120 0.120 19 ... SPO 1988 02 20 348.050 0.080 16 ... SPO 1988 02 21 348.100 0.140 11 ... SPO 1988 02 22 348.080 0.100 12 ... SPO 1988 02 23 348.050 0.140 23 ... SPO 1988 02 24 347.990 0.080 6 ... SPO 1988 02 25 348.100 0.090 21 ... SPO 1988 02 26 347.990 0.110 22 ... SPO 1988 02 27 348.080 0.080 23 ... SPO 1988 02 28 348.190 0.090 11 ... SPO 1988 02 29 348.270 0.090 14 ... SPO 1988 03 01 348.190 0.090 17 ... SPO 1988 03 02 348.190 0.090 19 ... SPO 1988 03 03 348.250 0.070 19 ... SPO 1988 03 04 348.070 0.130 22 ... SPO 1988 03 05 348.110 0.120 21 ... SPO 1988 03 06 348.020 0.100 15 ... SPO 1988 03 07 347.890 0.100 21 ... SPO 1988 03 08 347.890 0.130 14 ... SPO 1988 03 09 348.000 0.120 15 ... SPO 1988 03 10 348.020 0.170 13 ... SPO 1988 03 11 348.050 0.130 18 ... SPO 1988 03 12 348.190 0.080 23 ... SPO 1988 03 13 348.140 0.080 15 ... SPO 1988 03 14 347.950 0.120 20 ... SPO 1988 03 15 348.060 0.130 18 ... SPO 1988 03 16 348.040 0.100 18 ... SPO 1988 03 17 348.110 0.080 24 ... SPO 1988 03 18 348.110 0.070 24 ... SPO 1988 03 19 348.120 0.060 22 ... SPO 1988 03 20 348.240 0.050 8 ... SPO 1988 03 21 348.240 0.070 15 ... SPO 1988 03 22 348.270 0.120 19 ... SPO 1988 03 23 348.360 0.100 22 ... SPO 1988 03 24 348.370 0.090 24 ... SPO 1988 03 25 348.230 0.110 21 ... SPO 1988 03 26 348.410 0.110 19 ... SPO 1988 03 27 348.280 0.090 15 ... SPO 1988 03 28 348.290 0.080 11 ... SPO 1988 03 29 348.340 0.060 24 ... SPO 1988 03 30 348.350 0.070 24 ... SPO 1988 03 31 348.390 0.080 24 ... SPO 1988 04 01 348.360 0.110 24 ... SPO 1988 04 02 348.310 0.080 21 ... SPO 1988 04 03 348.310 0.030 8 ... SPO 1988 04 04 348.410 0.080 19 ... SPO 1988 04 05 348.260 0.080 22 ... SPO 1988 04 06 -999.990 -99.990 0 *.. SPO 1988 04 07 -999.990 -99.990 0 *.. SPO 1988 04 08 -999.990 -99.990 0 *.. SPO 1988 04 09 -999.990 -99.990 0 *.. SPO 1988 04 10 -999.990 -99.990 0 *.. SPO 1988 04 11 -999.990 -99.990 0 *.. SPO 1988 04 12 -999.990 -99.990 0 *.. SPO 1988 04 13 -999.990 -99.990 0 *.. SPO 1988 04 14 348.430 0.150 14 ... SPO 1988 04 15 348.370 0.110 16 ... SPO 1988 04 16 348.300 0.050 18 ... SPO 1988 04 17 348.260 0.090 17 ... SPO 1988 04 18 348.360 0.150 13 ... SPO 1988 04 19 348.430 0.100 19 ... SPO 1988 04 20 348.450 0.100 23 ... SPO 1988 04 21 348.470 0.130 20 ... SPO 1988 04 22 348.650 0.140 18 ... SPO 1988 04 23 348.410 0.170 11 ... SPO 1988 04 24 348.550 0.120 10 ... SPO 1988 04 25 348.400 0.120 7 ... SPO 1988 04 26 348.360 0.150 20 ... SPO 1988 04 27 348.350 0.120 9 ... SPO 1988 04 28 348.330 0.090 19 ... SPO 1988 04 29 348.250 0.070 23 ... SPO 1988 04 30 348.280 0.110 17 ... SPO 1988 05 01 348.230 0.080 13 ... SPO 1988 05 02 348.290 0.080 21 ... SPO 1988 05 03 348.420 0.100 20 ... SPO 1988 05 04 348.430 0.100 17 ... SPO 1988 05 05 348.350 0.090 20 ... SPO 1988 05 06 348.310 0.060 18 ... SPO 1988 05 07 348.290 0.060 21 ... SPO 1988 05 08 348.440 0.100 21 ... SPO 1988 05 09 348.300 0.100 21 ... SPO 1988 05 10 348.460 0.080 19 ... SPO 1988 05 11 348.250 0.090 24 ... SPO 1988 05 12 348.290 0.100 24 ... SPO 1988 05 13 348.420 0.140 21 ... SPO 1988 05 14 348.430 0.090 19 ... SPO 1988 05 15 348.500 0.100 24 ... SPO 1988 05 16 348.500 0.130 23 ... SPO 1988 05 17 348.230 0.070 24 ... SPO 1988 05 18 348.280 0.090 24 ... SPO 1988 05 19 348.380 0.110 23 ... SPO 1988 05 20 348.600 0.080 20 ... SPO 1988 05 21 348.580 0.130 18 ... SPO 1988 05 22 348.270 0.090 19 ... SPO 1988 05 23 348.270 0.090 24 ... SPO 1988 05 24 348.410 0.080 19 ... SPO 1988 05 25 348.430 0.120 23 ... SPO 1988 05 26 348.600 0.110 20 ... SPO 1988 05 27 348.520 0.090 24 ... SPO 1988 05 28 348.500 0.090 18 ... SPO 1988 05 29 348.510 0.150 15 ... SPO 1988 05 30 348.410 0.070 19 ... SPO 1988 05 31 348.410 0.070 19 ... SPO 1988 06 01 348.510 0.080 20 ... SPO 1988 06 02 348.450 0.070 21 ... SPO 1988 06 03 348.490 0.080 22 ... SPO 1988 06 04 348.470 0.070 20 ... SPO 1988 06 05 348.650 0.120 21 ... SPO 1988 06 06 348.670 0.100 24 ... SPO 1988 06 07 348.630 0.100 23 ... SPO 1988 06 08 348.530 0.100 22 ... SPO 1988 06 09 348.580 0.130 21 ... SPO 1988 06 10 348.750 0.110 20 ... SPO 1988 06 11 348.510 0.100 21 ... SPO 1988 06 12 348.680 0.100 18 ... SPO 1988 06 13 348.610 0.110 24 ... SPO 1988 06 14 348.570 0.090 23 ... SPO 1988 06 15 348.490 0.110 23 ... SPO 1988 06 16 348.600 0.110 24 ... SPO 1988 06 17 348.850 0.090 20 ... SPO 1988 06 18 348.590 0.060 17 ... SPO 1988 06 19 348.610 0.090 20 ... SPO 1988 06 20 348.590 0.070 23 ... SPO 1988 06 21 348.700 0.100 22 ... SPO 1988 06 22 348.630 0.130 24 ... SPO 1988 06 23 348.690 0.080 24 ... SPO 1988 06 24 348.610 0.100 20 ... SPO 1988 06 25 348.620 0.090 21 ... SPO 1988 06 26 348.780 0.090 20 ... SPO 1988 06 27 348.840 0.080 14 ... SPO 1988 06 28 348.710 0.070 22 ... SPO 1988 06 29 348.710 0.080 22 ... SPO 1988 06 30 348.750 0.070 20 ... SPO 1988 07 01 348.750 0.110 16 ... SPO 1988 07 02 349.000 0.090 17 ... SPO 1988 07 03 348.750 0.050 14 ... SPO 1988 07 04 348.750 0.040 23 ... SPO 1988 07 05 348.920 0.090 20 ... SPO 1988 07 06 348.830 0.110 24 ... SPO 1988 07 07 348.890 0.120 24 ... SPO 1988 07 08 348.800 0.050 22 ... SPO 1988 07 09 348.880 0.050 21 ... SPO 1988 07 10 348.900 0.110 20 ... SPO 1988 07 11 348.830 0.070 24 ... SPO 1988 07 12 348.770 0.110 24 ... SPO 1988 07 13 348.860 0.070 24 ... SPO 1988 07 14 348.990 0.120 21 ... SPO 1988 07 15 348.970 0.080 23 ... SPO 1988 07 16 348.950 0.130 22 ... SPO 1988 07 17 349.000 0.090 19 ... SPO 1988 07 18 349.060 0.100 19 ... SPO 1988 07 19 348.910 0.070 18 ... SPO 1988 07 20 349.070 0.110 22 ... SPO 1988 07 21 349.070 0.060 24 ... SPO 1988 07 22 349.090 0.070 24 ... SPO 1988 07 23 349.330 0.110 20 ... SPO 1988 07 24 349.250 0.090 17 ... SPO 1988 07 25 349.290 0.090 15 ... SPO 1988 07 26 349.240 0.080 19 ... SPO 1988 07 27 349.350 0.190 20 ... SPO 1988 07 28 349.400 0.130 22 ... SPO 1988 07 29 349.350 0.060 20 ... SPO 1988 07 30 349.370 0.110 19 ... SPO 1988 07 31 349.380 0.130 15 ... SPO 1988 08 01 349.440 0.110 7 ... SPO 1988 08 02 349.250 0.110 24 ... SPO 1988 08 03 349.410 0.110 24 ... SPO 1988 08 04 349.340 0.110 23 ... SPO 1988 08 05 349.270 0.070 24 ... SPO 1988 08 06 349.230 0.050 21 ... SPO 1988 08 07 349.330 0.060 17 ... SPO 1988 08 08 349.480 0.120 22 ... SPO 1988 08 09 349.480 0.110 20 ... SPO 1988 08 10 349.350 0.070 21 ... SPO 1988 08 11 349.450 0.100 23 ... SPO 1988 08 12 349.380 0.070 19 ... SPO 1988 08 13 349.440 0.090 21 ... SPO 1988 08 14 349.590 0.080 19 ... SPO 1988 08 15 349.560 0.070 24 ... SPO 1988 08 16 349.520 0.080 18 ... SPO 1988 08 17 349.520 0.050 24 ... SPO 1988 08 18 349.480 0.080 24 ... SPO 1988 08 19 349.530 0.120 22 ... SPO 1988 08 20 349.550 0.060 16 ... SPO 1988 08 21 349.530 0.040 17 ... SPO 1988 08 22 349.690 0.070 10 ... SPO 1988 08 23 349.670 0.120 16 ... SPO 1988 08 24 349.590 0.060 22 ... SPO 1988 08 25 349.660 0.080 23 ... SPO 1988 08 26 349.760 0.070 23 ... SPO 1988 08 27 349.860 0.070 22 ... SPO 1988 08 28 349.810 0.100 17 ... SPO 1988 08 29 349.660 0.060 22 ... SPO 1988 08 30 349.640 0.090 21 ... SPO 1988 08 31 349.650 0.050 23 ... SPO 1988 09 01 349.690 0.060 24 ... SPO 1988 09 02 349.630 0.080 21 ... SPO 1988 09 03 349.660 0.060 22 ... SPO 1988 09 04 349.580 0.050 15 ... SPO 1988 09 05 349.650 0.100 23 ... SPO 1988 09 06 349.540 0.110 24 ... SPO 1988 09 07 349.580 0.100 24 ... SPO 1988 09 08 349.860 0.090 22 ... SPO 1988 09 09 349.970 0.110 2 ... SPO 1988 09 10 349.800 0.070 14 ... SPO 1988 09 11 349.860 0.060 19 ... SPO 1988 09 12 349.770 0.050 24 ... SPO 1988 09 13 349.880 0.050 24 ... SPO 1988 09 14 349.770 0.090 11 ... SPO 1988 09 15 349.950 0.070 17 ... SPO 1988 09 16 349.860 0.180 24 ... SPO 1988 09 17 349.880 0.120 17 ... SPO 1988 09 18 349.790 0.090 5 ... SPO 1988 09 19 349.880 0.050 22 ... SPO 1988 09 20 349.860 0.090 24 ... SPO 1988 09 21 349.890 0.060 24 ... SPO 1988 09 22 349.920 0.080 22 ... SPO 1988 09 23 349.940 0.050 24 ... SPO 1988 09 24 349.900 0.070 21 ... SPO 1988 09 25 349.930 0.050 20 ... SPO 1988 09 26 350.000 0.060 23 ... SPO 1988 09 27 350.040 0.070 24 ... SPO 1988 09 28 350.040 0.070 24 ... SPO 1988 09 29 349.920 0.080 22 ... SPO 1988 09 30 349.830 0.070 24 ... SPO 1988 10 01 349.700 0.110 18 ... SPO 1988 10 02 349.840 0.080 20 ... SPO 1988 10 03 349.990 0.060 23 ... SPO 1988 10 04 349.900 0.080 14 ... SPO 1988 10 05 349.810 0.130 22 ... SPO 1988 10 06 349.950 0.130 24 ... SPO 1988 10 07 349.860 0.140 21 ... SPO 1988 10 08 349.940 0.100 20 ... SPO 1988 10 09 349.950 0.110 14 ... SPO 1988 10 10 349.880 0.070 22 ... SPO 1988 10 11 349.920 0.070 23 ... SPO 1988 10 12 349.940 0.090 24 ... SPO 1988 10 13 349.900 0.070 24 ... SPO 1988 10 14 349.940 0.080 23 ... SPO 1988 10 15 349.970 0.100 20 ... SPO 1988 10 16 349.910 0.060 16 ... SPO 1988 10 17 349.900 0.140 13 ... SPO 1988 10 18 349.910 0.080 23 ... SPO 1988 10 19 349.830 0.080 18 ... SPO 1988 10 20 349.800 0.090 20 ... SPO 1988 10 21 350.010 0.150 13 ... SPO 1988 10 22 350.050 0.080 10 ... SPO 1988 10 23 350.010 0.090 15 ... SPO 1988 10 24 349.930 0.140 15 ... SPO 1988 10 25 350.000 0.120 22 ... SPO 1988 10 26 350.120 0.130 24 ... SPO 1988 10 27 349.930 0.070 21 ... SPO 1988 10 28 350.000 0.110 13 ... SPO 1988 10 29 350.020 0.070 20 ... SPO 1988 10 30 349.950 0.140 15 ... SPO 1988 10 31 350.050 0.130 23 ... SPO 1988 11 01 350.110 0.080 21 ... SPO 1988 11 02 349.970 0.130 11 ... SPO 1988 11 03 349.990 0.070 23 ... SPO 1988 11 04 349.970 0.090 21 ... SPO 1988 11 05 350.120 0.100 20 ... SPO 1988 11 06 350.140 0.100 20 ... SPO 1988 11 07 349.870 0.110 22 ... SPO 1988 11 08 349.970 0.080 23 ... SPO 1988 11 09 350.000 0.080 15 ... SPO 1988 11 10 -999.990 -99.990 0 *.. SPO 1988 11 11 349.880 0.090 21 ... SPO 1988 11 12 349.750 0.090 19 ... SPO 1988 11 13 349.610 0.070 19 ... SPO 1988 11 14 349.760 0.090 20 ... SPO 1988 11 15 349.820 0.080 20 ... SPO 1988 11 16 349.740 0.080 21 ... SPO 1988 11 17 -999.990 -99.990 0 *.. SPO 1988 11 18 -999.990 -99.990 0 *.. SPO 1988 11 19 349.780 0.060 23 ... SPO 1988 11 20 349.790 0.060 19 ... SPO 1988 11 21 349.740 0.090 20 ... SPO 1988 11 22 349.720 0.100 18 ... SPO 1988 11 23 349.820 0.080 10 ... SPO 1988 11 24 349.810 0.070 14 ... SPO 1988 11 25 349.800 0.040 22 ... SPO 1988 11 26 349.790 0.090 17 ... SPO 1988 11 27 349.770 0.070 24 ... SPO 1988 11 28 349.680 0.060 17 ... SPO 1988 11 29 349.730 0.070 20 ... SPO 1988 11 30 349.680 0.030 19 ... SPO 1988 12 01 349.660 0.060 18 ... SPO 1988 12 02 349.680 0.090 19 ... SPO 1988 12 03 349.780 0.070 15 ... SPO 1988 12 04 349.700 0.070 18 ... SPO 1988 12 05 349.680 0.060 21 ... SPO 1988 12 06 349.660 0.050 18 ... SPO 1988 12 07 349.670 0.050 21 ... SPO 1988 12 08 349.680 0.060 19 ... SPO 1988 12 09 349.590 0.060 18 ... SPO 1988 12 10 349.590 0.040 16 ... SPO 1988 12 11 349.610 0.040 24 ... SPO 1988 12 12 349.670 0.050 24 ... SPO 1988 12 13 349.570 0.060 21 ... SPO 1988 12 14 349.560 0.080 22 ... SPO 1988 12 15 349.570 0.070 22 ... SPO 1988 12 16 349.600 0.040 24 ... SPO 1988 12 17 349.690 0.060 15 ... SPO 1988 12 18 349.660 0.060 20 ... SPO 1988 12 19 349.620 0.060 19 ... SPO 1988 12 20 349.580 0.060 18 ... SPO 1988 12 21 349.610 0.090 22 ... SPO 1988 12 22 349.540 0.090 20 ... SPO 1988 12 23 349.610 0.120 3 ... SPO 1988 12 24 -999.990 -99.990 0 *.. SPO 1988 12 25 -999.990 -99.990 0 *.. SPO 1988 12 26 349.990 0.100 19 ... SPO 1988 12 27 349.900 0.110 24 ... SPO 1988 12 28 349.910 0.060 20 ... SPO 1988 12 29 349.890 0.060 14 ... SPO 1988 12 30 349.870 0.090 16 ... SPO 1988 12 31 -999.990 -99.990 0 *.. SPO 1989 01 01 349.860 0.050 17 ... SPO 1989 01 02 349.810 0.050 6 ... SPO 1989 01 03 349.830 0.070 16 ... SPO 1989 01 04 349.890 0.060 17 ... SPO 1989 01 05 349.890 0.050 19 ... SPO 1989 01 06 349.910 0.080 18 ... SPO 1989 01 07 349.850 0.070 11 ... SPO 1989 01 08 349.900 0.050 14 ... SPO 1989 01 09 349.860 0.060 7 ... SPO 1989 01 10 349.920 0.090 9 ... SPO 1989 01 11 -999.990 -99.990 0 *.. SPO 1989 01 12 -999.990 -99.990 0 *.. SPO 1989 01 13 -999.990 -99.990 0 *.. SPO 1989 01 14 -999.990 -99.990 0 *.. SPO 1989 01 15 -999.990 -99.990 0 *.. SPO 1989 01 16 -999.990 -99.990 0 *.. SPO 1989 01 17 -999.990 -99.990 0 *.. SPO 1989 01 18 349.900 0.080 3 ... SPO 1989 01 19 349.760 0.000 1 ... SPO 1989 01 20 349.800 0.110 15 ... SPO 1989 01 21 349.860 0.120 8 ... SPO 1989 01 22 349.810 0.080 11 ... SPO 1989 01 23 -999.990 -99.990 0 *.. SPO 1989 01 24 349.800 0.130 14 ... SPO 1989 01 25 349.760 0.070 12 ... SPO 1989 01 26 349.790 0.050 14 ... SPO 1989 01 27 349.840 0.090 20 ... SPO 1989 01 28 349.850 0.070 12 ... SPO 1989 01 29 349.870 0.080 14 ... SPO 1989 01 30 349.880 0.080 16 ... SPO 1989 01 31 349.940 0.090 19 ... SPO 1989 02 01 349.950 0.060 6 ... SPO 1989 02 02 349.830 0.080 20 ... SPO 1989 02 03 349.840 0.080 24 ... SPO 1989 02 04 349.900 0.150 24 ... SPO 1989 02 05 349.740 0.080 13 ... SPO 1989 02 06 349.710 0.090 19 ... SPO 1989 02 07 349.860 0.070 21 ... SPO 1989 02 08 349.830 0.100 22 ... SPO 1989 02 09 349.820 0.070 23 ... SPO 1989 02 10 349.830 0.080 21 ... SPO 1989 02 11 349.820 0.040 17 ... SPO 1989 02 12 349.830 0.050 19 ... SPO 1989 02 13 349.820 0.060 18 ... SPO 1989 02 14 349.780 0.050 19 ... SPO 1989 02 15 349.780 0.040 19 ... SPO 1989 02 16 349.830 0.080 23 ... SPO 1989 02 17 349.940 0.050 21 ... SPO 1989 02 18 349.850 0.120 15 ... SPO 1989 02 19 349.830 0.050 22 ... SPO 1989 02 20 349.890 0.080 23 ... SPO 1989 02 21 349.930 0.040 22 ... SPO 1989 02 22 349.930 0.070 18 ... SPO 1989 02 23 349.890 0.090 22 ... SPO 1989 02 24 349.890 0.060 21 ... SPO 1989 02 25 349.810 0.050 20 ... SPO 1989 02 26 349.750 0.080 22 ... SPO 1989 02 27 349.740 0.070 24 ... SPO 1989 02 28 349.790 0.100 24 ... SPO 1989 03 01 349.860 0.070 24 ... SPO 1989 03 02 349.850 0.070 24 ... SPO 1989 03 03 349.840 0.060 24 ... SPO 1989 03 04 349.770 0.080 15 ... SPO 1989 03 05 349.760 0.060 24 ... SPO 1989 03 06 349.770 0.090 24 ... SPO 1989 03 07 349.790 0.080 22 ... SPO 1989 03 08 349.710 0.050 21 ... SPO 1989 03 09 349.740 0.070 24 ... SPO 1989 03 10 349.710 0.060 24 ... SPO 1989 03 11 349.700 0.070 17 ... SPO 1989 03 12 349.730 0.060 24 ... SPO 1989 03 13 349.760 0.100 24 ... SPO 1989 03 14 349.750 0.080 24 ... SPO 1989 03 15 349.760 0.090 24 ... SPO 1989 03 16 349.720 0.070 24 ... SPO 1989 03 17 349.680 0.100 24 ... SPO 1989 03 18 349.820 0.060 17 ... SPO 1989 03 19 349.790 0.030 24 ... SPO 1989 03 20 349.790 0.060 24 ... SPO 1989 03 21 349.740 0.080 21 ... SPO 1989 03 22 349.740 0.120 23 ... SPO 1989 03 23 349.750 0.050 23 ... SPO 1989 03 24 349.790 0.080 20 ... SPO 1989 03 25 349.800 0.040 17 ... SPO 1989 03 26 349.800 0.040 24 ... SPO 1989 03 27 349.820 0.030 24 ... SPO 1989 03 28 349.840 0.030 24 ... SPO 1989 03 29 349.900 0.040 24 ... SPO 1989 03 30 349.880 0.050 24 ... SPO 1989 03 31 349.870 0.060 24 ... SPO 1989 04 01 349.910 0.050 24 ... SPO 1989 04 02 349.880 0.060 18 ... SPO 1989 04 03 349.820 0.050 18 ... SPO 1989 04 04 349.890 0.040 24 ... SPO 1989 04 05 349.860 0.050 23 ... SPO 1989 04 06 349.870 0.070 24 ... SPO 1989 04 07 349.840 0.100 24 ... SPO 1989 04 08 349.910 0.080 17 ... SPO 1989 04 09 349.900 0.060 24 ... SPO 1989 04 10 349.830 0.080 24 ... SPO 1989 04 11 349.870 0.060 24 ... SPO 1989 04 12 349.840 0.030 24 ... SPO 1989 04 13 349.820 0.040 24 ... SPO 1989 04 14 349.860 0.050 24 ... SPO 1989 04 15 349.910 0.030 17 ... SPO 1989 04 16 349.890 0.050 21 ... SPO 1989 04 17 349.890 0.050 23 ... SPO 1989 04 18 349.890 0.070 24 ... SPO 1989 04 19 349.840 0.020 24 ... SPO 1989 04 20 349.900 0.040 24 ... SPO 1989 04 21 349.900 0.050 24 ... SPO 1989 04 22 349.930 0.050 17 ... SPO 1989 04 23 349.970 0.030 24 ... SPO 1989 04 24 349.950 0.050 24 ... SPO 1989 04 25 349.880 0.060 24 ... SPO 1989 04 26 349.900 0.070 24 ... SPO 1989 04 27 349.860 0.040 23 ... SPO 1989 04 28 349.900 0.050 24 ... SPO 1989 04 29 349.950 0.070 24 ... SPO 1989 04 30 349.950 0.070 24 ... SPO 1989 05 01 349.960 0.070 16 ... SPO 1989 05 02 350.020 0.050 24 ... SPO 1989 05 03 349.990 0.070 22 ... SPO 1989 05 04 349.960 0.080 24 ... SPO 1989 05 05 349.880 0.050 22 ... SPO 1989 05 06 349.900 0.030 19 ... SPO 1989 05 07 349.920 0.030 24 ... SPO 1989 05 08 350.000 0.060 24 ... SPO 1989 05 09 350.010 0.040 24 ... SPO 1989 05 10 350.040 0.030 24 ... SPO 1989 05 11 350.060 0.040 24 ... SPO 1989 05 12 350.110 0.030 24 ... SPO 1989 05 13 350.120 0.030 24 ... SPO 1989 05 14 350.090 0.040 24 ... SPO 1989 05 15 350.130 0.070 17 ... SPO 1989 05 16 350.170 0.060 24 ... SPO 1989 05 17 350.170 0.040 24 ... SPO 1989 05 18 350.160 0.030 24 ... SPO 1989 05 19 350.150 0.070 24 ... SPO 1989 05 20 350.100 0.030 17 ... SPO 1989 05 21 350.120 0.040 24 ... SPO 1989 05 22 350.220 0.050 24 ... SPO 1989 05 23 350.220 0.030 24 ... SPO 1989 05 24 350.240 0.040 24 ... SPO 1989 05 25 350.210 0.080 24 ... SPO 1989 05 26 350.180 0.060 23 ... SPO 1989 05 27 350.170 0.020 18 ... SPO 1989 05 28 350.260 0.070 24 ... SPO 1989 05 29 350.270 0.050 24 ... SPO 1989 05 30 350.270 0.040 23 ... SPO 1989 05 31 350.300 0.060 24 ... SPO 1989 06 01 350.310 0.030 24 ... SPO 1989 06 02 350.340 0.030 24 ... SPO 1989 06 03 350.320 0.040 17 ... SPO 1989 06 04 350.370 0.050 24 ... SPO 1989 06 05 350.410 0.040 24 ... SPO 1989 06 06 350.410 0.090 24 ... SPO 1989 06 07 350.410 0.060 24 ... SPO 1989 06 08 350.410 0.060 24 ... SPO 1989 06 09 350.370 0.050 23 ... SPO 1989 06 10 350.300 0.030 18 ... SPO 1989 06 11 350.330 0.060 24 ... SPO 1989 06 12 350.360 0.050 24 ... SPO 1989 06 13 350.350 0.050 24 ... SPO 1989 06 14 350.310 0.060 24 ... SPO 1989 06 15 350.370 0.060 23 ... SPO 1989 06 16 350.390 0.040 24 ... SPO 1989 06 17 350.380 0.060 24 ... SPO 1989 06 18 350.340 0.050 17 ... SPO 1989 06 19 350.320 0.030 24 ... SPO 1989 06 20 350.430 0.060 24 ... SPO 1989 06 21 350.510 0.020 24 ... SPO 1989 06 22 350.550 0.050 24 ... SPO 1989 06 23 350.490 0.060 23 ... SPO 1989 06 24 350.460 0.030 18 ... SPO 1989 06 25 350.480 0.030 24 ... SPO 1989 06 26 350.420 0.040 24 ... SPO 1989 06 27 350.480 0.050 24 ... SPO 1989 06 28 350.580 0.030 24 ... SPO 1989 06 29 350.510 0.030 24 ... SPO 1989 06 30 350.520 0.030 24 ... SPO 1989 07 01 350.530 0.050 17 ... SPO 1989 07 02 350.590 0.040 24 ... SPO 1989 07 03 350.670 0.050 24 ... SPO 1989 07 04 350.600 0.060 23 ... SPO 1989 07 05 350.550 0.050 24 ... SPO 1989 07 06 350.670 0.030 24 ... SPO 1989 07 07 350.630 0.050 24 ... SPO 1989 07 08 350.620 0.030 17 ... SPO 1989 07 09 350.570 0.050 24 ... SPO 1989 07 10 350.580 0.060 24 ... SPO 1989 07 11 350.680 0.050 24 ... SPO 1989 07 12 350.760 0.070 24 ... SPO 1989 07 13 350.770 0.060 24 ... SPO 1989 07 14 350.780 0.070 24 ... SPO 1989 07 15 350.740 0.070 17 ... SPO 1989 07 16 350.800 0.070 24 ... SPO 1989 07 17 350.660 0.050 24 ... SPO 1989 07 18 350.850 0.040 24 ... SPO 1989 07 19 350.880 0.030 24 ... SPO 1989 07 20 350.880 0.040 24 ... SPO 1989 07 21 350.860 0.060 24 ... SPO 1989 07 22 350.900 0.060 17 ... SPO 1989 07 23 350.940 0.030 24 ... SPO 1989 07 24 350.950 0.040 24 ... SPO 1989 07 25 350.900 0.020 24 ... SPO 1989 07 26 350.890 0.040 24 ... SPO 1989 07 27 350.930 0.040 24 ... SPO 1989 07 28 350.970 0.070 24 ... SPO 1989 07 29 351.170 0.100 17 ... SPO 1989 07 30 351.060 0.040 24 ... SPO 1989 07 31 350.940 0.030 24 ... SPO 1989 08 01 351.020 0.040 24 ... SPO 1989 08 02 351.040 0.040 24 ... SPO 1989 08 03 351.070 0.040 24 ... SPO 1989 08 04 351.060 0.030 24 ... SPO 1989 08 05 351.070 0.040 17 ... SPO 1989 08 06 351.060 0.040 24 ... SPO 1989 08 07 351.090 0.030 24 ... SPO 1989 08 08 351.100 0.060 24 ... SPO 1989 08 09 351.120 0.050 24 ... SPO 1989 08 10 351.140 0.060 24 ... SPO 1989 08 11 351.140 0.080 24 ... SPO 1989 08 12 351.170 0.040 17 ... SPO 1989 08 13 351.180 0.060 24 ... SPO 1989 08 14 351.270 0.050 24 ... SPO 1989 08 15 351.230 0.050 24 ... SPO 1989 08 16 351.170 0.070 24 ... SPO 1989 08 17 351.270 0.060 24 ... SPO 1989 08 18 351.350 0.050 24 ... SPO 1989 08 19 351.490 0.020 17 ... SPO 1989 08 20 351.450 0.030 24 ... SPO 1989 08 21 351.370 0.030 24 ... SPO 1989 08 22 351.340 0.050 24 ... SPO 1989 08 23 351.400 0.050 24 ... SPO 1989 08 24 351.230 0.080 24 ... SPO 1989 08 25 351.170 0.060 24 ... SPO 1989 08 26 351.160 0.060 17 ... SPO 1989 08 27 351.150 0.050 24 ... SPO 1989 08 28 351.280 0.070 24 ... SPO 1989 08 29 351.500 0.090 24 ... SPO 1989 08 30 351.460 0.040 24 ... SPO 1989 08 31 351.260 0.120 24 ... SPO 1989 09 01 351.180 0.050 24 ... SPO 1989 09 02 351.270 0.030 17 ... SPO 1989 09 03 351.220 0.040 24 ... SPO 1989 09 04 351.200 0.040 24 ... SPO 1989 09 05 351.170 0.050 24 ... SPO 1989 09 06 351.210 0.020 24 ... SPO 1989 09 07 351.250 0.030 24 ... SPO 1989 09 08 351.260 0.030 24 ... SPO 1989 09 09 351.360 0.050 17 ... SPO 1989 09 10 351.380 0.030 24 ... SPO 1989 09 11 351.400 0.030 24 ... SPO 1989 09 12 351.330 0.040 24 ... SPO 1989 09 13 351.400 0.050 24 ... SPO 1989 09 14 351.370 0.060 24 ... SPO 1989 09 15 351.300 0.050 24 ... SPO 1989 09 16 351.280 0.050 17 ... SPO 1989 09 17 351.480 0.050 21 ... SPO 1989 09 18 351.390 0.040 24 ... SPO 1989 09 19 351.330 0.040 24 ... SPO 1989 09 20 351.350 0.030 24 ... SPO 1989 09 21 351.410 0.220 24 ... SPO 1989 09 22 351.410 0.060 24 ... SPO 1989 09 23 351.260 0.080 17 ... SPO 1989 09 24 351.310 0.110 24 ... SPO 1989 09 25 351.300 0.030 24 ... SPO 1989 09 26 351.320 0.040 24 ... SPO 1989 09 27 351.320 0.040 24 ... SPO 1989 09 28 351.400 0.030 24 ... SPO 1989 09 29 351.400 0.020 24 ... SPO 1989 09 30 351.260 0.070 17 ... SPO 1989 10 01 351.270 0.040 24 ... SPO 1989 10 02 351.270 0.060 24 ... SPO 1989 10 03 351.340 0.030 24 ... SPO 1989 10 04 351.280 0.040 24 ... SPO 1989 10 05 351.340 0.030 24 ... SPO 1989 10 06 351.370 0.030 24 ... SPO 1989 10 07 351.320 0.060 17 ... SPO 1989 10 08 351.370 0.050 24 ... SPO 1989 10 09 351.450 0.070 24 ... SPO 1989 10 10 351.480 0.090 24 ... SPO 1989 10 11 351.370 0.070 24 ... SPO 1989 10 12 351.340 0.090 17 ... SPO 1989 10 13 351.550 0.030 24 ... SPO 1989 10 14 351.510 0.040 17 ... SPO 1989 10 15 351.410 0.040 24 ... SPO 1989 10 16 351.420 0.060 24 ... SPO 1989 10 17 351.400 0.040 24 ... SPO 1989 10 18 351.450 0.050 24 ... SPO 1989 10 19 351.460 0.050 24 ... SPO 1989 10 20 351.380 0.060 24 ... SPO 1989 10 21 351.300 0.030 17 ... SPO 1989 10 22 351.330 0.040 24 ... SPO 1989 10 23 351.400 0.070 24 ... SPO 1989 10 24 351.430 0.070 24 ... SPO 1989 10 25 351.470 0.060 23 ... SPO 1989 10 26 351.480 0.050 24 ... SPO 1989 10 27 351.420 0.060 24 ... SPO 1989 10 28 351.310 0.040 16 ... SPO 1989 10 29 351.300 0.080 24 ... SPO 1989 10 30 351.300 0.040 24 ... SPO 1989 10 31 351.290 0.050 22 ... SPO 1989 11 01 351.270 0.050 24 ... SPO 1989 11 02 351.330 0.070 24 ... SPO 1989 11 03 351.390 0.040 24 ... SPO 1989 11 04 351.380 0.030 16 ... SPO 1989 11 05 351.810 0.150 17 ... SPO 1989 11 06 351.740 0.070 24 ... SPO 1989 11 07 351.700 0.070 24 ... SPO 1989 11 08 351.590 0.070 23 ... SPO 1989 11 09 351.720 0.080 24 ... SPO 1989 11 10 351.790 0.080 24 ... SPO 1989 11 11 351.660 0.050 24 ... SPO 1989 11 12 351.700 0.070 17 ... SPO 1989 11 13 351.810 0.050 24 ... SPO 1989 11 14 351.760 0.070 19 ... SPO 1989 11 15 351.860 0.070 24 ... SPO 1989 11 16 351.830 0.040 24 ... SPO 1989 11 17 351.600 0.080 22 ... SPO 1989 11 18 351.570 0.060 17 ... SPO 1989 11 19 351.540 0.060 24 ... SPO 1989 11 20 351.560 0.080 24 ... SPO 1989 11 21 351.620 0.090 24 ... SPO 1989 11 22 351.600 0.190 18 ... SPO 1989 11 23 351.460 0.110 18 ... SPO 1989 11 24 351.380 0.100 21 ... SPO 1989 11 25 351.380 0.050 24 ... SPO 1989 11 26 351.390 0.060 24 ... SPO 1989 11 27 351.360 0.050 24 ... SPO 1989 11 28 351.270 0.080 17 ... SPO 1989 11 29 351.280 0.080 24 ... SPO 1989 11 30 351.260 0.090 24 ... SPO 1989 12 01 351.270 0.110 23 ... SPO 1989 12 02 351.210 0.040 14 ... SPO 1989 12 03 351.350 0.090 22 ... SPO 1989 12 04 351.390 0.080 23 ... SPO 1989 12 05 351.370 0.100 24 ... SPO 1989 12 06 351.220 0.110 24 ... SPO 1989 12 07 351.130 0.140 21 ... SPO 1989 12 08 351.300 0.080 24 ... SPO 1989 12 09 351.280 0.060 17 ... SPO 1989 12 10 351.230 0.080 23 ... SPO 1989 12 11 351.240 0.090 24 ... SPO 1989 12 12 351.220 0.070 24 ... SPO 1989 12 13 351.190 0.070 24 ... SPO 1989 12 14 351.240 0.050 24 ... SPO 1989 12 15 351.250 0.090 24 ... SPO 1989 12 16 351.270 0.050 17 ... SPO 1989 12 17 351.340 0.060 24 ... SPO 1989 12 18 351.350 0.100 15 ... SPO 1989 12 19 351.290 0.050 24 ... SPO 1989 12 20 351.220 0.100 22 ... SPO 1989 12 21 351.220 0.090 24 ... SPO 1989 12 22 351.110 0.050 24 ... SPO 1989 12 23 351.100 0.050 17 ... SPO 1989 12 24 351.110 0.030 24 ... SPO 1989 12 25 351.050 0.080 24 ... SPO 1989 12 26 350.780 0.170 24 ... SPO 1989 12 27 351.010 0.100 20 ... SPO 1989 12 28 350.960 0.060 24 ... SPO 1989 12 29 351.020 0.040 23 ... SPO 1989 12 30 350.920 0.050 16 ... SPO 1989 12 31 350.890 0.070 24 ... SPO 1990 01 01 351.000 0.170 24 ... SPO 1990 01 02 351.120 0.060 24 ... SPO 1990 01 03 351.130 0.040 24 ... SPO 1990 01 04 351.050 0.050 24 ... SPO 1990 01 05 351.060 0.090 4 ... SPO 1990 01 06 351.060 0.050 5 ... SPO 1990 01 07 351.070 0.130 24 ... SPO 1990 01 08 351.020 0.070 20 ... SPO 1990 01 09 351.020 0.040 24 ... SPO 1990 01 10 351.000 0.030 22 ... SPO 1990 01 11 350.990 0.040 24 ... SPO 1990 01 12 350.990 0.020 24 ... SPO 1990 01 13 351.070 0.100 17 ... SPO 1990 01 14 350.960 0.120 24 ... SPO 1990 01 15 351.070 0.110 22 ... SPO 1990 01 16 -999.990 -99.990 0 *.. SPO 1990 01 17 -999.990 -99.990 0 *.. SPO 1990 01 18 -999.990 -99.990 0 *.. SPO 1990 01 19 -999.990 -99.990 0 *.. SPO 1990 01 20 -999.990 -99.990 0 *.. SPO 1990 01 21 -999.990 -99.990 0 *.. SPO 1990 01 22 -999.990 -99.990 0 *.. SPO 1990 01 23 -999.990 -99.990 0 *.. SPO 1990 01 24 -999.990 -99.990 0 *.. SPO 1990 01 25 -999.990 -99.990 0 *.. SPO 1990 01 26 -999.990 -99.990 0 *.. SPO 1990 01 27 -999.990 -99.990 0 *.. SPO 1990 01 28 -999.990 -99.990 0 *.. SPO 1990 01 29 -999.990 -99.990 0 *.. SPO 1990 01 30 -999.990 -99.990 0 *.. SPO 1990 01 31 -999.990 -99.990 0 *.. SPO 1990 02 01 -999.990 -99.990 0 *.. SPO 1990 02 02 -999.990 -99.990 0 *.. SPO 1990 02 03 -999.990 -99.990 0 *.. SPO 1990 02 04 -999.990 -99.990 0 *.. SPO 1990 02 05 -999.990 -99.990 0 *.. SPO 1990 02 06 350.710 0.100 18 ... SPO 1990 02 07 350.830 0.050 10 ... SPO 1990 02 08 350.800 0.040 24 ... SPO 1990 02 09 350.790 0.040 24 ... SPO 1990 02 10 350.870 0.040 17 ... SPO 1990 02 11 350.750 0.070 17 ... SPO 1990 02 12 350.640 0.050 15 ... SPO 1990 02 13 350.760 0.130 23 ... SPO 1990 02 14 350.910 0.050 24 ... SPO 1990 02 15 350.780 0.050 24 ... SPO 1990 02 16 350.800 0.030 24 ... SPO 1990 02 17 350.770 0.050 17 ... SPO 1990 02 18 350.810 0.050 24 ... SPO 1990 02 19 350.990 0.170 24 ... SPO 1990 02 20 350.910 0.090 24 ... SPO 1990 02 21 350.720 0.140 24 ... SPO 1990 02 22 350.590 0.090 24 ... SPO 1990 02 23 350.810 0.060 24 ... SPO 1990 02 24 350.720 0.030 17 ... SPO 1990 02 25 350.620 0.100 20 ... SPO 1990 02 26 350.630 0.140 24 ... SPO 1990 02 27 350.580 0.180 24 ... SPO 1990 02 28 350.700 0.060 24 ... SPO 1990 03 01 350.820 0.050 24 ... SPO 1990 03 02 350.970 0.080 24 ... SPO 1990 03 03 351.020 0.050 24 ... SPO 1990 03 04 350.770 0.030 17 ... SPO 1990 03 05 350.810 0.090 24 ... SPO 1990 03 06 350.950 0.110 24 ... SPO 1990 03 07 351.070 0.090 24 ... SPO 1990 03 08 350.940 0.080 24 ... SPO 1990 03 09 350.940 0.060 24 ... SPO 1990 03 10 350.770 0.040 17 ... SPO 1990 03 11 351.090 0.070 24 ... SPO 1990 03 12 351.100 0.070 24 ... SPO 1990 03 13 350.900 0.130 24 ... SPO 1990 03 14 350.910 0.110 24 ... SPO 1990 03 15 350.880 0.040 24 ... SPO 1990 03 16 350.940 0.040 24 ... SPO 1990 03 17 350.900 0.030 17 ... SPO 1990 03 18 350.870 0.060 24 ... SPO 1990 03 19 350.850 0.060 24 ... SPO 1990 03 20 350.790 0.130 22 ... SPO 1990 03 21 350.700 0.030 24 ... SPO 1990 03 22 350.830 0.050 24 ... SPO 1990 03 23 350.870 0.040 20 ... SPO 1990 03 24 350.770 0.060 24 ... SPO 1990 03 25 350.740 0.040 24 ... SPO 1990 03 26 350.770 0.090 15 ... SPO 1990 03 27 350.810 0.050 24 ... SPO 1990 03 28 350.720 0.060 24 ... SPO 1990 03 29 350.700 0.030 24 ... SPO 1990 03 30 350.780 0.040 24 ... SPO 1990 03 31 350.800 0.030 17 ... SPO 1990 04 01 350.900 0.050 24 ... SPO 1990 04 02 350.930 0.040 24 ... SPO 1990 04 03 350.870 0.050 24 ... SPO 1990 04 04 350.850 0.060 24 ... SPO 1990 04 05 350.770 0.030 24 ... SPO 1990 04 06 350.740 0.060 24 ... SPO 1990 04 07 350.760 0.040 17 ... SPO 1990 04 08 350.700 0.040 24 ... SPO 1990 04 09 350.710 0.070 24 ... SPO 1990 04 10 350.790 0.030 24 ... SPO 1990 04 11 350.780 0.050 24 ... SPO 1990 04 12 350.840 0.040 24 ... SPO 1990 04 13 350.840 0.110 24 ... SPO 1990 04 14 350.910 0.020 17 ... SPO 1990 04 15 350.860 0.040 24 ... SPO 1990 04 16 350.850 0.050 24 ... SPO 1990 04 17 351.040 0.040 24 ... SPO 1990 04 18 351.030 0.040 23 ... SPO 1990 04 19 350.970 0.040 24 ... SPO 1990 04 20 350.940 0.040 24 ... SPO 1990 04 21 350.960 0.030 19 ... SPO 1990 04 22 351.070 0.060 22 ... SPO 1990 04 23 351.050 0.040 24 ... SPO 1990 04 24 351.260 0.130 24 ... SPO 1990 04 25 351.320 0.060 24 ... SPO 1990 04 26 351.180 0.070 24 ... SPO 1990 04 27 351.090 0.100 24 ... SPO 1990 04 28 351.070 0.050 24 ... SPO 1990 04 29 351.000 0.040 17 ... SPO 1990 04 30 350.990 0.020 24 ... SPO 1990 05 01 350.930 0.090 24 ... SPO 1990 05 02 350.890 0.050 24 ... SPO 1990 05 03 350.950 0.100 23 ... SPO 1990 05 04 351.080 0.100 24 ... SPO 1990 05 05 350.980 0.160 17 ... SPO 1990 05 06 350.940 0.090 24 ... SPO 1990 05 07 350.960 0.090 24 ... SPO 1990 05 08 351.360 0.070 24 ... SPO 1990 05 09 351.360 0.070 23 ... SPO 1990 05 10 351.440 0.050 13 ... SPO 1990 05 11 351.430 0.030 24 ... SPO 1990 05 12 351.430 0.050 24 ... SPO 1990 05 13 351.370 0.050 17 ... SPO 1990 05 14 351.400 0.040 23 ... SPO 1990 05 15 351.380 0.050 3 ... SPO 1990 05 16 351.460 0.040 24 ... SPO 1990 05 17 351.540 0.030 24 ... SPO 1990 05 18 351.510 0.040 24 ... SPO 1990 05 19 -999.990 -99.990 0 *.. SPO 1990 05 20 351.640 0.050 24 ... SPO 1990 05 21 351.600 0.070 24 ... SPO 1990 05 22 351.520 0.050 24 ... SPO 1990 05 23 351.520 0.050 24 ... SPO 1990 05 24 351.560 0.070 24 ... SPO 1990 05 25 351.540 0.040 24 ... SPO 1990 05 26 351.530 0.060 17 ... SPO 1990 05 27 351.570 0.040 24 ... SPO 1990 05 28 351.590 0.030 24 ... SPO 1990 05 29 351.570 0.060 23 ... SPO 1990 05 30 351.530 0.030 21 ... SPO 1990 05 31 351.600 0.060 24 ... SPO 1990 06 01 351.590 0.040 24 ... SPO 1990 06 02 351.600 0.040 24 ... SPO 1990 06 03 351.590 0.040 17 ... SPO 1990 06 04 351.570 0.040 24 ... SPO 1990 06 05 351.600 0.050 24 ... SPO 1990 06 06 351.640 0.060 24 ... SPO 1990 06 07 351.750 0.060 24 ... SPO 1990 06 08 351.720 0.030 24 ... SPO 1990 06 09 351.740 0.030 24 ... SPO 1990 06 10 351.680 0.040 17 ... SPO 1990 06 11 351.680 0.040 24 ... SPO 1990 06 12 351.680 0.040 24 ... SPO 1990 06 13 351.720 0.050 24 ... SPO 1990 06 14 351.750 0.090 24 ... SPO 1990 06 15 351.810 0.030 24 ... SPO 1990 06 16 351.790 0.040 24 ... SPO 1990 06 17 351.770 0.030 17 ... SPO 1990 06 18 351.840 0.040 24 ... SPO 1990 06 19 351.860 0.040 24 ... SPO 1990 06 20 351.900 0.050 24 ... SPO 1990 06 21 351.870 0.040 24 ... SPO 1990 06 22 351.900 0.040 24 ... SPO 1990 06 23 351.950 0.060 24 ... SPO 1990 06 24 351.970 0.030 17 ... SPO 1990 06 25 351.850 0.040 24 ... SPO 1990 06 26 351.870 0.060 24 ... SPO 1990 06 27 351.920 0.060 24 ... SPO 1990 06 28 351.940 0.040 24 ... SPO 1990 06 29 352.000 0.040 24 ... SPO 1990 06 30 352.040 0.030 24 ... SPO 1990 07 01 351.970 0.030 17 ... SPO 1990 07 02 351.990 0.040 24 ... SPO 1990 07 03 352.030 0.040 24 ... SPO 1990 07 04 352.150 0.060 24 ... SPO 1990 07 05 352.120 0.060 22 ... SPO 1990 07 06 352.040 0.050 24 ... SPO 1990 07 07 352.160 0.070 24 ... SPO 1990 07 08 352.170 0.040 17 ... SPO 1990 07 09 352.160 0.030 24 ... SPO 1990 07 10 352.140 0.040 24 ... SPO 1990 07 11 352.160 0.060 24 ... SPO 1990 07 12 352.440 0.080 24 ... SPO 1990 07 13 352.340 0.070 23 ... SPO 1990 07 14 352.330 0.040 24 ... SPO 1990 07 15 352.290 0.050 16 ... SPO 1990 07 16 352.340 0.090 22 ... SPO 1990 07 17 352.400 0.060 24 ... SPO 1990 07 18 352.390 0.040 24 ... SPO 1990 07 19 352.380 0.040 24 ... SPO 1990 07 20 352.290 0.040 24 ... SPO 1990 07 21 352.370 0.030 23 ... SPO 1990 07 22 352.390 0.030 17 ... SPO 1990 07 23 352.370 0.020 24 ... SPO 1990 07 24 352.340 0.020 24 ... SPO 1990 07 25 352.310 0.030 24 ... SPO 1990 07 26 352.320 0.030 24 ... SPO 1990 07 27 352.370 0.040 24 ... SPO 1990 07 28 352.450 0.060 17 ... SPO 1990 07 29 352.440 0.030 24 ... SPO 1990 07 30 352.440 0.040 24 ... SPO 1990 07 31 352.500 0.040 24 ... SPO 1990 08 01 352.420 0.050 22 ... SPO 1990 08 02 352.530 0.040 24 ... SPO 1990 08 03 352.530 0.040 23 ... SPO 1990 08 04 352.500 0.020 15 ... SPO 1990 08 05 352.490 0.030 17 ... SPO 1990 08 06 352.490 0.030 24 ... SPO 1990 08 07 352.520 0.050 24 ... SPO 1990 08 08 352.560 0.080 23 ... SPO 1990 08 09 352.520 0.070 24 ... SPO 1990 08 10 352.560 0.030 24 ... SPO 1990 08 11 352.550 0.030 24 ... SPO 1990 08 12 352.500 0.030 17 ... SPO 1990 08 13 352.560 0.030 24 ... SPO 1990 08 14 352.560 0.060 24 ... SPO 1990 08 15 352.540 0.040 24 ... SPO 1990 08 16 352.530 0.040 24 ... SPO 1990 08 17 352.520 0.060 24 ... SPO 1990 08 18 352.650 0.020 17 ... SPO 1990 08 19 352.670 0.030 24 ... SPO 1990 08 20 352.680 0.020 24 ... SPO 1990 08 21 352.740 0.040 23 ... SPO 1990 08 22 352.740 0.050 23 ... SPO 1990 08 23 352.700 0.070 24 ... SPO 1990 08 24 352.670 0.070 24 ... SPO 1990 08 25 352.810 0.080 17 ... SPO 1990 08 26 352.770 0.070 24 ... SPO 1990 08 27 352.840 0.050 24 ... SPO 1990 08 28 352.810 0.050 24 ... SPO 1990 08 29 352.700 0.030 24 ... SPO 1990 08 30 352.700 0.030 24 ... SPO 1990 08 31 352.740 0.030 24 ... SPO 1990 09 01 352.740 0.020 17 ... SPO 1990 09 02 352.760 0.050 15 ... SPO 1990 09 03 352.770 0.040 24 ... SPO 1990 09 04 352.730 0.040 24 ... SPO 1990 09 05 352.740 0.050 24 ... SPO 1990 09 06 352.730 0.050 24 ... SPO 1990 09 07 352.760 0.060 24 ... SPO 1990 09 08 352.880 0.030 24 ... SPO 1990 09 09 352.870 0.060 24 ... SPO 1990 09 10 352.820 0.050 24 ... SPO 1990 09 11 352.790 0.010 17 ... SPO 1990 09 12 352.770 0.030 24 ... SPO 1990 09 13 352.760 0.040 24 ... SPO 1990 09 14 352.730 0.040 24 ... SPO 1990 09 15 352.700 0.040 24 ... SPO 1990 09 16 352.770 0.040 17 ... SPO 1990 09 17 352.810 0.050 24 ... SPO 1990 09 18 352.910 0.060 24 ... SPO 1990 09 19 352.880 0.080 23 ... SPO 1990 09 20 352.920 0.050 24 ... SPO 1990 09 21 352.850 0.040 24 ... SPO 1990 09 22 352.890 0.040 17 ... SPO 1990 09 23 352.900 0.030 24 ... SPO 1990 09 24 352.930 0.080 24 ... SPO 1990 09 25 352.890 0.060 24 ... SPO 1990 09 26 352.890 0.050 24 ... SPO 1990 09 27 352.900 0.030 24 ... SPO 1990 09 28 352.890 0.030 24 ... SPO 1990 09 29 352.910 0.040 17 ... SPO 1990 09 30 352.810 0.070 24 ... SPO 1990 10 01 352.720 0.070 24 ... SPO 1990 10 02 352.840 0.050 24 ... SPO 1990 10 03 352.960 0.050 24 ... SPO 1990 10 04 352.780 0.140 24 ... SPO 1990 10 05 352.680 0.040 24 ... SPO 1990 10 06 352.740 0.030 24 ... SPO 1990 10 07 352.780 0.060 17 ... SPO 1990 10 08 352.960 0.070 24 ... SPO 1990 10 09 352.950 0.070 24 ... SPO 1990 10 10 352.910 0.060 24 ... SPO 1990 10 11 352.930 0.040 24 ... SPO 1990 10 12 352.920 0.040 24 ... SPO 1990 10 13 352.970 0.040 17 ... SPO 1990 10 14 353.040 0.060 24 ... SPO 1990 10 15 353.140 0.050 24 ... SPO 1990 10 16 352.960 0.080 24 ... SPO 1990 10 17 352.910 0.080 24 ... SPO 1990 10 18 352.840 0.080 24 ... SPO 1990 10 19 352.860 0.050 24 ... SPO 1990 10 20 352.900 0.060 16 ... SPO 1990 10 21 352.810 0.030 24 ... SPO 1990 10 22 352.830 0.050 24 ... SPO 1990 10 23 352.820 0.040 24 ... SPO 1990 10 24 352.840 0.040 24 ... SPO 1990 10 25 352.810 0.050 24 ... SPO 1990 10 26 352.840 0.080 24 ... SPO 1990 10 27 352.820 0.040 17 ... SPO 1990 10 28 352.930 0.040 24 ... SPO 1990 10 29 352.870 0.030 24 ... SPO 1990 10 30 352.880 0.060 24 ... SPO 1990 10 31 352.860 0.060 24 ... SPO 1990 11 01 352.930 0.060 24 ... SPO 1990 11 02 353.070 0.050 24 ... SPO 1990 11 03 353.020 0.070 24 ... SPO 1990 11 04 352.980 0.050 24 ... SPO 1990 11 05 353.020 0.060 17 ... SPO 1990 11 06 353.010 0.040 24 ... SPO 1990 11 07 352.960 0.090 24 ... SPO 1990 11 08 352.920 0.070 24 ... SPO 1990 11 09 352.930 0.060 24 ... SPO 1990 11 10 352.960 0.060 24 ... SPO 1990 11 11 353.000 0.070 24 ... SPO 1990 11 12 352.980 0.050 24 ... SPO 1990 11 13 352.930 0.060 24 ... SPO 1990 11 14 352.900 0.050 21 ... SPO 1990 11 15 352.950 0.070 20 ... SPO 1990 11 16 352.970 0.040 24 ... SPO 1990 11 17 352.920 0.050 24 ... SPO 1990 11 18 352.900 0.070 24 ... SPO 1990 11 19 352.840 0.040 24 ... SPO 1990 11 20 352.810 0.050 24 ... SPO 1990 11 21 352.770 0.060 24 ... SPO 1990 11 22 352.710 0.050 24 ... SPO 1990 11 23 352.840 0.060 24 ... SPO 1990 11 24 352.940 0.040 24 ... SPO 1990 11 25 352.830 0.050 22 ... SPO 1990 11 26 352.730 0.070 19 ... SPO 1990 11 27 352.740 0.050 24 ... SPO 1990 11 28 352.770 0.060 24 ... SPO 1990 11 29 352.630 0.040 24 ... SPO 1990 11 30 352.690 0.030 24 ... SPO 1990 12 01 352.730 0.060 17 ... SPO 1990 12 02 352.790 0.040 24 ... SPO 1990 12 03 352.730 0.070 24 ... SPO 1990 12 04 352.690 0.070 16 ... SPO 1990 12 05 352.580 0.010 6 ... SPO 1990 12 06 352.570 0.040 10 ... SPO 1990 12 07 352.520 0.030 5 ... SPO 1990 12 08 -999.990 -99.990 0 *.. SPO 1990 12 09 -999.990 -99.990 0 *.. SPO 1990 12 10 -999.990 -99.990 0 *.. SPO 1990 12 11 352.490 0.050 12 ... SPO 1990 12 12 352.550 0.080 23 ... SPO 1990 12 13 352.520 0.040 18 ... SPO 1990 12 14 352.490 0.080 21 ... SPO 1990 12 15 352.420 0.040 20 ... SPO 1990 12 16 352.290 0.070 23 ... SPO 1990 12 17 352.430 0.100 23 ... SPO 1990 12 18 352.460 0.030 24 ... SPO 1990 12 19 352.460 0.040 24 ... SPO 1990 12 20 352.450 0.040 24 ... SPO 1990 12 21 352.460 0.060 24 ... SPO 1990 12 22 352.520 0.040 17 ... SPO 1990 12 23 352.450 0.070 24 ... SPO 1990 12 24 352.410 0.060 24 ... SPO 1990 12 25 352.390 0.060 24 ... SPO 1990 12 26 352.370 0.060 24 ... SPO 1990 12 27 352.340 0.060 24 ... SPO 1990 12 28 352.420 0.050 22 ... SPO 1990 12 29 352.400 0.060 16 ... SPO 1990 12 30 352.310 0.080 24 ... SPO 1990 12 31 352.390 0.050 24 ... SPO 1991 01 01 352.420 0.050 24 ... SPO 1991 01 02 352.410 0.050 24 ... SPO 1991 01 03 352.420 0.050 24 ... SPO 1991 01 04 352.520 0.070 24 ... SPO 1991 01 05 352.590 0.030 17 ... SPO 1991 01 06 352.570 0.040 24 ... SPO 1991 01 07 352.620 0.060 24 ... SPO 1991 01 08 352.660 0.050 23 ... SPO 1991 01 09 352.590 0.070 20 ... SPO 1991 01 10 352.470 0.100 17 ... SPO 1991 01 11 352.580 0.100 24 ... SPO 1991 01 12 352.650 0.050 24 ... SPO 1991 01 13 352.470 0.090 24 ... SPO 1991 01 14 352.430 0.070 24 ... SPO 1991 01 15 352.290 0.160 24 ... SPO 1991 01 16 352.360 0.140 21 ... SPO 1991 01 17 352.320 0.100 17 ... SPO 1991 01 18 352.430 0.060 19 ... SPO 1991 01 19 352.550 0.030 24 ... SPO 1991 01 20 352.270 0.130 24 ... SPO 1991 01 21 352.260 0.050 24 ... SPO 1991 01 22 352.160 0.050 24 ... SPO 1991 01 23 352.340 0.080 18 ... SPO 1991 01 24 352.310 0.070 18 ... SPO 1991 01 25 352.430 0.110 10 ... SPO 1991 01 26 352.410 0.140 19 ... SPO 1991 01 27 352.210 0.070 24 ... SPO 1991 01 28 352.330 0.070 22 ... SPO 1991 01 29 352.400 0.070 24 ... SPO 1991 01 30 352.280 0.150 24 ... SPO 1991 01 31 352.120 0.110 17 ... SPO 1991 02 01 351.950 0.250 14 ... SPO 1991 02 02 351.580 0.070 24 ... SPO 1991 02 03 351.810 0.240 24 ... SPO 1991 02 04 351.950 0.090 24 ... SPO 1991 02 05 351.970 0.100 22 ... SPO 1991 02 06 352.050 0.040 23 ... SPO 1991 02 07 351.950 0.110 12 ... SPO 1991 02 08 351.760 0.100 4 ... SPO 1991 02 09 351.730 0.070 19 ... SPO 1991 02 10 352.050 0.180 24 ... SPO 1991 02 11 352.130 0.050 24 ... SPO 1991 02 12 352.130 0.110 24 ... SPO 1991 02 13 352.090 0.050 24 ... SPO 1991 02 14 352.210 0.040 17 ... SPO 1991 02 15 352.210 0.050 24 ... SPO 1991 02 16 352.190 0.050 24 ... SPO 1991 02 17 352.240 0.080 24 ... SPO 1991 02 18 352.310 0.060 24 ... SPO 1991 02 19 352.320 0.070 24 ... SPO 1991 02 20 352.270 0.070 24 ... SPO 1991 02 21 352.390 0.140 17 ... SPO 1991 02 22 352.570 0.090 24 ... SPO 1991 02 23 352.320 0.090 24 ... SPO 1991 02 24 352.330 0.040 23 ... SPO 1991 02 25 352.450 0.030 24 ... SPO 1991 02 26 352.450 0.090 24 ... SPO 1991 02 27 352.210 0.130 24 ... SPO 1991 02 28 351.980 0.070 17 ... SPO 1991 03 01 352.000 0.130 24 ... SPO 1991 03 02 351.970 0.040 24 ... SPO 1991 03 03 351.940 0.070 24 ... SPO 1991 03 04 351.880 0.070 24 ... SPO 1991 03 05 351.910 0.050 24 ... SPO 1991 03 06 352.010 0.050 24 ... SPO 1991 03 07 352.170 0.140 17 ... SPO 1991 03 08 352.150 0.080 24 ... SPO 1991 03 09 352.160 0.050 24 ... SPO 1991 03 10 352.320 0.060 24 ... SPO 1991 03 11 352.220 0.060 24 ... SPO 1991 03 12 351.950 0.060 24 ... SPO 1991 03 13 351.910 0.110 22 ... SPO 1991 03 14 351.790 0.060 19 ... SPO 1991 03 15 351.910 0.060 24 ... SPO 1991 03 16 351.690 0.090 24 ... SPO 1991 03 17 351.630 0.050 24 ... SPO 1991 03 18 351.640 0.090 24 ... SPO 1991 03 19 351.820 0.030 24 ... SPO 1991 03 20 351.680 0.060 24 ... SPO 1991 03 21 351.800 0.090 17 ... SPO 1991 03 22 351.810 0.040 24 ... SPO 1991 03 23 351.740 0.030 12 ... SPO 1991 03 24 -999.990 -99.990 0 *.. SPO 1991 03 25 -999.990 -99.990 0 *.. SPO 1991 03 26 351.800 0.090 14 ... SPO 1991 03 27 -999.990 -99.990 0 *.. SPO 1991 03 28 351.600 0.050 10 ... SPO 1991 03 29 351.700 0.020 24 ... SPO 1991 03 30 351.620 0.080 17 ... SPO 1991 03 31 351.820 0.070 24 ... SPO 1991 04 01 351.920 0.080 23 ... SPO 1991 04 02 352.050 0.120 24 ... SPO 1991 04 03 351.880 0.050 22 ... SPO 1991 04 04 351.870 0.070 19 ... SPO 1991 04 05 351.950 0.060 24 ... SPO 1991 04 06 351.970 0.060 16 ... SPO 1991 04 07 351.950 0.060 22 ... SPO 1991 04 08 352.060 0.070 24 ... SPO 1991 04 09 352.010 0.070 24 ... SPO 1991 04 10 352.120 0.080 22 ... SPO 1991 04 11 352.130 0.060 19 ... SPO 1991 04 12 352.130 0.070 24 ... SPO 1991 04 13 352.100 0.050 23 ... SPO 1991 04 14 352.040 0.040 24 ... SPO 1991 04 15 352.060 0.060 24 ... SPO 1991 04 16 352.120 0.060 24 ... SPO 1991 04 17 352.210 0.100 22 ... SPO 1991 04 18 352.080 0.040 18 ... SPO 1991 04 19 352.110 0.070 24 ... SPO 1991 04 20 352.170 0.060 24 ... SPO 1991 04 21 352.070 0.030 24 ... SPO 1991 04 22 352.120 0.040 24 ... SPO 1991 04 23 352.080 0.050 24 ... SPO 1991 04 24 352.180 0.040 21 ... SPO 1991 04 25 352.180 0.050 20 ... SPO 1991 04 26 352.210 0.080 24 ... SPO 1991 04 27 352.230 0.140 24 ... SPO 1991 04 28 352.220 0.070 24 ... SPO 1991 04 29 352.280 0.120 24 ... SPO 1991 04 30 352.220 0.070 18 ... SPO 1991 05 01 352.190 0.060 21 ... SPO 1991 05 02 352.190 0.060 20 ... SPO 1991 05 03 352.180 0.040 24 ... SPO 1991 05 04 352.170 0.070 24 ... SPO 1991 05 05 352.190 0.040 24 ... SPO 1991 05 06 352.240 0.040 24 ... SPO 1991 05 07 352.300 0.030 24 ... SPO 1991 05 08 352.300 0.050 20 ... SPO 1991 05 09 352.240 0.040 19 ... SPO 1991 05 10 352.320 0.040 24 ... SPO 1991 05 11 352.250 0.060 24 ... SPO 1991 05 12 352.180 0.050 24 ... SPO 1991 05 13 352.200 0.060 24 ... SPO 1991 05 14 352.230 0.060 24 ... SPO 1991 05 15 352.250 0.060 24 ... SPO 1991 05 16 352.250 0.050 17 ... SPO 1991 05 17 352.260 0.040 24 ... SPO 1991 05 18 352.230 0.100 24 ... SPO 1991 05 19 352.220 0.060 24 ... SPO 1991 05 20 352.360 0.090 24 ... SPO 1991 05 21 352.280 0.090 24 ... SPO 1991 05 22 352.570 0.170 24 ... SPO 1991 05 23 352.430 0.050 17 ... SPO 1991 05 24 352.710 0.060 22 ... SPO 1991 05 25 352.690 0.080 24 ... SPO 1991 05 26 352.500 0.030 24 ... SPO 1991 05 27 352.450 0.050 23 ... SPO 1991 05 28 352.510 0.060 24 ... SPO 1991 05 29 352.500 0.050 22 ... SPO 1991 05 30 352.570 0.100 14 ... SPO 1991 05 31 352.660 0.050 18 ... SPO 1991 06 01 352.650 0.070 9 ... SPO 1991 06 02 352.650 0.080 14 ... SPO 1991 06 03 352.650 0.040 19 ... SPO 1991 06 04 352.660 0.040 17 ... SPO 1991 06 05 352.680 0.050 22 ... SPO 1991 06 06 352.540 0.090 17 ... SPO 1991 06 07 352.560 0.060 24 ... SPO 1991 06 08 352.580 0.040 24 ... SPO 1991 06 09 352.550 0.080 24 ... SPO 1991 06 10 352.600 0.100 24 ... SPO 1991 06 11 352.600 0.050 24 ... SPO 1991 06 12 352.600 0.070 22 ... SPO 1991 06 13 352.630 0.050 19 ... SPO 1991 06 14 352.720 0.030 24 ... SPO 1991 06 15 352.670 0.100 24 ... SPO 1991 06 16 352.600 0.040 24 ... SPO 1991 06 17 352.700 0.060 24 ... SPO 1991 06 18 352.660 0.080 24 ... SPO 1991 06 19 352.670 0.060 21 ... SPO 1991 06 20 352.640 0.050 20 ... SPO 1991 06 21 352.680 0.050 24 ... SPO 1991 06 22 352.690 0.070 24 ... SPO 1991 06 23 352.690 0.030 24 ... SPO 1991 06 24 352.750 0.050 24 ... SPO 1991 06 25 352.670 0.050 21 ... SPO 1991 06 26 352.750 0.060 21 ... SPO 1991 06 27 352.760 0.030 19 ... SPO 1991 06 28 352.810 0.030 24 ... SPO 1991 06 29 352.860 0.060 24 ... SPO 1991 06 30 352.850 0.040 23 ... SPO 1991 07 01 352.880 0.030 22 ... SPO 1991 07 02 352.860 0.030 24 ... SPO 1991 07 03 352.890 0.040 21 ... SPO 1991 07 04 352.890 0.030 20 ... SPO 1991 07 05 352.930 0.040 24 ... SPO 1991 07 06 352.980 0.050 24 ... SPO 1991 07 07 352.960 0.030 24 ... SPO 1991 07 08 353.010 0.020 24 ... SPO 1991 07 09 353.040 0.040 24 ... SPO 1991 07 10 353.020 0.030 21 ... SPO 1991 07 11 353.010 0.040 20 ... SPO 1991 07 12 353.080 0.030 24 ... SPO 1991 07 13 353.080 0.050 23 ... SPO 1991 07 14 352.990 0.020 24 ... SPO 1991 07 15 352.990 0.050 24 ... SPO 1991 07 16 353.100 0.030 24 ... SPO 1991 07 17 353.150 0.050 24 ... SPO 1991 07 18 353.150 0.020 17 ... SPO 1991 07 19 353.090 0.040 23 ... SPO 1991 07 20 353.130 0.030 24 ... SPO 1991 07 21 353.130 0.040 24 ... SPO 1991 07 22 353.120 0.050 21 ... SPO 1991 07 23 353.150 0.030 24 ... SPO 1991 07 24 353.190 0.040 19 ... SPO 1991 07 25 353.190 0.040 20 ... SPO 1991 07 26 353.240 0.030 24 ... SPO 1991 07 27 353.220 0.040 24 ... SPO 1991 07 28 353.200 0.040 24 ... SPO 1991 07 29 353.300 0.050 24 ... SPO 1991 07 30 353.240 0.060 24 ... SPO 1991 07 31 353.380 0.040 20 ... SPO 1991 08 01 353.390 0.050 21 ... SPO 1991 08 02 353.460 0.070 24 ... SPO 1991 08 03 353.530 0.040 24 ... SPO 1991 08 04 353.490 0.050 24 ... SPO 1991 08 05 353.470 0.050 24 ... SPO 1991 08 06 353.610 0.050 24 ... SPO 1991 08 07 353.460 0.060 21 ... SPO 1991 08 08 353.480 0.030 20 ... SPO 1991 08 09 353.480 0.030 24 ... SPO 1991 08 10 353.460 0.050 24 ... SPO 1991 08 11 353.400 0.030 24 ... SPO 1991 08 12 353.390 0.060 24 ... SPO 1991 08 13 353.370 0.030 24 ... SPO 1991 08 14 353.380 0.050 21 ... SPO 1991 08 15 353.410 0.040 20 ... SPO 1991 08 16 353.470 0.060 24 ... SPO 1991 08 17 353.400 0.050 24 ... SPO 1991 08 18 353.420 0.040 24 ... SPO 1991 08 19 353.460 0.030 24 ... SPO 1991 08 20 353.510 0.030 24 ... SPO 1991 08 21 353.540 0.060 22 ... SPO 1991 08 22 353.480 0.030 19 ... SPO 1991 08 23 353.460 0.050 24 ... SPO 1991 08 24 353.480 0.070 24 ... SPO 1991 08 25 353.510 0.040 24 ... SPO 1991 08 26 353.480 0.040 24 ... SPO 1991 08 27 353.600 0.060 23 ... SPO 1991 08 28 353.560 0.030 21 ... SPO 1991 08 29 353.530 0.040 20 ... SPO 1991 08 30 353.530 0.030 24 ... SPO 1991 08 31 353.560 0.020 24 ... SPO 1991 09 01 353.540 0.030 24 ... SPO 1991 09 02 353.560 0.030 24 ... SPO 1991 09 03 353.600 0.040 24 ... SPO 1991 09 04 353.580 0.030 21 ... SPO 1991 09 05 353.610 0.050 20 ... SPO 1991 09 06 353.650 0.030 24 ... SPO 1991 09 07 353.600 0.020 21 ... SPO 1991 09 08 353.600 0.030 19 ... SPO 1991 09 09 353.570 0.030 24 ... SPO 1991 09 10 353.580 0.050 24 ... SPO 1991 09 11 353.610 0.060 21 ... SPO 1991 09 12 353.630 0.050 20 ... SPO 1991 09 13 353.620 0.090 24 ... SPO 1991 09 14 353.640 0.050 24 ... SPO 1991 09 15 353.670 0.050 24 ... SPO 1991 09 16 353.720 0.040 24 ... SPO 1991 09 17 353.610 0.070 24 ... SPO 1991 09 18 353.620 0.030 21 ... SPO 1991 09 19 353.640 0.070 20 ... SPO 1991 09 20 353.710 0.040 24 ... SPO 1991 09 21 353.570 0.080 24 ... SPO 1991 09 22 353.580 0.050 24 ... SPO 1991 09 23 353.570 0.050 24 ... SPO 1991 09 24 353.600 0.040 24 ... SPO 1991 09 25 353.590 0.060 20 ... SPO 1991 09 26 353.610 0.060 18 ... SPO 1991 09 27 353.670 0.080 24 ... SPO 1991 09 28 353.700 0.040 24 ... SPO 1991 09 29 353.620 0.050 24 ... SPO 1991 09 30 353.610 0.030 24 ... SPO 1991 10 01 353.550 0.050 24 ... SPO 1991 10 02 353.510 0.040 21 ... SPO 1991 10 03 353.490 0.020 20 ... SPO 1991 10 04 353.510 0.050 24 ... SPO 1991 10 05 353.560 0.050 24 ... SPO 1991 10 06 353.540 0.040 24 ... SPO 1991 10 07 353.480 0.040 24 ... SPO 1991 10 08 353.560 0.080 24 ... SPO 1991 10 09 353.500 0.050 19 ... SPO 1991 10 10 353.500 0.030 20 ... SPO 1991 10 11 353.430 0.030 24 ... SPO 1991 10 12 353.600 0.060 24 ... SPO 1991 10 13 353.630 0.030 24 ... SPO 1991 10 14 353.680 0.030 24 ... SPO 1991 10 15 353.580 0.040 24 ... SPO 1991 10 16 353.540 0.020 20 ... SPO 1991 10 17 353.750 0.020 15 ... SPO 1991 10 18 353.750 0.060 20 ... SPO 1991 10 19 353.810 0.050 24 ... SPO 1991 10 20 353.760 0.030 24 ... SPO 1991 10 21 353.760 0.030 24 ... SPO 1991 10 22 353.720 0.040 24 ... SPO 1991 10 23 353.720 0.020 21 ... SPO 1991 10 24 353.740 0.030 20 ... SPO 1991 10 25 353.750 0.030 24 ... SPO 1991 10 26 353.790 0.040 24 ... SPO 1991 10 27 353.720 0.040 24 ... SPO 1991 10 28 353.720 0.060 24 ... SPO 1991 10 29 353.690 0.050 23 ... SPO 1991 10 30 353.810 0.040 21 ... SPO 1991 10 31 353.830 0.040 20 ... SPO 1991 11 01 353.740 0.050 23 ... SPO 1991 11 02 353.700 0.040 24 ... SPO 1991 11 03 353.730 0.050 23 ... SPO 1991 11 04 353.750 0.020 23 ... SPO 1991 11 05 353.790 0.030 24 ... SPO 1991 11 06 353.810 0.030 20 ... SPO 1991 11 07 353.870 0.040 14 ... SPO 1991 11 08 353.900 0.040 21 ... SPO 1991 11 09 353.870 0.030 24 ... SPO 1991 11 10 353.880 0.030 24 ... SPO 1991 11 11 353.870 0.020 24 ... SPO 1991 11 12 353.880 0.030 21 ... SPO 1991 11 13 353.870 0.030 18 ... SPO 1991 11 14 353.900 0.030 21 ... SPO 1991 11 15 353.910 0.050 24 ... SPO 1991 11 16 353.870 0.030 21 ... SPO 1991 11 17 353.910 0.030 20 ... SPO 1991 11 18 353.930 0.030 23 ... SPO 1991 11 19 353.930 0.020 21 ... SPO 1991 11 20 353.880 0.040 17 ... SPO 1991 11 21 353.880 0.030 12 ... SPO 1991 11 22 353.860 0.020 18 ... SPO 1991 11 23 353.870 0.040 20 ... SPO 1991 11 24 353.890 0.040 14 ... SPO 1991 11 25 353.920 0.100 13 ... SPO 1991 11 26 353.870 0.060 13 ... SPO 1991 11 27 353.890 0.090 14 ... SPO 1991 11 28 353.860 0.100 11 ... SPO 1991 11 29 353.930 0.120 14 ... SPO 1991 11 30 353.920 0.070 17 ... SPO 1991 12 01 353.860 0.040 14 ... SPO 1991 12 02 353.860 0.080 16 ... SPO 1991 12 03 353.800 0.060 15 ... SPO 1991 12 04 353.770 0.040 14 ... SPO 1991 12 05 353.770 0.060 21 ... SPO 1991 12 06 353.810 0.030 13 ... SPO 1991 12 07 353.740 0.060 17 ... SPO 1991 12 08 353.700 0.070 16 ... SPO 1991 12 09 353.750 0.070 14 ... SPO 1991 12 10 353.770 0.050 16 ... SPO 1991 12 11 353.790 0.070 15 ... SPO 1991 12 12 353.730 0.050 14 ... SPO 1991 12 13 353.730 0.060 13 ... SPO 1991 12 14 353.720 0.050 16 ... SPO 1991 12 15 353.720 0.050 13 ... SPO 1991 12 16 353.710 0.030 11 ... SPO 1991 12 17 353.710 0.070 15 ... SPO 1991 12 18 353.720 0.050 10 ... SPO 1991 12 19 353.720 0.060 15 ... SPO 1991 12 20 353.720 0.090 18 ... SPO 1991 12 21 353.660 0.050 15 ... SPO 1991 12 22 353.660 0.030 12 ... SPO 1991 12 23 353.710 0.030 10 ... SPO 1991 12 24 353.740 0.050 20 ... SPO 1991 12 25 353.700 0.040 17 ... SPO 1991 12 26 353.670 0.080 10 ... SPO 1991 12 27 -999.990 -99.990 0 *.. SPO 1991 12 28 353.570 0.070 10 ... SPO 1991 12 29 353.670 0.120 15 ... SPO 1991 12 30 353.660 0.030 17 ... SPO 1991 12 31 353.690 0.050 19 ... SPO 1992 01 01 353.670 0.070 14 ... SPO 1992 01 02 353.680 0.060 18 ... SPO 1992 01 03 353.630 0.100 14 ... SPO 1992 01 04 353.390 0.080 22 ... SPO 1992 01 05 353.450 0.070 22 ... SPO 1992 01 06 353.540 0.040 20 ... SPO 1992 01 07 353.490 0.020 13 ... SPO 1992 01 08 353.440 0.020 5 ... SPO 1992 01 09 353.500 0.120 11 ... SPO 1992 01 10 353.460 0.050 18 ... SPO 1992 01 11 353.460 0.030 23 ... SPO 1992 01 12 353.510 0.050 16 ... SPO 1992 01 13 353.520 0.040 19 ... SPO 1992 01 14 353.500 0.020 13 ... SPO 1992 01 15 353.560 0.110 10 ... SPO 1992 01 16 353.480 0.040 19 ... SPO 1992 01 17 353.440 0.050 17 ... SPO 1992 01 18 353.390 0.070 24 ... SPO 1992 01 19 352.950 0.090 21 ... SPO 1992 01 20 353.080 0.060 21 ... SPO 1992 01 21 353.430 0.180 21 ... SPO 1992 01 22 353.490 0.050 14 ... SPO 1992 01 23 353.280 0.070 20 ... SPO 1992 01 24 353.220 0.050 23 ... SPO 1992 01 25 353.300 0.050 21 ... SPO 1992 01 26 353.460 0.060 18 ... SPO 1992 01 27 353.400 0.080 15 ... SPO 1992 01 28 353.560 0.120 18 ... SPO 1992 01 29 353.620 0.010 17 ... SPO 1992 01 30 353.600 0.030 22 ... SPO 1992 01 31 353.600 0.060 21 ... SPO 1992 02 01 353.560 0.080 23 ... SPO 1992 02 02 353.610 0.030 24 ... SPO 1992 02 03 353.480 0.040 24 ... SPO 1992 02 04 353.420 0.050 24 ... SPO 1992 02 05 353.370 0.060 18 ... SPO 1992 02 06 353.180 0.100 23 ... SPO 1992 02 07 353.300 0.120 24 ... SPO 1992 02 08 353.510 0.070 24 ... SPO 1992 02 09 353.410 0.040 24 ... SPO 1992 02 10 353.460 0.060 24 ... SPO 1992 02 11 353.300 0.100 24 ... SPO 1992 02 12 353.090 0.160 17 ... SPO 1992 02 13 353.220 0.070 24 ... SPO 1992 02 14 353.350 0.080 24 ... SPO 1992 02 15 353.070 0.080 24 ... SPO 1992 02 16 352.940 0.180 24 ... SPO 1992 02 17 352.720 0.130 18 ... SPO 1992 02 18 353.210 0.130 24 ... SPO 1992 02 19 353.190 0.060 16 ... SPO 1992 02 20 353.180 0.070 24 ... SPO 1992 02 21 353.040 0.050 24 ... SPO 1992 02 22 352.950 0.030 22 ... SPO 1992 02 23 352.960 0.050 24 ... SPO 1992 02 24 353.010 0.050 18 ... SPO 1992 02 25 352.990 0.050 23 ... SPO 1992 02 26 353.040 0.050 17 ... SPO 1992 02 27 352.960 0.040 21 ... SPO 1992 02 28 353.150 0.040 24 ... SPO 1992 02 29 353.220 0.030 20 ... SPO 1992 03 01 353.260 0.030 23 ... SPO 1992 03 02 353.220 0.080 24 ... SPO 1992 03 03 353.070 0.030 24 ... SPO 1992 03 04 353.000 0.060 17 ... SPO 1992 03 05 353.190 0.110 22 ... SPO 1992 03 06 353.120 0.050 24 ... SPO 1992 03 07 353.130 0.070 24 ... SPO 1992 03 08 352.780 0.140 24 ... SPO 1992 03 09 352.940 0.090 24 ... SPO 1992 03 10 353.140 0.070 24 ... SPO 1992 03 11 353.000 0.030 17 ... SPO 1992 03 12 353.190 0.060 24 ... SPO 1992 03 13 353.080 0.050 23 ... SPO 1992 03 14 353.040 0.040 24 ... SPO 1992 03 15 353.060 0.030 24 ... SPO 1992 03 16 352.840 0.060 24 ... SPO 1992 03 17 352.840 0.060 22 ... SPO 1992 03 18 353.060 0.080 17 ... SPO 1992 03 19 353.030 0.170 24 ... SPO 1992 03 20 352.940 0.040 24 ... SPO 1992 03 21 353.110 0.060 24 ... SPO 1992 03 22 353.090 0.050 24 ... SPO 1992 03 23 353.270 0.060 24 ... SPO 1992 03 24 352.950 0.090 24 ... SPO 1992 03 25 352.980 0.100 17 ... SPO 1992 03 26 353.150 0.160 23 ... SPO 1992 03 27 353.240 0.130 23 ... SPO 1992 03 28 353.460 0.050 24 ... SPO 1992 03 29 353.500 0.040 24 ... SPO 1992 03 30 353.340 0.100 24 ... SPO 1992 03 31 353.200 0.120 24 ... SPO 1992 04 01 353.040 0.020 17 ... SPO 1992 04 02 353.100 0.050 22 ... SPO 1992 04 03 353.360 0.110 18 ... SPO 1992 04 04 353.410 0.050 24 ... SPO 1992 04 05 353.340 0.060 22 ... SPO 1992 04 06 353.330 0.080 24 ... SPO 1992 04 07 353.260 0.040 24 ... SPO 1992 04 08 353.320 0.080 17 ... SPO 1992 04 09 353.380 0.090 24 ... SPO 1992 04 10 353.280 0.050 24 ... SPO 1992 04 11 353.380 0.030 23 ... SPO 1992 04 12 353.320 0.030 19 ... SPO 1992 04 13 353.330 0.040 23 ... SPO 1992 04 14 353.290 0.020 23 ... SPO 1992 04 15 353.420 0.040 17 ... SPO 1992 04 16 353.420 0.070 24 ... SPO 1992 04 17 353.380 0.040 24 ... SPO 1992 04 18 353.450 0.040 24 ... SPO 1992 04 19 353.470 0.040 24 ... SPO 1992 04 20 353.410 0.050 24 ... SPO 1992 04 21 353.490 0.050 23 ... SPO 1992 04 22 353.550 0.030 17 ... SPO 1992 04 23 353.530 0.040 24 ... SPO 1992 04 24 353.520 0.040 24 ... SPO 1992 04 25 353.540 0.030 24 ... SPO 1992 04 26 353.630 0.070 24 ... SPO 1992 04 27 353.670 0.060 21 ... SPO 1992 04 28 353.660 0.030 24 ... SPO 1992 04 29 353.620 0.030 15 ... SPO 1992 04 30 353.680 0.030 24 ... SPO 1992 05 01 353.660 0.030 23 ... SPO 1992 05 02 353.670 0.020 24 ... SPO 1992 05 03 353.600 0.040 24 ... SPO 1992 05 04 353.630 0.030 24 ... SPO 1992 05 05 353.730 0.060 24 ... SPO 1992 05 06 353.650 0.020 17 ... SPO 1992 05 07 353.640 0.040 23 ... SPO 1992 05 08 353.640 0.010 24 ... SPO 1992 05 09 353.690 0.070 24 ... SPO 1992 05 10 353.880 0.030 21 ... SPO 1992 05 11 353.840 0.030 22 ... SPO 1992 05 12 353.770 0.040 24 ... SPO 1992 05 13 353.800 0.030 16 ... SPO 1992 05 14 353.870 0.030 24 ... SPO 1992 05 15 353.840 0.060 24 ... SPO 1992 05 16 353.750 0.020 24 ... SPO 1992 05 17 353.770 0.020 24 ... SPO 1992 05 18 353.790 0.040 22 ... SPO 1992 05 19 353.800 0.020 24 ... SPO 1992 05 20 353.780 0.020 17 ... SPO 1992 05 21 353.810 0.040 23 ... SPO 1992 05 22 353.830 0.050 22 ... SPO 1992 05 23 353.830 0.040 24 ... SPO 1992 05 24 353.830 0.040 23 ... SPO 1992 05 25 353.840 0.040 24 ... SPO 1992 05 26 353.840 0.050 24 ... SPO 1992 05 27 353.860 0.030 17 ... SPO 1992 05 28 353.850 0.040 24 ... SPO 1992 05 29 353.910 0.070 24 ... SPO 1992 05 30 354.000 0.040 23 ... SPO 1992 05 31 353.950 0.040 24 ... SPO 1992 06 01 353.940 0.080 23 ... SPO 1992 06 02 353.950 0.030 24 ... SPO 1992 06 03 353.980 0.030 17 ... SPO 1992 06 04 353.960 0.050 22 ... SPO 1992 06 05 353.980 0.040 24 ... SPO 1992 06 06 354.050 0.020 24 ... SPO 1992 06 07 354.020 0.030 24 ... SPO 1992 06 08 354.040 0.030 24 ... SPO 1992 06 09 353.990 0.030 24 ... SPO 1992 06 10 354.060 0.020 17 ... SPO 1992 06 11 354.040 0.030 24 ... SPO 1992 06 12 354.030 0.040 22 ... SPO 1992 06 13 354.130 0.050 23 ... SPO 1992 06 14 354.230 0.030 24 ... SPO 1992 06 15 354.190 0.040 24 ... SPO 1992 06 16 354.180 0.060 24 ... SPO 1992 06 17 354.210 0.040 17 ... SPO 1992 06 18 354.240 0.030 23 ... SPO 1992 06 19 354.360 0.040 24 ... SPO 1992 06 20 354.380 0.030 24 ... SPO 1992 06 21 354.380 0.050 22 ... SPO 1992 06 22 354.380 0.030 21 ... SPO 1992 06 23 354.310 0.030 24 ... SPO 1992 06 24 354.340 0.040 17 ... SPO 1992 06 25 354.330 0.020 24 ... SPO 1992 06 26 354.340 0.030 24 ... SPO 1992 06 27 354.390 0.040 24 ... SPO 1992 06 28 354.380 0.020 24 ... SPO 1992 06 29 354.370 0.020 24 ... SPO 1992 06 30 354.430 0.040 24 ... SPO 1992 07 01 354.440 0.030 17 ... SPO 1992 07 02 354.480 0.030 24 ... SPO 1992 07 03 354.540 0.020 24 ... SPO 1992 07 04 354.640 0.040 24 ... SPO 1992 07 05 354.600 0.030 21 ... SPO 1992 07 06 354.620 0.020 24 ... SPO 1992 07 07 354.530 0.040 21 ... SPO 1992 07 08 354.480 0.020 17 ... SPO 1992 07 09 354.490 0.020 24 ... SPO 1992 07 10 354.620 0.060 23 ... SPO 1992 07 11 354.570 0.060 24 ... SPO 1992 07 12 354.590 0.040 24 ... SPO 1992 07 13 354.640 0.040 24 ... SPO 1992 07 14 354.590 0.030 24 ... SPO 1992 07 15 354.580 0.030 17 ... SPO 1992 07 16 354.650 0.030 22 ... SPO 1992 07 17 354.630 0.060 24 ... SPO 1992 07 18 354.680 0.040 24 ... SPO 1992 07 19 354.720 0.030 24 ... SPO 1992 07 20 354.720 0.030 24 ... SPO 1992 07 21 354.710 0.020 24 ... SPO 1992 07 22 354.700 0.010 17 ... SPO 1992 07 23 354.740 0.030 24 ... SPO 1992 07 24 354.710 0.030 24 ... SPO 1992 07 25 354.700 0.020 24 ... SPO 1992 07 26 354.720 0.020 24 ... SPO 1992 07 27 354.720 0.010 23 ... SPO 1992 07 28 354.730 0.020 24 ... SPO 1992 07 29 354.730 0.030 17 ... SPO 1992 07 30 354.760 0.040 24 ... SPO 1992 07 31 354.760 0.020 24 ... SPO 1992 08 01 354.820 0.030 24 ... SPO 1992 08 02 354.850 0.020 24 ... SPO 1992 08 03 354.870 0.040 24 ... SPO 1992 08 04 354.840 0.020 24 ... SPO 1992 08 05 354.850 0.030 16 ... SPO 1992 08 06 354.880 0.020 15 ... SPO 1992 08 07 354.900 0.040 24 ... SPO 1992 08 08 354.930 0.040 22 ... SPO 1992 08 09 355.000 0.030 24 ... SPO 1992 08 10 354.970 0.060 23 ... SPO 1992 08 11 355.020 0.030 22 ... SPO 1992 08 12 354.980 0.020 17 ... SPO 1992 08 13 355.020 0.030 24 ... SPO 1992 08 14 354.970 0.020 20 ... SPO 1992 08 15 355.000 0.060 19 ... SPO 1992 08 16 354.990 0.070 22 ... SPO 1992 08 17 355.180 0.030 23 ... SPO 1992 08 18 355.210 0.050 23 ... SPO 1992 08 19 355.060 0.030 15 ... SPO 1992 08 20 355.040 0.040 21 ... SPO 1992 08 21 355.140 0.040 24 ... SPO 1992 08 22 355.140 0.050 24 ... SPO 1992 08 23 355.100 0.020 24 ... SPO 1992 08 24 355.100 0.020 24 ... SPO 1992 08 25 355.090 0.030 24 ... SPO 1992 08 26 355.110 0.030 24 ... SPO 1992 08 27 355.120 0.030 17 ... SPO 1992 08 28 355.120 0.030 23 ... SPO 1992 08 29 355.180 0.020 24 ... SPO 1992 08 30 355.160 0.030 24 ... SPO 1992 08 31 355.130 0.040 21 ... SPO 1992 09 01 355.110 0.030 23 ... SPO 1992 09 02 355.100 0.020 16 ... SPO 1992 09 03 355.140 0.030 24 ... SPO 1992 09 04 355.130 0.040 24 ... SPO 1992 09 05 355.110 0.030 24 ... SPO 1992 09 06 355.110 0.040 22 ... SPO 1992 09 07 355.140 0.030 20 ... SPO 1992 09 08 355.060 0.040 2 ... SPO 1992 09 09 355.130 0.090 11 ... SPO 1992 09 10 355.330 0.040 19 ... SPO 1992 09 11 355.270 0.030 24 ... SPO 1992 09 12 355.260 0.040 22 ... SPO 1992 09 13 355.250 0.030 24 ... SPO 1992 09 14 355.320 0.020 24 ... SPO 1992 09 15 355.320 0.040 22 ... SPO 1992 09 16 355.260 0.020 17 ... SPO 1992 09 17 355.250 0.040 23 ... SPO 1992 09 18 355.290 0.040 19 ... SPO 1992 09 19 355.320 0.020 24 ... SPO 1992 09 20 355.320 0.040 19 ... SPO 1992 09 21 355.320 0.030 24 ... SPO 1992 09 22 355.340 0.040 21 ... SPO 1992 09 23 355.300 0.030 8 ... SPO 1992 09 24 355.250 0.060 23 ... SPO 1992 09 25 355.240 0.040 21 ... SPO 1992 09 26 355.320 0.040 24 ... SPO 1992 09 27 355.270 0.040 21 ... SPO 1992 09 28 355.320 0.030 23 ... SPO 1992 09 29 355.380 0.030 22 ... SPO 1992 09 30 355.360 0.050 17 ... SPO 1992 10 01 355.310 0.040 24 ... SPO 1992 10 02 355.360 0.040 20 ... SPO 1992 10 03 355.330 0.040 22 ... SPO 1992 10 04 355.350 0.050 24 ... SPO 1992 10 05 355.430 0.100 15 ... SPO 1992 10 06 355.370 0.020 24 ... SPO 1992 10 07 355.360 0.050 15 ... SPO 1992 10 08 355.550 0.030 11 ... SPO 1992 10 09 355.350 0.060 24 ... SPO 1992 10 10 355.340 0.020 20 ... SPO 1992 10 11 355.350 0.040 21 ... SPO 1992 10 12 355.350 0.060 14 ... SPO 1992 10 13 355.290 0.070 18 ... SPO 1992 10 14 355.340 0.040 17 ... SPO 1992 10 15 355.300 0.080 23 ... SPO 1992 10 16 355.340 0.040 20 ... SPO 1992 10 17 355.280 0.040 17 ... SPO 1992 10 18 355.230 0.070 18 ... SPO 1992 10 19 355.290 0.050 16 ... SPO 1992 10 20 355.220 0.040 17 ... SPO 1992 10 21 355.240 0.060 12 ... SPO 1992 10 22 355.220 0.040 14 ... SPO 1992 10 23 355.250 0.050 18 ... SPO 1992 10 24 355.180 0.040 22 ... SPO 1992 10 25 355.190 0.040 24 ... SPO 1992 10 26 355.180 0.040 22 ... SPO 1992 10 27 355.160 0.050 23 ... SPO 1992 10 28 355.210 0.030 22 ... SPO 1992 10 29 355.200 0.040 23 ... SPO 1992 10 30 355.150 0.030 18 ... SPO 1992 10 31 355.170 0.030 24 ... SPO 1992 11 01 355.220 0.080 24 ... SPO 1992 11 02 355.210 0.030 24 ... SPO 1992 11 03 355.220 0.040 24 ... SPO 1992 11 04 355.210 0.040 24 ... SPO 1992 11 05 355.180 0.030 17 ... SPO 1992 11 06 355.160 0.070 24 ... SPO 1992 11 07 355.100 0.040 24 ... SPO 1992 11 08 355.140 0.020 24 ... SPO 1992 11 09 355.080 0.050 21 ... SPO 1992 11 10 355.090 0.030 24 ... SPO 1992 11 11 355.120 0.030 23 ... SPO 1992 11 12 355.220 0.060 17 ... SPO 1992 11 13 355.180 0.050 24 ... SPO 1992 11 14 355.140 0.050 24 ... SPO 1992 11 15 355.170 0.030 24 ... SPO 1992 11 16 355.050 0.050 24 ... SPO 1992 11 17 355.040 0.070 21 ... SPO 1992 11 18 354.990 0.070 22 ... SPO 1992 11 19 355.040 0.050 17 ... SPO 1992 11 20 355.120 0.040 23 ... SPO 1992 11 21 355.070 0.070 24 ... SPO 1992 11 22 355.030 0.040 24 ... SPO 1992 11 23 355.070 0.030 24 ... SPO 1992 11 24 355.000 0.030 24 ... SPO 1992 11 25 355.030 0.030 24 ... SPO 1992 11 26 355.090 0.020 17 ... SPO 1992 11 27 355.090 0.030 24 ... SPO 1992 11 28 355.220 0.060 24 ... SPO 1992 11 29 355.210 0.030 24 ... SPO 1992 11 30 355.150 0.020 24 ... SPO 1992 12 01 355.070 0.060 24 ... SPO 1992 12 02 354.990 0.020 24 ... SPO 1992 12 03 354.980 0.060 16 ... SPO 1992 12 04 354.970 0.040 23 ... SPO 1992 12 05 354.950 0.020 24 ... SPO 1992 12 06 354.940 0.050 20 ... SPO 1992 12 07 354.920 0.020 22 ... SPO 1992 12 08 354.930 0.020 23 ... SPO 1992 12 09 354.980 0.040 23 ... SPO 1992 12 10 354.900 0.070 15 ... SPO 1992 12 11 354.940 0.070 24 ... SPO 1992 12 12 354.900 0.020 24 ... SPO 1992 12 13 354.910 0.020 24 ... SPO 1992 12 14 354.900 0.020 24 ... SPO 1992 12 15 354.930 0.020 24 ... SPO 1992 12 16 354.840 0.040 21 ... SPO 1992 12 17 354.820 0.070 6 ... SPO 1992 12 18 354.800 0.020 23 ... SPO 1992 12 19 354.810 0.030 17 ... SPO 1992 12 20 354.800 0.040 24 ... SPO 1992 12 21 354.820 0.040 20 ... SPO 1992 12 22 354.820 0.030 22 ... SPO 1992 12 23 354.800 0.030 23 ... SPO 1992 12 24 354.770 0.020 22 ... SPO 1992 12 25 354.730 0.020 19 ... SPO 1992 12 26 354.750 0.010 21 ... SPO 1992 12 27 354.740 0.050 18 ... SPO 1992 12 28 354.750 0.030 21 ... SPO 1992 12 29 354.730 0.040 21 ... SPO 1992 12 30 354.810 0.080 14 ... SPO 1992 12 31 354.750 0.050 16 ... SPO 1993 01 01 354.740 0.020 24 ... SPO 1993 01 02 354.710 0.020 24 ... SPO 1993 01 03 354.680 0.040 24 ... SPO 1993 01 04 354.650 0.030 24 ... SPO 1993 01 05 354.630 0.020 22 ... SPO 1993 01 06 354.630 0.020 24 ... SPO 1993 01 07 354.600 0.020 17 ... SPO 1993 01 08 354.600 0.030 21 ... SPO 1993 01 09 354.620 0.020 24 ... SPO 1993 01 10 354.610 0.030 21 ... SPO 1993 01 11 354.630 0.060 20 ... SPO 1993 01 12 354.500 0.030 17 ... SPO 1993 01 13 354.540 0.020 10 ... SPO 1993 01 14 354.460 0.070 9 ... SPO 1993 01 15 354.410 0.040 24 ... SPO 1993 01 16 354.530 0.040 22 ... SPO 1993 01 17 354.490 0.030 23 ... SPO 1993 01 18 354.530 0.030 24 ... SPO 1993 01 19 354.510 0.040 22 ... SPO 1993 01 20 354.550 0.050 22 ... SPO 1993 01 21 354.470 0.030 16 ... SPO 1993 01 22 354.510 0.030 24 ... SPO 1993 01 23 -999.990 -99.990 0 *.. SPO 1993 01 24 -999.990 -99.990 0 *.. SPO 1993 01 25 -999.990 -99.990 0 *.. SPO 1993 01 26 -999.990 -99.990 0 *.. SPO 1993 01 27 354.780 0.030 14 ... SPO 1993 01 28 354.800 0.040 17 ... SPO 1993 01 29 354.820 0.060 23 ... SPO 1993 01 30 354.820 0.050 24 ... SPO 1993 01 31 354.750 0.090 15 ... SPO 1993 02 01 354.850 0.050 23 ... SPO 1993 02 02 354.750 0.070 24 ... SPO 1993 02 03 354.660 0.240 22 ... SPO 1993 02 04 354.300 0.040 17 ... SPO 1993 02 05 354.530 0.050 21 ... SPO 1993 02 06 354.500 0.060 24 ... SPO 1993 02 07 354.420 0.030 24 ... SPO 1993 02 08 354.400 0.030 24 ... SPO 1993 02 09 354.440 0.040 24 ... SPO 1993 02 10 354.430 0.020 24 ... SPO 1993 02 11 354.390 0.060 17 ... SPO 1993 02 12 354.460 0.050 24 ... SPO 1993 02 13 354.460 0.020 24 ... SPO 1993 02 14 354.440 0.030 24 ... SPO 1993 02 15 354.450 0.040 24 ... SPO 1993 02 16 354.410 0.030 24 ... SPO 1993 02 17 354.340 0.050 22 ... SPO 1993 02 18 354.340 0.020 17 ... SPO 1993 02 19 354.330 0.030 23 ... SPO 1993 02 20 354.240 0.040 24 ... SPO 1993 02 21 354.220 0.040 24 ... SPO 1993 02 22 354.210 0.030 24 ... SPO 1993 02 23 354.190 0.030 23 ... SPO 1993 02 24 354.170 0.020 24 ... SPO 1993 02 25 354.180 0.040 17 ... SPO 1993 02 26 354.240 0.050 24 ... SPO 1993 02 27 354.180 0.060 23 ... SPO 1993 02 28 354.270 0.030 24 ... SPO 1993 03 01 354.250 0.020 24 ... SPO 1993 03 02 354.230 0.030 24 ... SPO 1993 03 03 354.250 0.040 21 ... SPO 1993 03 04 354.280 0.070 14 ... SPO 1993 03 05 354.320 0.030 23 ... SPO 1993 03 06 354.300 0.030 24 ... SPO 1993 03 07 354.170 0.030 24 ... SPO 1993 03 08 354.140 0.030 24 ... SPO 1993 03 09 354.260 0.100 24 ... SPO 1993 03 10 354.120 0.030 24 ... SPO 1993 03 11 354.240 0.040 17 ... SPO 1993 03 12 354.150 0.050 24 ... SPO 1993 03 13 354.240 0.020 24 ... SPO 1993 03 14 354.250 0.030 24 ... SPO 1993 03 15 354.260 0.040 24 ... SPO 1993 03 16 354.130 0.070 24 ... SPO 1993 03 17 354.000 0.110 24 ... SPO 1993 03 18 354.200 0.040 17 ... SPO 1993 03 19 354.260 0.040 24 ... SPO 1993 03 20 354.230 0.030 24 ... SPO 1993 03 21 354.290 0.060 24 ... SPO 1993 03 22 354.130 0.080 22 ... SPO 1993 03 23 354.120 0.060 24 ... SPO 1993 03 24 354.210 0.020 24 ... SPO 1993 03 25 354.250 0.070 17 ... SPO 1993 03 26 354.290 0.030 24 ... SPO 1993 03 27 354.320 0.060 7 ... SPO 1993 03 28 354.350 0.030 21 ... SPO 1993 03 29 354.310 0.040 24 ... SPO 1993 03 30 354.320 0.090 22 ... SPO 1993 03 31 354.340 0.030 24 ... SPO 1993 04 01 354.280 0.030 17 ... SPO 1993 04 02 354.310 0.020 24 ... SPO 1993 04 03 354.280 0.020 24 ... SPO 1993 04 04 354.280 0.020 24 ... SPO 1993 04 05 354.260 0.020 24 ... SPO 1993 04 06 354.240 0.070 24 ... SPO 1993 04 07 354.290 0.020 23 ... SPO 1993 04 08 354.350 0.020 18 ... SPO 1993 04 09 354.340 0.020 24 ... SPO 1993 04 10 354.360 0.020 24 ... SPO 1993 04 11 354.380 0.040 24 ... SPO 1993 04 12 354.370 0.020 24 ... SPO 1993 04 13 354.360 0.030 24 ... SPO 1993 04 14 354.320 0.030 24 ... SPO 1993 04 15 354.360 0.040 23 ... SPO 1993 04 16 354.330 0.020 18 ... SPO 1993 04 17 354.340 0.030 24 ... SPO 1993 04 18 354.340 0.020 24 ... SPO 1993 04 19 354.340 0.030 24 ... SPO 1993 04 20 354.370 0.040 23 ... SPO 1993 04 21 354.370 0.020 23 ... SPO 1993 04 22 354.330 0.020 18 ... SPO 1993 04 23 354.320 0.030 24 ... SPO 1993 04 24 354.340 0.010 24 ... SPO 1993 04 25 354.370 0.030 24 ... SPO 1993 04 26 354.380 0.020 24 ... SPO 1993 04 27 354.350 0.030 24 ... SPO 1993 04 28 354.400 0.020 23 ... SPO 1993 04 29 354.410 0.020 18 ... SPO 1993 04 30 354.300 0.060 14 ... SPO 1993 05 01 354.360 0.050 24 ... SPO 1993 05 02 354.320 0.050 24 ... SPO 1993 05 03 354.350 0.030 24 ... SPO 1993 05 04 354.370 0.030 24 ... SPO 1993 05 05 354.350 0.030 23 ... SPO 1993 05 06 354.380 0.020 18 ... SPO 1993 05 07 354.440 0.040 24 ... SPO 1993 05 08 354.420 0.020 24 ... SPO 1993 05 09 354.390 0.030 24 ... SPO 1993 05 10 354.420 0.030 24 ... SPO 1993 05 11 354.410 0.030 23 ... SPO 1993 05 12 354.450 0.020 23 ... SPO 1993 05 13 354.400 0.020 18 ... SPO 1993 05 14 354.430 0.020 23 ... SPO 1993 05 15 354.470 0.030 24 ... SPO 1993 05 16 354.500 0.020 16 ... SPO 1993 05 17 354.500 0.030 24 ... SPO 1993 05 18 354.530 0.040 23 ... SPO 1993 05 19 354.510 0.020 22 ... SPO 1993 05 20 354.490 0.030 18 ... SPO 1993 05 21 354.470 0.030 24 ... SPO 1993 05 22 354.470 0.020 24 ... SPO 1993 05 23 354.540 0.040 24 ... SPO 1993 05 24 354.580 0.020 24 ... SPO 1993 05 25 354.600 0.030 24 ... SPO 1993 05 26 354.610 0.020 23 ... SPO 1993 05 27 354.630 0.030 18 ... SPO 1993 05 28 354.610 0.030 24 ... SPO 1993 05 29 354.590 0.030 24 ... SPO 1993 05 30 354.600 0.020 24 ... SPO 1993 05 31 354.600 0.030 24 ... SPO 1993 06 01 354.660 0.030 23 ... SPO 1993 06 02 354.660 0.020 8 ... SPO 1993 06 03 354.610 0.040 18 ... SPO 1993 06 04 354.620 0.030 24 ... SPO 1993 06 05 354.630 0.040 24 ... SPO 1993 06 06 354.630 0.020 24 ... SPO 1993 06 07 354.640 0.030 24 ... SPO 1993 06 08 354.650 0.040 24 ... SPO 1993 06 09 354.720 0.030 22 ... SPO 1993 06 10 354.700 0.020 18 ... SPO 1993 06 11 354.700 0.010 24 ... SPO 1993 06 12 354.700 0.020 24 ... SPO 1993 06 13 354.680 0.050 24 ... SPO 1993 06 14 354.690 0.060 24 ... SPO 1993 06 15 354.730 0.030 24 ... SPO 1993 06 16 354.730 0.040 24 ... SPO 1993 06 17 354.700 0.030 17 ... SPO 1993 06 18 354.720 0.020 24 ... SPO 1993 06 19 354.710 0.020 24 ... SPO 1993 06 20 354.730 0.030 24 ... SPO 1993 06 21 354.800 0.050 23 ... SPO 1993 06 22 354.790 0.030 24 ... SPO 1993 06 23 354.890 0.050 24 ... SPO 1993 06 24 354.810 0.030 17 ... SPO 1993 06 25 354.910 0.040 24 ... SPO 1993 06 26 354.970 0.040 24 ... SPO 1993 06 27 354.990 0.040 24 ... SPO 1993 06 28 354.960 0.050 24 ... SPO 1993 06 29 354.980 0.030 24 ... SPO 1993 06 30 355.030 0.030 24 ... SPO 1993 07 01 355.070 0.040 16 ... SPO 1993 07 02 355.190 0.040 24 ... SPO 1993 07 03 355.200 0.030 24 ... SPO 1993 07 04 355.190 0.030 24 ... SPO 1993 07 05 355.160 0.020 24 ... SPO 1993 07 06 355.180 0.040 22 ... SPO 1993 07 07 355.160 0.020 23 ... SPO 1993 07 08 355.170 0.050 18 ... SPO 1993 07 09 355.150 0.010 24 ... SPO 1993 07 10 355.170 0.010 24 ... SPO 1993 07 11 355.170 0.020 24 ... SPO 1993 07 12 355.190 0.030 24 ... SPO 1993 07 13 355.190 0.040 24 ... SPO 1993 07 14 355.240 0.020 24 ... SPO 1993 07 15 355.200 0.020 17 ... SPO 1993 07 16 355.330 0.120 22 ... SPO 1993 07 17 355.300 0.030 24 ... SPO 1993 07 18 355.230 0.020 24 ... SPO 1993 07 19 355.240 0.020 24 ... SPO 1993 07 20 355.250 0.030 24 ... SPO 1993 07 21 355.300 0.040 24 ... SPO 1993 07 22 355.350 0.030 17 ... SPO 1993 07 23 355.410 0.040 24 ... SPO 1993 07 24 355.410 0.030 24 ... SPO 1993 07 25 355.380 0.030 24 ... SPO 1993 07 26 355.420 0.030 24 ... SPO 1993 07 27 355.490 0.030 24 ... SPO 1993 07 28 355.490 0.030 24 ... SPO 1993 07 29 355.560 0.070 17 ... SPO 1993 07 30 355.480 0.010 24 ... SPO 1993 07 31 355.470 0.030 24 ... SPO 1993 08 01 355.540 0.030 24 ... SPO 1993 08 02 355.520 0.030 24 ... SPO 1993 08 03 355.590 0.030 24 ... SPO 1993 08 04 355.590 0.030 24 ... SPO 1993 08 05 355.590 0.020 16 ... SPO 1993 08 06 355.640 0.020 24 ... SPO 1993 08 07 355.620 0.020 24 ... SPO 1993 08 08 355.650 0.020 24 ... SPO 1993 08 09 355.690 0.030 24 ... SPO 1993 08 10 355.650 0.030 24 ... SPO 1993 08 11 355.640 0.020 24 ... SPO 1993 08 12 355.700 0.050 17 ... SPO 1993 08 13 355.750 0.030 24 ... SPO 1993 08 14 355.810 0.060 24 ... SPO 1993 08 15 355.760 0.020 24 ... SPO 1993 08 16 355.740 0.030 22 ... SPO 1993 08 17 355.730 0.030 23 ... SPO 1993 08 18 355.780 0.020 22 ... SPO 1993 08 19 355.790 0.030 18 ... SPO 1993 08 20 355.800 0.030 24 ... SPO 1993 08 21 355.740 0.020 24 ... SPO 1993 08 22 355.750 0.030 24 ... SPO 1993 08 23 355.770 0.030 24 ... SPO 1993 08 24 355.770 0.020 24 ... SPO 1993 08 25 355.810 0.030 23 ... SPO 1993 08 26 355.850 0.010 18 ... SPO 1993 08 27 355.880 0.020 24 ... SPO 1993 08 28 355.860 0.020 24 ... SPO 1993 08 29 355.880 0.030 24 ... SPO 1993 08 30 355.870 0.030 24 ... SPO 1993 08 31 355.930 0.040 24 ... SPO 1993 09 01 355.980 0.050 22 ... SPO 1993 09 02 355.960 0.030 17 ... SPO 1993 09 03 355.930 0.020 24 ... SPO 1993 09 04 355.900 0.020 24 ... SPO 1993 09 05 355.920 0.040 24 ... SPO 1993 09 06 355.950 0.040 24 ... SPO 1993 09 07 355.870 0.020 24 ... SPO 1993 09 08 355.900 0.030 23 ... SPO 1993 09 09 355.910 0.030 18 ... SPO 1993 09 10 355.970 0.050 24 ... SPO 1993 09 11 356.010 0.030 24 ... SPO 1993 09 12 356.080 0.040 24 ... SPO 1993 09 13 355.960 0.080 24 ... SPO 1993 09 14 356.020 0.050 24 ... SPO 1993 09 15 355.980 0.040 23 ... SPO 1993 09 16 356.010 0.040 18 ... SPO 1993 09 17 356.020 0.040 24 ... SPO 1993 09 18 355.960 0.030 24 ... SPO 1993 09 19 355.920 0.020 24 ... SPO 1993 09 20 355.910 0.020 24 ... SPO 1993 09 21 355.920 0.030 23 ... SPO 1993 09 22 355.920 0.030 21 ... SPO 1993 09 23 355.950 0.050 18 ... SPO 1993 09 24 355.930 0.050 24 ... SPO 1993 09 25 355.950 0.030 24 ... SPO 1993 09 26 355.920 0.020 24 ... SPO 1993 09 27 355.930 0.030 24 ... SPO 1993 09 28 355.970 0.060 23 ... SPO 1993 09 29 356.040 0.040 23 ... SPO 1993 09 30 356.020 0.030 18 ... SPO 1993 10 01 356.020 0.040 24 ... SPO 1993 10 02 355.990 0.030 22 ... SPO 1993 10 03 355.980 0.020 24 ... SPO 1993 10 04 355.970 0.030 24 ... SPO 1993 10 05 355.970 0.050 24 ... SPO 1993 10 06 355.860 0.030 22 ... SPO 1993 10 07 355.910 0.040 11 ... SPO 1993 10 08 355.930 0.040 24 ... SPO 1993 10 09 355.970 0.040 22 ... SPO 1993 10 10 355.930 0.040 24 ... SPO 1993 10 11 355.800 0.060 23 ... SPO 1993 10 12 355.830 0.070 13 ... SPO 1993 10 13 355.840 0.050 24 ... SPO 1993 10 14 355.990 0.070 17 ... SPO 1993 10 15 356.020 0.030 24 ... SPO 1993 10 16 355.970 0.040 24 ... SPO 1993 10 17 356.010 0.050 23 ... SPO 1993 10 18 356.050 0.040 24 ... SPO 1993 10 19 355.980 0.040 23 ... SPO 1993 10 20 355.970 0.020 22 ... SPO 1993 10 21 355.910 0.050 17 ... SPO 1993 10 22 355.950 0.050 23 ... SPO 1993 10 23 355.970 0.030 24 ... SPO 1993 10 24 355.940 0.040 24 ... SPO 1993 10 25 355.980 0.040 24 ... SPO 1993 10 26 355.950 0.050 23 ... SPO 1993 10 27 355.950 0.040 23 ... SPO 1993 10 28 356.000 0.030 15 ... SPO 1993 10 29 355.990 0.040 23 ... SPO 1993 10 30 356.000 0.030 24 ... SPO 1993 10 31 355.970 0.030 24 ... SPO 1993 11 01 355.970 0.030 23 ... SPO 1993 11 02 355.990 0.020 24 ... SPO 1993 11 03 355.970 0.040 24 ... SPO 1993 11 04 356.020 0.030 16 ... SPO 1993 11 05 355.990 0.040 16 ... SPO 1993 11 06 356.020 0.040 20 ... SPO 1993 11 07 356.000 0.040 23 ... SPO 1993 11 08 355.940 0.050 24 ... SPO 1993 11 09 355.900 0.030 24 ... SPO 1993 11 10 355.960 0.040 17 ... SPO 1993 11 11 355.930 0.050 24 ... SPO 1993 11 12 355.910 0.040 22 ... SPO 1993 11 13 355.930 0.030 22 ... SPO 1993 11 14 355.960 0.060 24 ... SPO 1993 11 15 355.940 0.020 23 ... SPO 1993 11 16 355.910 0.070 24 ... SPO 1993 11 17 355.880 0.050 24 ... SPO 1993 11 18 355.970 0.020 18 ... SPO 1993 11 19 355.860 0.020 20 ... SPO 1993 11 20 355.920 0.040 23 ... SPO 1993 11 21 355.910 0.020 23 ... SPO 1993 11 22 355.890 0.020 23 ... SPO 1993 11 23 355.900 0.030 24 ... SPO 1993 11 24 355.890 0.040 24 ... SPO 1993 11 25 355.860 0.030 19 ... SPO 1993 11 26 355.770 0.030 21 ... SPO 1993 11 27 355.760 0.030 24 ... SPO 1993 11 28 355.860 0.030 20 ... SPO 1993 11 29 355.850 0.050 20 ... SPO 1993 11 30 355.840 0.020 21 ... SPO 1993 12 01 355.830 0.040 24 ... SPO 1993 12 02 355.840 0.060 17 ... SPO 1993 12 03 355.790 0.060 17 ... SPO 1993 12 04 355.800 0.070 19 ... SPO 1993 12 05 355.770 0.030 24 ... SPO 1993 12 06 355.780 0.040 22 ... SPO 1993 12 07 355.810 0.020 24 ... SPO 1993 12 08 355.800 0.030 24 ... SPO 1993 12 09 355.760 0.050 20 ... SPO 1993 12 10 355.670 0.050 21 ... SPO 1993 12 11 355.720 0.050 24 ... SPO 1993 12 12 355.740 0.050 20 ... SPO 1993 12 13 355.740 0.060 19 ... SPO 1993 12 14 355.760 0.100 14 ... SPO 1993 12 15 355.680 0.020 24 ... SPO 1993 12 16 355.680 0.040 18 ... SPO 1993 12 17 355.670 0.050 14 ... SPO 1993 12 18 355.650 0.030 24 ... SPO 1993 12 19 355.620 0.020 21 ... SPO 1993 12 20 355.670 0.130 19 ... SPO 1993 12 21 355.640 0.040 18 ... SPO 1993 12 22 355.670 0.070 22 ... SPO 1993 12 23 355.640 0.040 16 ... SPO 1993 12 24 355.640 0.050 23 ... SPO 1993 12 25 355.610 0.010 24 ... SPO 1993 12 26 355.630 0.050 23 ... SPO 1993 12 27 355.710 0.110 20 ... SPO 1993 12 28 355.690 0.030 24 ... SPO 1993 12 29 355.670 0.040 24 ... SPO 1993 12 30 355.600 0.050 20 ... SPO 1993 12 31 355.570 0.090 21 ... SPO 1994 01 01 355.450 0.030 23 ... SPO 1994 01 02 355.450 0.030 23 ... SPO 1994 01 03 355.330 0.150 24 ... SPO 1994 01 04 355.480 0.050 24 ... SPO 1994 01 05 355.500 0.040 24 ... SPO 1994 01 06 355.540 0.030 24 ... SPO 1994 01 07 355.540 0.020 20 ... SPO 1994 01 08 355.570 0.020 17 ... SPO 1994 01 09 355.550 0.040 23 ... SPO 1994 01 10 355.630 0.060 24 ... SPO 1994 01 11 355.630 0.070 22 ... SPO 1994 01 12 355.460 0.060 15 ... SPO 1994 01 13 355.590 0.060 23 ... SPO 1994 01 14 355.570 0.020 20 ... SPO 1994 01 15 355.710 0.040 21 ... SPO 1994 01 16 355.750 0.040 10 ... SPO 1994 01 17 -999.990 -99.990 0 *.. SPO 1994 01 18 -999.990 -99.990 0 *.. SPO 1994 01 19 355.570 0.050 12 ... SPO 1994 01 20 355.480 0.120 24 ... SPO 1994 01 21 355.490 0.070 16 ... SPO 1994 01 22 355.640 0.030 24 ... SPO 1994 01 23 355.550 0.070 21 ... SPO 1994 01 24 355.500 0.040 24 ... SPO 1994 01 25 355.600 0.030 20 ... SPO 1994 01 26 355.610 0.040 24 ... SPO 1994 01 27 355.600 0.050 24 ... SPO 1994 01 28 355.660 0.050 17 ... SPO 1994 01 29 355.560 0.050 24 ... SPO 1994 01 30 355.690 0.100 22 ... SPO 1994 01 31 355.710 0.050 20 ... SPO 1994 02 01 355.780 0.060 22 ... SPO 1994 02 02 355.680 0.050 24 ... SPO 1994 02 03 355.560 0.110 14 ... SPO 1994 02 04 355.720 0.030 17 ... SPO 1994 02 05 355.720 0.020 24 ... SPO 1994 02 06 355.650 0.030 19 ... SPO 1994 02 07 355.570 0.040 24 ... SPO 1994 02 08 355.620 0.030 22 ... SPO 1994 02 09 355.590 0.040 21 ... SPO 1994 02 10 355.630 0.030 20 ... SPO 1994 02 11 355.580 0.040 22 ... SPO 1994 02 12 355.510 0.080 24 ... SPO 1994 02 13 355.340 0.080 23 ... SPO 1994 02 14 355.260 0.050 23 ... SPO 1994 02 15 355.020 0.090 21 ... SPO 1994 02 16 355.340 0.100 24 ... SPO 1994 02 17 355.430 0.110 24 ... SPO 1994 02 18 355.490 0.090 24 ... SPO 1994 02 19 355.540 0.030 24 ... SPO 1994 02 20 355.590 0.020 24 ... SPO 1994 02 21 355.540 0.030 24 ... SPO 1994 02 22 355.650 0.040 17 ... SPO 1994 02 23 355.550 0.080 24 ... SPO 1994 02 24 355.550 0.050 24 ... SPO 1994 02 25 355.520 0.080 21 ... SPO 1994 02 26 355.510 0.080 23 ... SPO 1994 02 27 355.520 0.020 24 ... SPO 1994 02 28 355.540 0.030 24 ... SPO 1994 03 01 355.580 0.030 24 ... SPO 1994 03 02 355.620 0.040 24 ... SPO 1994 03 03 355.590 0.070 14 ... SPO 1994 03 04 355.550 0.020 23 ... SPO 1994 03 05 355.580 0.050 15 ... SPO 1994 03 06 355.490 0.030 24 ... SPO 1994 03 07 355.510 0.030 22 ... SPO 1994 03 08 355.560 0.050 15 ... SPO 1994 03 09 355.560 0.030 23 ... SPO 1994 03 10 355.530 0.030 22 ... SPO 1994 03 11 355.640 0.030 19 ... SPO 1994 03 12 355.600 0.040 24 ... SPO 1994 03 13 355.570 0.020 24 ... SPO 1994 03 14 355.580 0.030 24 ... SPO 1994 03 15 355.490 0.040 24 ... SPO 1994 03 16 355.590 0.040 20 ... SPO 1994 03 17 355.590 0.050 24 ... SPO 1994 03 18 355.620 0.030 17 ... SPO 1994 03 19 355.570 0.020 23 ... SPO 1994 03 20 355.650 0.120 19 ... SPO 1994 03 21 355.610 0.040 16 ... SPO 1994 03 22 355.570 0.030 17 ... SPO 1994 03 23 355.590 0.030 24 ... SPO 1994 03 24 355.580 0.030 24 ... SPO 1994 03 25 355.550 0.030 24 ... SPO 1994 03 26 355.530 0.020 24 ... SPO 1994 03 27 355.560 0.040 22 ... SPO 1994 03 28 355.610 0.070 15 ... SPO 1994 03 29 355.660 0.050 24 ... SPO 1994 03 30 355.640 0.040 24 ... SPO 1994 03 31 355.620 0.020 17 ... SPO 1994 04 01 355.600 0.020 24 ... SPO 1994 04 02 355.620 0.030 23 ... SPO 1994 04 03 355.660 0.010 24 ... SPO 1994 04 04 355.660 0.010 24 ... SPO 1994 04 05 355.640 0.030 22 ... SPO 1994 04 06 355.690 0.060 15 ... SPO 1994 04 07 355.660 0.070 21 ... SPO 1994 04 08 355.650 0.040 15 ... SPO 1994 04 09 355.670 0.030 23 ... SPO 1994 04 10 355.650 0.030 24 ... SPO 1994 04 11 355.670 0.040 24 ... SPO 1994 04 12 355.660 0.020 24 ... SPO 1994 04 13 355.650 0.040 23 ... SPO 1994 04 14 355.660 0.020 23 ... SPO 1994 04 15 355.650 0.050 17 ... SPO 1994 04 16 355.680 0.020 24 ... SPO 1994 04 17 355.700 0.020 24 ... SPO 1994 04 18 355.730 0.020 23 ... SPO 1994 04 19 355.700 0.030 23 ... SPO 1994 04 20 355.680 0.030 24 ... SPO 1994 04 21 355.610 0.060 24 ... SPO 1994 04 22 355.570 0.030 24 ... SPO 1994 04 23 355.550 0.020 24 ... SPO 1994 04 24 355.550 0.020 24 ... SPO 1994 04 25 355.590 0.040 17 ... SPO 1994 04 26 355.600 0.030 23 ... SPO 1994 04 27 355.670 0.060 23 ... SPO 1994 04 28 355.710 0.050 23 ... SPO 1994 04 29 355.710 0.010 24 ... SPO 1994 04 30 355.700 0.010 17 ... SPO 1994 05 01 355.700 0.020 22 ... SPO 1994 05 02 355.710 0.040 23 ... SPO 1994 05 03 355.740 0.030 24 ... SPO 1994 05 04 355.740 0.020 24 ... SPO 1994 05 05 355.730 0.030 23 ... SPO 1994 05 06 355.720 0.040 24 ... SPO 1994 05 07 355.730 0.040 17 ... SPO 1994 05 08 355.750 0.020 24 ... SPO 1994 05 09 355.740 0.030 24 ... SPO 1994 05 10 355.740 0.030 24 ... SPO 1994 05 11 355.750 0.050 23 ... SPO 1994 05 12 355.770 0.030 22 ... SPO 1994 05 13 355.780 0.020 14 ... SPO 1994 05 14 355.770 0.020 24 ... SPO 1994 05 15 355.760 0.030 20 ... SPO 1994 05 16 355.760 0.040 23 ... SPO 1994 05 17 355.790 0.020 24 ... SPO 1994 05 18 355.820 0.030 24 ... SPO 1994 05 19 355.790 0.030 24 ... SPO 1994 05 20 355.790 0.020 17 ... SPO 1994 05 21 355.810 0.050 21 ... SPO 1994 05 22 355.830 0.020 24 ... SPO 1994 05 23 355.850 0.030 24 ... SPO 1994 05 24 355.850 0.040 23 ... SPO 1994 05 25 355.860 0.030 20 ... SPO 1994 05 26 355.860 0.040 17 ... SPO 1994 05 27 355.890 0.070 16 ... SPO 1994 05 28 355.850 0.050 23 ... SPO 1994 05 29 355.870 0.030 24 ... SPO 1994 05 30 355.850 0.030 23 ... SPO 1994 05 31 355.860 0.050 22 ... SPO 1994 06 01 355.860 0.040 21 ... SPO 1994 06 02 355.910 0.050 24 ... SPO 1994 06 03 355.940 0.020 17 ... SPO 1994 06 04 355.940 0.020 24 ... SPO 1994 06 05 355.880 0.040 24 ... SPO 1994 06 06 355.930 0.020 24 ... SPO 1994 06 07 355.910 0.040 20 ... SPO 1994 06 08 355.940 0.020 24 ... SPO 1994 06 09 355.980 0.030 18 ... SPO 1994 06 10 355.990 0.020 24 ... SPO 1994 06 11 355.970 0.050 22 ... SPO 1994 06 12 355.870 0.070 15 ... SPO 1994 06 13 355.950 0.040 13 ... SPO 1994 06 14 356.010 0.040 24 ... SPO 1994 06 15 356.070 0.040 22 ... SPO 1994 06 16 356.140 0.040 23 ... SPO 1994 06 17 356.180 0.060 24 ... SPO 1994 06 18 356.170 0.050 15 ... SPO 1994 06 19 356.150 0.030 23 ... SPO 1994 06 20 356.210 0.030 22 ... SPO 1994 06 21 356.180 0.030 23 ... SPO 1994 06 22 356.140 0.020 24 ... SPO 1994 06 23 356.160 0.030 24 ... SPO 1994 06 24 356.140 0.040 17 ... SPO 1994 06 25 356.160 0.030 24 ... SPO 1994 06 26 356.170 0.030 21 ... SPO 1994 06 27 356.170 0.020 24 ... SPO 1994 06 28 356.290 0.040 24 ... SPO 1994 06 29 356.330 0.060 23 ... SPO 1994 06 30 356.230 0.010 22 ... SPO 1994 07 01 356.290 0.050 15 ... SPO 1994 07 02 356.240 0.030 24 ... SPO 1994 07 03 356.250 0.030 24 ... SPO 1994 07 04 356.270 0.030 23 ... SPO 1994 07 05 356.300 0.040 24 ... SPO 1994 07 06 356.290 0.030 24 ... SPO 1994 07 07 356.290 0.040 24 ... SPO 1994 07 08 356.310 0.030 17 ... SPO 1994 07 09 356.350 0.050 23 ... SPO 1994 07 10 356.350 0.030 24 ... SPO 1994 07 11 356.360 0.030 24 ... SPO 1994 07 12 356.350 0.040 24 ... SPO 1994 07 13 356.370 0.030 24 ... SPO 1994 07 14 356.370 0.030 24 ... SPO 1994 07 15 356.540 0.080 24 ... SPO 1994 07 16 356.530 0.030 17 ... SPO 1994 07 17 356.570 0.050 23 ... SPO 1994 07 18 356.530 0.030 24 ... SPO 1994 07 19 356.510 0.010 24 ... SPO 1994 07 20 356.510 0.030 24 ... SPO 1994 07 21 356.710 0.100 22 ... SPO 1994 07 22 356.650 0.070 17 ... SPO 1994 07 23 356.590 0.040 24 ... SPO 1994 07 24 356.650 0.030 24 ... SPO 1994 07 25 356.700 0.050 24 ... SPO 1994 07 26 356.720 0.040 24 ... SPO 1994 07 27 356.710 0.030 24 ... SPO 1994 07 28 356.770 0.020 24 ... SPO 1994 07 29 356.750 0.020 23 ... SPO 1994 07 30 356.680 0.040 17 ... SPO 1994 07 31 356.690 0.030 24 ... SPO 1994 08 01 356.720 0.040 24 ... SPO 1994 08 02 356.890 0.140 21 ... SPO 1994 08 03 357.020 0.070 24 ... SPO 1994 08 04 357.130 0.040 24 ... SPO 1994 08 05 357.070 0.030 17 ... SPO 1994 08 06 357.020 0.020 24 ... SPO 1994 08 07 357.000 0.020 24 ... SPO 1994 08 08 357.100 0.060 23 ... SPO 1994 08 09 357.110 0.040 23 ... SPO 1994 08 10 357.110 0.030 24 ... SPO 1994 08 11 357.200 0.080 24 ... SPO 1994 08 12 357.400 0.070 23 ... SPO 1994 08 13 357.310 0.030 17 ... SPO 1994 08 14 357.360 0.030 24 ... SPO 1994 08 15 357.390 0.020 22 ... SPO 1994 08 16 357.380 0.030 24 ... SPO 1994 08 17 357.430 0.050 23 ... SPO 1994 08 18 357.460 0.040 24 ... SPO 1994 08 19 357.450 0.040 17 ... SPO 1994 08 20 357.420 0.040 24 ... SPO 1994 08 21 357.420 0.030 24 ... SPO 1994 08 22 357.440 0.020 24 ... SPO 1994 08 23 357.410 0.040 22 ... SPO 1994 08 24 357.420 0.020 24 ... SPO 1994 08 25 357.450 0.040 24 ... SPO 1994 08 26 357.460 0.030 24 ... SPO 1994 08 27 357.440 0.040 22 ... SPO 1994 08 28 357.460 0.030 24 ... SPO 1994 08 29 357.500 0.020 24 ... SPO 1994 08 30 357.480 0.020 24 ... SPO 1994 08 31 357.520 0.050 24 ... SPO 1994 09 01 357.540 0.060 22 ... SPO 1994 09 02 357.590 0.040 15 ... SPO 1994 09 03 357.550 0.060 21 ... SPO 1994 09 04 357.540 0.040 24 ... SPO 1994 09 05 357.550 0.030 24 ... SPO 1994 09 06 357.530 0.030 21 ... SPO 1994 09 07 357.540 0.040 23 ... SPO 1994 09 08 357.560 0.030 24 ... SPO 1994 09 09 357.650 0.060 17 ... SPO 1994 09 10 357.720 0.030 24 ... SPO 1994 09 11 357.700 0.040 23 ... SPO 1994 09 12 357.820 0.050 23 ... SPO 1994 09 13 357.820 0.040 21 ... SPO 1994 09 14 357.740 0.030 24 ... SPO 1994 09 15 357.720 0.040 24 ... SPO 1994 09 16 357.700 0.030 24 ... SPO 1994 09 17 357.680 0.030 15 ... SPO 1994 09 18 357.660 0.030 24 ... SPO 1994 09 19 357.660 0.030 24 ... SPO 1994 09 20 357.710 0.050 22 ... SPO 1994 09 21 357.740 0.030 22 ... SPO 1994 09 22 357.740 0.030 24 ... SPO 1994 09 23 357.700 0.010 24 ... SPO 1994 09 24 357.700 0.020 20 ... SPO 1994 09 25 357.740 0.020 21 ... SPO 1994 09 26 357.790 0.030 24 ... SPO 1994 09 27 357.740 0.040 22 ... SPO 1994 09 28 357.710 0.030 23 ... SPO 1994 09 29 357.720 0.030 24 ... SPO 1994 09 30 357.720 0.030 24 ... SPO 1994 10 01 357.700 0.020 16 ... SPO 1994 10 02 357.670 0.030 24 ... SPO 1994 10 03 357.670 0.050 17 ... SPO 1994 10 04 357.650 0.040 24 ... SPO 1994 10 05 357.870 0.110 24 ... SPO 1994 10 06 357.940 0.070 15 ... SPO 1994 10 07 357.880 0.090 24 ... SPO 1994 10 08 357.770 0.050 24 ... SPO 1994 10 09 357.730 0.060 20 ... SPO 1994 10 10 357.780 0.050 24 ... SPO 1994 10 11 357.690 0.030 22 ... SPO 1994 10 12 357.690 0.040 22 ... SPO 1994 10 13 357.670 0.030 17 ... SPO 1994 10 14 357.640 0.040 23 ... SPO 1994 10 15 357.700 0.060 23 ... SPO 1994 10 16 357.750 0.020 23 ... SPO 1994 10 17 357.760 0.040 16 ... SPO 1994 10 18 357.760 0.070 16 ... SPO 1994 10 19 357.760 0.030 12 ... SPO 1994 10 20 357.750 0.050 22 ... SPO 1994 10 21 357.680 0.050 21 ... SPO 1994 10 22 357.700 0.040 24 ... SPO 1994 10 23 357.710 0.030 24 ... SPO 1994 10 24 357.730 0.060 22 ... SPO 1994 10 25 357.730 0.040 23 ... SPO 1994 10 26 357.680 0.030 24 ... SPO 1994 10 27 357.640 0.030 24 ... SPO 1994 10 28 357.600 0.060 14 ... SPO 1994 10 29 357.620 0.040 23 ... SPO 1994 10 30 357.630 0.030 24 ... SPO 1994 10 31 357.650 0.040 23 ... SPO 1994 11 01 357.660 0.020 21 ... SPO 1994 11 02 357.670 0.050 17 ... SPO 1994 11 03 357.700 0.040 21 ... SPO 1994 11 04 357.710 0.030 18 ... SPO 1994 11 05 357.710 0.020 24 ... SPO 1994 11 06 357.710 0.020 19 ... SPO 1994 11 07 357.710 0.030 20 ... SPO 1994 11 08 357.700 0.030 23 ... SPO 1994 11 09 357.660 0.050 23 ... SPO 1994 11 10 357.690 0.020 19 ... SPO 1994 11 11 357.660 0.050 20 ... SPO 1994 11 12 357.620 0.020 24 ... SPO 1994 11 13 357.590 0.020 24 ... SPO 1994 11 14 357.660 0.040 17 ... SPO 1994 11 15 357.740 0.060 19 ... SPO 1994 11 16 357.710 0.030 23 ... SPO 1994 11 17 357.710 0.030 22 ... SPO 1994 11 18 357.720 0.050 23 ... SPO 1994 11 19 357.720 0.030 23 ... SPO 1994 11 20 357.690 0.020 24 ... SPO 1994 11 21 357.660 0.040 20 ... SPO 1994 11 22 357.640 0.050 20 ... SPO 1994 11 23 357.730 0.100 24 ... SPO 1994 11 24 357.670 0.050 20 ... SPO 1994 11 25 357.640 0.030 20 ... SPO 1994 11 26 357.640 0.070 24 ... SPO 1994 11 27 357.670 0.060 24 ... SPO 1994 11 28 357.570 0.020 11 ... SPO 1994 11 29 357.720 0.080 14 ... SPO 1994 11 30 -999.990 -99.990 0 *.. SPO 1994 12 01 -999.990 -99.990 0 *.. SPO 1994 12 02 357.620 0.050 20 ... SPO 1994 12 03 357.590 0.040 24 ... SPO 1994 12 04 357.620 0.020 24 ... SPO 1994 12 05 357.600 0.020 24 ... SPO 1994 12 06 357.570 0.040 24 ... SPO 1994 12 07 357.510 0.030 18 ... SPO 1994 12 08 357.560 0.040 21 ... SPO 1994 12 09 357.610 0.060 24 ... SPO 1994 12 10 357.670 0.040 24 ... SPO 1994 12 11 357.610 0.070 19 ... SPO 1994 12 12 357.670 0.070 9 ... SPO 1994 12 13 357.560 0.090 20 ... SPO 1994 12 14 357.580 0.040 21 ... SPO 1994 12 15 357.460 0.040 17 ... SPO 1994 12 16 357.500 0.030 24 ... SPO 1994 12 17 357.530 0.030 24 ... SPO 1994 12 18 357.530 0.040 24 ... SPO 1994 12 19 357.550 0.040 24 ... SPO 1994 12 20 357.520 0.050 20 ... SPO 1994 12 21 357.520 0.050 20 ... SPO 1994 12 22 357.530 0.020 11 ... SPO 1994 12 23 357.500 0.030 24 ... SPO 1994 12 24 357.520 0.030 24 ... SPO 1994 12 25 357.450 0.050 24 ... SPO 1994 12 26 357.430 0.040 24 ... SPO 1994 12 27 357.480 0.070 19 ... SPO 1994 12 28 357.580 0.040 22 ... SPO 1994 12 29 357.520 0.030 24 ... SPO 1994 12 30 357.580 0.050 24 ... SPO 1994 12 31 357.550 0.030 24 ... SPO 1995 01 01 357.560 0.050 24 ... SPO 1995 01 02 357.670 0.110 23 ... SPO 1995 01 03 357.470 0.170 16 ... SPO 1995 01 04 357.410 0.050 21 ... SPO 1995 01 05 357.500 0.060 24 ... SPO 1995 01 06 357.400 0.030 24 ... SPO 1995 01 07 357.350 0.050 23 ... SPO 1995 01 08 357.560 0.080 19 ... SPO 1995 01 09 357.380 0.060 24 ... SPO 1995 01 10 357.340 0.040 20 ... SPO 1995 01 11 357.300 0.040 21 ... SPO 1995 01 12 357.350 0.050 20 ... SPO 1995 01 13 357.370 0.060 20 ... SPO 1995 01 14 357.350 0.020 24 ... SPO 1995 01 15 357.360 0.030 24 ... SPO 1995 01 16 357.400 0.080 24 ... SPO 1995 01 17 357.340 0.050 20 ... SPO 1995 01 18 357.340 0.020 21 ... SPO 1995 01 19 357.400 0.030 24 ... SPO 1995 01 20 357.380 0.030 24 ... SPO 1995 01 21 357.390 0.030 24 ... SPO 1995 01 22 357.350 0.030 24 ... SPO 1995 01 23 357.320 0.030 24 ... SPO 1995 01 24 357.300 0.070 19 ... SPO 1995 01 25 357.230 0.080 22 ... SPO 1995 01 26 357.250 0.070 24 ... SPO 1995 01 27 357.400 0.100 23 ... SPO 1995 01 28 357.330 0.090 24 ... SPO 1995 01 29 357.310 0.040 24 ... SPO 1995 01 30 357.280 0.040 17 ... SPO 1995 01 31 357.210 0.100 21 ... SPO 1995 02 01 357.290 0.070 21 ... SPO 1995 02 02 357.070 0.060 20 ... SPO 1995 02 03 357.200 0.050 24 ... SPO 1995 02 04 357.210 0.050 22 ... SPO 1995 02 05 357.400 0.060 23 ... SPO 1995 02 06 357.230 0.090 22 ... SPO 1995 02 07 357.250 0.050 20 ... SPO 1995 02 08 357.360 0.240 21 ... SPO 1995 02 09 357.600 0.070 24 ... SPO 1995 02 10 357.330 0.050 22 ... SPO 1995 02 11 357.420 0.040 23 ... SPO 1995 02 12 357.420 0.050 24 ... SPO 1995 02 13 357.400 0.180 21 ... SPO 1995 02 14 357.410 0.150 20 ... SPO 1995 02 15 357.460 0.060 20 ... SPO 1995 02 16 357.350 0.070 24 ... SPO 1995 02 17 357.370 0.030 21 ... SPO 1995 02 18 357.390 0.050 22 ... SPO 1995 02 19 357.440 0.130 24 ... SPO 1995 02 20 357.340 0.180 24 ... SPO 1995 02 21 357.410 0.130 21 ... SPO 1995 02 22 357.380 0.070 19 ... SPO 1995 02 23 357.490 0.080 24 ... SPO 1995 02 24 357.580 0.170 22 ... SPO 1995 02 25 357.490 0.100 24 ... SPO 1995 02 26 357.570 0.060 24 ... SPO 1995 02 27 357.450 0.090 23 ... SPO 1995 02 28 357.410 0.080 19 ... SPO 1995 03 01 357.620 0.080 22 ... SPO 1995 03 02 357.640 0.060 23 ... SPO 1995 03 03 357.660 0.060 24 ... SPO 1995 03 04 357.760 0.100 24 ... SPO 1995 03 05 357.650 0.120 24 ... SPO 1995 03 06 357.640 0.020 24 ... SPO 1995 03 07 357.590 0.130 19 ... SPO 1995 03 08 357.640 0.040 22 ... SPO 1995 03 09 357.630 0.070 24 ... SPO 1995 03 10 357.570 0.120 24 ... SPO 1995 03 11 357.690 0.040 24 ... SPO 1995 03 12 357.600 0.040 21 ... SPO 1995 03 13 357.530 0.070 20 ... SPO 1995 03 14 357.530 0.020 22 ... SPO 1995 03 15 357.380 0.070 19 ... SPO 1995 03 16 357.350 0.050 24 ... SPO 1995 03 17 357.640 0.060 21 ... SPO 1995 03 18 357.570 0.030 24 ... SPO 1995 03 19 357.480 0.050 24 ... SPO 1995 03 20 357.570 0.040 24 ... SPO 1995 03 21 357.590 0.030 22 ... SPO 1995 03 22 357.500 0.060 19 ... SPO 1995 03 23 357.460 0.060 24 ... SPO 1995 03 24 357.530 0.040 24 ... SPO 1995 03 25 357.560 0.040 24 ... SPO 1995 03 26 357.600 0.050 24 ... SPO 1995 03 27 357.590 0.030 24 ... SPO 1995 03 28 357.500 0.060 21 ... SPO 1995 03 29 357.560 0.050 20 ... SPO 1995 03 30 357.530 0.030 24 ... SPO 1995 03 31 357.450 0.070 24 ... SPO 1995 04 01 357.510 0.030 24 ... SPO 1995 04 02 357.510 0.020 24 ... SPO 1995 04 03 357.430 0.030 24 ... SPO 1995 04 04 357.410 0.030 22 ... SPO 1995 04 05 357.440 0.040 19 ... SPO 1995 04 06 357.460 0.050 24 ... SPO 1995 04 07 357.520 0.060 23 ... SPO 1995 04 08 357.550 0.020 24 ... SPO 1995 04 09 357.500 0.020 24 ... SPO 1995 04 10 357.490 0.040 24 ... SPO 1995 04 11 357.510 0.030 20 ... SPO 1995 04 12 357.540 0.020 20 ... SPO 1995 04 13 357.570 0.030 23 ... SPO 1995 04 14 357.600 0.030 24 ... SPO 1995 04 15 357.600 0.050 24 ... SPO 1995 04 16 357.600 0.030 24 ... SPO 1995 04 17 357.560 0.040 24 ... SPO 1995 04 18 357.580 0.020 21 ... SPO 1995 04 19 357.600 0.050 20 ... SPO 1995 04 20 357.560 0.040 24 ... SPO 1995 04 21 357.630 0.040 22 ... SPO 1995 04 22 357.610 0.030 24 ... SPO 1995 04 23 357.580 0.040 24 ... SPO 1995 04 24 357.610 0.020 24 ... SPO 1995 04 25 357.600 0.030 21 ... SPO 1995 04 26 357.630 0.020 20 ... SPO 1995 04 27 357.640 0.020 24 ... SPO 1995 04 28 357.660 0.040 23 ... SPO 1995 04 29 357.690 0.020 24 ... SPO 1995 04 30 357.720 0.020 24 ... SPO 1995 05 01 357.710 0.050 23 ... SPO 1995 05 02 357.700 0.030 20 ... SPO 1995 05 03 357.690 0.060 20 ... SPO 1995 05 04 357.700 0.020 24 ... SPO 1995 05 05 357.700 0.040 24 ... SPO 1995 05 06 357.700 0.030 24 ... SPO 1995 05 07 357.770 0.040 20 ... SPO 1995 05 08 357.740 0.040 24 ... SPO 1995 05 09 357.700 0.030 21 ... SPO 1995 05 10 357.730 0.030 20 ... SPO 1995 05 11 357.760 0.030 24 ... SPO 1995 05 12 357.750 0.040 24 ... SPO 1995 05 13 357.780 0.050 23 ... SPO 1995 05 14 357.840 0.040 24 ... SPO 1995 05 15 357.770 0.050 23 ... SPO 1995 05 16 357.750 0.040 23 ... SPO 1995 05 17 357.780 0.030 17 ... SPO 1995 05 18 357.790 0.020 24 ... SPO 1995 05 19 357.770 0.030 22 ... SPO 1995 05 20 357.780 0.030 24 ... SPO 1995 05 21 357.830 0.030 24 ... SPO 1995 05 22 357.930 0.050 18 ... SPO 1995 05 23 357.800 0.040 17 ... SPO 1995 05 24 357.830 0.020 24 ... SPO 1995 05 25 357.860 0.020 24 ... SPO 1995 05 26 357.900 0.030 24 ... SPO 1995 05 27 357.880 0.030 24 ... SPO 1995 05 28 357.870 0.040 24 ... SPO 1995 05 29 357.920 0.030 24 ... SPO 1995 05 30 357.880 0.020 22 ... SPO 1995 05 31 357.920 0.020 19 ... SPO 1995 06 01 357.900 0.020 24 ... SPO 1995 06 02 357.890 0.020 21 ... SPO 1995 06 03 357.870 0.020 24 ... SPO 1995 06 04 357.890 0.020 24 ... SPO 1995 06 05 357.910 0.030 23 ... SPO 1995 06 06 357.930 0.020 23 ... SPO 1995 06 07 357.930 0.030 18 ... SPO 1995 06 08 357.950 0.020 24 ... SPO 1995 06 09 357.970 0.040 24 ... SPO 1995 06 10 357.970 0.020 24 ... SPO 1995 06 11 357.920 0.030 24 ... SPO 1995 06 12 358.000 0.030 23 ... SPO 1995 06 13 357.980 0.040 21 ... SPO 1995 06 14 358.030 0.030 20 ... SPO 1995 06 15 357.990 0.030 24 ... SPO 1995 06 16 358.000 0.050 23 ... SPO 1995 06 17 358.050 0.030 24 ... SPO 1995 06 18 358.070 0.020 24 ... SPO 1995 06 19 358.050 0.030 24 ... SPO 1995 06 20 358.080 0.020 21 ... SPO 1995 06 21 358.120 0.030 20 ... SPO 1995 06 22 358.170 0.040 24 ... SPO 1995 06 23 358.160 0.040 24 ... SPO 1995 06 24 358.040 0.060 12 ... SPO 1995 06 25 358.120 0.020 24 ... SPO 1995 06 26 358.130 0.030 24 ... SPO 1995 06 27 358.220 0.050 23 ... SPO 1995 06 28 358.270 0.030 18 ... SPO 1995 06 29 358.220 0.050 21 ... SPO 1995 06 30 358.200 0.020 24 ... SPO 1995 07 01 358.140 0.050 24 ... SPO 1995 07 02 358.150 0.040 14 ... SPO 1995 07 03 358.130 0.020 22 ... SPO 1995 07 04 358.160 0.030 22 ... SPO 1995 07 05 358.190 0.020 17 ... SPO 1995 07 06 358.190 0.050 24 ... SPO 1995 07 07 358.220 0.020 24 ... SPO 1995 07 08 358.330 0.040 24 ... SPO 1995 07 09 358.320 0.040 24 ... SPO 1995 07 10 358.450 0.040 24 ... SPO 1995 07 11 358.500 0.030 22 ... SPO 1995 07 12 358.450 0.040 19 ... SPO 1995 07 13 358.430 0.030 22 ... SPO 1995 07 14 358.570 0.060 23 ... SPO 1995 07 15 358.590 0.030 24 ... SPO 1995 07 16 358.580 0.040 24 ... SPO 1995 07 17 358.660 0.070 24 ... SPO 1995 07 18 358.600 0.020 16 ... SPO 1995 07 19 358.570 0.040 19 ... SPO 1995 07 20 358.550 0.030 24 ... SPO 1995 07 21 358.640 0.040 22 ... SPO 1995 07 22 358.590 0.040 24 ... SPO 1995 07 23 358.620 0.040 24 ... SPO 1995 07 24 358.630 0.020 24 ... SPO 1995 07 25 358.650 0.040 22 ... SPO 1995 07 26 358.770 0.030 19 ... SPO 1995 07 27 358.700 0.040 24 ... SPO 1995 07 28 358.710 0.040 23 ... SPO 1995 07 29 358.720 0.050 24 ... SPO 1995 07 30 358.800 0.040 24 ... SPO 1995 07 31 358.820 0.040 23 ... SPO 1995 08 01 358.740 0.050 21 ... SPO 1995 08 02 358.780 0.060 20 ... SPO 1995 08 03 358.790 0.030 24 ... SPO 1995 08 04 358.880 0.030 23 ... SPO 1995 08 05 358.880 0.030 24 ... SPO 1995 08 06 358.830 0.040 24 ... SPO 1995 08 07 358.860 0.040 24 ... SPO 1995 08 08 358.940 0.030 23 ... SPO 1995 08 09 358.930 0.030 18 ... SPO 1995 08 10 358.950 0.030 24 ... SPO 1995 08 11 358.960 0.040 23 ... SPO 1995 08 12 358.970 0.030 24 ... SPO 1995 08 13 358.890 0.050 24 ... SPO 1995 08 14 358.850 0.050 24 ... SPO 1995 08 15 358.890 0.040 21 ... SPO 1995 08 16 358.870 0.030 20 ... SPO 1995 08 17 358.880 0.040 24 ... SPO 1995 08 18 358.940 0.040 22 ... SPO 1995 08 19 358.940 0.040 24 ... SPO 1995 08 20 358.910 0.020 24 ... SPO 1995 08 21 358.920 0.030 24 ... SPO 1995 08 22 358.930 0.020 23 ... SPO 1995 08 23 358.890 0.030 18 ... SPO 1995 08 24 358.920 0.040 24 ... SPO 1995 08 25 358.940 0.030 24 ... SPO 1995 08 26 358.950 0.030 24 ... SPO 1995 08 27 358.980 0.020 24 ... SPO 1995 08 28 359.070 0.060 22 ... SPO 1995 08 29 359.040 0.030 19 ... SPO 1995 08 30 359.050 0.030 24 ... SPO 1995 08 31 359.060 0.020 24 ... SPO 1995 09 01 359.070 0.060 24 ... SPO 1995 09 02 359.070 0.030 24 ... SPO 1995 09 03 359.130 0.040 24 ... SPO 1995 09 04 359.110 0.020 24 ... SPO 1995 09 05 359.120 0.040 22 ... SPO 1995 09 06 359.150 0.050 19 ... SPO 1995 09 07 359.170 0.040 24 ... SPO 1995 09 08 359.150 0.020 24 ... SPO 1995 09 09 359.160 0.020 24 ... SPO 1995 09 10 359.170 0.030 24 ... SPO 1995 09 11 359.210 0.030 24 ... SPO 1995 09 12 359.220 0.030 21 ... SPO 1995 09 13 359.180 0.030 20 ... SPO 1995 09 14 359.180 0.020 24 ... SPO 1995 09 15 359.210 0.060 24 ... SPO 1995 09 16 359.190 0.020 24 ... SPO 1995 09 17 359.190 0.030 24 ... SPO 1995 09 18 359.200 0.040 24 ... SPO 1995 09 19 359.280 0.080 21 ... SPO 1995 09 20 359.320 0.030 19 ... SPO 1995 09 21 359.400 0.060 23 ... SPO 1995 09 22 359.400 0.110 24 ... SPO 1995 09 23 359.310 0.020 24 ... SPO 1995 09 24 359.280 0.030 24 ... SPO 1995 09 25 359.400 0.050 24 ... SPO 1995 09 26 359.450 0.090 21 ... SPO 1995 09 27 359.360 0.060 20 ... SPO 1995 09 28 359.420 0.050 24 ... SPO 1995 09 29 359.400 0.070 24 ... SPO 1995 09 30 359.370 0.020 24 ... SPO 1995 10 01 359.400 0.040 24 ... SPO 1995 10 02 359.450 0.050 23 ... SPO 1995 10 03 359.440 0.040 20 ... SPO 1995 10 04 359.410 0.040 21 ... SPO 1995 10 05 359.370 0.030 24 ... SPO 1995 10 06 359.350 0.070 23 ... SPO 1995 10 07 359.340 0.020 24 ... SPO 1995 10 08 359.360 0.020 24 ... SPO 1995 10 09 359.360 0.020 24 ... SPO 1995 10 10 359.380 0.040 21 ... SPO 1995 10 11 359.420 0.030 20 ... SPO 1995 10 12 359.430 0.060 23 ... SPO 1995 10 13 359.510 0.060 24 ... SPO 1995 10 14 359.510 0.050 24 ... SPO 1995 10 15 359.490 0.030 24 ... SPO 1995 10 16 359.500 0.030 24 ... SPO 1995 10 17 359.480 0.030 21 ... SPO 1995 10 18 359.460 0.030 20 ... SPO 1995 10 19 359.490 0.030 24 ... SPO 1995 10 20 359.460 0.040 21 ... SPO 1995 10 21 359.460 0.030 24 ... SPO 1995 10 22 359.490 0.030 24 ... SPO 1995 10 23 359.500 0.030 24 ... SPO 1995 10 24 359.490 0.040 24 ... SPO 1995 10 25 359.450 0.020 24 ... SPO 1995 10 26 359.440 0.030 23 ... SPO 1995 10 27 359.360 0.050 11 ... SPO 1995 10 28 359.350 0.030 19 ... SPO 1995 10 29 359.400 0.060 24 ... SPO 1995 10 30 359.350 0.060 17 ... SPO 1995 10 31 359.380 0.050 11 ... SPO 1995 11 01 359.440 0.040 22 ... SPO 1995 11 02 359.440 0.030 18 ... SPO 1995 11 03 359.450 0.050 24 ... SPO 1995 11 04 359.450 0.030 24 ... SPO 1995 11 05 359.470 0.040 24 ... SPO 1995 11 06 359.460 0.020 24 ... SPO 1995 11 07 359.450 0.020 20 ... SPO 1995 11 08 359.440 0.040 11 ... SPO 1995 11 09 359.510 0.040 24 ... SPO 1995 11 10 359.540 0.040 22 ... SPO 1995 11 11 359.560 0.020 24 ... SPO 1995 11 12 359.550 0.020 24 ... SPO 1995 11 13 359.560 0.030 24 ... SPO 1995 11 14 359.570 0.030 17 ... SPO 1995 11 15 359.520 0.040 23 ... SPO 1995 11 16 359.560 0.030 24 ... SPO 1995 11 17 359.540 0.050 18 ... SPO 1995 11 18 359.550 0.030 22 ... SPO 1995 11 19 359.550 0.020 24 ... SPO 1995 11 20 359.520 0.020 24 ... SPO 1995 11 21 359.530 0.060 15 ... SPO 1995 11 22 359.520 0.040 24 ... SPO 1995 11 23 359.550 0.040 21 ... SPO 1995 11 24 359.530 0.030 20 ... SPO 1995 11 25 359.550 0.020 24 ... SPO 1995 11 26 359.580 0.040 23 ... SPO 1995 11 27 359.570 0.020 24 ... SPO 1995 11 28 359.600 0.030 17 ... SPO 1995 11 29 359.590 0.030 24 ... SPO 1995 11 30 359.580 0.030 24 ... SPO 1995 12 01 359.610 0.030 23 ... SPO 1995 12 02 359.590 0.040 23 ... SPO 1995 12 03 359.620 0.040 24 ... SPO 1995 12 04 359.620 0.060 24 ... SPO 1995 12 05 359.630 0.050 20 ... SPO 1995 12 06 359.610 0.020 18 ... SPO 1995 12 07 359.630 0.040 23 ... SPO 1995 12 08 359.610 0.020 23 ... SPO 1995 12 09 359.660 0.090 24 ... SPO 1995 12 10 359.800 0.230 13 ... SPO 1995 12 11 359.570 0.020 14 ... SPO 1995 12 12 359.590 0.060 16 ... SPO 1995 12 13 359.620 0.050 20 ... SPO 1995 12 14 359.600 0.040 5 ... SPO 1995 12 15 359.560 0.030 15 ... SPO 1995 12 16 359.530 0.050 16 ... SPO 1995 12 17 359.530 0.030 20 ... SPO 1995 12 18 359.580 0.060 16 ... SPO 1995 12 19 359.540 0.030 18 ... SPO 1995 12 20 359.560 0.060 8 ... SPO 1995 12 21 359.330 0.070 22 ... SPO 1995 12 22 359.310 0.200 14 ... SPO 1995 12 23 359.350 0.040 21 ... SPO 1995 12 24 359.420 0.060 23 ... SPO 1995 12 25 359.450 0.020 19 ... SPO 1995 12 26 359.600 0.030 17 ... SPO 1995 12 27 359.430 0.080 20 ... SPO 1995 12 28 359.480 0.080 12 ... SPO 1995 12 29 359.410 0.060 7 ... SPO 1995 12 30 359.460 0.060 21 ... SPO 1995 12 31 359.530 0.070 23 ... SPO 1996 01 01 359.420 0.030 18 ... SPO 1996 01 02 359.500 0.060 15 ... SPO 1996 01 03 359.470 0.040 12 ... SPO 1996 01 04 359.430 0.050 13 ... SPO 1996 01 05 359.470 0.050 14 ... SPO 1996 01 06 359.380 0.020 21 ... SPO 1996 01 07 359.450 0.050 13 ... SPO 1996 01 08 359.530 0.070 14 ... SPO 1996 01 09 359.550 0.010 10 ... SPO 1996 01 10 359.450 0.040 18 ... SPO 1996 01 11 359.480 0.050 21 ... SPO 1996 01 12 359.510 0.010 2 ... SPO 1996 01 13 359.220 0.200 12 ... SPO 1996 01 14 359.320 0.080 18 ... SPO 1996 01 15 359.360 0.070 14 ... SPO 1996 01 16 359.320 0.070 6 ... SPO 1996 01 17 359.430 0.040 20 ... SPO 1996 01 18 -999.990 -99.990 0 *.. SPO 1996 01 19 -999.990 -99.990 0 *.. SPO 1996 01 20 359.470 0.040 23 ... SPO 1996 01 21 359.450 0.040 22 ... SPO 1996 01 22 359.350 0.100 24 ... SPO 1996 01 23 359.280 0.090 20 ... SPO 1996 01 24 359.380 0.050 21 ... SPO 1996 01 25 359.450 0.050 11 ... SPO 1996 01 26 359.460 0.050 13 ... SPO 1996 01 27 359.540 0.040 6 ... SPO 1996 01 28 359.460 0.050 22 ... SPO 1996 01 29 359.250 0.090 24 ... SPO 1996 01 30 359.330 0.040 19 ... SPO 1996 01 31 359.410 0.060 14 ... SPO 1996 02 01 359.500 0.070 11 ... SPO 1996 02 02 359.360 0.040 16 ... SPO 1996 02 03 359.420 0.110 22 ... SPO 1996 02 04 359.470 0.050 19 ... SPO 1996 02 05 359.400 0.050 20 ... SPO 1996 02 06 359.430 0.050 19 ... SPO 1996 02 07 359.470 0.030 22 ... SPO 1996 02 08 359.530 0.020 23 ... SPO 1996 02 09 359.510 0.090 24 ... SPO 1996 02 10 359.450 0.020 24 ... SPO 1996 02 11 359.460 0.030 24 ... SPO 1996 02 12 359.420 0.030 20 ... SPO 1996 02 13 359.420 0.030 21 ... SPO 1996 02 14 359.370 0.120 24 ... SPO 1996 02 15 359.450 0.020 24 ... SPO 1996 02 16 359.500 0.060 24 ... SPO 1996 02 17 359.310 0.180 24 ... SPO 1996 02 18 359.310 0.070 23 ... SPO 1996 02 19 359.280 0.040 24 ... SPO 1996 02 20 359.130 0.110 20 ... SPO 1996 02 21 359.070 0.080 20 ... SPO 1996 02 22 359.260 0.060 24 ... SPO 1996 02 23 359.260 0.060 24 ... SPO 1996 02 24 359.320 0.070 24 ... SPO 1996 02 25 359.390 0.050 24 ... SPO 1996 02 26 359.410 0.050 23 ... SPO 1996 02 27 359.310 0.080 19 ... SPO 1996 02 28 359.330 0.080 22 ... SPO 1996 02 29 359.450 0.070 24 ... SPO 1996 03 01 359.410 0.050 12 ... SPO 1996 03 02 359.380 0.030 24 ... SPO 1996 03 03 359.320 0.070 24 ... SPO 1996 03 04 359.250 0.030 24 ... SPO 1996 03 05 359.210 0.030 19 ... SPO 1996 03 06 359.290 0.030 19 ... SPO 1996 03 07 359.280 0.030 21 ... SPO 1996 03 08 359.270 0.080 13 ... SPO 1996 03 09 359.390 0.040 24 ... SPO 1996 03 10 359.400 0.030 24 ... SPO 1996 03 11 359.400 0.030 24 ... SPO 1996 03 12 359.310 0.030 24 ... SPO 1996 03 13 359.330 0.030 20 ... SPO 1996 03 14 359.360 0.050 21 ... SPO 1996 03 15 359.440 0.030 24 ... SPO 1996 03 16 359.340 0.040 24 ... SPO 1996 03 17 359.390 0.040 24 ... SPO 1996 03 18 359.140 0.120 24 ... SPO 1996 03 19 359.180 0.090 21 ... SPO 1996 03 20 359.330 0.040 20 ... SPO 1996 03 21 359.290 0.040 24 ... SPO 1996 03 22 359.310 0.020 24 ... SPO 1996 03 23 359.330 0.020 24 ... SPO 1996 03 24 359.340 0.030 24 ... SPO 1996 03 25 359.370 0.030 24 ... SPO 1996 03 26 359.330 0.030 24 ... SPO 1996 03 27 359.370 0.030 21 ... SPO 1996 03 28 359.440 0.060 20 ... SPO 1996 03 29 359.440 0.070 20 ... SPO 1996 03 30 359.370 0.050 23 ... SPO 1996 03 31 359.380 0.030 24 ... SPO 1996 04 01 359.420 0.020 24 ... SPO 1996 04 02 359.380 0.030 21 ... SPO 1996 04 03 359.390 0.030 20 ... SPO 1996 04 04 359.380 0.020 24 ... SPO 1996 04 05 359.420 0.040 24 ... SPO 1996 04 06 359.360 0.030 24 ... SPO 1996 04 07 359.330 0.030 24 ... SPO 1996 04 08 359.330 0.030 24 ... SPO 1996 04 09 359.360 0.020 21 ... SPO 1996 04 10 359.340 0.020 19 ... SPO 1996 04 11 359.330 0.030 24 ... SPO 1996 04 12 359.330 0.030 24 ... SPO 1996 04 13 359.360 0.020 24 ... SPO 1996 04 14 359.380 0.040 22 ... SPO 1996 04 15 359.330 0.040 20 ... SPO 1996 04 16 359.310 0.030 20 ... SPO 1996 04 17 359.320 0.020 21 ... SPO 1996 04 18 359.330 0.030 24 ... SPO 1996 04 19 359.370 0.020 24 ... SPO 1996 04 20 359.360 0.040 24 ... SPO 1996 04 21 359.340 0.030 24 ... SPO 1996 04 22 359.340 0.040 24 ... SPO 1996 04 23 359.370 0.030 21 ... SPO 1996 04 24 359.330 0.040 19 ... SPO 1996 04 25 359.350 0.040 24 ... SPO 1996 04 26 359.430 0.020 24 ... SPO 1996 04 27 359.430 0.020 24 ... SPO 1996 04 28 359.460 0.020 24 ... SPO 1996 04 29 359.490 0.030 24 ... SPO 1996 04 30 359.500 0.030 22 ... SPO 1996 05 01 359.480 0.030 19 ... SPO 1996 05 02 359.480 0.020 24 ... SPO 1996 05 03 359.460 0.040 23 ... SPO 1996 05 04 359.470 0.030 24 ... SPO 1996 05 05 359.490 0.030 23 ... SPO 1996 05 06 359.500 0.030 24 ... SPO 1996 05 07 359.490 0.040 21 ... SPO 1996 05 08 359.500 0.050 19 ... SPO 1996 05 09 359.520 0.040 24 ... SPO 1996 05 10 359.520 0.060 24 ... SPO 1996 05 11 359.520 0.030 23 ... SPO 1996 05 12 359.530 0.040 24 ... SPO 1996 05 13 359.500 0.040 21 ... SPO 1996 05 14 359.500 0.030 20 ... SPO 1996 05 15 359.490 0.030 24 ... SPO 1996 05 16 359.550 0.030 24 ... SPO 1996 05 17 359.500 0.030 24 ... SPO 1996 05 18 359.530 0.020 24 ... SPO 1996 05 19 359.540 0.020 24 ... SPO 1996 05 20 359.520 0.030 24 ... SPO 1996 05 21 359.540 0.020 19 ... SPO 1996 05 22 359.570 0.030 18 ... SPO 1996 05 23 359.610 0.020 24 ... SPO 1996 05 24 359.590 0.030 24 ... SPO 1996 05 25 359.580 0.020 24 ... SPO 1996 05 26 359.630 0.020 24 ... SPO 1996 05 27 359.580 0.040 23 ... SPO 1996 05 28 359.570 0.020 23 ... SPO 1996 05 29 359.610 0.030 19 ... SPO 1996 05 30 359.610 0.020 20 ... SPO 1996 05 31 359.600 0.030 24 ... SPO 1996 06 01 359.570 0.030 23 ... SPO 1996 06 02 359.570 0.040 24 ... SPO 1996 06 03 359.630 0.030 24 ... SPO 1996 06 04 359.660 0.040 20 ... SPO 1996 06 05 359.680 0.030 21 ... SPO 1996 06 06 359.680 0.030 24 ... SPO 1996 06 07 359.690 0.030 24 ... SPO 1996 06 08 359.700 0.020 24 ... SPO 1996 06 09 359.700 0.030 23 ... SPO 1996 06 10 359.700 0.030 24 ... SPO 1996 06 11 359.680 0.030 24 ... SPO 1996 06 12 359.680 0.030 20 ... SPO 1996 06 13 359.730 0.020 21 ... SPO 1996 06 14 359.750 0.030 24 ... SPO 1996 06 15 359.790 0.020 24 ... SPO 1996 06 16 359.770 0.020 24 ... SPO 1996 06 17 359.780 0.040 24 ... SPO 1996 06 18 359.780 0.030 24 ... SPO 1996 06 19 359.780 0.030 21 ... SPO 1996 06 20 359.800 0.020 20 ... SPO 1996 06 21 359.790 0.040 24 ... SPO 1996 06 22 359.850 0.050 24 ... SPO 1996 06 23 359.830 0.020 24 ... SPO 1996 06 24 359.830 0.020 24 ... SPO 1996 06 25 359.910 0.020 20 ... SPO 1996 06 26 359.830 0.030 20 ... SPO 1996 06 27 359.850 0.030 21 ... SPO 1996 06 28 359.820 0.030 23 ... SPO 1996 06 29 359.820 0.030 21 ... SPO 1996 06 30 359.860 0.040 24 ... SPO 1996 07 01 359.880 0.040 13 ... SPO 1996 07 02 359.890 0.040 19 ... SPO 1996 07 03 359.860 0.020 23 ... SPO 1996 07 04 360.050 0.060 22 ... SPO 1996 07 05 360.030 0.020 17 ... SPO 1996 07 06 360.030 0.020 12 ... SPO 1996 07 07 360.080 0.020 24 ... SPO 1996 07 08 360.130 0.030 24 ... SPO 1996 07 09 360.070 0.030 20 ... SPO 1996 07 10 360.080 0.020 20 ... SPO 1996 07 11 360.130 0.030 13 ... SPO 1996 07 12 360.210 0.060 9 ... SPO 1996 07 13 360.140 0.030 24 ... SPO 1996 07 14 360.140 0.030 24 ... SPO 1996 07 15 360.170 0.030 24 ... SPO 1996 07 16 360.170 0.060 24 ... SPO 1996 07 17 360.150 0.020 13 ... SPO 1996 07 18 360.200 0.020 15 ... SPO 1996 07 19 360.190 0.050 15 ... SPO 1996 07 20 360.240 0.030 24 ... SPO 1996 07 21 360.340 0.030 22 ... SPO 1996 07 22 360.300 0.040 14 ... SPO 1996 07 23 360.330 0.020 12 ... SPO 1996 07 24 360.390 0.050 13 ... SPO 1996 07 25 360.380 0.040 11 ... SPO 1996 07 26 360.390 0.030 12 ... SPO 1996 07 27 360.360 0.020 12 ... SPO 1996 07 28 360.340 0.030 20 ... SPO 1996 07 29 360.340 0.030 16 ... SPO 1996 07 30 -999.990 -99.990 0 *.. SPO 1996 07 31 360.460 0.040 8 ... SPO 1996 08 01 360.440 0.050 15 ... SPO 1996 08 02 360.430 0.040 11 ... SPO 1996 08 03 360.460 0.070 9 ... SPO 1996 08 04 360.440 0.030 13 ... SPO 1996 08 05 360.440 0.030 18 ... SPO 1996 08 06 360.460 0.030 19 ... SPO 1996 08 07 360.460 0.020 22 ... SPO 1996 08 08 360.460 0.050 18 ... SPO 1996 08 09 360.510 0.020 11 ... SPO 1996 08 10 360.470 0.030 4 ... SPO 1996 08 11 360.560 0.030 13 ... SPO 1996 08 12 360.540 0.030 20 ... SPO 1996 08 13 360.560 0.030 20 ... SPO 1996 08 14 360.540 0.030 8 ... SPO 1996 08 15 360.590 0.020 14 ... SPO 1996 08 16 360.740 0.030 9 ... SPO 1996 08 17 360.660 0.030 10 ... SPO 1996 08 18 360.690 0.020 13 ... SPO 1996 08 19 360.710 0.060 10 ... SPO 1996 08 20 360.630 0.020 12 ... SPO 1996 08 21 360.670 0.030 20 ... SPO 1996 08 22 360.680 0.030 20 ... SPO 1996 08 23 360.700 0.030 24 ... SPO 1996 08 24 360.720 0.020 21 ... SPO 1996 08 25 360.660 0.070 11 ... SPO 1996 08 26 360.660 0.030 5 ... SPO 1996 08 27 360.670 0.070 13 ... SPO 1996 08 28 360.700 0.040 15 ... SPO 1996 08 29 360.680 0.030 9 ... SPO 1996 08 30 360.700 0.030 3 ... SPO 1996 08 31 360.730 0.040 12 ... SPO 1996 09 01 360.760 0.050 12 ... SPO 1996 09 02 360.710 0.020 6 ... SPO 1996 09 03 360.740 0.020 8 ... SPO 1996 09 04 360.690 0.050 13 ... SPO 1996 09 05 360.650 0.040 13 ... SPO 1996 09 06 360.700 0.040 16 ... SPO 1996 09 07 360.710 0.020 24 ... SPO 1996 09 08 360.710 0.020 24 ... SPO 1996 09 09 360.730 0.020 24 ... SPO 1996 09 10 360.740 0.050 18 ... SPO 1996 09 11 360.740 0.030 21 ... SPO 1996 09 12 360.720 0.040 24 ... SPO 1996 09 13 360.680 0.030 16 ... SPO 1996 09 14 360.680 0.020 24 ... SPO 1996 09 15 360.700 0.040 23 ... SPO 1996 09 16 360.640 0.030 19 ... SPO 1996 09 17 360.640 0.030 19 ... SPO 1996 09 18 360.700 0.030 21 ... SPO 1996 09 19 360.710 0.030 24 ... SPO 1996 09 20 360.670 0.020 19 ... SPO 1996 09 21 360.680 0.050 18 ... SPO 1996 09 22 360.720 0.050 22 ... SPO 1996 09 23 360.680 0.060 15 ... SPO 1996 09 24 360.740 0.050 20 ... SPO 1996 09 25 360.700 0.030 20 ... SPO 1996 09 26 360.720 0.030 16 ... SPO 1996 09 27 360.720 0.030 19 ... SPO 1996 09 28 360.720 0.050 17 ... SPO 1996 09 29 360.790 0.030 22 ... SPO 1996 09 30 360.710 0.040 24 ... SPO 1996 10 01 360.680 0.040 10 ... SPO 1996 10 02 360.640 0.050 21 ... SPO 1996 10 03 360.690 0.040 20 ... SPO 1996 10 04 360.650 0.030 24 ... SPO 1996 10 05 360.670 0.030 24 ... SPO 1996 10 06 360.700 0.020 24 ... SPO 1996 10 07 360.700 0.020 20 ... SPO 1996 10 08 360.720 0.040 21 ... SPO 1996 10 09 360.700 0.020 23 ... SPO 1996 10 10 360.720 0.050 22 ... SPO 1996 10 11 360.780 0.030 18 ... SPO 1996 10 12 360.760 0.020 22 ... SPO 1996 10 13 360.810 0.040 18 ... SPO 1996 10 14 360.810 0.040 23 ... SPO 1996 10 15 360.840 0.040 17 ... SPO 1996 10 16 360.780 0.050 21 ... SPO 1996 10 17 360.790 0.040 21 ... SPO 1996 10 18 360.770 0.030 24 ... SPO 1996 10 19 360.780 0.020 23 ... SPO 1996 10 20 360.780 0.020 24 ... SPO 1996 10 21 360.760 0.030 24 ... SPO 1996 10 22 360.780 0.020 17 ... SPO 1996 10 23 360.810 0.030 23 ... SPO 1996 10 24 360.830 0.030 21 ... SPO 1996 10 25 360.850 0.030 20 ... SPO 1996 10 26 360.830 0.030 21 ... SPO 1996 10 27 360.840 0.030 11 ... SPO 1996 10 28 360.850 0.030 4 ... SPO 1996 10 29 -999.990 -99.990 0 *.. SPO 1996 10 30 -999.990 -99.990 0 *.. SPO 1996 10 31 360.770 0.030 21 ... SPO 1996 11 01 360.770 0.020 9 ... SPO 1996 11 02 360.790 0.040 16 ... SPO 1996 11 03 360.780 0.040 23 ... SPO 1996 11 04 360.740 0.030 21 ... SPO 1996 11 05 360.740 0.050 11 ... SPO 1996 11 06 360.720 0.040 5 ... SPO 1996 11 07 360.740 0.020 7 ... SPO 1996 11 08 -999.990 -99.990 0 *.. SPO 1996 11 09 360.850 0.040 6 ... SPO 1996 11 10 360.820 0.030 23 ... SPO 1996 11 11 360.800 0.050 19 ... SPO 1996 11 12 360.780 0.050 17 ... SPO 1996 11 13 360.680 0.030 14 ... SPO 1996 11 14 360.680 0.020 24 ... SPO 1996 11 15 360.690 0.050 22 ... SPO 1996 11 16 360.790 0.040 23 ... SPO 1996 11 17 360.810 0.050 21 ... SPO 1996 11 18 360.730 0.040 10 ... SPO 1996 11 19 360.800 0.030 19 ... SPO 1996 11 20 360.770 0.040 17 ... SPO 1996 11 21 360.730 0.030 17 ... SPO 1996 11 22 360.730 0.040 10 ... SPO 1996 11 23 360.770 0.030 6 ... SPO 1996 11 24 360.770 0.040 21 ... SPO 1996 11 25 360.760 0.030 15 ... SPO 1996 11 26 360.750 0.030 15 ... SPO 1996 11 27 360.720 0.040 13 ... SPO 1996 11 28 360.720 0.040 8 ... SPO 1996 11 29 360.850 0.080 15 ... SPO 1996 11 30 360.720 0.040 21 ... SPO 1996 12 01 -999.990 -99.990 0 *.. SPO 1996 12 02 -999.990 -99.990 0 *.. SPO 1996 12 03 360.760 0.070 11 ... SPO 1996 12 04 360.750 0.030 18 ... SPO 1996 12 05 360.720 0.030 19 ... SPO 1996 12 06 360.730 0.020 18 ... SPO 1996 12 07 360.710 0.030 9 ... SPO 1996 12 08 360.720 0.020 15 ... SPO 1996 12 09 360.750 0.050 5 ... SPO 1996 12 10 -999.990 -99.990 0 *.. SPO 1996 12 11 360.760 0.040 10 ... SPO 1996 12 12 360.740 0.060 13 ... SPO 1996 12 13 360.740 0.040 6 ... SPO 1996 12 14 -999.990 -99.990 0 *.. SPO 1996 12 15 360.780 0.020 4 ... SPO 1996 12 16 -999.990 -99.990 0 *.. SPO 1996 12 17 -999.990 -99.990 0 *.. SPO 1996 12 18 360.760 0.090 5 ... SPO 1996 12 19 360.660 0.100 7 ... SPO 1996 12 20 360.820 0.030 7 ... SPO 1996 12 21 360.860 0.130 18 ... SPO 1996 12 22 360.770 0.050 14 ... SPO 1996 12 23 360.680 0.020 17 ... SPO 1996 12 24 360.680 0.020 16 ... SPO 1996 12 25 360.710 0.040 13 ... SPO 1996 12 26 360.720 0.040 15 ... SPO 1996 12 27 360.810 0.040 13 ... SPO 1996 12 28 360.810 0.070 20 ... SPO 1996 12 29 360.600 0.060 22 ... SPO 1996 12 30 360.610 0.070 19 ... SPO 1996 12 31 360.750 0.040 11 ... SPO 1997 01 01 360.700 0.060 20 ... SPO 1997 01 02 360.680 0.070 21 ... SPO 1997 01 03 360.720 0.140 24 ... SPO 1997 01 04 360.450 0.050 24 ... SPO 1997 01 05 360.530 0.080 22 ... SPO 1997 01 06 360.760 0.170 17 ... SPO 1997 01 07 360.650 0.030 17 ... SPO 1997 01 08 360.680 0.080 13 ... SPO 1997 01 09 360.600 0.030 20 ... SPO 1997 01 10 360.580 0.050 22 ... SPO 1997 01 11 360.620 0.020 21 ... SPO 1997 01 12 360.610 0.020 13 ... SPO 1997 01 13 360.710 0.040 2 ... SPO 1997 01 14 360.690 0.040 17 ... SPO 1997 01 15 360.510 0.040 17 ... SPO 1997 01 16 360.650 0.060 20 ... SPO 1997 01 17 360.530 0.050 24 ... SPO 1997 01 18 360.500 0.030 21 ... SPO 1997 01 19 -999.990 -99.990 0 *.. SPO 1997 01 20 -999.990 -99.990 0 *.. SPO 1997 01 21 -999.990 -99.990 0 *.. SPO 1997 01 22 -999.990 -99.990 0 *.. SPO 1997 01 23 -999.990 -99.990 0 *.. SPO 1997 01 24 -999.990 -99.990 0 *.. SPO 1997 01 25 -999.990 -99.990 0 *.. SPO 1997 01 26 -999.990 -99.990 0 *.. SPO 1997 01 27 -999.990 -99.990 0 *.. SPO 1997 01 28 -999.990 -99.990 0 *.. SPO 1997 01 29 360.450 0.030 16 ... SPO 1997 01 30 360.490 0.060 21 ... SPO 1997 01 31 360.590 0.070 24 ... SPO 1997 02 01 360.470 0.080 23 ... SPO 1997 02 02 360.480 0.050 24 ... SPO 1997 02 03 360.540 0.050 23 ... SPO 1997 02 04 360.530 0.060 17 ... SPO 1997 02 05 360.460 0.030 20 ... SPO 1997 02 06 360.500 0.030 24 ... SPO 1997 02 07 360.490 0.020 24 ... SPO 1997 02 08 360.320 0.070 24 ... SPO 1997 02 09 360.550 0.030 24 ... SPO 1997 02 10 360.600 0.020 8 ... SPO 1997 02 11 360.410 0.080 19 ... SPO 1997 02 12 360.460 0.050 22 ... SPO 1997 02 13 360.610 0.080 20 ... SPO 1997 02 14 360.600 0.030 23 ... SPO 1997 02 15 360.490 0.030 24 ... SPO 1997 02 16 360.470 0.030 24 ... SPO 1997 02 17 360.470 0.030 24 ... SPO 1997 02 18 360.360 0.060 18 ... SPO 1997 02 19 360.270 0.040 23 ... SPO 1997 02 20 360.390 0.130 24 ... SPO 1997 02 21 360.410 0.070 24 ... SPO 1997 02 22 360.420 0.080 24 ... SPO 1997 02 23 360.450 0.030 24 ... SPO 1997 02 24 360.350 0.100 24 ... SPO 1997 02 25 360.360 0.060 17 ... SPO 1997 02 26 360.310 0.060 24 ... SPO 1997 02 27 360.190 0.090 24 ... SPO 1997 02 28 360.320 0.040 18 ... SPO 1997 03 01 360.390 0.030 24 ... SPO 1997 03 02 360.430 0.060 24 ... SPO 1997 03 03 360.390 0.090 24 ... SPO 1997 03 04 360.310 0.040 17 ... SPO 1997 03 05 360.400 0.120 24 ... SPO 1997 03 06 360.310 0.050 24 ... SPO 1997 03 07 360.430 0.050 22 ... SPO 1997 03 08 360.420 0.020 24 ... SPO 1997 03 09 360.460 0.040 24 ... SPO 1997 03 10 360.440 0.090 24 ... SPO 1997 03 11 360.370 0.040 17 ... SPO 1997 03 12 360.400 0.040 24 ... SPO 1997 03 13 360.460 0.050 24 ... SPO 1997 03 14 360.490 0.070 22 ... SPO 1997 03 15 360.560 0.080 24 ... SPO 1997 03 16 360.530 0.030 24 ... SPO 1997 03 17 360.460 0.100 24 ... SPO 1997 03 18 360.630 0.090 17 ... SPO 1997 03 19 360.450 0.050 24 ... SPO 1997 03 20 360.460 0.030 24 ... SPO 1997 03 21 360.490 0.030 24 ... SPO 1997 03 22 360.450 0.030 24 ... SPO 1997 03 23 360.560 0.040 24 ... SPO 1997 03 24 360.590 0.020 24 ... SPO 1997 03 25 360.560 0.030 17 ... SPO 1997 03 26 360.430 0.040 22 ... SPO 1997 03 27 360.550 0.040 24 ... SPO 1997 03 28 360.560 0.040 24 ... SPO 1997 03 29 360.570 0.060 24 ... SPO 1997 03 30 360.590 0.040 24 ... SPO 1997 03 31 360.620 0.030 24 ... SPO 1997 04 01 360.660 0.040 17 ... SPO 1997 04 02 360.590 0.030 24 ... SPO 1997 04 03 360.640 0.020 24 ... SPO 1997 04 04 360.680 0.050 24 ... SPO 1997 04 05 360.700 0.050 24 ... SPO 1997 04 06 360.710 0.050 24 ... SPO 1997 04 07 360.630 0.040 24 ... SPO 1997 04 08 360.640 0.010 17 ... SPO 1997 04 09 360.640 0.040 24 ... SPO 1997 04 10 360.700 0.020 24 ... SPO 1997 04 11 360.720 0.030 24 ... SPO 1997 04 12 360.740 0.020 24 ... SPO 1997 04 13 360.750 0.040 24 ... SPO 1997 04 14 360.730 0.030 24 ... SPO 1997 04 15 360.720 0.040 17 ... SPO 1997 04 16 360.720 0.020 24 ... SPO 1997 04 17 360.690 0.030 24 ... SPO 1997 04 18 360.670 0.060 24 ... SPO 1997 04 19 360.740 0.030 24 ... SPO 1997 04 20 360.720 0.030 24 ... SPO 1997 04 21 360.780 0.030 24 ... SPO 1997 04 22 360.790 0.020 18 ... SPO 1997 04 23 360.770 0.050 24 ... SPO 1997 04 24 360.820 0.050 24 ... SPO 1997 04 25 360.820 0.030 24 ... SPO 1997 04 26 360.830 0.030 24 ... SPO 1997 04 27 360.800 0.020 24 ... SPO 1997 04 28 360.820 0.030 24 ... SPO 1997 04 29 360.830 0.020 16 ... SPO 1997 04 30 360.840 0.030 24 ... SPO 1997 05 01 360.840 0.020 24 ... SPO 1997 05 02 360.810 0.040 24 ... SPO 1997 05 03 360.790 0.040 24 ... SPO 1997 05 04 360.820 0.020 24 ... SPO 1997 05 05 360.800 0.030 24 ... SPO 1997 05 06 360.790 0.020 17 ... SPO 1997 05 07 360.810 0.020 24 ... SPO 1997 05 08 360.850 0.040 24 ... SPO 1997 05 09 360.870 0.020 24 ... SPO 1997 05 10 360.890 0.040 24 ... SPO 1997 05 11 360.780 0.030 24 ... SPO 1997 05 12 360.770 0.020 17 ... SPO 1997 05 13 360.850 0.020 24 ... SPO 1997 05 14 360.840 0.020 24 ... SPO 1997 05 15 360.830 0.020 24 ... SPO 1997 05 16 360.850 0.020 24 ... SPO 1997 05 17 360.880 0.040 24 ... SPO 1997 05 18 360.860 0.050 24 ... SPO 1997 05 19 360.880 0.060 24 ... SPO 1997 05 20 360.940 0.060 17 ... SPO 1997 05 21 -999.990 -99.990 0 *.. SPO 1997 05 22 361.000 0.030 23 ... SPO 1997 05 23 361.010 0.030 22 ... SPO 1997 05 24 360.980 0.030 6 ... SPO 1997 05 25 361.010 0.060 6 ... SPO 1997 05 26 -999.990 -99.990 0 *.. SPO 1997 05 27 361.020 0.030 9 ... SPO 1997 05 28 360.960 0.060 21 ... SPO 1997 05 29 361.000 0.050 9 ... SPO 1997 05 30 361.010 0.050 9 ... SPO 1997 05 31 361.080 0.030 21 ... SPO 1997 06 01 361.060 0.030 24 ... SPO 1997 06 02 361.040 0.060 21 ... SPO 1997 06 03 361.160 0.030 17 ... SPO 1997 06 04 361.120 0.050 16 ... SPO 1997 06 05 361.150 0.050 18 ... SPO 1997 06 06 361.230 0.080 23 ... SPO 1997 06 07 361.190 0.020 24 ... SPO 1997 06 08 361.170 0.060 24 ... SPO 1997 06 09 361.120 0.030 17 ... SPO 1997 06 10 361.140 0.040 12 ... SPO 1997 06 11 361.180 0.040 24 ... SPO 1997 06 12 361.190 0.050 24 ... SPO 1997 06 13 361.150 0.040 23 ... SPO 1997 06 14 361.210 0.060 22 ... SPO 1997 06 15 361.220 0.050 24 ... SPO 1997 06 16 361.250 0.050 24 ... SPO 1997 06 17 361.260 0.050 12 ... SPO 1997 06 18 361.260 0.080 24 ... SPO 1997 06 19 361.240 0.030 24 ... SPO 1997 06 20 361.260 0.020 24 ... SPO 1997 06 21 361.260 0.030 24 ... SPO 1997 06 22 361.220 0.080 14 ... SPO 1997 06 23 361.270 0.070 24 ... SPO 1997 06 24 361.310 0.030 17 ... SPO 1997 06 25 361.340 0.020 24 ... SPO 1997 06 26 361.480 0.160 24 ... SPO 1997 06 27 361.660 0.120 24 ... SPO 1997 06 28 361.380 0.040 23 ... SPO 1997 06 29 361.370 0.030 24 ... SPO 1997 06 30 361.390 0.030 24 ... SPO 1997 07 01 361.340 0.020 17 ... SPO 1997 07 02 -999.990 -99.990 0 *.. SPO 1997 07 03 361.370 0.020 24 ... SPO 1997 07 04 361.330 0.050 24 ... SPO 1997 07 05 361.430 0.050 20 ... SPO 1997 07 06 361.460 0.020 24 ... SPO 1997 07 07 361.430 0.020 24 ... SPO 1997 07 08 361.380 0.010 4 ... SPO 1997 07 09 361.450 0.080 8 ... SPO 1997 07 10 361.470 0.020 12 ... SPO 1997 07 11 361.440 0.020 18 ... SPO 1997 07 12 361.460 0.010 14 ... SPO 1997 07 13 361.480 0.020 22 ... SPO 1997 07 14 361.530 0.060 24 ... SPO 1997 07 15 361.570 0.020 17 ... SPO 1997 07 16 361.550 0.010 2 ... SPO 1997 07 17 -999.990 -99.990 0 *.. SPO 1997 07 18 361.600 0.030 11 ... SPO 1997 07 19 361.630 0.040 21 ... SPO 1997 07 20 361.660 0.020 24 ... SPO 1997 07 21 361.570 0.030 13 ... SPO 1997 07 22 361.640 0.030 8 ... SPO 1997 07 23 361.610 0.040 15 ... SPO 1997 07 24 361.630 0.080 24 ... SPO 1997 07 25 361.570 0.010 24 ... SPO 1997 07 26 361.620 0.020 24 ... SPO 1997 07 27 361.670 0.040 24 ... SPO 1997 07 28 361.710 0.020 24 ... SPO 1997 07 29 361.670 0.020 14 ... SPO 1997 07 30 361.720 0.020 20 ... SPO 1997 07 31 361.740 0.030 24 ... SPO 1997 08 01 361.680 0.040 24 ... SPO 1997 08 02 361.650 0.010 24 ... SPO 1997 08 03 361.650 0.030 24 ... SPO 1997 08 04 361.670 0.030 24 ... SPO 1997 08 05 361.730 0.040 18 ... SPO 1997 08 06 361.780 0.020 24 ... SPO 1997 08 07 361.760 0.020 24 ... SPO 1997 08 08 361.770 0.020 24 ... SPO 1997 08 09 361.680 0.040 24 ... SPO 1997 08 10 361.690 0.040 24 ... SPO 1997 08 11 361.760 0.040 24 ... SPO 1997 08 12 361.740 0.030 18 ... SPO 1997 08 13 361.770 0.020 24 ... SPO 1997 08 14 361.800 0.030 24 ... SPO 1997 08 15 361.850 0.040 24 ... SPO 1997 08 16 361.910 0.030 24 ... SPO 1997 08 17 361.880 0.020 24 ... SPO 1997 08 18 361.920 0.030 24 ... SPO 1997 08 19 361.940 0.030 18 ... SPO 1997 08 20 361.930 0.040 24 ... SPO 1997 08 21 362.020 0.070 24 ... SPO 1997 08 22 362.040 0.080 24 ... SPO 1997 08 23 361.950 0.020 24 ... SPO 1997 08 24 361.960 0.020 24 ... SPO 1997 08 25 362.020 0.030 24 ... SPO 1997 08 26 361.970 0.020 18 ... SPO 1997 08 27 361.980 0.030 24 ... SPO 1997 08 28 362.020 0.020 24 ... SPO 1997 08 29 362.030 0.020 24 ... SPO 1997 08 30 362.100 0.040 24 ... SPO 1997 08 31 362.140 0.020 24 ... SPO 1997 09 01 362.080 0.030 24 ... SPO 1997 09 02 362.090 0.020 17 ... SPO 1997 09 03 362.120 0.050 24 ... SPO 1997 09 04 362.190 0.020 24 ... SPO 1997 09 05 362.140 0.040 24 ... SPO 1997 09 06 362.160 0.030 24 ... SPO 1997 09 07 362.220 0.030 23 ... SPO 1997 09 08 362.160 0.020 24 ... SPO 1997 09 09 362.160 0.030 17 ... SPO 1997 09 10 362.200 0.030 24 ... SPO 1997 09 11 362.160 0.030 24 ... SPO 1997 09 12 362.170 0.030 24 ... SPO 1997 09 13 362.120 0.040 24 ... SPO 1997 09 14 362.150 0.020 24 ... SPO 1997 09 15 362.180 0.030 24 ... SPO 1997 09 16 362.210 0.020 17 ... SPO 1997 09 17 362.170 0.020 24 ... SPO 1997 09 18 362.170 0.010 24 ... SPO 1997 09 19 362.190 0.040 24 ... SPO 1997 09 20 362.190 0.030 24 ... SPO 1997 09 21 362.220 0.050 24 ... SPO 1997 09 22 362.250 0.030 21 ... SPO 1997 09 23 362.260 0.050 17 ... SPO 1997 09 24 362.250 0.050 24 ... SPO 1997 09 25 362.260 0.010 24 ... SPO 1997 09 26 362.220 0.070 24 ... SPO 1997 09 27 362.250 0.020 24 ... SPO 1997 09 28 362.230 0.040 24 ... SPO 1997 09 29 362.240 0.040 24 ... SPO 1997 09 30 362.210 0.040 17 ... SPO 1997 10 01 362.230 0.040 24 ... SPO 1997 10 02 362.300 0.060 23 ... SPO 1997 10 03 362.260 0.040 24 ... SPO 1997 10 04 362.220 0.030 24 ... SPO 1997 10 05 362.210 0.010 24 ... SPO 1997 10 06 362.220 0.030 24 ... SPO 1997 10 07 362.250 0.060 17 ... SPO 1997 10 08 362.180 0.040 24 ... SPO 1997 10 09 362.200 0.060 24 ... SPO 1997 10 10 362.230 0.040 24 ... SPO 1997 10 11 362.220 0.040 24 ... SPO 1997 10 12 362.190 0.040 24 ... SPO 1997 10 13 362.160 0.040 24 ... SPO 1997 10 14 362.160 0.040 18 ... SPO 1997 10 15 362.210 0.030 23 ... SPO 1997 10 16 362.240 0.020 24 ... SPO 1997 10 17 362.210 0.030 24 ... SPO 1997 10 18 362.200 0.020 24 ... SPO 1997 10 19 362.200 0.030 24 ... SPO 1997 10 20 362.230 0.070 24 ... SPO 1997 10 21 362.340 0.020 16 ... SPO 1997 10 22 -999.990 -99.990 0 *.. SPO 1997 10 23 -999.990 -99.990 0 *.. SPO 1997 10 24 -999.990 -99.990 0 *.. SPO 1997 10 25 362.400 0.050 21 ... SPO 1997 10 26 362.380 0.040 23 ... SPO 1997 10 27 362.390 0.060 24 ... SPO 1997 10 28 362.370 0.060 17 ... SPO 1997 10 29 362.470 0.080 24 ... SPO 1997 10 30 362.470 0.070 24 ... SPO 1997 10 31 362.450 0.050 24 ... SPO 1997 11 01 362.430 0.030 24 ... SPO 1997 11 02 362.380 0.020 24 ... SPO 1997 11 03 362.350 0.040 22 ... SPO 1997 11 04 362.330 0.080 20 ... SPO 1997 11 05 362.390 0.080 20 ... SPO 1997 11 06 362.330 0.030 24 ... SPO 1997 11 07 362.330 0.030 24 ... SPO 1997 11 08 362.360 0.060 24 ... SPO 1997 11 09 362.340 0.070 24 ... SPO 1997 11 10 362.340 0.070 24 ... SPO 1997 11 11 362.310 0.060 19 ... SPO 1997 11 12 362.320 0.030 16 ... SPO 1997 11 13 362.330 0.030 24 ... SPO 1997 11 14 362.390 0.030 24 ... SPO 1997 11 15 362.420 0.050 24 ... SPO 1997 11 16 362.430 0.060 24 ... SPO 1997 11 17 362.460 0.090 23 ... SPO 1997 11 18 362.400 0.040 21 ... SPO 1997 11 19 362.360 0.110 19 ... SPO 1997 11 20 362.460 0.080 21 ... SPO 1997 11 21 362.440 0.110 23 ... SPO 1997 11 22 362.470 0.060 24 ... SPO 1997 11 23 362.410 0.050 24 ... SPO 1997 11 24 362.490 0.060 24 ... SPO 1997 11 25 362.460 0.020 21 ... SPO 1997 11 26 362.450 0.030 20 ... SPO 1997 11 27 362.420 0.030 24 ... SPO 1997 11 28 362.390 0.060 24 ... SPO 1997 11 29 362.390 0.060 24 ... SPO 1997 11 30 362.390 0.090 24 ... SPO 1997 12 01 362.440 0.020 24 ... SPO 1997 12 02 362.400 0.050 21 ... SPO 1997 12 03 362.390 0.040 12 ... SPO 1997 12 04 362.290 0.080 12 ... SPO 1997 12 05 362.310 0.060 11 ... SPO 1997 12 06 362.320 0.050 23 ... SPO 1997 12 07 362.480 0.080 16 ... SPO 1997 12 08 362.410 0.060 20 ... SPO 1997 12 09 362.380 0.040 23 ... SPO 1997 12 10 362.430 0.050 10 ... SPO 1997 12 11 362.360 0.080 12 ... SPO 1997 12 12 362.420 0.100 18 ... SPO 1997 12 13 -999.990 -99.990 0 *.. SPO 1997 12 14 362.330 0.050 17 ... SPO 1997 12 15 362.330 0.020 12 ... SPO 1997 12 16 362.370 0.080 12 ... SPO 1997 12 17 362.350 0.040 16 ... SPO 1997 12 18 362.310 0.030 14 ... SPO 1997 12 19 362.560 0.010 5 ... SPO 1997 12 20 362.440 0.050 18 ... SPO 1997 12 21 362.440 0.030 19 ... SPO 1997 12 22 362.390 0.030 9 ... SPO 1997 12 23 362.380 0.050 24 ... SPO 1997 12 24 362.450 0.060 15 ... SPO 1997 12 25 362.420 0.030 22 ... SPO 1997 12 26 362.430 0.080 24 ... SPO 1997 12 27 362.460 0.030 17 ... SPO 1997 12 28 362.490 0.040 21 ... SPO 1997 12 29 362.540 0.020 24 ... SPO 1997 12 30 362.500 0.020 21 ... SPO 1997 12 31 362.400 0.040 18 ... SPO 1998 01 01 362.440 0.030 24 ... SPO 1998 01 02 362.450 0.030 23 ... SPO 1998 01 03 362.360 0.040 21 ... SPO 1998 01 04 362.370 0.030 17 ... SPO 1998 01 05 362.390 0.030 10 ... SPO 1998 01 06 362.310 0.060 18 ... SPO 1998 01 07 361.750 0.030 2 ... SPO 1998 01 08 361.790 0.110 18 ... SPO 1998 01 09 361.970 0.150 16 ... SPO 1998 01 10 362.340 0.030 9 ... SPO 1998 01 11 362.330 0.130 22 ... SPO 1998 01 12 362.210 0.170 23 ... SPO 1998 01 13 362.210 0.200 21 ... SPO 1998 01 14 362.330 0.050 19 ... SPO 1998 01 15 362.360 0.030 12 ... SPO 1998 01 16 362.640 0.080 23 ... SPO 1998 01 17 362.550 0.060 24 ... SPO 1998 01 18 362.500 0.060 22 ... SPO 1998 01 19 362.420 0.070 14 ... SPO 1998 01 20 362.410 0.080 21 ... SPO 1998 01 21 362.380 0.070 19 ... SPO 1998 01 22 362.450 0.110 23 ... SPO 1998 01 23 362.540 0.100 24 ... SPO 1998 01 24 362.360 0.040 15 ... SPO 1998 01 25 362.420 0.040 23 ... SPO 1998 01 26 362.340 0.120 22 ... SPO 1998 01 27 362.360 0.090 23 ... SPO 1998 01 28 362.370 0.060 14 ... SPO 1998 01 29 362.330 0.090 23 ... SPO 1998 01 30 362.310 0.010 2 ... SPO 1998 01 31 362.610 0.080 24 ... SPO 1998 02 01 362.600 0.090 24 ... SPO 1998 02 02 362.610 0.070 24 ... SPO 1998 02 03 362.490 0.080 23 ... SPO 1998 02 04 362.370 0.040 20 ... SPO 1998 02 05 362.350 0.080 21 ... SPO 1998 02 06 362.310 0.070 21 ... SPO 1998 02 07 362.370 0.130 18 ... SPO 1998 02 08 362.410 0.060 21 ... SPO 1998 02 09 362.500 0.080 19 ... SPO 1998 02 10 362.380 0.080 13 ... SPO 1998 02 11 362.430 0.090 22 ... SPO 1998 02 12 362.440 0.090 20 ... SPO 1998 02 13 362.470 0.100 20 ... SPO 1998 02 14 362.390 0.140 17 ... SPO 1998 02 15 362.300 0.200 21 ... SPO 1998 02 16 362.390 0.150 22 ... SPO 1998 02 17 362.630 0.060 19 ... SPO 1998 02 18 362.670 0.060 20 ... SPO 1998 02 19 362.620 0.090 22 ... SPO 1998 02 20 362.620 0.160 20 ... SPO 1998 02 21 362.530 0.060 21 ... SPO 1998 02 22 362.570 0.100 22 ... SPO 1998 02 23 362.520 0.070 22 ... SPO 1998 02 24 362.520 0.060 18 ... SPO 1998 02 25 362.530 0.140 20 ... SPO 1998 02 26 362.520 0.060 24 ... SPO 1998 02 27 362.320 0.140 24 ... SPO 1998 02 28 362.110 0.050 23 ... SPO 1998 03 01 362.440 0.170 24 ... SPO 1998 03 02 362.570 0.070 24 ... SPO 1998 03 03 362.560 0.100 21 ... SPO 1998 03 04 362.550 0.160 15 ... SPO 1998 03 05 362.620 0.090 21 ... SPO 1998 03 06 362.440 0.150 23 ... SPO 1998 03 07 362.230 0.120 23 ... SPO 1998 03 08 362.590 0.090 21 ... SPO 1998 03 09 362.520 0.110 17 ... SPO 1998 03 10 362.470 0.070 20 ... SPO 1998 03 11 362.530 0.060 18 ... SPO 1998 03 12 362.560 0.090 19 ... SPO 1998 03 13 362.520 0.030 21 ... SPO 1998 03 14 362.470 0.060 21 ... SPO 1998 03 15 362.430 0.110 21 ... SPO 1998 03 16 362.500 0.090 23 ... SPO 1998 03 17 362.520 0.050 18 ... SPO 1998 03 18 362.420 0.120 15 ... SPO 1998 03 19 362.440 0.100 19 ... SPO 1998 03 20 362.460 0.120 22 ... SPO 1998 03 21 362.570 0.040 20 ... SPO 1998 03 22 362.550 0.130 20 ... SPO 1998 03 23 362.620 0.070 17 ... SPO 1998 03 24 362.570 0.020 21 ... SPO 1998 03 25 362.660 0.020 20 ... SPO 1998 03 26 362.630 0.100 18 ... SPO 1998 03 27 362.610 0.120 16 ... SPO 1998 03 28 362.640 0.030 21 ... SPO 1998 03 29 362.660 0.060 24 ... SPO 1998 03 30 362.560 0.100 13 ... SPO 1998 03 31 362.530 0.070 19 ... SPO 1998 04 01 362.660 0.090 16 ... SPO 1998 04 02 362.730 0.060 17 ... SPO 1998 04 03 362.770 0.130 23 ... SPO 1998 04 04 362.780 0.040 24 ... SPO 1998 04 05 362.810 0.040 24 ... SPO 1998 04 06 362.780 0.050 24 ... SPO 1998 04 07 362.780 0.030 21 ... SPO 1998 04 08 362.810 0.060 19 ... SPO 1998 04 09 362.840 0.110 23 ... SPO 1998 04 10 362.860 0.070 24 ... SPO 1998 04 11 362.840 0.060 24 ... SPO 1998 04 12 362.840 0.050 24 ... SPO 1998 04 13 362.920 0.030 24 ... SPO 1998 04 14 362.800 0.040 24 ... SPO 1998 04 15 362.830 0.050 17 ... SPO 1998 04 16 362.810 0.020 24 ... SPO 1998 04 17 362.860 0.060 24 ... SPO 1998 04 18 362.840 0.030 24 ... SPO 1998 04 19 362.880 0.030 24 ... SPO 1998 04 20 362.870 0.030 24 ... SPO 1998 04 21 362.840 0.050 24 ... SPO 1998 04 22 362.860 0.050 17 ... SPO 1998 04 23 362.910 0.060 24 ... SPO 1998 04 24 362.920 0.060 24 ... SPO 1998 04 25 362.870 0.060 24 ... SPO 1998 04 26 362.870 0.040 24 ... SPO 1998 04 27 362.920 0.030 24 ... SPO 1998 04 28 363.050 0.110 24 ... SPO 1998 04 29 362.990 0.020 17 ... SPO 1998 04 30 362.960 0.030 24 ... SPO 1998 05 01 362.990 0.090 23 ... SPO 1998 05 02 363.000 0.070 24 ... SPO 1998 05 03 362.970 0.040 24 ... SPO 1998 05 04 363.000 0.030 24 ... SPO 1998 05 05 362.970 0.020 24 ... SPO 1998 05 06 363.020 0.030 17 ... SPO 1998 05 07 363.020 0.030 24 ... SPO 1998 05 08 363.010 0.040 23 ... SPO 1998 05 09 363.030 0.040 23 ... SPO 1998 05 10 363.090 0.060 24 ... SPO 1998 05 11 363.070 0.030 24 ... SPO 1998 05 12 363.090 0.050 24 ... SPO 1998 05 13 363.170 0.040 17 ... SPO 1998 05 14 363.140 0.040 24 ... SPO 1998 05 15 363.190 0.040 24 ... SPO 1998 05 16 363.190 0.030 24 ... SPO 1998 05 17 363.180 0.030 24 ... SPO 1998 05 18 363.170 0.040 24 ... SPO 1998 05 19 363.160 0.060 24 ... SPO 1998 05 20 363.210 0.040 17 ... SPO 1998 05 21 363.240 0.030 24 ... SPO 1998 05 22 363.260 0.040 24 ... SPO 1998 05 23 363.290 0.020 24 ... SPO 1998 05 24 363.360 0.020 24 ... SPO 1998 05 25 363.340 0.040 23 ... SPO 1998 05 26 363.310 0.040 24 ... SPO 1998 05 27 363.370 0.050 17 ... SPO 1998 05 28 363.440 0.050 24 ... SPO 1998 05 29 363.370 0.030 24 ... SPO 1998 05 30 363.430 0.050 24 ... SPO 1998 05 31 363.440 0.060 24 ... SPO 1998 06 01 363.490 0.040 24 ... SPO 1998 06 02 363.430 0.050 24 ... SPO 1998 06 03 363.470 0.030 17 ... SPO 1998 06 04 363.430 0.020 24 ... SPO 1998 06 05 363.530 0.040 24 ... SPO 1998 06 06 363.600 0.070 21 ... SPO 1998 06 07 363.570 0.040 24 ... SPO 1998 06 08 363.550 0.040 24 ... SPO 1998 06 09 363.620 0.060 24 ... SPO 1998 06 10 363.660 0.030 17 ... SPO 1998 06 11 363.670 0.040 24 ... SPO 1998 06 12 363.600 0.060 22 ... SPO 1998 06 13 363.610 0.060 24 ... SPO 1998 06 14 363.630 0.060 23 ... SPO 1998 06 15 363.640 0.040 24 ... SPO 1998 06 16 363.620 0.040 24 ... SPO 1998 06 17 363.630 0.030 17 ... SPO 1998 06 18 363.690 0.040 24 ... SPO 1998 06 19 363.720 0.090 24 ... SPO 1998 06 20 363.700 0.050 23 ... SPO 1998 06 21 363.820 0.090 22 ... SPO 1998 06 22 363.940 0.160 21 ... SPO 1998 06 23 363.860 0.080 21 ... SPO 1998 06 24 363.730 0.070 20 ... SPO 1998 06 25 363.770 0.120 21 ... SPO 1998 06 26 363.840 0.100 23 ... SPO 1998 06 27 363.880 0.090 24 ... SPO 1998 06 28 363.890 0.080 24 ... SPO 1998 06 29 363.840 0.070 23 ... SPO 1998 06 30 363.840 0.090 23 ... SPO 1998 07 01 363.890 0.080 17 ... SPO 1998 07 02 363.910 0.120 24 ... SPO 1998 07 03 364.050 0.080 24 ... SPO 1998 07 04 363.970 0.080 24 ... SPO 1998 07 05 364.050 0.120 24 ... SPO 1998 07 06 363.970 0.050 24 ... SPO 1998 07 07 363.960 0.090 24 ... SPO 1998 07 08 363.950 0.080 17 ... SPO 1998 07 09 364.010 0.110 23 ... SPO 1998 07 10 363.990 0.080 22 ... SPO 1998 07 11 364.030 0.040 24 ... SPO 1998 07 12 364.010 0.040 24 ... SPO 1998 07 13 364.010 0.080 24 ... SPO 1998 07 14 364.080 0.080 24 ... SPO 1998 07 15 364.110 0.080 19 ... SPO 1998 07 16 364.150 0.060 22 ... SPO 1998 07 17 364.140 0.060 24 ... SPO 1998 07 18 364.090 0.040 24 ... SPO 1998 07 19 364.150 0.070 22 ... SPO 1998 07 20 364.230 0.030 24 ... SPO 1998 07 21 364.210 0.020 24 ... SPO 1998 07 22 364.270 0.030 19 ... SPO 1998 07 23 364.300 0.010 22 ... SPO 1998 07 24 364.320 0.040 24 ... SPO 1998 07 25 364.370 0.060 24 ... SPO 1998 07 26 364.350 0.060 24 ... SPO 1998 07 27 364.510 0.110 9 ... SPO 1998 07 28 364.540 0.080 6 ... SPO 1998 07 29 364.500 0.040 16 ... SPO 1998 07 30 364.510 0.040 9 ... SPO 1998 07 31 364.530 0.060 11 ... SPO 1998 08 01 364.520 0.060 16 ... SPO 1998 08 02 364.560 0.100 24 ... SPO 1998 08 03 364.550 0.050 14 ... SPO 1998 08 04 364.550 0.030 7 ... SPO 1998 08 05 364.660 0.100 17 ... SPO 1998 08 06 364.610 0.050 13 ... SPO 1998 08 07 364.600 0.060 8 ... SPO 1998 08 08 364.680 0.070 18 ... SPO 1998 08 09 364.730 0.120 16 ... SPO 1998 08 10 364.690 0.070 12 ... SPO 1998 08 11 364.750 0.050 9 ... SPO 1998 08 12 364.810 0.060 16 ... SPO 1998 08 13 364.800 0.030 16 ... SPO 1998 08 14 364.840 0.090 15 ... SPO 1998 08 15 364.780 0.060 17 ... SPO 1998 08 16 364.770 0.040 19 ... SPO 1998 08 17 364.770 0.040 13 ... SPO 1998 08 18 364.760 0.080 14 ... SPO 1998 08 19 364.800 0.050 12 ... SPO 1998 08 20 364.850 0.030 13 ... SPO 1998 08 21 -999.990 -99.990 0 *.. SPO 1998 08 22 364.880 0.060 19 ... SPO 1998 08 23 364.880 0.040 19 ... SPO 1998 08 24 364.880 0.040 17 ... SPO 1998 08 25 364.900 0.050 11 ... SPO 1998 08 26 364.910 0.050 14 ... SPO 1998 08 27 364.980 0.030 15 ... SPO 1998 08 28 364.950 0.040 10 ... SPO 1998 08 29 364.970 0.060 21 ... SPO 1998 08 30 365.020 0.050 13 ... SPO 1998 08 31 365.040 0.090 18 ... SPO 1998 09 01 365.010 0.050 18 ... SPO 1998 09 02 364.980 0.060 16 ... SPO 1998 09 03 364.990 0.060 13 ... SPO 1998 09 04 365.010 0.040 16 ... SPO 1998 09 05 365.000 0.090 17 ... SPO 1998 09 06 365.020 0.060 19 ... SPO 1998 09 07 365.010 0.050 18 ... SPO 1998 09 08 365.010 0.040 13 ... SPO 1998 09 09 365.100 0.100 12 ... SPO 1998 09 10 365.210 0.060 16 ... SPO 1998 09 11 365.170 0.050 16 ... SPO 1998 09 12 365.110 0.040 19 ... SPO 1998 09 13 365.110 0.040 14 ... SPO 1998 09 14 365.100 0.040 15 ... SPO 1998 09 15 365.090 0.070 19 ... SPO 1998 09 16 365.090 0.080 16 ... SPO 1998 09 17 365.090 0.070 19 ... SPO 1998 09 18 365.060 0.040 18 ... SPO 1998 09 19 365.060 0.040 20 ... SPO 1998 09 20 365.110 0.060 19 ... SPO 1998 09 21 365.120 0.040 11 ... SPO 1998 09 22 365.200 0.060 14 ... SPO 1998 09 23 365.180 0.050 15 ... SPO 1998 09 24 365.140 0.020 14 ... SPO 1998 09 25 365.160 0.070 16 ... SPO 1998 09 26 365.170 0.080 21 ... SPO 1998 09 27 365.160 0.060 14 ... SPO 1998 09 28 365.100 0.040 17 ... SPO 1998 09 29 365.120 0.060 19 ... SPO 1998 09 30 365.070 0.070 17 ... SPO 1998 10 01 365.060 0.040 18 ... SPO 1998 10 02 365.120 0.050 18 ... SPO 1998 10 03 365.120 0.060 23 ... SPO 1998 10 04 365.120 0.080 15 ... SPO 1998 10 05 365.120 0.060 20 ... SPO 1998 10 06 365.090 0.050 17 ... SPO 1998 10 07 365.150 0.050 23 ... SPO 1998 10 08 365.140 0.060 17 ... SPO 1998 10 09 365.170 0.050 18 ... SPO 1998 10 10 365.150 0.060 22 ... SPO 1998 10 11 365.090 0.050 24 ... SPO 1998 10 12 365.120 0.040 20 ... SPO 1998 10 13 365.130 0.040 13 ... SPO 1998 10 14 365.120 0.060 12 ... SPO 1998 10 15 365.120 0.030 13 ... SPO 1998 10 16 365.120 0.050 18 ... SPO 1998 10 17 365.080 0.030 13 ... SPO 1998 10 18 365.100 0.050 17 ... SPO 1998 10 19 365.130 0.050 22 ... SPO 1998 10 20 365.170 0.030 18 ... SPO 1998 10 21 365.230 0.020 5 ... SPO 1998 10 22 365.240 0.050 4 ... SPO 1998 10 23 365.180 0.050 9 ... SPO 1998 10 24 365.170 0.060 15 ... SPO 1998 10 25 365.160 0.040 9 ... SPO 1998 10 26 365.130 0.060 17 ... SPO 1998 10 27 365.160 0.080 9 ... SPO 1998 10 28 365.170 0.050 12 ... SPO 1998 10 29 365.160 0.020 6 ... SPO 1998 10 30 365.180 0.040 11 ... SPO 1998 10 31 365.210 0.050 7 ... SPO 1998 11 01 365.270 0.010 4 ... SPO 1998 11 02 365.200 0.040 8 ... SPO 1998 11 03 365.220 0.040 17 ... SPO 1998 11 04 365.230 0.070 12 ... SPO 1998 11 05 365.260 0.090 20 ... SPO 1998 11 06 365.190 0.020 12 ... SPO 1998 11 07 365.160 0.060 12 ... SPO 1998 11 08 365.210 0.050 11 ... SPO 1998 11 09 365.040 0.010 10 ... SPO 1998 11 10 365.080 0.030 15 ... SPO 1998 11 11 365.060 0.060 11 ... SPO 1998 11 12 365.060 0.010 11 ... SPO 1998 11 13 365.100 0.030 5 ... SPO 1998 11 14 -999.990 -99.990 0 *.. SPO 1998 11 15 365.100 0.050 12 ... SPO 1998 11 16 365.080 0.030 13 ... SPO 1998 11 17 365.110 0.080 11 ... SPO 1998 11 18 365.130 0.030 11 ... SPO 1998 11 19 365.150 0.060 9 ... SPO 1998 11 20 365.170 0.020 5 ... SPO 1998 11 21 365.150 0.040 11 ... SPO 1998 11 22 365.150 0.020 7 ... SPO 1998 11 23 365.340 0.040 7 ... SPO 1998 11 24 365.090 0.050 8 ... SPO 1998 11 25 365.070 0.050 11 ... SPO 1998 11 26 -999.990 -99.990 0 *.. SPO 1998 11 27 -999.990 -99.990 0 *.. SPO 1998 11 28 -999.990 -99.990 0 *.. SPO 1998 11 29 365.150 0.030 10 ... SPO 1998 11 30 365.120 0.040 18 ... SPO 1998 12 01 365.110 0.030 24 ... SPO 1998 12 02 365.140 0.020 23 ... SPO 1998 12 03 365.160 0.020 23 ... SPO 1998 12 04 365.160 0.030 23 ... SPO 1998 12 05 365.180 0.030 23 ... SPO 1998 12 06 365.180 0.040 23 ... SPO 1998 12 07 365.170 0.040 23 ... SPO 1998 12 08 365.180 0.020 23 ... SPO 1998 12 09 365.190 0.030 23 ... SPO 1998 12 10 365.120 0.050 17 ... SPO 1998 12 11 365.110 0.030 18 ... SPO 1998 12 12 365.100 0.020 23 ... SPO 1998 12 13 365.090 0.020 23 ... SPO 1998 12 14 365.070 0.020 23 ... SPO 1998 12 15 365.080 0.020 23 ... SPO 1998 12 16 365.090 0.020 23 ... SPO 1998 12 17 365.110 0.050 14 ... SPO 1998 12 18 365.080 0.030 20 ... SPO 1998 12 19 365.090 0.030 13 ... SPO 1998 12 20 365.050 0.020 21 ... SPO 1998 12 21 365.020 0.040 17 ... SPO 1998 12 22 365.050 0.020 17 ... SPO 1998 12 23 365.030 0.020 17 ... SPO 1998 12 24 365.050 0.030 9 ... SPO 1998 12 25 365.030 0.060 20 ... SPO 1998 12 26 364.970 0.040 17 ... SPO 1998 12 27 364.950 0.050 15 ... SPO 1998 12 28 364.980 0.040 18 ... SPO 1998 12 29 365.000 0.050 17 ... SPO 1998 12 30 365.010 0.050 19 ... SPO 1998 12 31 365.000 0.070 19 ... SPO 1999 01 01 365.040 0.030 20 ... SPO 1999 01 02 365.080 0.040 23 ... SPO 1999 01 03 365.090 0.040 18 ... SPO 1999 01 04 365.130 0.060 17 ... SPO 1999 01 05 365.050 0.070 19 ... SPO 1999 01 06 365.120 0.020 20 ... SPO 1999 01 07 365.090 0.040 19 ... SPO 1999 01 08 365.090 0.040 18 ... SPO 1999 01 09 365.050 0.030 18 ... SPO 1999 01 10 364.920 0.080 19 ... SPO 1999 01 11 364.910 0.050 21 ... SPO 1999 01 12 364.960 0.050 20 ... SPO 1999 01 13 364.940 0.040 23 ... SPO 1999 01 14 364.770 0.090 15 ... SPO 1999 01 15 364.730 0.080 15 ... SPO 1999 01 16 364.990 0.060 22 ... SPO 1999 01 17 365.010 0.040 17 ... SPO 1999 01 18 365.040 0.020 21 ... SPO 1999 01 19 364.950 0.040 19 ... SPO 1999 01 20 364.860 0.060 19 ... SPO 1999 01 21 364.870 0.050 23 ... SPO 1999 01 22 365.080 0.150 18 ... SPO 1999 01 23 365.120 0.040 16 ... SPO 1999 01 24 365.120 0.020 16 ... SPO 1999 01 25 365.130 0.010 18 ... SPO 1999 01 26 365.080 0.060 15 ... SPO 1999 01 27 365.150 0.080 16 ... SPO 1999 01 28 365.090 0.020 13 ... SPO 1999 01 29 365.110 0.040 16 ... SPO 1999 01 30 365.150 0.020 16 ... SPO 1999 01 31 365.060 0.050 17 ... SPO 1999 02 01 365.070 0.070 19 ... SPO 1999 02 02 365.070 0.150 16 ... SPO 1999 02 03 365.050 0.090 12 ... SPO 1999 02 04 364.810 0.120 11 ... SPO 1999 02 05 364.920 0.030 8 ... SPO 1999 02 06 364.900 0.020 16 ... SPO 1999 02 07 364.910 0.030 19 ... SPO 1999 02 08 364.830 0.110 21 ... SPO 1999 02 09 364.780 0.080 16 ... SPO 1999 02 10 364.850 0.050 16 ... SPO 1999 02 11 364.970 0.040 23 ... SPO 1999 02 12 364.950 0.030 23 ... SPO 1999 02 13 364.930 0.040 23 ... SPO 1999 02 14 364.850 0.050 23 ... SPO 1999 02 15 364.860 0.030 23 ... SPO 1999 02 16 364.900 0.020 23 ... SPO 1999 02 17 364.920 0.030 23 ... SPO 1999 02 18 364.940 0.030 23 ... SPO 1999 02 19 365.060 0.050 24 ... SPO 1999 02 20 365.090 0.020 23 ... SPO 1999 02 21 365.060 0.040 23 ... SPO 1999 02 22 364.980 0.040 23 ... SPO 1999 02 23 364.920 0.050 23 ... SPO 1999 02 24 364.990 0.040 21 ... SPO 1999 02 25 364.900 0.030 17 ... SPO 1999 02 26 364.980 0.080 22 ... SPO 1999 02 27 365.050 0.040 17 ... SPO 1999 02 28 364.900 0.100 17 ... SPO 1999 03 01 364.980 0.110 17 ... SPO 1999 03 02 364.960 0.050 7 ... SPO 1999 03 03 364.890 0.070 20 ... SPO 1999 03 04 364.850 0.050 21 ... SPO 1999 03 05 364.870 0.070 19 ... SPO 1999 03 06 364.720 0.110 19 ... SPO 1999 03 07 364.780 0.030 15 ... SPO 1999 03 08 364.750 0.080 15 ... SPO 1999 03 09 364.880 0.060 19 ... SPO 1999 03 10 364.980 0.050 20 ... SPO 1999 03 11 364.920 0.060 19 ... SPO 1999 03 12 364.880 0.020 16 ... SPO 1999 03 13 364.830 0.060 13 ... SPO 1999 03 14 364.850 0.070 16 ... SPO 1999 03 15 364.850 0.040 10 ... SPO 1999 03 16 364.820 0.070 21 ... SPO 1999 03 17 364.850 0.100 23 ... SPO 1999 03 18 364.890 0.030 23 ... SPO 1999 03 19 364.860 0.030 22 ... SPO 1999 03 20 364.850 0.020 23 ... SPO 1999 03 21 364.830 0.040 20 ... SPO 1999 03 22 364.800 0.010 13 ... SPO 1999 03 23 364.760 0.090 6 ... SPO 1999 03 24 364.790 0.080 10 ... SPO 1999 03 25 364.850 0.050 4 ... SPO 1999 03 26 364.800 0.080 11 ... SPO 1999 03 27 364.830 0.010 12 ... SPO 1999 03 28 364.880 0.010 6 ... SPO 1999 03 29 364.870 0.030 18 ... SPO 1999 03 30 364.830 0.060 12 ... SPO 1999 03 31 364.930 0.050 11 ... SPO 1999 04 01 364.930 0.030 10 ... SPO 1999 04 02 364.970 0.040 14 ... SPO 1999 04 03 364.970 0.040 7 ... SPO 1999 04 04 364.970 0.020 16 ... SPO 1999 04 05 364.970 0.040 12 ... SPO 1999 04 06 365.000 0.050 12 ... SPO 1999 04 07 365.020 0.040 18 ... SPO 1999 04 08 365.010 0.020 17 ... SPO 1999 04 09 365.000 0.020 21 ... SPO 1999 04 10 365.030 0.020 23 ... SPO 1999 04 11 365.010 0.030 20 ... SPO 1999 04 12 364.990 0.020 23 ... SPO 1999 04 13 365.010 0.030 17 ... SPO 1999 04 14 365.030 0.020 22 ... SPO 1999 04 15 365.030 0.030 16 ... SPO 1999 04 16 365.010 0.010 18 ... SPO 1999 04 17 365.000 0.030 23 ... SPO 1999 04 18 365.000 0.020 17 ... SPO 1999 04 19 365.010 0.040 21 ... SPO 1999 04 20 365.020 0.020 21 ... SPO 1999 04 21 365.020 0.040 22 ... SPO 1999 04 22 365.040 0.040 20 ... SPO 1999 04 23 365.020 0.010 22 ... SPO 1999 04 24 365.010 0.040 22 ... SPO 1999 04 25 365.070 0.040 23 ... SPO 1999 04 26 365.080 0.030 20 ... SPO 1999 04 27 365.090 0.020 23 ... SPO 1999 04 28 365.100 0.020 22 ... SPO 1999 04 29 365.120 0.020 19 ... SPO 1999 04 30 365.090 0.040 10 ... SPO 1999 05 01 365.090 0.030 18 ... SPO 1999 05 02 365.120 0.020 18 ... SPO 1999 05 03 365.120 0.040 23 ... SPO 1999 05 04 365.160 0.030 22 ... SPO 1999 05 05 365.130 0.020 11 ... SPO 1999 05 06 365.230 0.030 15 ... SPO 1999 05 07 365.230 0.040 20 ... SPO 1999 05 08 365.190 0.040 22 ... SPO 1999 05 09 365.190 0.030 23 ... SPO 1999 05 10 365.200 0.030 23 ... SPO 1999 05 11 365.200 0.030 22 ... SPO 1999 05 12 365.180 0.030 23 ... SPO 1999 05 13 365.160 0.020 23 ... SPO 1999 05 14 365.180 0.030 20 ... SPO 1999 05 15 365.180 0.020 20 ... SPO 1999 05 16 365.210 0.020 22 ... SPO 1999 05 17 365.210 0.020 20 ... SPO 1999 05 18 365.220 0.020 19 ... SPO 1999 05 19 365.220 0.020 21 ... SPO 1999 05 20 365.250 0.050 21 ... SPO 1999 05 21 365.220 0.030 19 ... SPO 1999 05 22 365.250 0.060 19 ... SPO 1999 05 23 365.290 0.030 19 ... SPO 1999 05 24 365.280 0.050 22 ... SPO 1999 05 25 365.270 0.030 23 ... SPO 1999 05 26 365.350 0.020 22 ... SPO 1999 05 27 365.340 0.040 23 ... SPO 1999 05 28 365.350 0.020 18 ... SPO 1999 05 29 365.380 0.050 22 ... SPO 1999 05 30 365.360 0.020 23 ... SPO 1999 05 31 365.420 0.060 23 ... SPO 1999 06 01 365.460 0.030 21 ... SPO 1999 06 02 365.520 0.070 20 ... SPO 1999 06 03 365.500 0.040 21 ... SPO 1999 06 04 365.450 0.040 20 ... SPO 1999 06 05 365.440 0.070 19 ... SPO 1999 06 06 365.440 0.080 22 ... SPO 1999 06 07 365.480 0.090 23 ... SPO 1999 06 08 365.500 0.040 23 ... SPO 1999 06 09 365.520 0.070 22 ... SPO 1999 06 10 365.510 0.040 23 ... SPO 1999 06 11 365.510 0.030 23 ... SPO 1999 06 12 365.510 0.020 23 ... SPO 1999 06 13 365.530 0.030 23 ... SPO 1999 06 14 365.520 0.020 24 ... SPO 1999 06 15 365.520 0.040 19 ... SPO 1999 06 16 365.550 0.060 22 ... SPO 1999 06 17 365.540 0.070 18 ... SPO 1999 06 18 365.570 0.080 21 ... SPO 1999 06 19 365.520 0.050 22 ... SPO 1999 06 20 365.640 0.050 23 ... SPO 1999 06 21 365.600 0.050 23 ... SPO 1999 06 22 365.590 0.020 23 ... SPO 1999 06 23 365.610 0.040 23 ... SPO 1999 06 24 365.650 0.030 17 ... SPO 1999 06 25 365.630 0.010 23 ... SPO 1999 06 26 365.670 0.030 23 ... SPO 1999 06 27 365.670 0.020 22 ... SPO 1999 06 28 365.660 0.030 23 ... SPO 1999 06 29 365.640 0.020 23 ... SPO 1999 06 30 365.600 0.110 14 ... SPO 1999 07 01 365.670 0.010 22 ... SPO 1999 07 02 365.690 0.020 18 ... SPO 1999 07 03 365.740 0.020 16 ... SPO 1999 07 04 365.740 0.020 23 ... SPO 1999 07 05 365.760 0.030 22 ... SPO 1999 07 06 365.750 0.050 23 ... SPO 1999 07 07 365.720 0.050 19 ... SPO 1999 07 08 365.720 0.030 17 ... SPO 1999 07 09 365.800 0.040 20 ... SPO 1999 07 10 365.810 0.050 20 ... SPO 1999 07 11 365.860 0.040 23 ... SPO 1999 07 12 365.940 0.050 23 ... SPO 1999 07 13 365.870 0.030 21 ... SPO 1999 07 14 365.870 0.040 16 ... SPO 1999 07 15 365.890 0.070 14 ... SPO 1999 07 16 365.990 0.020 23 ... SPO 1999 07 17 365.950 0.050 19 ... SPO 1999 07 18 365.920 0.030 17 ... SPO 1999 07 19 365.890 0.050 16 ... SPO 1999 07 20 365.880 0.040 16 ... SPO 1999 07 21 365.890 0.040 20 ... SPO 1999 07 22 365.920 0.020 18 ... SPO 1999 07 23 365.930 0.060 19 ... SPO 1999 07 24 365.970 0.050 23 ... SPO 1999 07 25 365.940 0.050 19 ... SPO 1999 07 26 365.990 0.070 22 ... SPO 1999 07 27 365.990 0.030 23 ... SPO 1999 07 28 365.990 0.040 2 ... SPO 1999 07 29 366.060 0.060 15 ... SPO 1999 07 30 366.090 0.050 23 ... SPO 1999 07 31 366.040 0.100 23 ... SPO 1999 08 01 366.060 0.070 23 ... SPO 1999 08 02 366.080 0.070 23 ... SPO 1999 08 03 366.130 0.060 21 ... SPO 1999 08 04 366.130 0.090 21 ... SPO 1999 08 05 366.130 0.070 23 ... SPO 1999 08 06 366.140 0.070 23 ... SPO 1999 08 07 366.140 0.050 23 ... SPO 1999 08 08 366.160 0.010 23 ... SPO 1999 08 09 366.140 0.050 23 ... SPO 1999 08 10 366.110 0.080 23 ... SPO 1999 08 11 366.170 0.080 20 ... SPO 1999 08 12 366.190 0.050 23 ... SPO 1999 08 13 366.210 0.060 22 ... SPO 1999 08 14 366.260 0.100 23 ... SPO 1999 08 15 366.200 0.020 23 ... SPO 1999 08 16 366.250 0.070 24 ... SPO 1999 08 17 366.250 0.050 23 ... SPO 1999 08 18 366.310 0.070 23 ... SPO 1999 08 19 366.380 0.080 23 ... SPO 1999 08 20 366.320 0.080 23 ... SPO 1999 08 21 366.300 0.020 22 ... SPO 1999 08 22 366.330 0.070 23 ... SPO 1999 08 23 366.370 0.100 22 ... SPO 1999 08 24 366.440 0.030 22 ... SPO 1999 08 25 366.440 0.060 23 ... SPO 1999 08 26 366.440 0.060 23 ... SPO 1999 08 27 366.410 0.070 22 ... SPO 1999 08 28 366.390 0.070 23 ... SPO 1999 08 29 366.370 0.060 23 ... SPO 1999 08 30 366.470 0.070 23 ... SPO 1999 08 31 366.530 0.050 22 ... SPO 1999 09 01 366.540 0.040 23 ... SPO 1999 09 02 366.550 0.040 16 ... SPO 1999 09 03 366.590 0.090 23 ... SPO 1999 09 04 366.480 0.070 23 ... SPO 1999 09 05 366.460 0.050 24 ... SPO 1999 09 06 366.410 0.040 23 ... SPO 1999 09 07 -999.990 -99.990 0 *.. SPO 1999 09 08 366.470 0.060 19 ... SPO 1999 09 09 366.470 0.010 23 ... SPO 1999 09 10 366.480 0.050 23 ... SPO 1999 09 11 366.520 0.030 23 ... SPO 1999 09 12 366.500 0.060 23 ... SPO 1999 09 13 366.490 0.070 22 ... SPO 1999 09 14 366.510 0.060 23 ... SPO 1999 09 15 366.480 0.040 23 ... SPO 1999 09 16 366.510 0.060 23 ... SPO 1999 09 17 366.500 0.030 23 ... SPO 1999 09 18 366.520 0.030 23 ... SPO 1999 09 19 366.560 0.080 23 ... SPO 1999 09 20 366.560 0.040 23 ... SPO 1999 09 21 366.550 0.060 23 ... SPO 1999 09 22 366.510 0.020 23 ... SPO 1999 09 23 366.500 0.030 23 ... SPO 1999 09 24 366.590 0.040 23 ... SPO 1999 09 25 366.610 0.060 22 ... SPO 1999 09 26 366.540 0.050 23 ... SPO 1999 09 27 366.590 0.050 22 ... SPO 1999 09 28 366.560 0.030 23 ... SPO 1999 09 29 366.590 0.050 23 ... SPO 1999 09 30 366.600 0.030 24 ... SPO 1999 10 01 366.650 0.050 23 ... SPO 1999 10 02 366.590 0.030 23 ... SPO 1999 10 03 366.620 0.060 23 ... SPO 1999 10 04 366.630 0.080 23 ... SPO 1999 10 05 366.590 0.050 20 ... SPO 1999 10 06 366.540 0.080 23 ... SPO 1999 10 07 366.600 0.150 23 ... SPO 1999 10 08 366.720 0.060 23 ... SPO 1999 10 09 366.750 0.070 23 ... SPO 1999 10 10 366.730 0.060 23 ... SPO 1999 10 11 366.720 0.070 23 ... SPO 1999 10 12 366.730 0.060 23 ... SPO 1999 10 13 366.700 0.080 23 ... SPO 1999 10 14 366.700 0.100 22 ... SPO 1999 10 15 366.710 0.080 18 ... SPO 1999 10 16 366.720 0.040 23 ... SPO 1999 10 17 366.600 0.120 23 ... SPO 1999 10 18 366.560 0.050 23 ... SPO 1999 10 19 366.440 0.060 23 ... SPO 1999 10 20 366.570 0.120 23 ... SPO 1999 10 21 366.470 0.050 23 ... SPO 1999 10 22 366.490 0.080 23 ... SPO 1999 10 23 366.650 0.110 23 ... SPO 1999 10 24 366.670 0.110 23 ... SPO 1999 10 25 366.760 0.100 23 ... SPO 1999 10 26 366.830 0.080 21 ... SPO 1999 10 27 366.750 0.050 23 ... SPO 1999 10 28 366.720 0.050 23 ... SPO 1999 10 29 366.830 0.080 23 ... SPO 1999 10 30 366.740 0.060 23 ... SPO 1999 10 31 366.750 0.070 23 ... SPO 1999 11 01 366.730 0.080 23 ... SPO 1999 11 02 366.800 0.080 23 ... SPO 1999 11 03 366.780 0.060 10 ... SPO 1999 11 04 366.840 0.120 14 ... SPO 1999 11 05 366.740 0.030 22 ... SPO 1999 11 06 366.770 0.070 16 ... SPO 1999 11 07 366.820 0.040 15 ... SPO 1999 11 08 366.750 0.110 22 ... SPO 1999 11 09 366.780 0.030 23 ... SPO 1999 11 10 366.800 0.050 18 ... SPO 1999 11 11 366.790 0.020 23 ... SPO 1999 11 12 366.830 0.030 23 ... SPO 1999 11 13 366.780 0.050 23 ... SPO 1999 11 14 366.750 0.050 23 ... SPO 1999 11 15 366.770 0.040 23 ... SPO 1999 11 16 366.770 0.060 23 ... SPO 1999 11 17 366.720 0.080 23 ... SPO 1999 11 18 366.750 0.070 23 ... SPO 1999 11 19 366.760 0.040 22 ... SPO 1999 11 20 366.800 0.060 23 ... SPO 1999 11 21 366.740 0.030 23 ... SPO 1999 11 22 366.750 0.040 23 ... SPO 1999 11 23 366.750 0.080 23 ... SPO 1999 11 24 366.790 0.070 22 ... SPO 1999 11 25 366.710 0.050 23 ... SPO 1999 11 26 366.770 0.050 20 ... SPO 1999 11 27 366.740 0.020 8 ... SPO 1999 11 28 366.770 0.030 6 ... SPO 1999 11 29 366.770 0.040 23 ... SPO 1999 11 30 366.810 0.030 23 ... SPO 1999 12 01 366.810 0.050 20 ... SPO 1999 12 02 366.810 0.050 20 ... SPO 1999 12 03 366.780 0.050 23 ... SPO 1999 12 04 366.760 0.040 23 ... SPO 1999 12 05 366.840 0.030 5 ... SPO 1999 12 06 366.810 0.050 19 ... SPO 1999 12 07 366.780 0.040 23 ... SPO 1999 12 08 366.760 0.070 22 ... SPO 1999 12 09 366.750 0.080 23 ... SPO 1999 12 10 366.720 0.060 23 ... SPO 1999 12 11 366.700 0.050 23 ... SPO 1999 12 12 366.690 0.040 23 ... SPO 1999 12 13 366.720 0.030 23 ... SPO 1999 12 14 366.720 0.040 23 ... SPO 1999 12 15 366.710 0.040 23 ... SPO 1999 12 16 366.710 0.070 22 ... SPO 1999 12 17 366.720 0.030 23 ... SPO 1999 12 18 366.750 0.060 23 ... SPO 1999 12 19 366.690 0.060 23 ... SPO 1999 12 20 366.640 0.060 23 ... SPO 1999 12 21 366.570 0.060 23 ... SPO 1999 12 22 366.590 0.080 19 ... SPO 1999 12 23 366.490 0.030 19 ... SPO 1999 12 24 366.490 0.030 23 ... SPO 1999 12 25 366.590 0.050 22 ... SPO 1999 12 26 366.680 0.070 18 ... SPO 1999 12 27 366.610 0.050 24 ... SPO 1999 12 28 366.560 0.030 23 ... SPO 1999 12 29 366.620 0.050 23 ... SPO 1999 12 30 366.650 0.070 23 ... SPO 1999 12 31 366.600 0.030 23 ... SPO 2000 01 01 366.640 0.030 19 ... SPO 2000 01 02 366.640 0.030 23 ... SPO 2000 01 03 366.630 0.030 23 ... SPO 2000 01 04 366.630 0.020 23 ... SPO 2000 01 05 366.630 0.050 23 ... SPO 2000 01 06 366.650 0.080 18 ... SPO 2000 01 07 366.600 0.030 23 ... SPO 2000 01 08 366.590 0.050 23 ... SPO 2000 01 09 366.600 0.040 22 ... SPO 2000 01 10 366.560 0.030 23 ... SPO 2000 01 11 366.560 0.080 23 ... SPO 2000 01 12 366.480 0.110 23 ... SPO 2000 01 13 366.380 0.130 23 ... SPO 2000 01 14 366.530 0.090 22 ... SPO 2000 01 15 366.380 0.120 23 ... SPO 2000 01 16 366.520 0.070 23 ... SPO 2000 01 17 366.530 0.080 22 ... SPO 2000 01 18 366.550 0.050 22 ... SPO 2000 01 19 366.470 0.090 22 ... SPO 2000 01 20 366.330 0.050 23 ... SPO 2000 01 21 366.370 0.080 23 ... SPO 2000 01 22 366.460 0.090 23 ... SPO 2000 01 23 366.490 0.070 22 ... SPO 2000 01 24 366.520 0.080 23 ... SPO 2000 01 25 366.430 0.050 22 ... SPO 2000 01 26 366.380 0.090 23 ... SPO 2000 01 27 366.480 0.110 22 ... SPO 2000 01 28 366.590 0.060 23 ... SPO 2000 01 29 366.590 0.110 23 ... SPO 2000 01 30 366.650 0.070 23 ... SPO 2000 01 31 366.470 0.080 21 ... SPO 2000 02 01 366.590 0.100 23 ... SPO 2000 02 02 366.550 0.090 22 ... SPO 2000 02 03 -999.990 -99.990 0 *.. SPO 2000 02 04 -999.990 -99.990 0 *.. SPO 2000 02 05 366.420 0.060 23 ... SPO 2000 02 06 366.350 0.160 23 ... SPO 2000 02 07 366.250 0.060 19 ... SPO 2000 02 08 366.270 0.040 17 ... SPO 2000 02 09 -999.990 -99.990 0 *.. SPO 2000 02 10 366.300 0.090 10 ... SPO 2000 02 11 366.300 0.020 20 ... SPO 2000 02 12 366.300 0.050 16 ... SPO 2000 02 13 366.260 0.070 21 ... SPO 2000 02 14 366.420 0.040 15 ... SPO 2000 02 15 366.330 0.070 15 ... SPO 2000 02 16 366.280 0.030 14 ... SPO 2000 02 17 366.330 0.030 23 ... SPO 2000 02 18 366.330 0.030 23 ... SPO 2000 02 19 366.360 0.020 19 ... SPO 2000 02 20 366.370 0.010 13 ... SPO 2000 02 21 366.390 0.030 21 ... SPO 2000 02 22 366.380 0.020 22 ... SPO 2000 02 23 366.430 0.050 23 ... SPO 2000 02 24 366.400 0.030 20 ... SPO 2000 02 25 366.430 0.060 23 ... SPO 2000 02 26 366.450 0.060 22 ... SPO 2000 02 27 366.390 0.020 20 ... SPO 2000 02 28 -999.990 -99.990 0 *.. SPO 2000 02 29 -999.990 -99.990 0 *.. SPO 2000 03 01 -999.990 -99.990 0 *.. SPO 2000 03 02 -999.990 -99.990 0 *.. SPO 2000 03 03 -999.990 -99.990 0 *.. SPO 2000 03 04 -999.990 -99.990 0 *.. SPO 2000 03 05 -999.990 -99.990 0 *.. SPO 2000 03 06 -999.990 -99.990 0 *.. SPO 2000 03 07 -999.990 -99.990 0 *.. SPO 2000 03 08 366.310 0.020 15 ... SPO 2000 03 09 366.330 0.010 5 ... SPO 2000 03 10 -999.990 -99.990 0 *.. SPO 2000 03 11 366.290 0.050 12 ... SPO 2000 03 12 366.240 0.020 23 ... SPO 2000 03 13 366.260 0.020 23 ... SPO 2000 03 14 366.260 0.010 21 ... SPO 2000 03 15 366.300 0.020 21 ... SPO 2000 03 16 366.270 0.030 23 ... SPO 2000 03 17 366.260 0.030 23 ... SPO 2000 03 18 366.350 0.040 23 ... SPO 2000 03 19 366.260 0.080 23 ... SPO 2000 03 20 366.260 0.060 23 ... SPO 2000 03 21 366.250 0.030 23 ... SPO 2000 03 22 366.280 0.030 23 ... SPO 2000 03 23 366.330 0.020 23 ... SPO 2000 03 24 366.270 0.020 24 ... SPO 2000 03 25 366.260 0.020 22 ... SPO 2000 03 26 366.280 0.020 23 ... SPO 2000 03 27 366.260 0.010 23 ... SPO 2000 03 28 366.260 0.010 23 ... SPO 2000 03 29 366.320 0.080 22 ... SPO 2000 03 30 366.400 0.020 23 ... SPO 2000 03 31 366.340 0.030 21 ... SPO 2000 04 01 366.350 0.020 23 ... SPO 2000 04 02 366.240 0.050 23 ... SPO 2000 04 03 366.330 0.020 23 ... SPO 2000 04 04 366.320 0.020 23 ... SPO 2000 04 05 366.320 0.020 23 ... SPO 2000 04 06 366.270 0.010 23 ... SPO 2000 04 07 366.290 0.030 23 ... SPO 2000 04 08 366.290 0.010 23 ... SPO 2000 04 09 366.310 0.010 23 ... SPO 2000 04 10 366.320 0.020 23 ... SPO 2000 04 11 366.350 0.030 23 ... SPO 2000 04 12 366.410 0.020 23 ... SPO 2000 04 13 366.460 0.020 23 ... SPO 2000 04 14 366.350 0.080 23 ... SPO 2000 04 15 366.270 0.020 23 ... SPO 2000 04 16 366.380 0.020 23 ... SPO 2000 04 17 366.370 0.020 23 ... SPO 2000 04 18 366.320 0.020 24 ... SPO 2000 04 19 366.420 0.030 23 ... SPO 2000 04 20 366.430 0.010 23 ... SPO 2000 04 21 366.400 0.010 23 ... SPO 2000 04 22 366.420 0.020 23 ... SPO 2000 04 23 366.430 0.010 23 ... SPO 2000 04 24 366.430 0.010 23 ... SPO 2000 04 25 366.390 0.030 23 ... SPO 2000 04 26 366.440 0.040 22 ... SPO 2000 04 27 366.440 0.020 23 ... SPO 2000 04 28 366.380 0.030 23 ... SPO 2000 04 29 366.350 0.020 23 ... SPO 2000 04 30 366.310 0.020 23 ... SPO 2000 05 01 366.330 0.010 12 ... SPO 2000 05 02 366.410 0.010 15 ... SPO 2000 05 03 366.420 0.010 23 ... SPO 2000 05 04 366.430 0.020 23 ... SPO 2000 05 05 366.410 0.030 23 ... SPO 2000 05 06 366.380 0.020 23 ... SPO 2000 05 07 366.410 0.010 23 ... SPO 2000 05 08 366.410 0.010 23 ... SPO 2000 05 09 366.430 0.010 23 ... SPO 2000 05 10 366.390 0.020 23 ... SPO 2000 05 11 366.390 0.010 23 ... SPO 2000 05 12 366.420 0.010 23 ... SPO 2000 05 13 366.430 0.030 23 ... SPO 2000 05 14 366.420 0.010 23 ... SPO 2000 05 15 366.500 0.030 23 ... SPO 2000 05 16 366.530 0.040 23 ... SPO 2000 05 17 366.520 0.030 23 ... SPO 2000 05 18 366.480 0.020 24 ... SPO 2000 05 19 366.520 0.030 23 ... SPO 2000 05 20 366.540 0.040 23 ... SPO 2000 05 21 366.570 0.040 23 ... SPO 2000 05 22 366.590 0.020 23 ... SPO 2000 05 23 366.590 0.030 23 ... SPO 2000 05 24 366.550 0.020 23 ... SPO 2000 05 25 366.650 0.070 23 ... SPO 2000 05 26 366.560 0.030 23 ... SPO 2000 05 27 366.550 0.020 23 ... SPO 2000 05 28 366.520 0.030 23 ... SPO 2000 05 29 366.520 0.020 23 ... SPO 2000 05 30 366.540 0.040 23 ... SPO 2000 05 31 366.580 0.010 23 ... SPO 2000 06 01 366.590 0.030 23 ... SPO 2000 06 02 366.680 0.060 23 ... SPO 2000 06 03 366.710 0.020 23 ... SPO 2000 06 04 366.730 0.040 23 ... SPO 2000 06 05 366.620 0.040 23 ... SPO 2000 06 06 366.610 0.020 23 ... SPO 2000 06 07 366.650 0.020 23 ... SPO 2000 06 08 366.660 0.020 23 ... SPO 2000 06 09 366.630 0.020 23 ... SPO 2000 06 10 366.630 0.020 23 ... SPO 2000 06 11 366.600 0.030 23 ... SPO 2000 06 12 366.600 0.030 24 ... SPO 2000 06 13 366.610 0.030 23 ... SPO 2000 06 14 366.690 0.030 23 ... SPO 2000 06 15 366.810 0.100 20 ... SPO 2000 06 16 366.930 0.050 23 ... SPO 2000 06 17 366.960 0.030 23 ... SPO 2000 06 18 366.960 0.050 23 ... SPO 2000 06 19 366.860 0.040 23 ... SPO 2000 06 20 366.810 0.040 23 ... SPO 2000 06 21 366.880 0.020 23 ... SPO 2000 06 22 366.840 0.030 23 ... SPO 2000 06 23 366.820 0.020 23 ... SPO 2000 06 24 366.810 0.020 23 ... SPO 2000 06 25 366.820 0.020 23 ... SPO 2000 06 26 366.940 0.030 23 ... SPO 2000 06 27 366.980 0.030 23 ... SPO 2000 06 28 366.960 0.040 23 ... SPO 2000 06 29 367.020 0.060 23 ... SPO 2000 06 30 367.070 0.050 23 ... SPO 2000 07 01 366.990 0.050 18 ... SPO 2000 07 02 366.900 0.040 18 ... SPO 2000 07 03 366.990 0.080 19 ... SPO 2000 07 04 367.080 0.040 15 ... SPO 2000 07 05 367.130 0.020 23 ... SPO 2000 07 06 367.160 0.030 23 ... SPO 2000 07 07 367.190 0.010 24 ... SPO 2000 07 08 367.190 0.020 23 ... SPO 2000 07 09 367.150 0.030 23 ... SPO 2000 07 10 367.120 0.050 23 ... SPO 2000 07 11 367.150 0.070 23 ... SPO 2000 07 12 367.120 0.050 23 ... SPO 2000 07 13 367.170 0.060 23 ... SPO 2000 07 14 367.220 0.030 23 ... SPO 2000 07 15 367.180 0.050 23 ... SPO 2000 07 16 367.120 0.050 23 ... SPO 2000 07 17 367.230 0.030 23 ... SPO 2000 07 18 367.220 0.020 23 ... SPO 2000 07 19 367.240 0.010 23 ... SPO 2000 07 20 367.150 0.040 23 ... SPO 2000 07 21 367.250 0.080 23 ... SPO 2000 07 22 367.320 0.030 23 ... SPO 2000 07 23 367.320 0.020 23 ... SPO 2000 07 24 367.320 0.040 23 ... SPO 2000 07 25 367.290 0.040 23 ... SPO 2000 07 26 367.330 0.080 23 ... SPO 2000 07 27 367.360 0.030 23 ... SPO 2000 07 28 367.470 0.040 23 ... SPO 2000 07 29 367.470 0.030 23 ... SPO 2000 07 30 367.470 0.030 23 ... SPO 2000 07 31 367.460 0.030 23 ... SPO 2000 08 01 367.450 0.020 24 ... SPO 2000 08 02 367.430 0.020 23 ... SPO 2000 08 03 367.430 0.030 23 ... SPO 2000 08 04 367.510 0.050 22 ... SPO 2000 08 05 367.510 0.060 19 ... SPO 2000 08 06 -999.990 -99.990 0 *.. SPO 2000 08 07 367.630 0.050 23 ... SPO 2000 08 08 367.570 0.080 23 ... SPO 2000 08 09 -999.990 -99.990 0 *.. SPO 2000 08 10 367.660 0.050 23 ... SPO 2000 08 11 367.750 0.040 23 ... SPO 2000 08 12 367.770 0.030 23 ... SPO 2000 08 13 367.590 0.030 23 ... SPO 2000 08 14 367.710 0.060 23 ... SPO 2000 08 15 367.760 0.050 23 ... SPO 2000 08 16 367.720 0.050 23 ... SPO 2000 08 17 367.780 0.050 23 ... SPO 2000 08 18 367.720 0.040 23 ... SPO 2000 08 19 367.740 0.010 23 ... SPO 2000 08 20 367.720 0.030 23 ... SPO 2000 08 21 367.840 0.100 23 ... SPO 2000 08 22 367.840 0.040 23 ... SPO 2000 08 23 367.760 0.040 23 ... SPO 2000 08 24 367.850 0.100 23 ... SPO 2000 08 25 367.760 0.060 23 ... SPO 2000 08 26 367.840 0.050 24 ... SPO 2000 08 27 367.850 0.050 23 ... SPO 2000 08 28 367.800 0.030 23 ... SPO 2000 08 29 367.810 0.020 23 ... SPO 2000 08 30 367.850 0.040 23 ... SPO 2000 08 31 367.920 0.050 14 ... SPO 2000 09 01 367.780 0.010 12 ... SPO 2000 09 02 367.840 0.030 23 ... SPO 2000 09 03 367.880 0.020 23 ... SPO 2000 09 04 367.860 0.070 23 ... SPO 2000 09 05 367.830 0.020 23 ... SPO 2000 09 06 367.940 0.060 23 ... SPO 2000 09 07 367.840 0.060 22 ... SPO 2000 09 08 367.790 0.030 23 ... SPO 2000 09 09 367.790 0.040 23 ... SPO 2000 09 10 367.940 0.050 23 ... SPO 2000 09 11 367.970 0.020 23 ... SPO 2000 09 12 367.920 0.020 23 ... SPO 2000 09 13 367.960 0.060 23 ... SPO 2000 09 14 367.840 0.100 24 ... SPO 2000 09 15 367.760 0.020 22 ... SPO 2000 09 16 367.790 0.030 23 ... SPO 2000 09 17 368.050 0.100 23 ... SPO 2000 09 18 368.110 0.080 23 ... SPO 2000 09 19 367.950 0.040 23 ... SPO 2000 09 20 367.940 0.020 23 ... SPO 2000 09 21 367.940 0.070 23 ... SPO 2000 09 22 368.050 0.060 23 ... SPO 2000 09 23 367.970 0.060 23 ... SPO 2000 09 24 367.910 0.050 23 ... SPO 2000 09 25 367.920 0.040 23 ... SPO 2000 09 26 367.950 0.040 23 ... SPO 2000 09 27 367.980 0.040 23 ... SPO 2000 09 28 367.970 0.030 23 ... SPO 2000 09 29 367.980 0.060 23 ... SPO 2000 09 30 367.970 0.070 23 ... SPO 2000 10 01 367.990 0.060 23 ... SPO 2000 10 02 367.820 0.030 23 ... SPO 2000 10 03 367.830 0.040 23 ... SPO 2000 10 04 367.930 0.040 23 ... SPO 2000 10 05 367.870 0.030 23 ... SPO 2000 10 06 367.860 0.020 18 ... SPO 2000 10 07 367.860 0.020 23 ... SPO 2000 10 08 367.870 0.010 23 ... SPO 2000 10 09 367.960 0.110 23 ... SPO 2000 10 10 367.900 0.060 6 ... SPO 2000 10 11 367.890 0.050 22 ... SPO 2000 10 12 367.910 0.030 23 ... SPO 2000 10 13 367.930 0.030 23 ... SPO 2000 10 14 367.970 0.020 23 ... SPO 2000 10 15 367.950 0.020 23 ... SPO 2000 10 16 367.990 0.020 23 ... SPO 2000 10 17 367.950 0.010 23 ... SPO 2000 10 18 367.930 0.010 23 ... SPO 2000 10 19 367.960 0.020 23 ... SPO 2000 10 20 367.940 0.020 23 ... SPO 2000 10 21 367.940 0.020 23 ... SPO 2000 10 22 367.950 0.010 23 ... SPO 2000 10 23 367.960 0.010 23 ... SPO 2000 10 24 367.940 0.010 23 ... SPO 2000 10 25 367.930 0.020 23 ... SPO 2000 10 26 367.920 0.030 18 ... SPO 2000 10 27 367.870 0.040 19 ... SPO 2000 10 28 367.920 0.010 23 ... SPO 2000 10 29 367.900 0.030 23 ... SPO 2000 10 30 367.950 0.070 23 ... SPO 2000 10 31 367.830 0.040 19 ... SPO 2000 11 01 367.840 0.030 22 ... SPO 2000 11 02 367.920 0.050 23 ... SPO 2000 11 03 368.030 0.170 20 ... SPO 2000 11 04 367.880 0.030 23 ... SPO 2000 11 05 367.870 0.040 23 ... SPO 2000 11 06 367.860 0.040 21 ... SPO 2000 11 07 367.900 0.060 23 ... SPO 2000 11 08 367.910 0.030 23 ... SPO 2000 11 09 367.890 0.010 21 ... SPO 2000 11 10 367.960 0.050 23 ... SPO 2000 11 11 367.880 0.050 23 ... SPO 2000 11 12 367.900 0.040 23 ... SPO 2000 11 13 367.900 0.040 17 ... SPO 2000 11 14 367.820 0.040 23 ... SPO 2000 11 15 367.850 0.020 5 ... SPO 2000 11 16 367.850 0.020 23 ... SPO 2000 11 17 367.810 0.050 23 ... SPO 2000 11 18 367.800 0.020 23 ... SPO 2000 11 19 367.790 0.020 23 ... SPO 2000 11 20 367.790 0.030 23 ... SPO 2000 11 21 367.790 0.020 23 ... SPO 2000 11 22 367.760 0.030 20 ... SPO 2000 11 23 367.780 0.040 23 ... SPO 2000 11 24 367.690 0.030 23 ... SPO 2000 11 25 367.700 0.050 22 ... SPO 2000 11 26 367.750 0.020 23 ... SPO 2000 11 27 367.800 0.030 23 ... SPO 2000 11 28 367.750 0.020 23 ... SPO 2000 11 29 367.810 0.060 21 ... SPO 2000 11 30 367.800 0.040 23 ... SPO 2000 12 01 367.740 0.050 23 ... SPO 2000 12 02 367.770 0.020 23 ... SPO 2000 12 03 367.820 0.030 23 ... SPO 2000 12 04 367.820 0.010 10 ... SPO 2000 12 05 368.100 0.150 18 ... SPO 2000 12 06 368.170 0.010 23 ... SPO 2000 12 07 368.180 0.020 23 ... SPO 2000 12 08 368.170 0.030 23 ... SPO 2000 12 09 368.230 0.050 23 ... SPO 2000 12 10 368.200 0.020 23 ... SPO 2000 12 11 368.190 0.020 11 ... SPO 2000 12 12 368.210 0.030 18 ... SPO 2000 12 13 368.150 0.030 21 ... SPO 2000 12 14 368.160 0.020 21 ... SPO 2000 12 15 368.180 0.020 23 ... SPO 2000 12 16 368.100 0.030 23 ... SPO 2000 12 17 368.050 0.010 23 ... SPO 2000 12 18 368.140 0.040 23 ... SPO 2000 12 19 368.170 0.030 23 ... SPO 2000 12 20 368.190 0.020 10 ... SPO 2000 12 21 368.210 0.010 18 ... SPO 2000 12 22 368.200 0.020 11 ... SPO 2000 12 23 368.170 0.030 23 ... SPO 2000 12 24 368.120 0.030 23 ... SPO 2000 12 25 368.060 0.040 23 ... SPO 2000 12 26 368.020 0.050 23 ... SPO 2000 12 27 367.980 0.030 14 ... SPO 2000 12 28 367.990 0.020 22 ... SPO 2000 12 29 368.010 0.020 23 ... SPO 2000 12 30 368.050 0.040 21 ... SPO 2000 12 31 368.070 0.070 23 ... SPO 2001 01 01 368.010 0.020 23 ... SPO 2001 01 02 368.060 0.100 23 ... SPO 2001 01 03 368.130 0.010 5 ... SPO 2001 01 04 368.220 0.060 7 ... SPO 2001 01 05 368.080 0.040 19 ... SPO 2001 01 06 368.040 0.060 22 ... SPO 2001 01 07 368.020 0.110 21 ... SPO 2001 01 08 368.040 0.050 17 ... SPO 2001 01 09 368.070 0.030 21 ... SPO 2001 01 10 367.990 0.030 22 ... SPO 2001 01 11 367.840 0.050 22 ... SPO 2001 01 12 367.780 0.010 22 ... SPO 2001 01 13 367.860 0.050 22 ... SPO 2001 01 14 367.930 0.040 18 ... SPO 2001 01 15 367.910 0.120 20 ... SPO 2001 01 16 367.880 0.050 22 ... SPO 2001 01 17 367.920 0.050 23 ... SPO 2001 01 18 367.800 0.040 21 ... SPO 2001 01 19 367.880 0.060 23 ... SPO 2001 01 20 367.840 0.020 21 ... SPO 2001 01 21 367.870 0.020 21 ... SPO 2001 01 22 367.880 0.020 21 ... SPO 2001 01 23 368.000 0.060 23 ... SPO 2001 01 24 368.000 0.060 22 ... SPO 2001 01 25 368.010 0.030 22 ... SPO 2001 01 26 367.900 0.070 22 ... SPO 2001 01 27 367.760 0.060 22 ... SPO 2001 01 28 367.730 0.040 18 ... SPO 2001 01 29 367.800 0.040 22 ... SPO 2001 01 30 367.760 0.020 21 ... SPO 2001 01 31 367.690 0.040 23 ... SPO 2001 02 01 367.650 0.060 20 ... SPO 2001 02 02 367.660 0.020 22 ... SPO 2001 02 03 367.660 0.030 22 ... SPO 2001 02 04 367.620 0.010 23 ... SPO 2001 02 05 367.700 0.110 19 ... SPO 2001 02 06 367.760 0.080 23 ... SPO 2001 02 07 367.750 0.120 21 ... SPO 2001 02 08 367.530 0.040 22 ... SPO 2001 02 09 367.640 0.020 23 ... SPO 2001 02 10 367.680 0.050 23 ... SPO 2001 02 11 367.690 0.040 19 ... SPO 2001 02 12 367.680 0.000 2 ... SPO 2001 02 13 367.700 0.020 20 ... SPO 2001 02 14 367.670 0.030 23 ... SPO 2001 02 15 367.540 0.030 23 ... SPO 2001 02 16 367.660 0.020 23 ... SPO 2001 02 17 367.630 0.040 23 ... SPO 2001 02 18 367.630 0.020 23 ... SPO 2001 02 19 367.660 0.050 23 ... SPO 2001 02 20 367.710 0.040 23 ... SPO 2001 02 21 367.760 0.080 19 ... SPO 2001 02 22 367.540 0.120 23 ... SPO 2001 02 23 367.520 0.070 22 ... SPO 2001 02 24 367.420 0.060 21 ... SPO 2001 02 25 367.680 0.070 23 ... SPO 2001 02 26 367.590 0.050 23 ... SPO 2001 02 27 367.560 0.020 21 ... SPO 2001 02 28 367.570 0.040 22 ... SPO 2001 03 01 367.580 0.020 23 ... SPO 2001 03 02 367.550 0.030 22 ... SPO 2001 03 03 367.490 0.020 23 ... SPO 2001 03 04 367.500 0.020 23 ... SPO 2001 03 05 367.500 0.020 22 ... SPO 2001 03 06 367.570 0.020 23 ... SPO 2001 03 07 367.560 0.010 22 ... SPO 2001 03 08 367.550 0.020 22 ... SPO 2001 03 09 367.520 0.020 23 ... SPO 2001 03 10 367.530 0.020 23 ... SPO 2001 03 11 367.540 0.020 22 ... SPO 2001 03 12 367.550 0.020 22 ... SPO 2001 03 13 367.570 0.010 23 ... SPO 2001 03 14 367.600 0.010 20 ... SPO 2001 03 15 367.580 0.030 22 ... SPO 2001 03 16 367.580 0.010 22 ... SPO 2001 03 17 367.570 0.020 22 ... SPO 2001 03 18 367.580 0.030 23 ... SPO 2001 03 19 367.590 0.040 22 ... SPO 2001 03 20 367.430 0.070 23 ... SPO 2001 03 21 367.570 0.060 22 ... SPO 2001 03 22 367.670 0.010 22 ... SPO 2001 03 23 367.690 0.030 22 ... SPO 2001 03 24 367.650 0.020 22 ... SPO 2001 03 25 367.650 0.030 20 ... SPO 2001 03 26 367.570 0.040 23 ... SPO 2001 03 27 367.610 0.040 23 ... SPO 2001 03 28 367.620 0.070 17 ... SPO 2001 03 29 -999.990 -99.990 0 *.. SPO 2001 03 30 367.640 0.020 23 ... SPO 2001 03 31 367.610 0.010 22 ... SPO 2001 04 01 367.630 0.020 23 ... SPO 2001 04 02 367.650 0.010 22 ... SPO 2001 04 03 367.630 0.020 22 ... SPO 2001 04 04 367.720 0.050 22 ... SPO 2001 04 05 367.760 0.050 17 ... SPO 2001 04 06 367.670 0.020 22 ... SPO 2001 04 07 367.750 0.080 23 ... SPO 2001 04 08 367.840 0.020 23 ... SPO 2001 04 09 367.790 0.020 22 ... SPO 2001 04 10 367.760 0.030 21 ... SPO 2001 04 11 367.800 0.010 23 ... SPO 2001 04 12 367.800 0.020 23 ... SPO 2001 04 13 367.800 0.020 23 ... SPO 2001 04 14 367.840 0.030 23 ... SPO 2001 04 15 367.860 0.020 23 ... SPO 2001 04 16 367.850 0.030 23 ... SPO 2001 04 17 367.870 0.020 23 ... SPO 2001 04 18 367.930 0.020 22 ... SPO 2001 04 19 367.890 0.020 22 ... SPO 2001 04 20 367.910 0.020 23 ... SPO 2001 04 21 367.920 0.020 20 ... SPO 2001 04 22 367.940 0.010 21 ... SPO 2001 04 23 367.950 0.020 23 ... SPO 2001 04 24 367.930 0.010 23 ... SPO 2001 04 25 367.950 0.020 22 ... SPO 2001 04 26 367.940 0.010 23 ... SPO 2001 04 27 367.940 0.020 23 ... SPO 2001 04 28 367.980 0.030 23 ... SPO 2001 04 29 367.980 0.010 23 ... SPO 2001 04 30 367.980 0.010 23 ... SPO 2001 05 01 367.980 0.020 23 ... SPO 2001 05 02 367.950 0.020 22 ... SPO 2001 05 03 367.990 0.020 23 ... SPO 2001 05 04 368.040 0.030 23 ... SPO 2001 05 05 368.050 0.020 24 ... SPO 2001 05 06 368.040 0.020 22 ... SPO 2001 05 07 368.070 0.010 23 ... SPO 2001 05 08 368.050 0.020 22 ... SPO 2001 05 09 368.030 0.020 20 ... SPO 2001 05 10 368.040 0.040 23 ... SPO 2001 05 11 368.020 0.030 22 ... SPO 2001 05 12 368.030 0.020 23 ... SPO 2001 05 13 368.030 0.020 23 ... SPO 2001 05 14 368.030 0.010 22 ... SPO 2001 05 15 368.060 0.020 23 ... SPO 2001 05 16 368.080 0.020 22 ... SPO 2001 05 17 368.080 0.020 23 ... SPO 2001 05 18 368.120 0.020 22 ... SPO 2001 05 19 368.100 0.020 22 ... SPO 2001 05 20 368.110 0.010 22 ... SPO 2001 05 21 368.120 0.010 23 ... SPO 2001 05 22 368.150 0.010 21 ... SPO 2001 05 23 368.150 0.040 22 ... SPO 2001 05 24 368.200 0.020 22 ... SPO 2001 05 25 368.210 0.020 23 ... SPO 2001 05 26 368.240 0.020 23 ... SPO 2001 05 27 368.220 0.020 23 ... SPO 2001 05 28 368.190 0.030 23 ... SPO 2001 05 29 368.260 0.070 22 ... SPO 2001 05 30 368.260 0.020 22 ... SPO 2001 05 31 368.260 0.030 22 ... SPO 2001 06 01 368.330 0.020 23 ... SPO 2001 06 02 368.300 0.010 23 ... SPO 2001 06 03 368.280 0.010 23 ... SPO 2001 06 04 368.240 0.030 23 ... SPO 2001 06 05 368.250 0.020 23 ... SPO 2001 06 06 368.280 0.010 23 ... SPO 2001 06 07 368.290 0.020 23 ... SPO 2001 06 08 368.270 0.010 22 ... SPO 2001 06 09 368.290 0.030 23 ... SPO 2001 06 10 368.320 0.020 23 ... SPO 2001 06 11 368.380 0.020 23 ... SPO 2001 06 12 368.410 0.020 22 ... SPO 2001 06 13 368.360 0.010 23 ... SPO 2001 06 14 368.330 0.010 22 ... SPO 2001 06 15 368.330 0.010 23 ... SPO 2001 06 16 368.320 0.020 23 ... SPO 2001 06 17 368.300 0.010 23 ... SPO 2001 06 18 368.320 0.020 23 ... SPO 2001 06 19 368.330 0.020 23 ... SPO 2001 06 20 368.330 0.010 22 ... SPO 2001 06 21 368.380 0.020 23 ... SPO 2001 06 22 368.420 0.020 22 ... SPO 2001 06 23 368.410 0.010 23 ... SPO 2001 06 24 368.400 0.020 22 ... SPO 2001 06 25 368.410 0.010 22 ... SPO 2001 06 26 368.410 0.020 23 ... SPO 2001 06 27 368.500 0.010 23 ... SPO 2001 06 28 368.530 0.030 23 ... SPO 2001 06 29 368.590 0.030 23 ... SPO 2001 06 30 368.540 0.010 22 ... SPO 2001 07 01 368.480 0.020 22 ... SPO 2001 07 02 368.510 0.040 23 ... SPO 2001 07 03 368.580 0.020 22 ... SPO 2001 07 04 368.540 0.010 23 ... SPO 2001 07 05 368.560 0.020 23 ... SPO 2001 07 06 368.550 0.010 22 ... SPO 2001 07 07 368.570 0.020 23 ... SPO 2001 07 08 368.570 0.010 23 ... SPO 2001 07 09 368.560 0.020 23 ... SPO 2001 07 10 368.580 0.010 21 ... SPO 2001 07 11 368.640 0.030 22 ... SPO 2001 07 12 368.700 0.020 22 ... SPO 2001 07 13 368.830 0.030 22 ... SPO 2001 07 14 368.870 0.050 23 ... SPO 2001 07 15 368.890 0.030 24 ... SPO 2001 07 16 368.890 0.010 22 ... SPO 2001 07 17 368.880 0.030 21 ... SPO 2001 07 18 368.910 0.010 23 ... SPO 2001 07 19 368.900 0.010 23 ... SPO 2001 07 20 368.910 0.020 23 ... SPO 2001 07 21 368.890 0.020 22 ... SPO 2001 07 22 368.920 0.030 23 ... SPO 2001 07 23 368.980 0.040 24 ... SPO 2001 07 24 369.000 0.020 21 ... SPO 2001 07 25 368.960 0.010 22 ... SPO 2001 07 26 368.960 0.010 23 ... SPO 2001 07 27 368.990 0.020 22 ... SPO 2001 07 28 369.020 0.010 22 ... SPO 2001 07 29 369.020 0.020 23 ... SPO 2001 07 30 369.000 0.010 23 ... SPO 2001 07 31 368.980 0.020 23 ... SPO 2001 08 01 369.000 0.030 22 ... SPO 2001 08 02 369.010 0.010 23 ... SPO 2001 08 03 369.020 0.010 23 ... SPO 2001 08 04 369.040 0.020 23 ... SPO 2001 08 05 369.080 0.010 23 ... SPO 2001 08 06 369.130 0.020 23 ... SPO 2001 08 07 369.160 0.010 23 ... SPO 2001 08 08 369.190 0.020 23 ... SPO 2001 08 09 369.210 0.030 23 ... SPO 2001 08 10 369.250 0.020 23 ... SPO 2001 08 11 369.260 0.010 23 ... SPO 2001 08 12 369.320 0.010 22 ... SPO 2001 08 13 369.310 0.010 23 ... SPO 2001 08 14 369.330 0.010 23 ... SPO 2001 08 15 369.340 0.030 23 ... SPO 2001 08 16 369.340 0.020 23 ... SPO 2001 08 17 369.360 0.040 22 ... SPO 2001 08 18 369.370 0.040 23 ... SPO 2001 08 19 369.320 0.010 23 ... SPO 2001 08 20 369.350 0.010 23 ... SPO 2001 08 21 369.350 0.010 23 ... SPO 2001 08 22 369.350 0.020 23 ... SPO 2001 08 23 369.380 0.030 23 ... SPO 2001 08 24 369.400 0.020 23 ... SPO 2001 08 25 369.420 0.020 22 ... SPO 2001 08 26 369.430 0.010 23 ... SPO 2001 08 27 369.430 0.010 21 ... SPO 2001 08 28 369.460 0.010 23 ... SPO 2001 08 29 369.460 0.010 22 ... SPO 2001 08 30 369.480 0.020 23 ... SPO 2001 08 31 369.460 0.020 22 ... SPO 2001 09 01 369.490 0.020 23 ... SPO 2001 09 02 369.500 0.010 23 ... SPO 2001 09 03 369.490 0.020 23 ... SPO 2001 09 04 369.490 0.030 22 ... SPO 2001 09 05 369.570 0.030 23 ... SPO 2001 09 06 369.560 0.020 22 ... SPO 2001 09 07 369.530 0.020 23 ... SPO 2001 09 08 369.530 0.030 23 ... SPO 2001 09 09 369.570 0.030 23 ... SPO 2001 09 10 369.650 0.020 23 ... SPO 2001 09 11 369.600 0.050 23 ... SPO 2001 09 12 369.700 0.100 23 ... SPO 2001 09 13 369.620 0.090 24 ... SPO 2001 09 14 369.480 0.060 23 ... SPO 2001 09 15 369.390 0.100 22 ... SPO 2001 09 16 369.520 0.030 23 ... SPO 2001 09 17 369.540 0.040 22 ... SPO 2001 09 18 369.540 0.060 22 ... SPO 2001 09 19 369.670 0.020 22 ... SPO 2001 09 20 369.710 0.030 23 ... SPO 2001 09 21 369.700 0.020 22 ... SPO 2001 09 22 369.710 0.020 22 ... SPO 2001 09 23 369.730 0.030 23 ... SPO 2001 09 24 369.680 0.030 21 ... SPO 2001 09 25 369.700 0.060 23 ... SPO 2001 09 26 369.750 0.030 23 ... SPO 2001 09 27 369.850 0.030 22 ... SPO 2001 09 28 369.840 0.050 23 ... SPO 2001 09 29 369.760 0.020 23 ... SPO 2001 09 30 369.690 0.040 23 ... SPO 2001 10 01 369.810 0.100 23 ... SPO 2001 10 02 369.780 0.030 22 ... SPO 2001 10 03 369.740 0.030 22 ... SPO 2001 10 04 369.790 0.020 22 ... SPO 2001 10 05 369.780 0.030 23 ... SPO 2001 10 06 369.740 0.030 23 ... SPO 2001 10 07 369.750 0.020 23 ... SPO 2001 10 08 369.830 0.020 23 ... SPO 2001 10 09 369.870 0.030 23 ... SPO 2001 10 10 369.910 0.030 23 ... SPO 2001 10 11 369.870 0.040 23 ... SPO 2001 10 12 369.850 0.020 22 ... SPO 2001 10 13 369.800 0.040 23 ... SPO 2001 10 14 369.780 0.010 22 ... SPO 2001 10 15 369.800 0.010 23 ... SPO 2001 10 16 369.790 0.020 23 ... SPO 2001 10 17 369.890 0.030 23 ... SPO 2001 10 18 369.840 0.030 23 ... SPO 2001 10 19 369.850 0.040 21 ... SPO 2001 10 20 369.880 0.050 23 ... SPO 2001 10 21 369.990 0.020 23 ... SPO 2001 10 22 369.970 0.030 23 ... SPO 2001 10 23 370.000 0.040 22 ... SPO 2001 10 24 369.880 0.030 23 ... SPO 2001 10 25 369.960 0.020 23 ... SPO 2001 10 26 370.050 0.040 22 ... SPO 2001 10 27 370.070 0.020 22 ... SPO 2001 10 28 370.020 0.030 19 ... SPO 2001 10 29 369.900 0.020 23 ... SPO 2001 10 30 369.900 0.070 22 ... SPO 2001 10 31 369.960 0.020 23 ... SPO 2001 11 01 370.050 0.060 16 ... SPO 2001 11 02 370.020 0.090 22 ... SPO 2001 11 03 369.960 0.050 12 ... SPO 2001 11 04 369.940 0.020 23 ... SPO 2001 11 05 369.900 0.040 23 ... SPO 2001 11 06 369.900 0.050 21 ... SPO 2001 11 07 370.050 0.100 5 ... SPO 2001 11 08 369.870 0.030 18 ... SPO 2001 11 09 369.870 0.030 22 ... SPO 2001 11 10 369.850 0.020 23 ... SPO 2001 11 11 369.900 0.020 23 ... SPO 2001 11 12 369.920 0.010 23 ... SPO 2001 11 13 369.940 0.010 22 ... SPO 2001 11 14 369.950 0.010 22 ... SPO 2001 11 15 369.930 0.020 23 ... SPO 2001 11 16 369.920 0.020 23 ... SPO 2001 11 17 369.900 0.020 23 ... SPO 2001 11 18 369.850 0.030 21 ... SPO 2001 11 19 369.920 0.020 22 ... SPO 2001 11 20 369.900 0.020 23 ... SPO 2001 11 21 369.890 0.010 23 ... SPO 2001 11 22 369.890 0.030 23 ... SPO 2001 11 23 369.860 0.020 24 ... SPO 2001 11 24 369.920 0.020 23 ... SPO 2001 11 25 369.930 0.030 23 ... SPO 2001 11 26 369.850 0.010 23 ... SPO 2001 11 27 369.880 0.010 23 ... SPO 2001 11 28 369.890 0.020 21 ... SPO 2001 11 29 369.860 0.020 23 ... SPO 2001 11 30 369.840 0.040 22 ... SPO 2001 12 01 369.820 0.010 22 ... SPO 2001 12 02 369.800 0.010 15 ... SPO 2001 12 03 369.800 0.010 23 ... SPO 2001 12 04 369.820 0.020 23 ... SPO 2001 12 05 369.830 0.020 23 ... SPO 2001 12 06 369.860 0.020 23 ... SPO 2001 12 07 369.790 0.030 18 ... SPO 2001 12 08 369.720 0.070 19 ... SPO 2001 12 09 369.550 0.050 23 ... SPO 2001 12 10 369.570 0.070 23 ... SPO 2001 12 11 369.760 0.010 23 ... SPO 2001 12 12 369.740 0.030 20 ... SPO 2001 12 13 369.680 0.020 23 ... SPO 2001 12 14 369.710 0.030 21 ... SPO 2001 12 15 -999.990 -99.990 0 *.. SPO 2001 12 16 -999.990 -99.990 0 *.. SPO 2001 12 17 -999.990 -99.990 0 *.. SPO 2001 12 18 369.750 0.020 24 ... SPO 2001 12 19 369.800 0.020 22 ... SPO 2001 12 20 369.730 0.010 22 ... SPO 2001 12 21 369.690 0.020 22 ... SPO 2001 12 22 369.710 0.030 23 ... SPO 2001 12 23 369.610 0.060 23 ... SPO 2001 12 24 369.600 0.030 23 ... SPO 2001 12 25 369.730 0.060 22 ... SPO 2001 12 26 369.710 0.040 23 ... SPO 2001 12 27 369.640 0.030 23 ... SPO 2001 12 28 369.670 0.010 22 ... SPO 2001 12 29 369.640 0.020 23 ... SPO 2001 12 30 369.530 0.070 23 ... SPO 2001 12 31 369.600 0.050 22 ... SPO 2002 01 01 369.550 0.020 23 ... SPO 2002 01 02 369.530 0.020 23 ... SPO 2002 01 03 369.550 0.010 23 ... SPO 2002 01 04 369.560 0.070 21 ... SPO 2002 01 05 369.490 0.050 23 ... SPO 2002 01 06 369.490 0.050 22 ... SPO 2002 01 07 369.590 0.060 23 ... SPO 2002 01 08 369.690 0.030 19 ... SPO 2002 01 09 369.540 0.070 23 ... SPO 2002 01 10 369.650 0.040 23 ... SPO 2002 01 11 369.620 0.030 23 ... SPO 2002 01 12 369.520 0.210 21 ... SPO 2002 01 13 369.240 0.180 23 ... SPO 2002 01 14 369.480 0.070 23 ... SPO 2002 01 15 369.640 0.060 23 ... SPO 2002 01 16 369.570 0.030 23 ... SPO 2002 01 17 369.560 0.050 23 ... SPO 2002 01 18 369.610 0.090 23 ... SPO 2002 01 19 369.600 0.040 21 ... SPO 2002 01 20 369.510 0.020 22 ... SPO 2002 01 21 369.560 0.050 23 ... SPO 2002 01 22 369.650 0.030 23 ... SPO 2002 01 23 369.580 0.030 23 ... SPO 2002 01 24 369.610 0.020 23 ... SPO 2002 01 25 369.560 0.040 21 ... SPO 2002 01 26 369.530 0.050 23 ... SPO 2002 01 27 369.590 0.020 23 ... SPO 2002 01 28 369.600 0.010 23 ... SPO 2002 01 29 369.620 0.020 23 ... SPO 2002 01 30 369.630 0.020 23 ... SPO 2002 01 31 369.640 0.010 21 ... SPO 2002 02 01 369.510 0.090 23 ... SPO 2002 02 02 369.620 0.020 23 ... SPO 2002 02 03 369.580 0.030 23 ... SPO 2002 02 04 369.640 0.050 23 ... SPO 2002 02 05 369.530 0.030 23 ... SPO 2002 02 06 -999.990 -99.990 0 *.. SPO 2002 02 07 369.510 0.010 15 ... SPO 2002 02 08 369.520 0.020 22 ... SPO 2002 02 09 369.520 0.020 23 ... SPO 2002 02 10 369.560 0.030 22 ... SPO 2002 02 11 369.490 0.050 22 ... SPO 2002 02 12 369.520 0.030 22 ... SPO 2002 02 13 369.530 0.030 22 ... SPO 2002 02 14 369.560 0.040 22 ... SPO 2002 02 15 369.540 0.030 22 ... SPO 2002 02 16 369.480 0.100 21 ... SPO 2002 02 17 369.490 0.130 23 ... SPO 2002 02 18 369.340 0.040 22 ... SPO 2002 02 19 369.290 0.040 23 ... SPO 2002 02 20 369.290 0.040 22 ... SPO 2002 02 21 369.370 0.020 22 ... SPO 2002 02 22 369.410 0.010 22 ... SPO 2002 02 23 369.440 0.030 22 ... SPO 2002 02 24 369.450 0.020 22 ... SPO 2002 02 25 369.490 0.020 17 ... SPO 2002 02 26 369.470 0.020 24 ... SPO 2002 02 27 369.430 0.040 23 ... SPO 2002 02 28 369.400 0.020 22 ... SPO 2002 03 01 369.460 0.050 19 ... SPO 2002 03 02 369.530 0.050 22 ... SPO 2002 03 03 369.460 0.080 22 ... SPO 2002 03 04 369.600 0.010 22 ... SPO 2002 03 05 369.300 0.130 23 ... SPO 2002 03 06 369.450 0.060 22 ... SPO 2002 03 07 369.440 0.030 22 ... SPO 2002 03 08 369.420 0.020 22 ... SPO 2002 03 09 369.420 0.020 12 ... SPO 2002 03 10 369.490 0.020 13 ... SPO 2002 03 11 369.420 0.030 8 ... SPO 2002 03 12 369.430 0.030 22 ... SPO 2002 03 13 369.470 0.010 22 ... SPO 2002 03 14 369.480 0.030 22 ... SPO 2002 03 15 369.570 0.050 22 ... SPO 2002 03 16 369.580 0.030 22 ... SPO 2002 03 17 369.500 0.020 22 ... SPO 2002 03 18 369.520 0.030 23 ... SPO 2002 03 19 369.630 0.020 22 ... SPO 2002 03 20 369.600 0.010 21 ... SPO 2002 03 21 369.610 0.010 23 ... SPO 2002 03 22 369.610 0.020 22 ... SPO 2002 03 23 369.590 0.020 22 ... SPO 2002 03 24 369.570 0.040 22 ... SPO 2002 03 25 369.480 0.020 22 ... SPO 2002 03 26 369.430 0.030 23 ... SPO 2002 03 27 369.540 0.030 23 ... SPO 2002 03 28 369.540 0.030 18 ... SPO 2002 03 29 369.670 0.020 14 ... SPO 2002 03 30 369.680 0.040 22 ... SPO 2002 03 31 369.620 0.020 22 ... SPO 2002 04 01 369.680 0.020 23 ... SPO 2002 04 02 369.690 0.020 23 ... SPO 2002 04 03 369.700 0.010 23 ... SPO 2002 04 04 369.740 0.010 23 ... SPO 2002 04 05 369.740 0.010 16 ... SPO 2002 04 06 369.730 0.020 23 ... SPO 2002 04 07 369.720 0.010 23 ... SPO 2002 04 08 369.750 0.020 23 ... SPO 2002 04 09 369.750 0.010 23 ... SPO 2002 04 10 369.760 0.030 22 ... SPO 2002 04 11 369.730 0.000 1 ... SPO 2002 04 12 369.760 0.030 23 ... SPO 2002 04 13 369.740 0.010 24 ... SPO 2002 04 14 369.780 0.010 23 ... SPO 2002 04 15 369.820 0.020 23 ... SPO 2002 04 16 369.780 0.020 22 ... SPO 2002 04 17 369.750 0.010 23 ... SPO 2002 04 18 369.780 0.020 21 ... SPO 2002 04 19 369.800 0.020 23 ... SPO 2002 04 20 369.800 0.010 10 ... SPO 2002 04 21 369.810 0.010 23 ... SPO 2002 04 22 369.880 0.030 23 ... SPO 2002 04 23 369.830 0.030 23 ... SPO 2002 04 24 369.820 0.010 23 ... SPO 2002 04 25 369.840 0.010 23 ... SPO 2002 04 26 369.860 0.010 23 ... SPO 2002 04 27 369.840 0.010 23 ... SPO 2002 04 28 369.860 0.020 23 ... SPO 2002 04 29 369.880 0.020 23 ... SPO 2002 04 30 369.890 0.020 23 ... SPO 2002 05 01 369.900 0.010 24 ... SPO 2002 05 02 369.910 0.010 23 ... SPO 2002 05 03 369.910 0.020 7 ... SPO 2002 05 04 369.910 0.010 23 ... SPO 2002 05 05 369.940 0.010 23 ... SPO 2002 05 06 369.940 0.020 23 ... SPO 2002 05 07 369.960 0.020 23 ... SPO 2002 05 08 369.960 0.010 20 ... SPO 2002 05 09 369.990 0.010 24 ... SPO 2002 05 10 369.990 0.020 23 ... SPO 2002 05 11 369.960 0.010 23 ... SPO 2002 05 12 369.990 0.020 23 ... SPO 2002 05 13 369.990 0.010 23 ... SPO 2002 05 14 369.990 0.010 23 ... SPO 2002 05 15 369.990 0.010 13 ... SPO 2002 05 16 370.000 0.010 23 ... SPO 2002 05 17 370.030 0.010 23 ... SPO 2002 05 18 370.040 0.010 23 ... SPO 2002 05 19 370.050 0.010 23 ... SPO 2002 05 20 370.060 0.010 23 ... SPO 2002 05 21 370.080 0.020 23 ... SPO 2002 05 22 370.120 0.020 23 ... SPO 2002 05 23 370.090 0.020 23 ... SPO 2002 05 24 370.090 0.020 23 ... SPO 2002 05 25 370.110 0.020 23 ... SPO 2002 05 26 370.180 0.030 23 ... SPO 2002 05 27 370.180 0.020 23 ... SPO 2002 05 28 370.230 0.030 23 ... SPO 2002 05 29 370.230 0.030 24 ... SPO 2002 05 30 370.250 0.040 23 ... SPO 2002 05 31 370.230 0.010 23 ... SPO 2002 06 01 370.240 0.020 23 ... SPO 2002 06 02 370.250 0.030 23 ... SPO 2002 06 03 370.270 0.020 23 ... SPO 2002 06 04 370.260 0.010 23 ... SPO 2002 06 05 370.290 0.020 23 ... SPO 2002 06 06 370.340 0.030 23 ... SPO 2002 06 07 370.350 0.020 23 ... SPO 2002 06 08 370.350 0.020 23 ... SPO 2002 06 09 370.340 0.020 23 ... SPO 2002 06 10 370.400 0.020 23 ... SPO 2002 06 11 370.420 0.030 23 ... SPO 2002 06 12 370.400 0.030 23 ... SPO 2002 06 13 370.420 0.020 23 ... SPO 2002 06 14 370.460 0.030 23 ... SPO 2002 06 15 370.490 0.020 23 ... SPO 2002 06 16 370.460 0.010 23 ... SPO 2002 06 17 370.470 0.010 23 ... SPO 2002 06 18 370.470 0.020 23 ... SPO 2002 06 19 370.490 0.020 23 ... SPO 2002 06 20 370.510 0.040 23 ... SPO 2002 06 21 370.530 0.020 23 ... SPO 2002 06 22 370.530 0.010 23 ... SPO 2002 06 23 370.530 0.020 24 ... SPO 2002 06 24 370.550 0.020 23 ... SPO 2002 06 25 370.550 0.020 23 ... SPO 2002 06 26 370.580 0.020 23 ... SPO 2002 06 27 370.550 0.020 23 ... SPO 2002 06 28 370.530 0.030 23 ... SPO 2002 06 29 370.570 0.020 23 ... SPO 2002 06 30 370.600 0.010 23 ... SPO 2002 07 01 370.670 0.030 23 ... SPO 2002 07 02 370.710 0.020 23 ... SPO 2002 07 03 370.730 0.010 9 ... SPO 2002 07 04 370.740 0.010 20 ... SPO 2002 07 05 370.740 0.010 23 ... SPO 2002 07 06 370.780 0.030 22 ... SPO 2002 07 07 370.790 0.040 23 ... SPO 2002 07 08 370.880 0.040 23 ... SPO 2002 07 09 370.920 0.030 23 ... SPO 2002 07 10 370.860 0.030 23 ... SPO 2002 07 11 370.830 0.030 23 ... SPO 2002 07 12 370.910 0.030 21 ... SPO 2002 07 13 370.840 0.030 23 ... SPO 2002 07 14 370.920 0.050 23 ... SPO 2002 07 15 370.970 0.030 23 ... SPO 2002 07 16 370.980 0.020 23 ... SPO 2002 07 17 370.950 0.020 6 ... SPO 2002 07 18 370.950 0.020 23 ... SPO 2002 07 19 370.980 0.020 23 ... SPO 2002 07 20 371.020 0.030 23 ... SPO 2002 07 21 371.050 0.020 24 ... SPO 2002 07 22 371.050 0.010 23 ... SPO 2002 07 23 371.050 0.010 23 ... SPO 2002 07 24 371.020 0.030 23 ... SPO 2002 07 25 371.080 0.020 23 ... SPO 2002 07 26 371.090 0.030 4 ... SPO 2002 07 27 371.100 0.010 23 ... SPO 2002 07 28 371.100 0.020 23 ... SPO 2002 07 29 371.150 0.020 23 ... SPO 2002 07 30 371.160 0.020 23 ... SPO 2002 07 31 371.150 0.030 24 ... SPO 2002 08 01 371.170 0.010 23 ... SPO 2002 08 02 371.170 0.020 23 ... SPO 2002 08 03 371.180 0.020 23 ... SPO 2002 08 04 371.180 0.020 23 ... SPO 2002 08 05 371.240 0.030 23 ... SPO 2002 08 06 371.280 0.010 22 ... SPO 2002 08 07 371.280 0.020 23 ... SPO 2002 08 08 371.270 0.020 23 ... SPO 2002 08 09 371.280 0.010 23 ... SPO 2002 08 10 371.330 0.020 23 ... SPO 2002 08 11 371.360 0.060 23 ... SPO 2002 08 12 371.450 0.030 23 ... SPO 2002 08 13 371.510 0.030 23 ... SPO 2002 08 14 371.590 0.040 23 ... SPO 2002 08 15 371.530 0.050 23 ... SPO 2002 08 16 371.540 0.020 23 ... SPO 2002 08 17 371.580 0.040 17 ... SPO 2002 08 18 371.590 0.030 23 ... SPO 2002 08 19 371.570 0.020 23 ... SPO 2002 08 20 371.500 0.030 23 ... SPO 2002 08 21 371.500 0.010 23 ... SPO 2002 08 22 371.510 0.020 23 ... SPO 2002 08 23 371.520 0.030 23 ... SPO 2002 08 24 371.510 0.020 23 ... SPO 2002 08 25 371.590 0.020 24 ... SPO 2002 08 26 -999.990 -99.990 0 *.. SPO 2002 08 27 371.570 0.060 23 ... SPO 2002 08 28 371.720 0.030 23 ... SPO 2002 08 29 371.750 0.020 23 ... SPO 2002 08 30 371.780 0.030 23 ... SPO 2002 08 31 371.810 0.010 23 ... SPO 2002 09 01 371.810 0.030 21 ... SPO 2002 09 02 371.760 0.030 23 ... SPO 2002 09 03 371.750 0.030 23 ... SPO 2002 09 04 371.770 0.020 23 ... SPO 2002 09 05 371.770 0.020 17 ... SPO 2002 09 06 371.770 0.020 23 ... SPO 2002 09 07 371.800 0.020 22 ... SPO 2002 09 08 371.810 0.030 23 ... SPO 2002 09 09 371.820 0.020 22 ... SPO 2002 09 10 371.810 0.020 23 ... SPO 2002 09 11 371.800 0.020 21 ... SPO 2002 09 12 371.790 0.010 22 ... SPO 2002 09 13 371.820 0.020 23 ... SPO 2002 09 14 371.870 0.050 19 ... SPO 2002 09 15 371.870 0.070 22 ... SPO 2002 09 16 -999.990 -99.990 0 *.. SPO 2002 09 17 371.910 0.010 16 ... SPO 2002 09 18 371.900 0.010 23 ... SPO 2002 09 19 371.900 0.020 23 ... SPO 2002 09 20 371.920 0.010 23 ... SPO 2002 09 21 371.960 0.030 23 ... SPO 2002 09 22 371.980 0.010 23 ... SPO 2002 09 23 372.010 0.030 23 ... SPO 2002 09 24 372.040 0.010 23 ... SPO 2002 09 25 371.990 0.010 23 ... SPO 2002 09 26 372.030 0.020 23 ... SPO 2002 09 27 372.050 0.010 22 ... SPO 2002 09 28 372.040 0.020 23 ... SPO 2002 09 29 372.040 0.020 23 ... SPO 2002 09 30 372.040 0.010 23 ... SPO 2002 10 01 372.040 0.010 23 ... SPO 2002 10 02 372.050 0.020 24 ... SPO 2002 10 03 372.070 0.010 23 ... SPO 2002 10 04 372.080 0.010 23 ... SPO 2002 10 05 372.070 0.010 23 ... SPO 2002 10 06 372.090 0.020 23 ... SPO 2002 10 07 372.120 0.010 23 ... SPO 2002 10 08 372.090 0.030 23 ... SPO 2002 10 09 372.130 0.010 23 ... SPO 2002 10 10 372.120 0.030 23 ... SPO 2002 10 11 372.080 0.010 23 ... SPO 2002 10 12 372.070 0.020 23 ... SPO 2002 10 13 372.070 0.010 23 ... SPO 2002 10 14 372.030 0.020 21 ... SPO 2002 10 15 372.070 0.040 23 ... SPO 2002 10 16 372.070 0.030 13 ... SPO 2002 10 17 372.030 0.010 23 ... SPO 2002 10 18 372.020 0.030 22 ... SPO 2002 10 19 372.060 0.010 23 ... SPO 2002 10 20 372.060 0.020 23 ... SPO 2002 10 21 372.030 0.010 23 ... SPO 2002 10 22 372.050 0.010 22 ... SPO 2002 10 23 372.040 0.020 22 ... SPO 2002 10 24 372.030 0.010 23 ... SPO 2002 10 25 372.040 0.010 23 ... SPO 2002 10 26 372.080 0.030 23 ... SPO 2002 10 27 372.090 0.020 23 ... SPO 2002 10 28 372.060 0.030 23 ... SPO 2002 10 29 372.040 0.020 23 ... SPO 2002 10 30 372.030 0.010 23 ... SPO 2002 10 31 372.050 0.020 23 ... SPO 2002 11 01 372.000 0.050 20 ... SPO 2002 11 02 372.010 0.020 23 ... SPO 2002 11 03 372.020 0.010 23 ... SPO 2002 11 04 372.030 0.010 23 ... SPO 2002 11 05 372.050 0.010 22 ... SPO 2002 11 06 372.050 0.020 23 ... SPO 2002 11 07 372.030 0.020 21 ... SPO 2002 11 08 372.030 0.030 23 ... SPO 2002 11 09 372.000 0.010 24 ... SPO 2002 11 10 372.000 0.030 22 ... SPO 2002 11 11 372.010 0.010 15 ... SPO 2002 11 12 372.030 0.010 20 ... SPO 2002 11 13 372.020 0.040 23 ... SPO 2002 11 14 372.030 0.010 23 ... SPO 2002 11 15 372.020 0.020 23 ... SPO 2002 11 16 372.030 0.010 23 ... SPO 2002 11 17 371.980 0.080 20 ... SPO 2002 11 18 372.000 0.060 21 ... SPO 2002 11 19 372.060 0.010 23 ... SPO 2002 11 20 372.040 0.010 23 ... SPO 2002 11 21 372.050 0.030 17 ... SPO 2002 11 22 372.040 0.030 19 ... SPO 2002 11 23 372.060 0.090 20 ... SPO 2002 11 24 372.020 0.020 23 ... SPO 2002 11 25 372.000 0.020 23 ... SPO 2002 11 26 372.010 0.030 21 ... SPO 2002 11 27 372.010 0.010 23 ... SPO 2002 11 28 372.010 0.010 22 ... SPO 2002 11 29 372.020 0.010 23 ... SPO 2002 11 30 372.020 0.010 23 ... SPO 2002 12 01 371.990 0.010 23 ... SPO 2002 12 02 371.980 0.010 23 ... SPO 2002 12 03 371.970 0.020 23 ... SPO 2002 12 04 371.980 0.030 23 ... SPO 2002 12 05 371.910 0.050 23 ... SPO 2002 12 06 371.880 0.020 23 ... SPO 2002 12 07 371.860 0.010 23 ... SPO 2002 12 08 371.880 0.030 23 ... SPO 2002 12 09 371.950 0.010 20 ... SPO 2002 12 10 371.940 0.040 23 ... SPO 2002 12 11 371.860 0.030 23 ... SPO 2002 12 12 371.820 0.020 23 ... SPO 2002 12 13 371.830 0.010 23 ... SPO 2002 12 14 371.850 0.020 23 ... SPO 2002 12 15 371.860 0.020 23 ... SPO 2002 12 16 371.850 0.030 23 ... SPO 2002 12 17 371.860 0.020 21 ... SPO 2002 12 18 371.840 0.020 23 ... SPO 2002 12 19 371.870 0.020 23 ... SPO 2002 12 20 371.890 0.040 24 ... SPO 2002 12 21 372.020 0.010 20 ... SPO 2002 12 22 372.000 0.020 23 ... SPO 2002 12 23 372.050 0.060 19 ... SPO 2002 12 24 371.980 0.110 22 ... SPO 2002 12 25 371.820 0.070 23 ... SPO 2002 12 26 371.910 0.050 23 ... SPO 2002 12 27 371.780 0.010 10 ... SPO 2002 12 28 371.930 0.020 24 ... SPO 2002 12 29 371.900 0.070 23 ... SPO 2002 12 30 -999.990 -99.990 0 *.. SPO 2002 12 31 371.880 0.060 22 ... SPO 2003 01 01 371.840 0.130 16 ... SPO 2003 01 02 371.860 0.030 24 ... SPO 2003 01 03 371.970 0.020 23 ... SPO 2003 01 04 372.040 0.020 23 ... SPO 2003 01 05 371.970 0.030 23 ... SPO 2003 01 06 371.950 0.020 23 ... SPO 2003 01 07 371.920 0.040 23 ... SPO 2003 01 08 371.970 0.010 23 ... SPO 2003 01 09 371.940 0.040 23 ... SPO 2003 01 10 372.020 0.030 23 ... SPO 2003 01 11 372.030 0.030 23 ... SPO 2003 01 12 371.970 0.040 23 ... SPO 2003 01 13 371.910 0.020 13 ... SPO 2003 01 14 371.940 0.040 23 ... SPO 2003 01 15 372.050 0.080 23 ... SPO 2003 01 16 372.110 0.020 23 ... SPO 2003 01 17 372.130 0.010 23 ... SPO 2003 01 18 372.070 0.070 23 ... SPO 2003 01 19 372.010 0.030 23 ... SPO 2003 01 20 372.020 0.020 23 ... SPO 2003 01 21 372.000 0.040 23 ... SPO 2003 01 22 371.970 0.050 23 ... SPO 2003 01 23 372.010 0.030 23 ... SPO 2003 01 24 372.010 0.020 22 ... SPO 2003 01 25 371.950 0.020 23 ... SPO 2003 01 26 371.920 0.030 23 ... SPO 2003 01 27 371.910 0.030 24 ... SPO 2003 01 28 371.920 0.030 23 ... SPO 2003 01 29 371.920 0.030 23 ... SPO 2003 01 30 372.030 0.030 23 ... SPO 2003 01 31 372.030 0.030 23 ... SPO 2003 02 01 371.980 0.030 23 ... SPO 2003 02 02 372.000 0.010 23 ... SPO 2003 02 03 371.850 0.110 23 ... SPO 2003 02 04 371.960 0.070 23 ... SPO 2003 02 05 371.910 0.100 23 ... SPO 2003 02 06 371.940 0.060 23 ... SPO 2003 02 07 371.930 0.090 23 ... SPO 2003 02 08 372.030 0.050 23 ... SPO 2003 02 09 371.900 0.010 23 ... SPO 2003 02 10 371.920 0.020 23 ... SPO 2003 02 11 371.940 0.020 23 ... SPO 2003 02 12 372.070 0.070 23 ... SPO 2003 02 13 372.120 0.020 22 ... SPO 2003 02 14 372.130 0.020 23 ... SPO 2003 02 15 372.120 0.020 23 ... SPO 2003 02 16 372.100 0.010 23 ... SPO 2003 02 17 372.090 0.040 23 ... SPO 2003 02 18 372.010 0.060 23 ... SPO 2003 02 19 371.960 0.030 23 ... SPO 2003 02 20 371.980 0.020 22 ... SPO 2003 02 21 371.730 0.110 24 ... SPO 2003 02 22 371.700 0.080 23 ... SPO 2003 02 23 371.730 0.020 23 ... SPO 2003 02 24 371.780 0.120 23 ... SPO 2003 02 25 371.250 0.090 23 ... SPO 2003 02 26 371.280 0.100 23 ... SPO 2003 02 27 371.790 0.190 23 ... SPO 2003 02 28 371.580 0.070 23 ... SPO 2003 03 01 371.750 0.030 23 ... SPO 2003 03 02 371.550 0.060 23 ... SPO 2003 03 03 371.710 0.150 20 ... SPO 2003 03 04 371.770 0.080 23 ... SPO 2003 03 05 371.950 0.160 23 ... SPO 2003 03 06 372.110 0.040 23 ... SPO 2003 03 07 372.150 0.080 23 ... SPO 2003 03 08 372.060 0.070 23 ... SPO 2003 03 09 371.930 0.030 23 ... SPO 2003 03 10 372.020 0.090 19 ... SPO 2003 03 11 371.990 0.050 23 ... SPO 2003 03 12 371.910 0.040 23 ... SPO 2003 03 13 371.990 0.060 23 ... SPO 2003 03 14 372.040 0.030 23 ... SPO 2003 03 15 372.030 0.020 24 ... SPO 2003 03 16 371.950 0.040 23 ... SPO 2003 03 17 371.960 0.070 23 ... SPO 2003 03 18 371.910 0.070 23 ... SPO 2003 03 19 371.990 0.030 14 ... SPO 2003 03 20 371.940 0.050 23 ... SPO 2003 03 21 371.860 0.030 23 ... SPO 2003 03 22 371.930 0.040 23 ... SPO 2003 03 23 371.940 0.040 23 ... SPO 2003 03 24 372.170 0.080 20 ... SPO 2003 03 25 372.170 0.130 23 ... SPO 2003 03 26 372.140 0.080 20 ... SPO 2003 03 27 372.190 0.060 17 ... SPO 2003 03 28 372.300 0.040 19 ... SPO 2003 03 29 372.150 0.050 23 ... SPO 2003 03 30 372.110 0.080 23 ... SPO 2003 03 31 372.040 0.020 23 ... SPO 2003 04 01 371.950 0.030 23 ... SPO 2003 04 02 371.860 0.030 23 ... SPO 2003 04 03 372.050 0.110 23 ... SPO 2003 04 04 372.150 0.040 21 ... SPO 2003 04 05 372.090 0.040 23 ... SPO 2003 04 06 372.030 0.020 23 ... SPO 2003 04 07 372.050 0.030 23 ... SPO 2003 04 08 372.040 0.040 23 ... SPO 2003 04 09 372.140 0.020 23 ... SPO 2003 04 10 372.160 0.010 23 ... SPO 2003 04 11 372.080 0.050 23 ... SPO 2003 04 12 372.050 0.070 23 ... SPO 2003 04 13 372.090 0.020 23 ... SPO 2003 04 14 372.080 0.020 24 ... SPO 2003 04 15 372.080 0.020 23 ... SPO 2003 04 16 372.210 0.090 23 ... SPO 2003 04 17 372.160 0.030 23 ... SPO 2003 04 18 372.110 0.010 23 ... SPO 2003 04 19 372.120 0.020 23 ... SPO 2003 04 20 372.170 0.020 13 ... SPO 2003 04 21 372.180 0.030 23 ... SPO 2003 04 22 372.220 0.030 23 ... SPO 2003 04 23 372.230 0.060 23 ... SPO 2003 04 24 372.210 0.050 23 ... SPO 2003 04 25 372.270 0.020 15 ... SPO 2003 04 26 372.240 0.030 23 ... SPO 2003 04 27 372.290 0.030 23 ... SPO 2003 04 28 372.290 0.020 23 ... SPO 2003 04 29 372.320 0.020 23 ... SPO 2003 04 30 372.320 0.040 23 ... SPO 2003 05 01 372.290 0.020 23 ... SPO 2003 05 02 372.320 0.020 23 ... SPO 2003 05 03 372.340 0.020 23 ... SPO 2003 05 04 372.340 0.020 23 ... SPO 2003 05 05 372.350 0.020 23 ... SPO 2003 05 06 372.360 0.020 23 ... SPO 2003 05 07 372.380 0.020 23 ... SPO 2003 05 08 372.400 0.020 23 ... SPO 2003 05 09 372.380 0.020 23 ... SPO 2003 05 10 372.400 0.020 23 ... SPO 2003 05 11 372.430 0.020 23 ... SPO 2003 05 12 372.460 0.020 23 ... SPO 2003 05 13 372.460 0.020 22 ... SPO 2003 05 14 372.440 0.020 23 ... SPO 2003 05 15 372.460 0.020 23 ... SPO 2003 05 16 372.480 0.030 23 ... SPO 2003 05 17 372.470 0.020 23 ... SPO 2003 05 18 372.490 0.010 23 ... SPO 2003 05 19 372.510 0.020 24 ... SPO 2003 05 20 372.500 0.020 23 ... SPO 2003 05 21 372.510 0.040 23 ... SPO 2003 05 22 372.570 0.030 23 ... SPO 2003 05 23 372.560 0.030 23 ... SPO 2003 05 24 372.540 0.030 23 ... SPO 2003 05 25 372.540 0.020 23 ... SPO 2003 05 26 372.630 0.030 23 ... SPO 2003 05 27 372.580 0.010 23 ... SPO 2003 05 28 372.580 0.010 7 ... SPO 2003 05 29 372.560 0.020 12 ... SPO 2003 05 30 372.590 0.010 12 ... SPO 2003 05 31 372.630 0.040 12 ... SPO 2003 06 01 372.620 0.020 23 ... SPO 2003 06 02 372.630 0.010 23 ... SPO 2003 06 03 372.640 0.020 14 ... SPO 2003 06 04 372.650 0.010 23 ... SPO 2003 06 05 372.640 0.010 23 ... SPO 2003 06 06 372.670 0.040 18 ... SPO 2003 06 07 372.680 0.010 11 ... SPO 2003 06 08 372.670 0.020 14 ... SPO 2003 06 09 372.680 0.010 18 ... SPO 2003 06 10 372.710 0.020 23 ... SPO 2003 06 11 372.760 0.020 23 ... SPO 2003 06 12 372.770 0.020 23 ... SPO 2003 06 13 372.790 0.020 23 ... SPO 2003 06 14 372.790 0.020 23 ... SPO 2003 06 15 372.800 0.020 23 ... SPO 2003 06 16 372.790 0.020 23 ... SPO 2003 06 17 372.800 0.020 23 ... SPO 2003 06 18 372.840 0.020 23 ... SPO 2003 06 19 372.840 0.020 23 ... SPO 2003 06 20 372.840 0.020 17 ... SPO 2003 06 21 -999.990 -99.990 0 *.. SPO 2003 06 22 372.900 0.020 9 ... SPO 2003 06 23 372.920 0.010 16 ... SPO 2003 06 24 372.980 0.010 14 ... SPO 2003 06 25 372.990 0.010 23 ... SPO 2003 06 26 373.010 0.020 23 ... SPO 2003 06 27 373.000 0.030 23 ... SPO 2003 06 28 372.970 0.010 23 ... SPO 2003 06 29 372.980 0.010 23 ... SPO 2003 06 30 372.960 0.010 23 ... SPO 2003 07 01 372.960 0.010 23 ... SPO 2003 07 02 372.990 0.020 23 ... SPO 2003 07 03 373.030 0.020 23 ... SPO 2003 07 04 373.030 0.020 23 ... SPO 2003 07 05 373.000 0.020 23 ... SPO 2003 07 06 373.040 0.030 23 ... SPO 2003 07 07 373.060 0.010 23 ... SPO 2003 07 08 373.060 0.010 24 ... SPO 2003 07 09 373.080 0.010 23 ... SPO 2003 07 10 373.110 0.040 23 ... SPO 2003 07 11 373.180 0.020 23 ... SPO 2003 07 12 373.200 0.020 23 ... SPO 2003 07 13 373.220 0.030 23 ... SPO 2003 07 14 373.220 0.020 23 ... SPO 2003 07 15 373.250 0.020 23 ... SPO 2003 07 16 373.210 0.020 23 ... SPO 2003 07 17 373.260 0.020 12 ... SPO 2003 07 18 373.320 0.020 23 ... SPO 2003 07 19 373.300 0.010 10 ... SPO 2003 07 20 373.320 0.010 23 ... SPO 2003 07 21 373.330 0.010 23 ... SPO 2003 07 22 373.360 0.010 23 ... SPO 2003 07 23 373.390 0.020 23 ... SPO 2003 07 24 373.390 0.030 23 ... SPO 2003 07 25 373.380 0.010 23 ... SPO 2003 07 26 373.400 0.010 23 ... SPO 2003 07 27 373.410 0.010 23 ... SPO 2003 07 28 373.440 0.020 23 ... SPO 2003 07 29 373.450 0.010 23 ... SPO 2003 07 30 373.440 0.010 24 ... SPO 2003 07 31 373.460 0.010 23 ... SPO 2003 08 01 373.460 0.030 23 ... SPO 2003 08 02 373.510 0.030 23 ... SPO 2003 08 03 373.510 0.030 23 ... SPO 2003 08 04 373.510 0.020 23 ... SPO 2003 08 05 373.500 0.030 23 ... SPO 2003 08 06 373.530 0.020 23 ... SPO 2003 08 07 373.580 0.020 23 ... SPO 2003 08 08 373.600 0.030 23 ... SPO 2003 08 09 373.650 0.070 23 ... SPO 2003 08 10 373.710 0.010 23 ... SPO 2003 08 11 373.740 0.020 23 ... SPO 2003 08 12 373.720 0.020 23 ... SPO 2003 08 13 373.760 0.030 23 ... SPO 2003 08 14 373.780 0.030 23 ... SPO 2003 08 15 373.850 0.030 23 ... SPO 2003 08 16 373.880 0.010 23 ... SPO 2003 08 17 373.870 0.010 23 ... SPO 2003 08 18 373.870 0.010 23 ... SPO 2003 08 19 373.880 0.020 23 ... SPO 2003 08 20 373.910 0.020 23 ... SPO 2003 08 21 373.910 0.020 23 ... SPO 2003 08 22 373.940 0.020 23 ... SPO 2003 08 23 373.950 0.020 23 ... SPO 2003 08 24 373.980 0.020 24 ... SPO 2003 08 25 374.000 0.030 18 ... SPO 2003 08 26 374.050 0.020 23 ... SPO 2003 08 27 374.050 0.020 16 ... SPO 2003 08 28 374.080 0.030 23 ... SPO 2003 08 29 374.070 0.030 23 ... SPO 2003 08 30 374.080 0.020 23 ... SPO 2003 08 31 374.070 0.010 23 ... SPO 2003 09 01 374.060 0.020 23 ... SPO 2003 09 02 374.070 0.010 23 ... SPO 2003 09 03 374.090 0.020 19 ... SPO 2003 09 04 374.080 0.010 23 ... SPO 2003 09 05 374.050 0.010 23 ... SPO 2003 09 06 374.060 0.010 23 ... SPO 2003 09 07 374.080 0.040 23 ... SPO 2003 09 08 374.170 0.030 23 ... SPO 2003 09 09 374.210 0.040 23 ... SPO 2003 09 10 374.100 0.030 23 ... SPO 2003 09 11 374.120 0.030 23 ... SPO 2003 09 12 374.140 0.020 24 ... SPO 2003 09 13 374.100 0.020 23 ... SPO 2003 09 14 374.110 0.010 23 ... SPO 2003 09 15 374.130 0.030 23 ... SPO 2003 09 16 374.140 0.040 23 ... SPO 2003 09 17 374.170 0.020 23 ... SPO 2003 09 18 374.170 0.020 23 ... SPO 2003 09 19 374.140 0.010 23 ... SPO 2003 09 20 374.140 0.030 23 ... SPO 2003 09 21 374.090 0.010 23 ... SPO 2003 09 22 374.110 0.020 23 ... SPO 2003 09 23 374.090 0.020 23 ... SPO 2003 09 24 374.080 0.020 23 ... SPO 2003 09 25 374.120 0.010 23 ... SPO 2003 09 26 374.140 0.020 23 ... SPO 2003 09 27 374.090 0.030 23 ... SPO 2003 09 28 374.100 0.020 23 ... SPO 2003 09 29 374.100 0.020 23 ... SPO 2003 09 30 374.190 0.060 23 ... SPO 2003 10 01 374.210 0.040 22 ... SPO 2003 10 02 374.170 0.030 23 ... SPO 2003 10 03 374.110 0.020 23 ... SPO 2003 10 04 374.110 0.020 23 ... SPO 2003 10 05 374.080 0.010 23 ... SPO 2003 10 06 374.100 0.030 23 ... SPO 2003 10 07 374.130 0.020 24 ... SPO 2003 10 08 374.180 0.040 23 ... SPO 2003 10 09 374.190 0.080 23 ... SPO 2003 10 10 374.220 0.060 21 ... SPO 2003 10 11 374.200 0.090 23 ... SPO 2003 10 12 374.160 0.060 23 ... SPO 2003 10 13 374.240 0.090 22 ... SPO 2003 10 14 374.200 0.050 23 ... SPO 2003 10 15 374.170 0.050 23 ... SPO 2003 10 16 374.140 0.050 23 ... SPO 2003 10 17 374.130 0.040 23 ... SPO 2003 10 18 374.120 0.020 23 ... SPO 2003 10 19 374.140 0.060 23 ... SPO 2003 10 20 374.130 0.050 23 ... SPO 2003 10 21 374.080 0.050 23 ... SPO 2003 10 22 374.100 0.050 21 ... SPO 2003 10 23 374.090 0.060 22 ... SPO 2003 10 24 374.080 0.050 23 ... SPO 2003 10 25 374.140 0.050 23 ... SPO 2003 10 26 374.120 0.030 22 ... SPO 2003 10 27 374.060 0.030 23 ... SPO 2003 10 28 374.030 0.020 23 ... SPO 2003 10 29 374.030 0.010 23 ... SPO 2003 10 30 374.020 0.030 23 ... SPO 2003 10 31 374.020 0.020 23 ... SPO 2003 11 01 373.970 0.020 24 ... SPO 2003 11 02 373.860 0.070 23 ... SPO 2003 11 03 373.920 0.020 2 ... SPO 2003 11 04 373.950 0.020 23 ... SPO 2003 11 05 374.000 0.030 23 ... SPO 2003 11 06 373.970 0.040 24 ... SPO 2003 11 07 374.150 0.040 23 ... SPO 2003 11 08 374.040 0.060 23 ... SPO 2003 11 09 374.040 0.020 23 ... SPO 2003 11 10 374.050 0.030 23 ... SPO 2003 11 11 374.050 0.040 23 ... SPO 2003 11 12 374.040 0.020 23 ... SPO 2003 11 13 374.040 0.020 23 ... SPO 2003 11 14 374.010 0.030 23 ... SPO 2003 11 15 374.050 0.010 23 ... SPO 2003 11 16 374.050 0.030 23 ... SPO 2003 11 17 374.050 0.030 23 ... SPO 2003 11 18 374.050 0.020 23 ... SPO 2003 11 19 374.020 0.040 23 ... SPO 2003 11 20 374.070 0.030 23 ... SPO 2003 11 21 374.030 0.050 23 ... SPO 2003 11 22 374.000 0.020 23 ... SPO 2003 11 23 373.990 0.020 13 ... SPO 2003 11 24 374.000 0.010 23 ... SPO 2003 11 25 374.010 0.020 21 ... SPO 2003 11 26 374.020 0.020 23 ... SPO 2003 11 27 374.010 0.010 23 ... SPO 2003 11 28 374.000 0.010 23 ... SPO 2003 11 29 373.980 0.010 23 ... SPO 2003 11 30 373.970 0.010 23 ... SPO 2003 12 01 373.970 0.020 24 ... SPO 2003 12 02 373.950 0.010 22 ... SPO 2003 12 03 374.020 0.030 23 ... SPO 2003 12 04 374.010 0.030 23 ... SPO 2003 12 05 373.970 0.020 23 ... SPO 2003 12 06 373.990 0.020 23 ... SPO 2003 12 07 373.990 0.030 23 ... SPO 2003 12 08 373.960 0.020 23 ... SPO 2003 12 09 373.960 0.020 23 ... SPO 2003 12 10 373.980 0.040 23 ... SPO 2003 12 11 373.990 0.060 19 ... SPO 2003 12 12 373.970 0.010 16 ... SPO 2003 12 13 374.010 0.040 23 ... SPO 2003 12 14 -999.990 -99.990 0 *.. SPO 2003 12 15 374.010 0.040 23 ... SPO 2003 12 16 374.000 0.020 23 ... SPO 2003 12 17 373.990 0.040 23 ... SPO 2003 12 18 374.050 0.030 23 ... SPO 2003 12 19 374.030 0.050 23 ... SPO 2003 12 20 373.960 0.070 23 ... SPO 2003 12 21 374.070 0.030 23 ... SPO 2003 12 22 374.060 0.030 23 ... SPO 2003 12 23 374.060 0.020 22 ... SPO 2003 12 24 374.050 0.010 23 ... SPO 2003 12 25 374.160 0.000 1 ... SPO 2003 12 26 -999.990 -99.990 0 *.. SPO 2003 12 27 -999.990 -99.990 0 *.. SPO 2003 12 28 374.070 0.130 23 ... SPO 2003 12 29 374.020 0.040 20 ... SPO 2003 12 30 374.080 0.030 23 ... SPO 2003 12 31 373.970 0.040 22 ... SPO 2004 01 01 373.960 0.020 23 ... SPO 2004 01 02 374.060 0.050 23 ... SPO 2004 01 03 374.070 0.030 23 ... SPO 2004 01 04 374.100 0.150 22 ... SPO 2004 01 05 374.030 0.080 22 ... SPO 2004 01 06 -999.990 -99.990 0 *.. SPO 2004 01 07 -999.990 -99.990 0 *.. SPO 2004 01 08 -999.990 -99.990 0 *.. SPO 2004 01 09 -999.990 -99.990 0 *.. SPO 2004 01 10 -999.990 -99.990 0 *.. SPO 2004 01 11 -999.990 -99.990 0 *.. SPO 2004 01 12 -999.990 -99.990 0 *.. SPO 2004 01 13 -999.990 -99.990 0 *.. SPO 2004 01 14 -999.990 -99.990 0 *.. SPO 2004 01 15 374.050 0.020 6 ... SPO 2004 01 16 374.070 0.050 3 ... SPO 2004 01 17 374.040 0.030 23 ... SPO 2004 01 18 374.050 0.070 23 ... SPO 2004 01 19 374.100 0.040 23 ... SPO 2004 01 20 373.880 0.060 23 ... SPO 2004 01 21 374.140 0.180 23 ... SPO 2004 01 22 374.300 0.040 23 ... SPO 2004 01 23 374.110 0.110 23 ... SPO 2004 01 24 374.040 0.020 23 ... SPO 2004 01 25 374.000 0.040 23 ... SPO 2004 01 26 374.050 0.100 23 ... SPO 2004 01 27 374.200 0.040 23 ... SPO 2004 01 28 374.120 0.100 23 ... SPO 2004 01 29 373.940 0.090 23 ... SPO 2004 01 30 373.900 0.050 23 ... SPO 2004 01 31 373.880 0.080 23 ... SPO 2004 02 01 373.790 0.050 22 ... SPO 2004 02 02 373.710 0.030 23 ... SPO 2004 02 03 373.810 0.040 22 ... SPO 2004 02 04 373.840 0.070 23 ... SPO 2004 02 05 373.690 0.040 23 ... SPO 2004 02 06 373.590 0.040 23 ... SPO 2004 02 07 373.650 0.060 23 ... SPO 2004 02 08 373.690 0.250 23 ... SPO 2004 02 09 374.000 0.040 23 ... SPO 2004 02 10 373.980 0.020 23 ... SPO 2004 02 11 373.950 0.020 23 ... SPO 2004 02 12 373.940 0.020 23 ... SPO 2004 02 13 373.760 0.090 24 ... SPO 2004 02 14 373.760 0.070 23 ... SPO 2004 02 15 373.790 0.030 23 ... SPO 2004 02 16 373.890 0.040 23 ... SPO 2004 02 17 374.040 0.050 23 ... SPO 2004 02 18 373.920 0.070 23 ... SPO 2004 02 19 373.660 0.130 23 ... SPO 2004 02 20 373.640 0.170 23 ... SPO 2004 02 21 373.680 0.120 23 ... SPO 2004 02 22 373.810 0.060 23 ... SPO 2004 02 23 373.950 0.100 23 ... SPO 2004 02 24 374.150 0.110 23 ... SPO 2004 02 25 374.050 0.180 23 ... SPO 2004 02 26 373.960 0.100 23 ... SPO 2004 02 27 374.050 0.130 23 ... SPO 2004 02 28 374.070 0.070 23 ... SPO 2004 02 29 374.000 0.030 23 ... SPO 2004 03 01 374.220 0.060 23 ... SPO 2004 03 02 374.110 0.090 23 ... SPO 2004 03 03 374.220 0.040 23 ... SPO 2004 03 04 374.210 0.070 22 ... SPO 2004 03 05 374.170 0.090 23 ... SPO 2004 03 06 373.940 0.040 23 ... SPO 2004 03 07 373.840 0.020 23 ... SPO 2004 03 08 373.800 0.040 23 ... SPO 2004 03 09 373.900 0.070 24 ... SPO 2004 03 10 374.010 0.020 23 ... SPO 2004 03 11 374.010 0.030 23 ... SPO 2004 03 12 374.140 0.060 23 ... SPO 2004 03 13 373.890 0.080 23 ... SPO 2004 03 14 373.880 0.030 23 ... SPO 2004 03 15 373.940 0.040 23 ... SPO 2004 03 16 373.990 0.040 23 ... SPO 2004 03 17 373.990 0.020 23 ... SPO 2004 03 18 374.010 0.020 23 ... SPO 2004 03 19 374.010 0.060 22 ... SPO 2004 03 20 374.140 0.050 22 ... SPO 2004 03 21 374.090 0.060 23 ... SPO 2004 03 22 374.200 0.020 23 ... SPO 2004 03 23 374.160 0.050 23 ... SPO 2004 03 24 374.120 0.020 23 ... SPO 2004 03 25 374.180 0.040 23 ... SPO 2004 03 26 374.190 0.020 23 ... SPO 2004 03 27 374.170 0.020 23 ... SPO 2004 03 28 374.120 0.030 23 ... SPO 2004 03 29 374.100 0.030 23 ... SPO 2004 03 30 373.980 0.030 23 ... SPO 2004 03 31 374.000 0.020 23 ... SPO 2004 04 01 373.980 0.080 23 ... SPO 2004 04 02 374.110 0.030 23 ... SPO 2004 04 03 374.130 0.010 24 ... SPO 2004 04 04 373.990 0.050 23 ... SPO 2004 04 05 374.200 0.030 23 ... SPO 2004 04 06 374.180 0.040 23 ... SPO 2004 04 07 374.300 0.070 23 ... SPO 2004 04 08 374.300 0.040 23 ... SPO 2004 04 09 374.080 0.120 23 ... SPO 2004 04 10 373.980 0.040 23 ... SPO 2004 04 11 374.120 0.060 23 ... SPO 2004 04 12 374.150 0.030 23 ... SPO 2004 04 13 374.160 0.030 23 ... SPO 2004 04 14 374.170 0.040 23 ... SPO 2004 04 15 374.110 0.040 23 ... SPO 2004 04 16 374.120 0.030 23 ... SPO 2004 04 17 374.130 0.050 23 ... SPO 2004 04 18 374.110 0.050 23 ... SPO 2004 04 19 374.280 0.040 23 ... SPO 2004 04 20 374.370 0.070 23 ... SPO 2004 04 21 374.380 0.020 23 ... SPO 2004 04 22 374.270 0.050 23 ... SPO 2004 04 23 374.240 0.050 23 ... SPO 2004 04 24 374.300 0.010 23 ... SPO 2004 04 25 374.290 0.020 23 ... SPO 2004 04 26 374.280 0.040 23 ... SPO 2004 04 27 374.280 0.060 23 ... SPO 2004 04 28 374.240 0.040 24 ... SPO 2004 04 29 374.170 0.010 23 ... SPO 2004 04 30 374.210 0.040 23 ... SPO 2004 05 01 374.280 0.070 23 ... SPO 2004 05 02 374.200 0.010 23 ... SPO 2004 05 03 374.220 0.010 23 ... SPO 2004 05 04 374.250 0.040 23 ... SPO 2004 05 05 374.340 0.020 23 ... SPO 2004 05 06 374.290 0.020 23 ... SPO 2004 05 07 374.310 0.010 23 ... SPO 2004 05 08 374.320 0.010 23 ... SPO 2004 05 09 374.310 0.020 23 ... SPO 2004 05 10 374.330 0.020 23 ... SPO 2004 05 11 374.340 0.030 23 ... SPO 2004 05 12 374.370 0.010 23 ... SPO 2004 05 13 374.380 0.010 23 ... SPO 2004 05 14 374.400 0.020 23 ... SPO 2004 05 15 374.420 0.010 23 ... SPO 2004 05 16 374.410 0.020 23 ... SPO 2004 05 17 374.400 0.010 23 ... SPO 2004 05 18 374.400 0.020 23 ... SPO 2004 05 19 374.430 0.020 23 ... SPO 2004 05 20 374.440 0.020 23 ... SPO 2004 05 21 374.460 0.020 23 ... SPO 2004 05 22 374.470 0.010 23 ... SPO 2004 05 23 374.490 0.010 24 ... SPO 2004 05 24 374.440 0.020 23 ... SPO 2004 05 25 374.460 0.030 23 ... SPO 2004 05 26 374.460 0.010 23 ... SPO 2004 05 27 374.440 0.010 23 ... SPO 2004 05 28 374.490 0.040 23 ... SPO 2004 05 29 374.550 0.010 23 ... SPO 2004 05 30 374.520 0.020 23 ... SPO 2004 05 31 374.500 0.030 21 ... SPO 2004 06 01 374.530 0.010 23 ... SPO 2004 06 02 374.520 0.010 23 ... SPO 2004 06 03 374.540 0.020 23 ... SPO 2004 06 04 374.600 0.010 23 ... SPO 2004 06 05 374.660 0.050 23 ... SPO 2004 06 06 374.690 0.010 23 ... SPO 2004 06 07 374.680 0.010 23 ... SPO 2004 06 08 374.670 0.010 23 ... SPO 2004 06 09 374.670 0.010 23 ... SPO 2004 06 10 374.730 0.020 23 ... SPO 2004 06 11 374.850 0.040 23 ... SPO 2004 06 12 374.910 0.020 23 ... SPO 2004 06 13 374.880 0.040 23 ... SPO 2004 06 14 374.780 0.020 23 ... SPO 2004 06 15 374.790 0.010 23 ... SPO 2004 06 16 374.770 0.020 23 ... SPO 2004 06 17 374.750 0.020 24 ... SPO 2004 06 18 374.790 0.020 23 ... SPO 2004 06 19 374.720 0.070 21 ... SPO 2004 06 20 374.800 0.020 23 ... SPO 2004 06 21 374.780 0.030 23 ... SPO 2004 06 22 374.820 0.030 23 ... SPO 2004 06 23 374.800 0.010 23 ... SPO 2004 06 24 374.830 0.050 23 ... SPO 2004 06 25 374.850 0.020 23 ... SPO 2004 06 26 374.860 0.010 23 ... SPO 2004 06 27 374.870 0.010 23 ... SPO 2004 06 28 374.840 0.020 23 ... SPO 2004 06 29 374.840 0.010 23 ... SPO 2004 06 30 374.870 0.010 23 ... SPO 2004 07 01 374.900 0.020 23 ... SPO 2004 07 02 374.900 0.020 23 ... SPO 2004 07 03 374.910 0.010 23 ... SPO 2004 07 04 374.920 0.010 23 ... SPO 2004 07 05 374.930 0.020 23 ... SPO 2004 07 06 374.960 0.010 23 ... SPO 2004 07 07 374.970 0.020 23 ... SPO 2004 07 08 374.990 0.020 23 ... SPO 2004 07 09 375.010 0.010 21 ... SPO 2004 07 10 375.030 0.020 23 ... SPO 2004 07 11 375.040 0.010 23 ... SPO 2004 07 12 375.050 0.010 24 ... SPO 2004 07 13 375.040 0.020 23 ... SPO 2004 07 14 375.030 0.010 16 ... SPO 2004 07 15 375.030 0.050 19 ... SPO 2004 07 16 375.030 0.050 23 ... SPO 2004 07 17 375.050 0.010 23 ... SPO 2004 07 18 375.060 0.010 23 ... SPO 2004 07 19 375.090 0.020 22 ... SPO 2004 07 20 375.080 0.020 23 ... SPO 2004 07 21 375.120 0.010 23 ... SPO 2004 07 22 375.130 0.010 23 ... SPO 2004 07 23 375.130 0.010 23 ... SPO 2004 07 24 375.120 0.010 23 ... SPO 2004 07 25 375.140 0.030 23 ... SPO 2004 07 26 375.200 0.020 23 ... SPO 2004 07 27 375.220 0.020 23 ... SPO 2004 07 28 375.260 0.010 23 ... SPO 2004 07 29 375.280 0.030 23 ... SPO 2004 07 30 375.310 0.050 23 ... SPO 2004 07 31 375.370 0.010 23 ... SPO 2004 08 01 375.380 0.010 23 ... SPO 2004 08 02 375.390 0.010 23 ... SPO 2004 08 03 375.450 0.050 23 ... SPO 2004 08 04 375.500 0.020 23 ... SPO 2004 08 05 375.450 0.030 23 ... SPO 2004 08 06 375.470 0.060 24 ... SPO 2004 08 07 375.500 0.050 23 ... SPO 2004 08 08 375.570 0.030 23 ... SPO 2004 08 09 375.540 0.040 23 ... SPO 2004 08 10 375.530 0.030 21 ... SPO 2004 08 11 375.500 0.010 23 ... SPO 2004 08 12 375.550 0.050 23 ... SPO 2004 08 13 375.560 0.020 23 ... SPO 2004 08 14 375.580 0.030 23 ... SPO 2004 08 15 375.550 0.020 23 ... SPO 2004 08 16 375.550 0.010 23 ... SPO 2004 08 17 375.550 0.010 23 ... SPO 2004 08 18 375.560 0.020 23 ... SPO 2004 08 19 375.630 0.020 23 ... SPO 2004 08 20 375.600 0.020 23 ... SPO 2004 08 21 375.600 0.010 23 ... SPO 2004 08 22 375.680 0.010 23 ... SPO 2004 08 23 375.660 0.020 23 ... SPO 2004 08 24 375.700 0.020 23 ... SPO 2004 08 25 375.660 0.030 23 ... SPO 2004 08 26 375.670 0.040 23 ... SPO 2004 08 27 375.710 0.010 23 ... SPO 2004 08 28 375.720 0.010 23 ... SPO 2004 08 29 375.710 0.020 23 ... SPO 2004 08 30 375.730 0.050 24 ... SPO 2004 08 31 375.730 0.020 23 ... SPO 2004 09 01 375.700 0.010 23 ... SPO 2004 09 02 375.700 0.010 23 ... SPO 2004 09 03 375.690 0.010 23 ... SPO 2004 09 04 375.660 0.020 23 ... SPO 2004 09 05 375.690 0.030 23 ... SPO 2004 09 06 375.720 0.030 23 ... SPO 2004 09 07 375.710 0.020 23 ... SPO 2004 09 08 375.670 0.020 23 ... SPO 2004 09 09 375.710 0.030 23 ... SPO 2004 09 10 375.680 0.020 23 ... SPO 2004 09 11 375.680 0.030 23 ... SPO 2004 09 12 375.750 0.010 23 ... SPO 2004 09 13 375.750 0.030 23 ... SPO 2004 09 14 375.750 0.020 23 ... SPO 2004 09 15 375.740 0.030 23 ... SPO 2004 09 16 375.710 0.040 23 ... SPO 2004 09 17 375.730 0.030 23 ... SPO 2004 09 18 375.670 0.050 23 ... SPO 2004 09 19 375.560 0.010 23 ... SPO 2004 09 20 375.640 0.080 23 ... SPO 2004 09 21 375.910 0.020 23 ... SPO 2004 09 22 375.790 0.030 23 ... SPO 2004 09 23 375.800 0.020 23 ... SPO 2004 09 24 375.780 0.030 24 ... SPO 2004 09 25 375.750 0.030 23 ... SPO 2004 09 26 375.830 0.020 23 ... SPO 2004 09 27 375.890 0.030 23 ... SPO 2004 09 28 375.880 0.030 23 ... SPO 2004 09 29 375.880 0.050 23 ... SPO 2004 09 30 375.900 0.030 23 ... SPO 2004 10 01 375.840 0.040 23 ... SPO 2004 10 02 375.800 0.010 23 ... SPO 2004 10 03 375.800 0.010 23 ... SPO 2004 10 04 375.770 0.020 23 ... SPO 2004 10 05 375.730 0.040 23 ... SPO 2004 10 06 375.730 0.020 23 ... SPO 2004 10 07 375.790 0.020 23 ... SPO 2004 10 08 375.780 0.030 23 ... SPO 2004 10 09 375.740 0.020 23 ... SPO 2004 10 10 375.650 0.070 23 ... SPO 2004 10 11 375.630 0.030 22 ... SPO 2004 10 12 375.570 0.060 23 ... SPO 2004 10 13 375.660 0.030 23 ... SPO 2004 10 14 375.700 0.030 23 ... SPO 2004 10 15 375.640 0.060 23 ... SPO 2004 10 16 375.700 0.020 23 ... SPO 2004 10 17 375.720 0.020 23 ... SPO 2004 10 18 375.720 0.040 23 ... SPO 2004 10 19 375.720 0.020 24 ... SPO 2004 10 20 375.720 0.020 23 ... SPO 2004 10 21 375.730 0.030 23 ... SPO 2004 10 22 375.730 0.030 23 ... SPO 2004 10 23 375.710 0.050 23 ... SPO 2004 10 24 375.690 0.040 23 ... SPO 2004 10 25 375.680 0.030 23 ... SPO 2004 10 26 375.660 0.040 23 ... SPO 2004 10 27 375.670 0.040 23 ... SPO 2004 10 28 375.670 0.020 23 ... SPO 2004 10 29 375.700 0.020 23 ... SPO 2004 10 30 375.780 0.050 23 ... SPO 2004 10 31 375.850 0.040 22 ... SPO 2004 11 01 375.780 0.020 23 ... SPO 2004 11 02 375.800 0.020 23 ... SPO 2004 11 03 375.790 0.020 23 ... SPO 2004 11 04 375.770 0.020 23 ... SPO 2004 11 05 375.760 0.010 23 ... SPO 2004 11 06 375.770 0.020 23 ... SPO 2004 11 07 375.780 0.030 23 ... SPO 2004 11 08 375.790 0.030 23 ... SPO 2004 11 09 375.760 0.020 23 ... SPO 2004 11 10 375.770 0.010 23 ... SPO 2004 11 11 375.760 0.020 20 ... SPO 2004 11 12 375.720 0.020 23 ... SPO 2004 11 13 375.740 0.020 24 ... SPO 2004 11 14 375.630 0.030 23 ... SPO 2004 11 15 375.660 0.020 23 ... SPO 2004 11 16 375.620 0.020 23 ... SPO 2004 11 17 375.560 0.030 23 ... SPO 2004 11 18 375.640 0.020 23 ... SPO 2004 11 19 375.550 0.050 23 ... SPO 2004 11 20 375.580 0.020 23 ... SPO 2004 11 21 375.610 0.020 23 ... SPO 2004 11 22 375.610 0.010 23 ... SPO 2004 11 23 375.600 0.030 23 ... SPO 2004 11 24 375.590 0.020 23 ... SPO 2004 11 25 375.610 0.020 22 ... SPO 2004 11 26 375.620 0.010 23 ... SPO 2004 11 27 375.610 0.010 23 ... SPO 2004 11 28 375.620 0.010 23 ... SPO 2004 11 29 375.630 0.020 23 ... SPO 2004 11 30 375.620 0.010 23 ... SPO 2004 12 01 375.590 0.070 23 ... SPO 2004 12 02 375.680 0.090 23 ... SPO 2004 12 03 375.790 0.020 23 ... SPO 2004 12 04 375.730 0.040 23 ... SPO 2004 12 05 375.680 0.020 23 ... SPO 2004 12 06 375.780 0.050 23 ... SPO 2004 12 07 375.750 0.040 23 ... SPO 2004 12 08 375.780 0.070 24 ... SPO 2004 12 09 375.630 0.020 23 ... SPO 2004 12 10 375.660 0.040 23 ... SPO 2004 12 11 375.640 0.030 23 ... SPO 2004 12 12 375.550 0.070 23 ... SPO 2004 12 13 375.530 0.050 23 ... SPO 2004 12 14 375.620 0.030 20 ... SPO 2004 12 15 375.540 0.020 15 ... SPO 2004 12 16 375.710 0.060 23 ... SPO 2004 12 17 375.600 0.080 23 ... SPO 2004 12 18 375.570 0.030 23 ... SPO 2004 12 19 375.630 0.040 23 ... SPO 2004 12 20 375.600 0.040 23 ... SPO 2004 12 21 375.610 0.020 23 ... SPO 2004 12 22 375.660 0.040 23 ... SPO 2004 12 23 375.730 0.010 23 ... SPO 2004 12 24 375.740 0.020 23 ... SPO 2004 12 25 375.610 0.140 23 ... SPO 2004 12 26 375.550 0.050 23 ... SPO 2004 12 27 375.560 0.020 23 ... SPO 2004 12 28 375.630 0.030 23 ... SPO 2004 12 29 375.710 0.050 23 ... SPO 2004 12 30 375.630 0.060 23 ... SPO 2004 12 31 375.660 0.030 22 ... SPO 2005 01 01 375.700 0.020 23 ... SPO 2005 01 02 375.750 0.010 24 ... SPO 2005 01 03 375.590 0.060 23 ... SPO 2005 01 04 375.600 0.130 22 ... SPO 2005 01 05 375.880 0.060 23 ... SPO 2005 01 06 375.700 0.030 23 ... SPO 2005 01 07 375.680 0.010 23 ... SPO 2005 01 08 375.700 0.040 23 ... SPO 2005 01 09 375.580 0.020 23 ... SPO 2005 01 10 375.570 0.050 23 ... SPO 2005 01 11 375.530 0.050 23 ... SPO 2005 01 12 375.550 0.010 23 ... SPO 2005 01 13 375.530 0.020 23 ... SPO 2005 01 14 375.550 0.040 23 ... SPO 2005 01 15 375.580 0.020 23 ... SPO 2005 01 16 375.660 0.120 22 ... SPO 2005 01 17 375.610 0.040 23 ... SPO 2005 01 18 375.670 0.040 23 ... SPO 2005 01 19 375.620 0.020 23 ... SPO 2005 01 20 375.620 0.010 23 ... SPO 2005 01 21 375.590 0.020 23 ... SPO 2005 01 22 375.580 0.020 23 ... SPO 2005 01 23 375.630 0.030 23 ... SPO 2005 01 24 375.630 0.010 23 ... SPO 2005 01 25 375.580 0.060 23 ... SPO 2005 01 26 375.550 0.040 23 ... SPO 2005 01 27 375.510 0.030 24 ... SPO 2005 01 28 375.390 0.040 16 ... SPO 2005 01 29 -999.990 -99.990 0 *.. SPO 2005 01 30 -999.990 -99.990 0 *.. SPO 2005 01 31 -999.990 -99.990 0 *.. SPO 2005 02 01 -999.990 -99.990 0 *.. SPO 2005 02 02 -999.990 -99.990 0 *.. SPO 2005 02 03 375.640 0.010 4 ... SPO 2005 02 04 375.450 0.100 23 ... SPO 2005 02 05 375.320 0.040 23 ... SPO 2005 02 06 375.390 0.060 23 ... SPO 2005 02 07 375.380 0.060 23 ... SPO 2005 02 08 375.410 0.060 23 ... SPO 2005 02 09 375.250 0.070 22 ... SPO 2005 02 10 375.160 0.030 23 ... SPO 2005 02 11 375.210 0.040 23 ... SPO 2005 02 12 375.220 0.040 23 ... SPO 2005 02 13 375.250 0.120 23 ... SPO 2005 02 14 375.340 0.070 23 ... SPO 2005 02 15 375.380 0.050 23 ... SPO 2005 02 16 375.360 0.030 23 ... SPO 2005 02 17 375.350 0.040 23 ... SPO 2005 02 18 375.310 0.030 23 ... SPO 2005 02 19 375.180 0.050 23 ... SPO 2005 02 20 375.270 0.180 23 ... SPO 2005 02 21 374.880 0.020 24 ... SPO 2005 02 22 374.870 0.040 22 ... SPO 2005 02 23 374.930 0.070 23 ... SPO 2005 02 24 375.020 0.020 23 ... SPO 2005 02 25 375.070 0.030 23 ... SPO 2005 02 26 375.200 0.090 23 ... SPO 2005 02 27 375.340 0.040 23 ... SPO 2005 02 28 375.240 0.050 23 ... SPO 2005 03 01 375.340 0.120 20 ... SPO 2005 03 02 375.500 0.050 23 ... SPO 2005 03 03 375.410 0.050 23 ... SPO 2005 03 04 375.460 0.070 23 ... SPO 2005 03 05 375.370 0.170 23 ... SPO 2005 03 06 375.270 0.130 23 ... SPO 2005 03 07 375.220 0.040 23 ... SPO 2005 03 08 375.220 0.060 23 ... SPO 2005 03 09 375.250 0.060 23 ... SPO 2005 03 10 375.390 0.070 23 ... SPO 2005 03 11 375.470 0.020 23 ... SPO 2005 03 12 375.490 0.020 23 ... SPO 2005 03 13 375.420 0.020 23 ... SPO 2005 03 14 375.410 0.010 23 ... SPO 2005 03 15 375.460 0.050 23 ... SPO 2005 03 16 375.560 0.020 23 ... SPO 2005 03 17 375.570 0.020 23 ... SPO 2005 03 18 375.570 0.020 24 ... SPO 2005 03 19 375.590 0.010 23 ... SPO 2005 03 20 375.540 0.050 23 ... SPO 2005 03 21 375.490 0.030 23 ... SPO 2005 03 22 375.440 0.070 23 ... SPO 2005 03 23 375.430 0.030 22 ... SPO 2005 03 24 375.350 0.050 23 ... SPO 2005 03 25 375.350 0.020 23 ... SPO 2005 03 26 375.410 0.020 23 ... SPO 2005 03 27 375.450 0.010 23 ... SPO 2005 03 28 375.450 0.030 23 ... SPO 2005 03 29 375.490 0.020 23 ... SPO 2005 03 30 375.530 0.020 23 ... SPO 2005 03 31 375.610 0.070 23 ... SPO 2005 04 01 375.540 0.050 23 ... SPO 2005 04 02 375.410 0.020 23 ... SPO 2005 04 03 375.360 0.010 23 ... SPO 2005 04 04 375.470 0.080 23 ... SPO 2005 04 05 375.510 0.030 23 ... SPO 2005 04 06 375.530 0.010 23 ... SPO 2005 04 07 375.590 0.020 23 ... SPO 2005 04 08 375.620 0.030 23 ... SPO 2005 04 09 375.630 0.020 23 ... SPO 2005 04 10 375.560 0.030 23 ... SPO 2005 04 11 375.510 0.020 23 ... SPO 2005 04 12 375.620 0.040 24 ... SPO 2005 04 13 375.620 0.050 23 ... SPO 2005 04 14 375.580 0.010 23 ... SPO 2005 04 15 375.510 0.050 23 ... SPO 2005 04 16 375.620 0.020 23 ... SPO 2005 04 17 375.640 0.010 23 ... SPO 2005 04 18 375.630 0.020 23 ... SPO 2005 04 19 375.630 0.010 23 ... SPO 2005 04 20 375.640 0.010 23 ... SPO 2005 04 21 375.700 0.050 23 ... SPO 2005 04 22 375.700 0.020 23 ... SPO 2005 04 23 375.710 0.020 23 ... SPO 2005 04 24 375.670 0.020 23 ... SPO 2005 04 25 375.650 0.020 23 ... SPO 2005 04 26 375.680 0.020 23 ... SPO 2005 04 27 375.710 0.010 23 ... SPO 2005 04 28 375.770 0.050 23 ... SPO 2005 04 29 375.890 0.030 23 ... SPO 2005 04 30 375.920 0.070 23 ... SPO 2005 05 01 375.830 0.020 23 ... SPO 2005 05 02 375.830 0.020 23 ... SPO 2005 05 03 375.830 0.020 23 ... SPO 2005 05 04 375.920 0.040 23 ... SPO 2005 05 05 375.860 0.040 23 ... SPO 2005 05 06 375.830 0.010 23 ... SPO 2005 05 07 375.870 0.010 24 ... SPO 2005 05 08 375.890 0.030 23 ... SPO 2005 05 09 375.950 0.010 23 ... SPO 2005 05 10 375.960 0.010 23 ... SPO 2005 05 11 375.930 0.010 23 ... SPO 2005 05 12 376.010 0.060 23 ... SPO 2005 05 13 376.070 0.010 23 ... SPO 2005 05 14 376.070 0.010 23 ... SPO 2005 05 15 376.070 0.010 23 ... SPO 2005 05 16 376.100 0.020 23 ... SPO 2005 05 17 376.130 0.010 23 ... SPO 2005 05 18 376.130 0.020 23 ... SPO 2005 05 19 376.120 0.010 22 ... SPO 2005 05 20 376.120 0.010 23 ... SPO 2005 05 21 376.150 0.020 23 ... SPO 2005 05 22 376.180 0.020 23 ... SPO 2005 05 23 376.180 0.010 23 ... SPO 2005 05 24 376.130 0.010 23 ... SPO 2005 05 25 376.170 0.020 23 ... SPO 2005 05 26 376.180 0.010 23 ... SPO 2005 05 27 376.200 0.020 23 ... SPO 2005 05 28 376.230 0.010 23 ... SPO 2005 05 29 376.270 0.040 23 ... SPO 2005 05 30 376.320 0.010 23 ... SPO 2005 05 31 376.350 0.030 23 ... SPO 2005 06 01 376.330 0.020 24 ... SPO 2005 06 02 376.340 0.020 23 ... SPO 2005 06 03 376.360 0.020 23 ... SPO 2005 06 04 376.390 0.010 23 ... SPO 2005 06 05 376.390 0.040 23 ... SPO 2005 06 06 376.350 0.030 23 ... SPO 2005 06 07 376.390 0.050 23 ... SPO 2005 06 08 376.470 0.070 21 ... SPO 2005 06 09 376.580 0.090 20 ... SPO 2005 06 10 376.470 0.030 18 ... SPO 2005 06 11 376.530 0.020 23 ... SPO 2005 06 12 376.560 0.020 23 ... SPO 2005 06 13 376.540 0.020 23 ... SPO 2005 06 14 376.550 0.020 23 ... SPO 2005 06 15 376.560 0.010 23 ... SPO 2005 06 16 376.560 0.010 23 ... SPO 2005 06 17 376.570 0.020 23 ... SPO 2005 06 18 376.590 0.020 23 ... SPO 2005 06 19 376.620 0.020 23 ... SPO 2005 06 20 376.680 0.010 23 ... SPO 2005 06 21 376.720 0.030 23 ... SPO 2005 06 22 376.770 0.020 23 ... SPO 2005 06 23 376.760 0.020 23 ... SPO 2005 06 24 376.770 0.020 23 ... SPO 2005 06 25 376.750 0.030 23 ... SPO 2005 06 26 376.740 0.030 24 ... SPO 2005 06 27 376.710 0.010 23 ... SPO 2005 06 28 376.790 0.040 23 ... SPO 2005 06 29 376.770 0.040 23 ... SPO 2005 06 30 376.770 0.030 23 ... SPO 2005 07 01 376.820 0.040 23 ... SPO 2005 07 02 376.840 0.050 23 ... SPO 2005 07 03 376.950 0.030 23 ... SPO 2005 07 04 376.970 0.020 23 ... SPO 2005 07 05 376.940 0.010 23 ... SPO 2005 07 06 376.930 0.010 23 ... SPO 2005 07 07 376.930 0.010 23 ... SPO 2005 07 08 376.890 0.030 23 ... SPO 2005 07 09 376.840 0.010 23 ... SPO 2005 07 10 376.900 0.070 22 ... SPO 2005 07 11 377.050 0.030 23 ... SPO 2005 07 12 377.040 0.010 22 ... SPO 2005 07 13 377.050 0.020 23 ... SPO 2005 07 14 377.090 0.010 23 ... SPO 2005 07 15 377.160 0.020 23 ... SPO 2005 07 16 377.150 0.010 23 ... SPO 2005 07 17 377.150 0.010 23 ... SPO 2005 07 18 377.170 0.020 23 ... SPO 2005 07 19 377.180 0.020 23 ... SPO 2005 07 20 377.210 0.010 23 ... SPO 2005 07 21 377.220 0.020 24 ... SPO 2005 07 22 377.210 0.010 23 ... SPO 2005 07 23 377.190 0.010 23 ... SPO 2005 07 24 377.210 0.010 23 ... SPO 2005 07 25 377.200 0.010 23 ... SPO 2005 07 26 377.240 0.030 23 ... SPO 2005 07 27 377.250 0.020 23 ... SPO 2005 07 28 377.240 0.020 23 ... SPO 2005 07 29 377.280 0.020 23 ... SPO 2005 07 30 377.310 0.010 23 ... SPO 2005 07 31 377.300 0.010 23 ... SPO 2005 08 01 377.320 0.050 23 ... SPO 2005 08 02 377.450 0.020 23 ... SPO 2005 08 03 377.450 0.020 23 ... SPO 2005 08 04 377.490 0.020 23 ... SPO 2005 08 05 377.480 0.010 23 ... SPO 2005 08 06 377.510 0.020 23 ... SPO 2005 08 07 377.520 0.020 23 ... SPO 2005 08 08 377.520 0.010 23 ... SPO 2005 08 09 377.530 0.010 23 ... SPO 2005 08 10 377.560 0.010 23 ... SPO 2005 08 11 377.570 0.010 23 ... SPO 2005 08 12 377.590 0.010 23 ... SPO 2005 08 13 377.610 0.010 23 ... SPO 2005 08 14 377.610 0.010 23 ... SPO 2005 08 15 377.630 0.010 24 ... SPO 2005 08 16 377.640 0.010 23 ... SPO 2005 08 17 377.650 0.010 23 ... SPO 2005 08 18 377.660 0.010 23 ... SPO 2005 08 19 377.690 0.020 23 ... SPO 2005 08 20 377.650 0.020 23 ... SPO 2005 08 21 377.660 0.020 23 ... SPO 2005 08 22 377.660 0.010 23 ... SPO 2005 08 23 377.680 0.020 23 ... SPO 2005 08 24 377.700 0.010 23 ... SPO 2005 08 25 377.720 0.010 23 ... SPO 2005 08 26 377.720 0.010 23 ... SPO 2005 08 27 377.720 0.020 23 ... SPO 2005 08 28 377.720 0.020 23 ... SPO 2005 08 29 377.770 0.050 23 ... SPO 2005 08 30 377.730 0.020 23 ... SPO 2005 08 31 377.750 0.010 23 ... SPO 2005 09 01 377.730 0.020 23 ... SPO 2005 09 02 377.750 0.030 23 ... SPO 2005 09 03 377.790 0.020 23 ... SPO 2005 09 04 377.820 0.010 23 ... SPO 2005 09 05 377.800 0.010 23 ... SPO 2005 09 06 377.840 0.030 23 ... SPO 2005 09 07 377.930 0.050 17 ... SPO 2005 09 08 377.860 0.090 16 ... SPO 2005 09 09 377.840 0.020 24 ... SPO 2005 09 10 377.850 0.020 23 ... SPO 2005 09 11 377.840 0.020 23 ... SPO 2005 09 12 377.850 0.010 23 ... SPO 2005 09 13 377.840 0.030 23 ... SPO 2005 09 14 377.890 0.030 23 ... SPO 2005 09 15 377.850 0.020 23 ... SPO 2005 09 16 377.880 0.040 23 ... SPO 2005 09 17 377.810 0.030 23 ... SPO 2005 09 18 377.880 0.030 23 ... SPO 2005 09 19 377.900 0.010 23 ... SPO 2005 09 20 377.920 0.010 23 ... SPO 2005 09 21 377.950 0.020 23 ... SPO 2005 09 22 377.950 0.030 23 ... SPO 2005 09 23 377.970 0.010 23 ... SPO 2005 09 24 377.920 0.020 23 ... SPO 2005 09 25 377.950 0.070 23 ... SPO 2005 09 26 377.960 0.110 23 ... SPO 2005 09 27 377.900 0.010 23 ... SPO 2005 09 28 377.970 0.030 23 ... SPO 2005 09 29 378.000 0.030 23 ... SPO 2005 09 30 377.950 0.020 23 ... SPO 2005 10 01 377.920 0.030 23 ... SPO 2005 10 02 377.950 0.030 23 ... SPO 2005 10 03 377.950 0.020 23 ... SPO 2005 10 04 377.980 0.010 24 ... SPO 2005 10 05 378.030 0.030 23 ... SPO 2005 10 06 378.050 0.040 23 ... SPO 2005 10 07 378.000 0.030 23 ... SPO 2005 10 08 378.010 0.020 23 ... SPO 2005 10 09 378.060 0.020 23 ... SPO 2005 10 10 377.980 0.050 23 ... SPO 2005 10 11 377.960 0.030 23 ... SPO 2005 10 12 378.010 0.020 23 ... SPO 2005 10 13 378.030 0.020 23 ... SPO 2005 10 14 377.940 0.030 23 ... SPO 2005 10 15 377.890 0.020 23 ... SPO 2005 10 16 377.980 0.030 23 ... SPO 2005 10 17 377.990 0.030 23 ... SPO 2005 10 18 377.980 0.040 23 ... SPO 2005 10 19 378.000 0.020 23 ... SPO 2005 10 20 377.970 0.030 23 ... SPO 2005 10 21 377.960 0.030 23 ... SPO 2005 10 22 377.940 0.010 23 ... SPO 2005 10 23 377.980 0.030 23 ... SPO 2005 10 24 377.950 0.030 22 ... SPO 2005 10 25 377.950 0.030 23 ... SPO 2005 10 26 377.940 0.010 23 ... SPO 2005 10 27 377.920 0.020 23 ... SPO 2005 10 28 377.880 0.010 23 ... SPO 2005 10 29 377.900 0.010 24 ... SPO 2005 10 30 377.900 0.020 23 ... SPO 2005 10 31 377.860 0.010 23 ... SPO 2005 11 01 377.860 0.010 23 ... SPO 2005 11 02 377.860 0.010 23 ... SPO 2005 11 03 377.870 0.010 21 ... SPO 2005 11 04 377.870 0.010 23 ... SPO 2005 11 05 -999.990 -99.990 0 *.. SPO 2005 11 06 -999.990 -99.990 0 *.. SPO 2005 11 07 377.960 0.040 11 ... SPO 2005 11 08 377.920 0.060 17 ... SPO 2005 11 09 377.960 0.040 19 ... SPO 2005 11 10 377.930 0.020 23 ... SPO 2005 11 11 377.900 0.030 23 ... SPO 2005 11 12 377.910 0.060 23 ... SPO 2005 11 13 377.870 0.010 23 ... SPO 2005 11 14 377.870 0.020 23 ... SPO 2005 11 15 377.870 0.010 23 ... SPO 2005 11 16 377.870 0.010 23 ... SPO 2005 11 17 377.890 0.020 23 ... SPO 2005 11 18 377.940 0.070 18 ... SPO 2005 11 19 377.930 0.050 19 ... SPO 2005 11 20 377.950 0.010 23 ... SPO 2005 11 21 377.940 0.020 23 ... SPO 2005 11 22 377.930 0.020 23 ... SPO 2005 11 23 377.900 0.020 23 ... SPO 2005 11 24 377.950 0.010 23 ... SPO 2005 11 25 377.940 0.020 23 ... SPO 2005 11 26 377.930 0.010 23 ... SPO 2005 11 27 377.940 0.020 23 ... SPO 2005 11 28 377.910 0.020 23 ... SPO 2005 11 29 377.920 0.020 24 ... SPO 2005 11 30 377.960 0.020 22 ... SPO 2005 12 01 377.900 0.080 23 ... SPO 2005 12 02 377.920 0.060 23 ... SPO 2005 12 03 377.920 0.050 23 ... SPO 2005 12 04 377.930 0.030 23 ... SPO 2005 12 05 377.920 0.050 22 ... SPO 2005 12 06 377.890 0.020 23 ... SPO 2005 12 07 377.930 0.040 23 ... SPO 2005 12 08 377.900 0.010 6 ... SPO 2005 12 09 377.880 0.020 23 ... SPO 2005 12 10 377.860 0.030 23 ... SPO 2005 12 11 377.840 0.010 23 ... SPO 2005 12 12 377.910 0.060 23 ... SPO 2005 12 13 377.920 0.030 23 ... SPO 2005 12 14 377.930 0.030 13 ... SPO 2005 12 15 378.000 0.050 21 ... SPO 2005 12 16 377.810 0.120 20 ... SPO 2005 12 17 377.890 0.080 21 ... SPO 2005 12 18 377.970 0.020 23 ... SPO 2005 12 19 377.930 0.030 23 ... SPO 2005 12 20 378.000 0.020 23 ... SPO 2005 12 21 377.990 0.020 23 ... SPO 2005 12 22 377.930 0.060 21 ... SPO 2005 12 23 377.900 0.020 23 ... SPO 2005 12 24 377.950 0.040 23 ... SPO 2005 12 25 377.960 0.050 22 ... SPO 2005 12 26 377.870 0.020 23 ... SPO 2005 12 27 377.870 0.050 21 ... SPO 2005 12 28 377.940 0.040 23 ... SPO 2005 12 29 377.940 0.030 23 ... SPO 2005 12 30 377.850 0.050 16 ... SPO 2005 12 31 377.910 0.140 11 ... SPO 2006 01 01 377.990 0.020 23 ... SPO 2006 01 02 378.000 0.030 23 ... SPO 2006 01 03 378.030 0.030 23 ... SPO 2006 01 04 378.070 0.010 23 ... SPO 2006 01 05 378.060 0.020 24 ... SPO 2006 01 06 378.060 0.050 23 ... SPO 2006 01 07 378.010 0.030 23 ... SPO 2006 01 08 377.940 0.040 23 ... SPO 2006 01 09 377.950 0.030 21 ... SPO 2006 01 10 378.000 0.030 21 ... SPO 2006 01 11 377.960 0.090 23 ... SPO 2006 01 12 377.970 0.070 23 ... SPO 2006 01 13 377.890 0.160 20 ... SPO 2006 01 14 377.810 0.160 23 ... SPO 2006 01 15 378.060 0.060 23 ... SPO 2006 01 16 378.020 0.090 23 ... SPO 2006 01 17 377.990 0.020 23 ... SPO 2006 01 18 377.950 0.080 22 ... SPO 2006 01 19 377.860 0.070 23 ... SPO 2006 01 20 377.840 0.030 23 ... SPO 2006 01 21 377.830 0.030 23 ... SPO 2006 01 22 377.820 0.020 16 ... SPO 2006 01 23 377.900 0.110 17 ... SPO 2006 01 24 377.900 0.220 11 ... SPO 2006 01 25 377.790 0.030 23 ... SPO 2006 01 26 377.770 0.060 23 ... SPO 2006 01 27 377.920 0.020 23 ... SPO 2006 01 28 377.880 0.020 22 ... SPO 2006 01 29 377.820 0.050 12 ... SPO 2006 01 30 377.730 0.050 21 ... SPO 2006 01 31 377.690 0.080 23 ... SPO 2006 02 01 377.610 0.040 23 ... SPO 2006 02 02 377.690 0.030 23 ... SPO 2006 02 03 377.720 0.030 23 ... SPO 2006 02 04 377.740 0.040 23 ... SPO 2006 02 05 377.720 0.030 23 ... SPO 2006 02 06 377.570 0.080 23 ... SPO 2006 02 07 377.510 0.020 22 ... SPO 2006 02 08 377.570 0.030 23 ... SPO 2006 02 09 377.700 0.070 23 ... SPO 2006 02 10 377.700 0.040 23 ... SPO 2006 02 11 377.680 0.010 17 ... SPO 2006 02 12 377.680 0.020 23 ... SPO 2006 02 13 377.690 0.040 23 ... SPO 2006 02 14 377.610 0.040 23 ... SPO 2006 02 15 377.690 0.040 23 ... SPO 2006 02 16 377.770 0.050 23 ... SPO 2006 02 17 377.670 0.030 23 ... SPO 2006 02 18 377.770 0.040 23 ... SPO 2006 02 19 377.670 0.040 23 ... SPO 2006 02 20 377.540 0.060 23 ... SPO 2006 02 21 377.430 0.080 23 ... SPO 2006 02 22 377.730 0.130 23 ... SPO 2006 02 23 377.720 0.040 23 ... SPO 2006 02 24 377.810 0.060 24 ... SPO 2006 02 25 377.660 0.030 23 ... SPO 2006 02 26 377.570 0.030 23 ... SPO 2006 02 27 377.580 0.020 23 ... SPO 2006 02 28 377.520 0.070 23 ... SPO 2006 03 01 377.680 0.030 22 ... SPO 2006 03 02 377.660 0.040 23 ... SPO 2006 03 03 377.630 0.070 23 ... SPO 2006 03 04 377.680 0.040 23 ... SPO 2006 03 05 377.820 0.090 23 ... SPO 2006 03 06 377.780 0.030 23 ... SPO 2006 03 07 377.760 0.020 23 ... SPO 2006 03 08 377.710 0.030 23 ... SPO 2006 03 09 377.700 0.030 23 ... SPO 2006 03 10 377.650 0.030 23 ... SPO 2006 03 11 377.670 0.020 23 ... SPO 2006 03 12 377.710 0.020 23 ... SPO 2006 03 13 377.710 0.030 23 ... SPO 2006 03 14 377.610 0.050 23 ... SPO 2006 03 15 377.680 0.070 23 ... SPO 2006 03 16 377.820 0.050 23 ... SPO 2006 03 17 377.880 0.030 23 ... SPO 2006 03 18 377.940 0.040 14 ... SPO 2006 03 19 377.970 0.020 7 ... SPO 2006 03 20 377.920 0.030 23 ... SPO 2006 03 21 377.790 0.090 23 ... SPO 2006 03 22 377.810 0.020 14 ... SPO 2006 03 23 377.900 0.040 20 ... SPO 2006 03 24 377.950 0.040 23 ... SPO 2006 03 25 377.850 0.030 23 ... SPO 2006 03 26 377.930 0.060 23 ... SPO 2006 03 27 377.950 0.050 23 ... SPO 2006 03 28 378.000 0.020 18 ... SPO 2006 03 29 377.950 0.030 12 ... SPO 2006 03 30 377.980 0.030 23 ... SPO 2006 03 31 377.860 0.060 22 ... SPO 2006 04 01 377.860 0.020 23 ... SPO 2006 04 02 377.840 0.040 23 ... SPO 2006 04 03 377.800 0.030 23 ... SPO 2006 04 04 377.810 0.030 23 ... SPO 2006 04 05 377.810 0.040 20 ... SPO 2006 04 06 377.790 0.030 23 ... SPO 2006 04 07 377.840 0.030 12 ... SPO 2006 04 08 377.810 0.020 23 ... SPO 2006 04 09 377.790 0.030 23 ... SPO 2006 04 10 377.780 0.060 23 ... SPO 2006 04 11 377.830 0.030 21 ... SPO 2006 04 12 377.840 0.030 23 ... SPO 2006 04 13 377.890 0.030 23 ... SPO 2006 04 14 377.970 0.040 23 ... SPO 2006 04 15 378.010 0.070 23 ... SPO 2006 04 16 377.980 0.060 23 ... SPO 2006 04 17 377.900 0.030 23 ... SPO 2006 04 18 377.860 0.030 23 ... SPO 2006 04 19 377.870 0.020 23 ... SPO 2006 04 20 377.880 0.020 23 ... SPO 2006 04 21 377.940 0.080 23 ... SPO 2006 04 22 378.010 0.020 23 ... SPO 2006 04 23 377.960 0.020 23 ... SPO 2006 04 24 377.940 0.020 23 ... SPO 2006 04 25 377.950 0.020 23 ... SPO 2006 04 26 377.980 0.020 23 ... SPO 2006 04 27 378.060 0.040 23 ... SPO 2006 04 28 378.080 0.030 23 ... SPO 2006 04 29 378.060 0.010 23 ... SPO 2006 04 30 378.100 0.030 23 ... SPO 2006 05 01 378.050 0.030 23 ... SPO 2006 05 02 378.150 0.030 23 ... SPO 2006 05 03 378.130 0.040 23 ... SPO 2006 05 04 378.080 0.030 23 ... SPO 2006 05 05 378.110 0.020 23 ... SPO 2006 05 06 378.160 0.030 24 ... SPO 2006 05 07 378.120 0.020 23 ... SPO 2006 05 08 378.110 0.040 23 ... SPO 2006 05 09 378.090 0.020 23 ... SPO 2006 05 10 378.140 0.030 23 ... SPO 2006 05 11 378.170 0.020 23 ... SPO 2006 05 12 378.170 0.020 23 ... SPO 2006 05 13 378.160 0.030 23 ... SPO 2006 05 14 378.140 0.020 23 ... SPO 2006 05 15 378.160 0.030 23 ... SPO 2006 05 16 378.130 0.040 23 ... SPO 2006 05 17 378.150 0.030 23 ... SPO 2006 05 18 378.180 0.030 23 ... SPO 2006 05 19 378.200 0.030 23 ... SPO 2006 05 20 378.200 0.020 23 ... SPO 2006 05 21 378.220 0.010 23 ... SPO 2006 05 22 378.230 0.020 23 ... SPO 2006 05 23 378.240 0.070 23 ... SPO 2006 05 24 378.170 0.040 23 ... SPO 2006 05 25 378.140 0.030 23 ... SPO 2006 05 26 378.180 0.020 23 ... SPO 2006 05 27 378.200 0.030 23 ... SPO 2006 05 28 378.260 0.030 23 ... SPO 2006 05 29 378.260 0.030 23 ... SPO 2006 05 30 378.270 0.040 23 ... SPO 2006 05 31 378.320 0.030 5 ... SPO 2006 06 01 378.310 0.020 23 ... SPO 2006 06 02 378.320 0.030 17 ... SPO 2006 06 03 378.310 0.040 20 ... SPO 2006 06 04 378.360 0.030 22 ... SPO 2006 06 05 378.400 0.030 23 ... SPO 2006 06 06 378.310 0.030 23 ... SPO 2006 06 07 378.420 0.040 23 ... SPO 2006 06 08 378.360 0.030 23 ... SPO 2006 06 09 378.390 0.020 23 ... SPO 2006 06 10 378.400 0.020 23 ... SPO 2006 06 11 378.390 0.020 9 ... SPO 2006 06 12 378.430 0.040 23 ... SPO 2006 06 13 378.390 0.020 23 ... SPO 2006 06 14 378.400 0.010 23 ... SPO 2006 06 15 378.380 0.020 23 ... SPO 2006 06 16 378.390 0.020 23 ... SPO 2006 06 17 378.400 0.030 23 ... SPO 2006 06 18 378.460 0.030 21 ... SPO 2006 06 19 378.460 0.030 23 ... SPO 2006 06 20 378.470 0.040 23 ... SPO 2006 06 21 378.400 0.020 23 ... SPO 2006 06 22 378.430 0.020 23 ... SPO 2006 06 23 378.430 0.020 23 ... SPO 2006 06 24 378.390 0.020 23 ... SPO 2006 06 25 378.410 0.020 24 ... SPO 2006 06 26 378.430 0.020 23 ... SPO 2006 06 27 378.470 0.030 23 ... SPO 2006 06 28 378.560 0.030 23 ... SPO 2006 06 29 378.520 0.030 23 ... SPO 2006 06 30 378.520 0.020 23 ... SPO 2006 07 01 378.560 0.030 23 ... SPO 2006 07 02 378.550 0.010 23 ... SPO 2006 07 03 378.550 0.030 23 ... SPO 2006 07 04 378.560 0.030 23 ... SPO 2006 07 05 378.570 0.010 23 ... SPO 2006 07 06 378.600 0.050 23 ... SPO 2006 07 07 378.630 0.040 23 ... SPO 2006 07 08 378.650 0.020 23 ... SPO 2006 07 09 378.640 0.020 23 ... SPO 2006 07 10 378.690 0.020 23 ... SPO 2006 07 11 378.670 0.020 23 ... SPO 2006 07 12 378.670 0.020 23 ... SPO 2006 07 13 378.640 0.020 10 ... SPO 2006 07 14 378.710 0.030 8 ... SPO 2006 07 15 378.670 0.030 21 ... SPO 2006 07 16 378.670 0.030 12 ... SPO 2006 07 17 378.770 0.040 23 ... SPO 2006 07 18 378.780 0.010 11 ... SPO 2006 07 19 378.780 0.020 9 ... SPO 2006 07 20 378.850 0.030 15 ... SPO 2006 07 21 378.930 0.020 21 ... SPO 2006 07 22 378.910 0.020 23 ... SPO 2006 07 23 378.880 0.040 15 ... SPO 2006 07 24 378.820 0.020 23 ... SPO 2006 07 25 378.850 0.020 23 ... SPO 2006 07 26 378.920 0.030 17 ... SPO 2006 07 27 378.930 0.040 20 ... SPO 2006 07 28 378.970 0.030 23 ... SPO 2006 07 29 378.990 0.020 21 ... SPO 2006 07 30 378.990 0.020 20 ... SPO 2006 07 31 379.020 0.020 17 ... SPO 2006 08 01 379.160 0.020 22 ... SPO 2006 08 02 379.140 0.040 6 ... SPO 2006 08 03 379.070 0.030 12 ... SPO 2006 08 04 379.040 0.020 22 ... SPO 2006 08 05 379.060 0.020 18 ... SPO 2006 08 06 379.040 0.000 4 ... SPO 2006 08 07 379.060 0.010 18 ... SPO 2006 08 08 379.070 0.040 15 ... SPO 2006 08 09 379.210 0.100 13 ... SPO 2006 08 10 379.170 0.050 7 ... SPO 2006 08 11 379.140 0.020 14 ... SPO 2006 08 12 379.160 0.020 12 ... SPO 2006 08 13 379.190 0.120 11 ... SPO 2006 08 14 379.240 0.090 6 ... SPO 2006 08 15 379.290 0.020 12 ... SPO 2006 08 16 379.300 0.030 7 ... SPO 2006 08 17 379.230 0.020 12 ... SPO 2006 08 18 379.240 0.020 5 ... SPO 2006 08 19 379.280 0.030 15 ... SPO 2006 08 20 379.250 0.030 12 ... SPO 2006 08 21 379.250 0.020 14 ... SPO 2006 08 22 379.290 0.030 11 ... SPO 2006 08 23 379.290 0.020 12 ... SPO 2006 08 24 379.280 0.030 19 ... SPO 2006 08 25 379.300 0.010 20 ... SPO 2006 08 26 379.400 0.030 21 ... SPO 2006 08 27 379.400 0.020 13 ... SPO 2006 08 28 379.430 0.010 12 ... SPO 2006 08 29 379.410 0.020 14 ... SPO 2006 08 30 379.410 0.020 22 ... SPO 2006 08 31 379.370 0.040 23 ... SPO 2006 09 01 379.350 0.020 14 ... SPO 2006 09 02 379.350 0.020 9 ... SPO 2006 09 03 379.350 0.050 13 ... SPO 2006 09 04 379.360 0.020 21 ... SPO 2006 09 05 379.420 0.030 23 ... SPO 2006 09 06 379.380 0.030 23 ... SPO 2006 09 07 379.400 0.030 22 ... SPO 2006 09 08 379.420 0.030 9 ... SPO 2006 09 09 379.430 0.020 10 ... SPO 2006 09 10 379.470 0.030 10 ... SPO 2006 09 11 379.450 0.020 12 ... SPO 2006 09 12 379.480 0.040 12 ... SPO 2006 09 13 379.500 0.040 22 ... SPO 2006 09 14 379.540 0.020 23 ... SPO 2006 09 15 379.540 0.020 6 ... SPO 2006 09 16 379.530 0.030 18 ... SPO 2006 09 17 379.530 0.040 23 ... SPO 2006 09 18 379.480 0.030 17 ... SPO 2006 09 19 379.470 0.030 22 ... SPO 2006 09 20 379.510 0.020 11 ... SPO 2006 09 21 379.510 0.030 24 ... SPO 2006 09 22 379.490 0.020 12 ... SPO 2006 09 23 379.510 0.020 12 ... SPO 2006 09 24 379.560 0.030 8 ... SPO 2006 09 25 379.570 0.020 23 ... SPO 2006 09 26 379.590 0.030 13 ... SPO 2006 09 27 379.540 0.030 18 ... SPO 2006 09 28 379.660 0.040 11 ... SPO 2006 09 29 379.570 0.040 15 ... SPO 2006 09 30 379.560 0.030 14 ... SPO 2006 10 01 379.610 0.030 14 ... SPO 2006 10 02 379.600 0.020 10 ... SPO 2006 10 03 379.590 0.010 5 ... SPO 2006 10 04 379.560 0.030 21 ... SPO 2006 10 05 379.580 0.020 9 ... SPO 2006 10 06 379.580 0.020 6 ... SPO 2006 10 07 379.570 0.020 23 ... SPO 2006 10 08 379.560 0.020 22 ... SPO 2006 10 09 379.550 0.030 19 ... SPO 2006 10 10 -999.990 -99.990 0 *.. SPO 2006 10 11 379.620 0.030 23 ... SPO 2006 10 12 379.600 0.010 23 ... SPO 2006 10 13 379.570 0.040 23 ... SPO 2006 10 14 379.540 0.010 23 ... SPO 2006 10 15 379.530 0.020 23 ... SPO 2006 10 16 379.520 0.030 23 ... SPO 2006 10 17 379.540 0.020 23 ... SPO 2006 10 18 379.560 0.020 23 ... SPO 2006 10 19 379.560 0.020 23 ... SPO 2006 10 20 379.570 0.020 23 ... SPO 2006 10 21 379.620 0.020 23 ... SPO 2006 10 22 379.660 0.030 23 ... SPO 2006 10 23 379.690 0.010 23 ... SPO 2006 10 24 379.680 0.030 20 ... SPO 2006 10 25 379.600 0.030 17 ... SPO 2006 10 26 379.610 0.030 16 ... SPO 2006 10 27 379.600 0.020 22 ... SPO 2006 10 28 379.610 0.030 8 ... SPO 2006 10 29 379.630 0.020 21 ... SPO 2006 10 30 379.620 0.030 23 ... SPO 2006 10 31 379.560 0.030 23 ... SPO 2006 11 01 379.570 0.030 23 ... SPO 2006 11 02 379.580 0.020 23 ... SPO 2006 11 03 379.560 0.020 23 ... SPO 2006 11 04 379.570 0.020 23 ... SPO 2006 11 05 379.550 0.020 23 ... SPO 2006 11 06 379.600 0.040 23 ... SPO 2006 11 07 379.580 0.040 23 ... SPO 2006 11 08 379.530 0.020 23 ... SPO 2006 11 09 379.590 0.030 23 ... SPO 2006 11 10 379.570 0.030 23 ... SPO 2006 11 11 379.550 0.020 23 ... SPO 2006 11 12 379.560 0.010 23 ... SPO 2006 11 13 -999.990 -99.990 0 *.. SPO 2006 11 14 379.520 0.020 15 ... SPO 2006 11 15 379.570 0.040 23 ... SPO 2006 11 16 379.550 0.050 23 ... SPO 2006 11 17 379.490 0.030 23 ... SPO 2006 11 18 379.510 0.030 23 ... SPO 2006 11 19 379.550 0.060 23 ... SPO 2006 11 20 379.580 0.020 23 ... SPO 2006 11 21 379.560 0.020 23 ... SPO 2006 11 22 379.560 0.030 23 ... SPO 2006 11 23 379.570 0.020 23 ... SPO 2006 11 24 379.570 0.020 23 ... SPO 2006 11 25 379.570 0.020 23 ... SPO 2006 11 26 379.520 0.040 23 ... SPO 2006 11 27 379.460 0.020 16 ... SPO 2006 11 28 379.600 0.010 3 ... SPO 2006 11 29 379.590 0.040 23 ... SPO 2006 11 30 379.510 0.040 23 ... SPO 2006 12 01 379.540 0.030 23 ... SPO 2006 12 02 379.520 0.030 24 ... SPO 2006 12 03 379.530 0.030 22 ... SPO 2006 12 04 379.520 0.040 23 ... SPO 2006 12 05 379.500 0.020 23 ... SPO 2006 12 06 379.530 0.030 23 ... SPO 2006 12 07 379.520 0.030 23 ... SPO 2006 12 08 379.490 0.030 23 ... SPO 2006 12 09 379.540 0.050 23 ... SPO 2006 12 10 379.620 0.040 23 ... SPO 2006 12 11 379.630 0.020 23 ... SPO 2006 12 12 379.610 0.030 23 ... SPO 2006 12 13 379.560 0.050 18 ... SPO 2006 12 14 379.560 0.060 23 ... SPO 2006 12 15 379.580 0.020 23 ... SPO 2006 12 16 379.600 0.030 23 ... SPO 2006 12 17 379.670 0.020 23 ... SPO 2006 12 18 379.640 0.040 23 ... SPO 2006 12 19 379.630 0.020 23 ... SPO 2006 12 20 379.600 0.030 23 ... SPO 2006 12 21 379.590 0.070 23 ... SPO 2006 12 22 379.480 0.020 23 ... SPO 2006 12 23 379.480 0.020 23 ... SPO 2006 12 24 379.470 0.030 23 ... SPO 2006 12 25 379.490 0.050 20 ... SPO 2006 12 26 379.580 0.020 18 ... SPO 2006 12 27 379.670 0.150 16 ... SPO 2006 12 28 379.600 0.150 20 ... SPO 2006 12 29 379.550 0.110 19 ... SPO 2006 12 30 379.500 0.050 23 ... SPO 2006 12 31 379.510 0.130 14 ... SPO 2007 01 01 379.370 0.050 20 ... SPO 2007 01 02 379.530 0.060 23 ... SPO 2007 01 03 379.560 0.040 23 ... SPO 2007 01 04 379.400 0.080 23 ... SPO 2007 01 05 379.400 0.080 23 ... SPO 2007 01 06 379.390 0.080 23 ... SPO 2007 01 07 379.410 0.030 23 ... SPO 2007 01 08 379.410 0.050 5 ... SPO 2007 01 09 -999.990 -99.990 0 *.. SPO 2007 01 10 -999.990 -99.990 0 *.. SPO 2007 01 11 -999.990 -99.990 0 *.. SPO 2007 01 12 -999.990 -99.990 0 *.. SPO 2007 01 13 -999.990 -99.990 0 *.. SPO 2007 01 14 -999.990 -99.990 0 *.. SPO 2007 01 15 -999.990 -99.990 0 *.. SPO 2007 01 16 -999.990 -99.990 0 *.. SPO 2007 01 17 -999.990 -99.990 0 *.. SPO 2007 01 18 -999.990 -99.990 0 *.. SPO 2007 01 19 -999.990 -99.990 0 *.. SPO 2007 01 20 -999.990 -99.990 0 *.. SPO 2007 01 21 -999.990 -99.990 0 *.. SPO 2007 01 22 -999.990 -99.990 0 *.. SPO 2007 01 23 -999.990 -99.990 0 *.. SPO 2007 01 24 -999.990 -99.990 0 *.. SPO 2007 01 25 -999.990 -99.990 0 *.. SPO 2007 01 26 379.620 0.030 18 ... SPO 2007 01 27 379.570 0.070 21 ... SPO 2007 01 28 379.590 0.050 22 ... SPO 2007 01 29 379.630 0.030 23 ... SPO 2007 01 30 379.630 0.030 23 ... SPO 2007 01 31 379.610 0.040 20 ... SPO 2007 02 01 379.560 0.060 23 ... SPO 2007 02 02 379.630 0.070 23 ... SPO 2007 02 03 379.610 0.030 23 ... SPO 2007 02 04 379.600 0.040 23 ... SPO 2007 02 05 379.640 0.080 20 ... SPO 2007 02 06 379.580 0.050 22 ... SPO 2007 02 07 379.580 0.040 23 ... SPO 2007 02 08 379.530 0.030 24 ... SPO 2007 02 09 379.500 0.030 23 ... SPO 2007 02 10 379.560 0.070 23 ... SPO 2007 02 11 379.550 0.040 23 ... SPO 2007 02 12 379.300 0.140 23 ... SPO 2007 02 13 379.410 0.140 23 ... SPO 2007 02 14 379.480 0.140 23 ... SPO 2007 02 15 379.400 0.090 23 ... SPO 2007 02 16 379.570 0.130 23 ... SPO 2007 02 17 379.370 0.130 23 ... SPO 2007 02 18 379.430 0.080 23 ... SPO 2007 02 19 379.340 0.040 23 ... SPO 2007 02 20 379.350 0.040 23 ... SPO 2007 02 21 379.400 0.040 23 ... SPO 2007 02 22 379.470 0.030 23 ... SPO 2007 02 23 379.490 0.020 23 ... SPO 2007 02 24 379.490 0.040 23 ... SPO 2007 02 25 379.460 0.070 23 ... SPO 2007 02 26 379.470 0.070 23 ... SPO 2007 02 27 379.350 0.020 23 ... SPO 2007 02 28 379.340 0.020 23 ... SPO 2007 03 01 379.370 0.030 23 ... SPO 2007 03 02 379.320 0.020 23 ... SPO 2007 03 03 379.350 0.020 23 ... SPO 2007 03 04 379.350 0.020 23 ... SPO 2007 03 05 379.350 0.060 24 ... SPO 2007 03 06 379.440 0.020 23 ... SPO 2007 03 07 379.470 0.030 23 ... SPO 2007 03 08 379.460 0.020 23 ... SPO 2007 03 09 379.500 0.030 23 ... SPO 2007 03 10 379.460 0.030 23 ... SPO 2007 03 11 379.370 0.050 23 ... SPO 2007 03 12 379.370 0.050 23 ... SPO 2007 03 13 379.490 0.040 23 ... SPO 2007 03 14 379.500 0.020 23 ... SPO 2007 03 15 379.530 0.040 23 ... SPO 2007 03 16 379.510 0.040 23 ... SPO 2007 03 17 379.510 0.020 23 ... SPO 2007 03 18 379.540 0.040 23 ... SPO 2007 03 19 379.410 0.080 23 ... SPO 2007 03 20 379.370 0.020 23 ... SPO 2007 03 21 379.420 0.060 23 ... SPO 2007 03 22 379.430 0.050 23 ... SPO 2007 03 23 379.500 0.030 23 ... SPO 2007 03 24 379.480 0.040 23 ... SPO 2007 03 25 379.470 0.040 23 ... SPO 2007 03 26 379.540 0.040 23 ... SPO 2007 03 27 379.490 0.020 23 ... SPO 2007 03 28 379.560 0.060 23 ... SPO 2007 03 29 379.690 0.030 23 ... SPO 2007 03 30 379.640 0.060 24 ... SPO 2007 03 31 379.580 0.020 23 ... SPO 2007 04 01 379.580 0.030 23 ... SPO 2007 04 02 379.600 0.030 23 ... SPO 2007 04 03 379.660 0.030 23 ... SPO 2007 04 04 379.690 0.020 23 ... SPO 2007 04 05 379.750 0.020 23 ... SPO 2007 04 06 379.730 0.040 23 ... SPO 2007 04 07 379.790 0.030 23 ... SPO 2007 04 08 379.930 0.040 23 ... SPO 2007 04 09 379.870 0.060 23 ... SPO 2007 04 10 379.750 0.040 23 ... SPO 2007 04 11 379.790 0.040 23 ... SPO 2007 04 12 379.890 0.020 23 ... SPO 2007 04 13 379.840 0.040 23 ... SPO 2007 04 14 379.790 0.040 23 ... SPO 2007 04 15 379.810 0.020 23 ... SPO 2007 04 16 379.800 0.020 23 ... SPO 2007 04 17 379.820 0.020 23 ... SPO 2007 04 18 379.810 0.030 23 ... SPO 2007 04 19 379.770 0.020 23 ... SPO 2007 04 20 379.780 0.020 23 ... SPO 2007 04 21 379.760 0.020 23 ... SPO 2007 04 22 379.770 0.030 23 ... SPO 2007 04 23 379.850 0.030 23 ... SPO 2007 04 24 379.880 0.040 24 ... SPO 2007 04 25 379.880 0.010 23 ... SPO 2007 04 26 379.880 0.030 23 ... SPO 2007 04 27 379.910 0.020 23 ... SPO 2007 04 28 379.960 0.040 23 ... SPO 2007 04 29 379.900 0.020 23 ... SPO 2007 04 30 379.920 0.050 23 ... SPO 2007 05 01 379.970 0.030 23 ... SPO 2007 05 02 380.010 0.030 23 ... SPO 2007 05 03 380.050 0.030 23 ... SPO 2007 05 04 380.080 0.040 23 ... SPO 2007 05 05 380.040 0.020 23 ... SPO 2007 05 06 380.060 0.010 23 ... SPO 2007 05 07 380.120 0.030 23 ... SPO 2007 05 08 380.090 0.060 23 ... SPO 2007 05 09 380.070 0.030 23 ... SPO 2007 05 10 380.050 0.050 23 ... SPO 2007 05 11 380.030 0.020 23 ... SPO 2007 05 12 380.020 0.020 23 ... SPO 2007 05 13 380.080 0.030 23 ... SPO 2007 05 14 380.060 0.020 23 ... SPO 2007 05 15 380.040 0.020 23 ... SPO 2007 05 16 380.120 0.060 23 ... SPO 2007 05 17 380.180 0.020 23 ... SPO 2007 05 18 380.130 0.030 23 ... SPO 2007 05 19 380.090 0.030 24 ... SPO 2007 05 20 380.090 0.030 23 ... SPO 2007 05 21 380.130 0.030 23 ... SPO 2007 05 22 380.180 0.020 23 ... SPO 2007 05 23 380.170 0.040 23 ... SPO 2007 05 24 380.190 0.050 23 ... SPO 2007 05 25 380.240 0.040 23 ... SPO 2007 05 26 380.280 0.060 23 ... SPO 2007 05 27 380.230 0.030 23 ... SPO 2007 05 28 380.260 0.020 23 ... SPO 2007 05 29 380.270 0.020 23 ... SPO 2007 05 30 380.270 0.020 23 ... SPO 2007 05 31 380.310 0.010 23 ... SPO 2007 06 01 380.320 0.030 23 ... SPO 2007 06 02 380.300 0.030 23 ... SPO 2007 06 03 380.310 0.020 23 ... SPO 2007 06 04 380.330 0.040 23 ... SPO 2007 06 05 380.400 0.020 23 ... SPO 2007 06 06 380.400 0.020 23 ... SPO 2007 06 07 380.400 0.020 23 ... SPO 2007 06 08 380.420 0.030 23 ... SPO 2007 06 09 380.410 0.020 23 ... SPO 2007 06 10 380.400 0.020 23 ... SPO 2007 06 11 380.400 0.030 23 ... SPO 2007 06 12 380.440 0.030 23 ... SPO 2007 06 13 380.440 0.020 24 ... SPO 2007 06 14 380.440 0.020 23 ... SPO 2007 06 15 380.440 0.020 23 ... SPO 2007 06 16 380.460 0.020 23 ... SPO 2007 06 17 380.500 0.020 23 ... SPO 2007 06 18 380.500 0.030 23 ... SPO 2007 06 19 380.520 0.020 23 ... SPO 2007 06 20 380.550 0.030 23 ... SPO 2007 06 21 380.590 0.020 23 ... SPO 2007 06 22 380.570 0.020 23 ... SPO 2007 06 23 380.560 0.020 23 ... SPO 2007 06 24 380.590 0.020 23 ... SPO 2007 06 25 380.600 0.030 23 ... SPO 2007 06 26 380.600 0.020 23 ... SPO 2007 06 27 380.610 0.040 23 ... SPO 2007 06 28 380.640 0.020 23 ... SPO 2007 06 29 380.630 0.030 23 ... SPO 2007 06 30 380.630 0.030 23 ... SPO 2007 07 01 380.640 0.020 23 ... SPO 2007 07 02 380.670 0.020 23 ... SPO 2007 07 03 380.680 0.020 23 ... SPO 2007 07 04 380.690 0.030 23 ... SPO 2007 07 05 380.730 0.030 23 ... SPO 2007 07 06 380.720 0.020 23 ... SPO 2007 07 07 380.740 0.030 23 ... SPO 2007 07 08 380.770 0.030 24 ... SPO 2007 07 09 380.750 0.030 23 ... SPO 2007 07 10 380.760 0.020 23 ... SPO 2007 07 11 380.770 0.030 23 ... SPO 2007 07 12 380.900 0.050 23 ... SPO 2007 07 13 380.810 0.020 23 ... SPO 2007 07 14 380.810 0.020 23 ... SPO 2007 07 15 380.820 0.030 22 ... SPO 2007 07 16 380.820 0.020 23 ... SPO 2007 07 17 380.910 0.030 23 ... SPO 2007 07 18 381.000 0.030 23 ... SPO 2007 07 19 380.980 0.030 23 ... SPO 2007 07 20 381.040 0.030 23 ... SPO 2007 07 21 381.000 0.060 23 ... SPO 2007 07 22 380.910 0.020 23 ... SPO 2007 07 23 380.940 0.030 23 ... SPO 2007 07 24 381.020 0.050 23 ... SPO 2007 07 25 381.080 0.020 23 ... SPO 2007 07 26 381.110 0.030 23 ... SPO 2007 07 27 381.100 0.030 23 ... SPO 2007 07 28 381.090 0.020 23 ... SPO 2007 07 29 381.120 0.020 23 ... SPO 2007 07 30 381.130 0.020 23 ... SPO 2007 07 31 381.150 0.040 23 ... SPO 2007 08 01 381.100 0.020 23 ... SPO 2007 08 02 381.120 0.040 24 ... SPO 2007 08 03 381.130 0.030 23 ... SPO 2007 08 04 381.150 0.020 23 ... SPO 2007 08 05 381.160 0.020 23 ... SPO 2007 08 06 381.150 0.030 23 ... SPO 2007 08 07 381.260 0.050 23 ... SPO 2007 08 08 381.230 0.030 23 ... SPO 2007 08 09 381.200 0.030 23 ... SPO 2007 08 10 381.270 0.050 21 ... SPO 2007 08 11 381.310 0.030 23 ... SPO 2007 08 12 381.300 0.020 23 ... SPO 2007 08 13 381.310 0.040 23 ... SPO 2007 08 14 381.340 0.040 23 ... SPO 2007 08 15 381.400 0.060 23 ... SPO 2007 08 16 381.330 0.040 23 ... SPO 2007 08 17 381.290 0.030 23 ... SPO 2007 08 18 381.290 0.020 23 ... SPO 2007 08 19 381.320 0.020 23 ... SPO 2007 08 20 381.340 0.020 23 ... SPO 2007 08 21 381.330 0.020 23 ... SPO 2007 08 22 381.350 0.020 23 ... SPO 2007 08 23 381.400 0.030 23 ... SPO 2007 08 24 381.420 0.020 23 ... SPO 2007 08 25 381.440 0.020 23 ... SPO 2007 08 26 381.470 0.030 23 ... SPO 2007 08 27 381.460 0.020 24 ... SPO 2007 08 28 381.460 0.020 23 ... SPO 2007 08 29 381.490 0.030 23 ... SPO 2007 08 30 381.500 0.030 23 ... SPO 2007 08 31 381.500 0.030 23 ... SPO 2007 09 01 381.500 0.030 23 ... SPO 2007 09 02 381.510 0.030 23 ... SPO 2007 09 03 381.540 0.020 23 ... SPO 2007 09 04 381.570 0.020 23 ... SPO 2007 09 05 381.570 0.030 23 ... SPO 2007 09 06 381.620 0.060 23 ... SPO 2007 09 07 381.620 0.020 23 ... SPO 2007 09 08 381.620 0.020 23 ... SPO 2007 09 09 381.620 0.020 23 ... SPO 2007 09 10 381.630 0.040 23 ... SPO 2007 09 11 381.680 0.020 23 ... SPO 2007 09 12 381.660 0.020 23 ... SPO 2007 09 13 381.670 0.020 23 ... SPO 2007 09 14 381.700 0.020 23 ... SPO 2007 09 15 381.720 0.030 23 ... SPO 2007 09 16 381.700 0.020 23 ... SPO 2007 09 17 381.700 0.030 23 ... SPO 2007 09 18 381.720 0.020 23 ... SPO 2007 09 19 381.670 0.020 23 ... SPO 2007 09 20 381.680 0.020 23 ... SPO 2007 09 21 381.650 0.020 24 ... SPO 2007 09 22 381.630 0.020 23 ... SPO 2007 09 23 381.710 0.060 23 ... SPO 2007 09 24 381.790 0.030 23 ... SPO 2007 09 25 381.810 0.020 23 ... SPO 2007 09 26 381.770 0.030 23 ... SPO 2007 09 27 381.780 0.030 23 ... SPO 2007 09 28 381.810 0.030 23 ... SPO 2007 09 29 381.780 0.030 23 ... SPO 2007 09 30 381.790 0.030 23 ... SPO 2007 10 01 381.750 0.040 23 ... SPO 2007 10 02 381.800 0.040 23 ... SPO 2007 10 03 381.800 0.030 23 ... SPO 2007 10 04 381.790 0.030 23 ... SPO 2007 10 05 381.730 0.030 23 ... SPO 2007 10 06 381.740 0.030 23 ... SPO 2007 10 07 381.820 0.020 23 ... SPO 2007 10 08 381.880 0.030 23 ... SPO 2007 10 09 381.880 0.030 23 ... SPO 2007 10 10 381.820 0.030 23 ... SPO 2007 10 11 381.870 0.030 23 ... SPO 2007 10 12 381.840 0.030 23 ... SPO 2007 10 13 381.790 0.030 23 ... SPO 2007 10 14 381.780 0.040 23 ... SPO 2007 10 15 381.790 0.020 23 ... SPO 2007 10 16 381.810 0.030 24 ... SPO 2007 10 17 381.810 0.020 23 ... SPO 2007 10 18 381.820 0.020 23 ... SPO 2007 10 19 381.810 0.020 23 ... SPO 2007 10 20 381.800 0.030 23 ... SPO 2007 10 21 381.790 0.030 23 ... SPO 2007 10 22 381.810 0.040 23 ... SPO 2007 10 23 381.740 0.050 23 ... SPO 2007 10 24 381.660 0.030 23 ... SPO 2007 10 25 381.770 0.030 23 ... SPO 2007 10 26 381.800 0.020 23 ... SPO 2007 10 27 381.810 0.030 23 ... SPO 2007 10 28 381.800 0.030 23 ... SPO 2007 10 29 381.780 0.020 23 ... SPO 2007 10 30 381.780 0.020 23 ... SPO 2007 10 31 381.790 0.010 23 ... SPO 2007 11 01 381.780 0.020 23 ... SPO 2007 11 02 381.750 0.020 23 ... SPO 2007 11 03 381.760 0.020 23 ... SPO 2007 11 04 381.760 0.020 23 ... SPO 2007 11 05 381.740 0.040 23 ... SPO 2007 11 06 381.770 0.030 23 ... SPO 2007 11 07 381.790 0.030 23 ... SPO 2007 11 08 381.790 0.050 23 ... SPO 2007 11 09 381.770 0.040 23 ... SPO 2007 11 10 381.730 0.020 24 ... SPO 2007 11 11 381.780 0.020 23 ... SPO 2007 11 12 381.800 0.050 23 ... SPO 2007 11 13 -999.990 -99.990 0 *.. SPO 2007 11 14 381.810 0.040 12 ... SPO 2007 11 15 381.770 0.020 23 ... SPO 2007 11 16 381.800 0.020 24 ... SPO 2007 11 17 381.860 0.020 23 ... SPO 2007 11 18 381.840 0.020 23 ... SPO 2007 11 19 381.810 0.020 23 ... SPO 2007 11 20 381.820 0.030 23 ... SPO 2007 11 21 381.840 0.020 23 ... SPO 2007 11 22 381.850 0.020 23 ... SPO 2007 11 23 381.820 0.040 23 ... SPO 2007 11 24 381.830 0.020 22 ... SPO 2007 11 25 381.920 0.090 7 ... SPO 2007 11 26 381.850 0.040 17 ... SPO 2007 11 27 381.920 0.030 23 ... SPO 2007 11 28 381.870 0.050 23 ... SPO 2007 11 29 381.780 0.040 23 ... SPO 2007 11 30 381.780 0.050 21 ... SPO 2007 12 01 381.750 0.020 23 ... SPO 2007 12 02 381.840 0.050 22 ... SPO 2007 12 03 381.850 0.030 23 ... SPO 2007 12 04 381.820 0.040 23 ... SPO 2007 12 05 381.810 0.030 23 ... SPO 2007 12 06 381.810 0.010 23 ... SPO 2007 12 07 381.810 0.020 23 ... SPO 2007 12 08 381.820 0.020 23 ... SPO 2007 12 09 381.790 0.020 23 ... SPO 2007 12 10 381.780 0.020 23 ... SPO 2007 12 11 381.710 0.040 24 ... SPO 2007 12 12 381.690 0.050 22 ... SPO 2007 12 13 381.830 0.020 23 ... SPO 2007 12 14 381.820 0.020 23 ... SPO 2007 12 15 381.700 0.070 23 ... SPO 2007 12 16 381.800 0.050 23 ... SPO 2007 12 17 381.840 0.040 23 ... SPO 2007 12 18 381.850 0.020 22 ... SPO 2007 12 19 381.970 0.100 22 ... SPO 2007 12 20 381.960 0.180 9 ... SPO 2007 12 21 381.730 0.040 14 ... SPO 2007 12 22 381.730 0.060 23 ... SPO 2007 12 23 381.900 0.020 23 ... SPO 2007 12 24 381.840 0.070 23 ... SPO 2007 12 25 381.770 0.030 23 ... SPO 2007 12 26 381.780 0.020 23 ... SPO 2007 12 27 381.820 0.020 22 ... SPO 2007 12 28 381.880 0.030 23 ... SPO 2007 12 29 381.870 0.020 23 ... SPO 2007 12 30 381.870 0.040 23 ... SPO 2007 12 31 381.860 0.040 19 ... SPO 2008 01 01 381.860 0.040 23 ... SPO 2008 01 02 381.860 0.040 23 ... SPO 2008 01 03 381.790 0.050 23 ... SPO 2008 01 04 381.790 0.050 23 ... SPO 2008 01 05 381.790 0.030 24 ... SPO 2008 01 06 381.860 0.060 16 ... SPO 2008 01 07 381.900 0.040 22 ... SPO 2008 01 08 381.790 0.180 18 ... SPO 2008 01 09 381.830 0.140 23 ... SPO 2008 01 10 381.940 0.030 23 ... SPO 2008 01 11 381.870 0.030 23 ... SPO 2008 01 12 381.880 0.020 23 ... SPO 2008 01 13 381.920 0.040 23 ... SPO 2008 01 14 381.800 0.050 23 ... SPO 2008 01 15 381.810 0.120 23 ... SPO 2008 01 16 381.670 0.200 21 ... SPO 2008 01 17 381.780 0.040 3 ... SPO 2008 01 18 381.740 0.070 23 ... SPO 2008 01 19 381.740 0.060 23 ... SPO 2008 01 20 381.800 0.040 23 ... SPO 2008 01 21 381.700 0.030 23 ... SPO 2008 01 22 381.700 0.020 23 ... SPO 2008 01 23 381.700 0.020 23 ... SPO 2008 01 24 381.730 0.020 23 ... SPO 2008 01 25 381.680 0.040 23 ... SPO 2008 01 26 381.710 0.040 23 ... SPO 2008 01 27 381.690 0.030 23 ... SPO 2008 01 28 381.690 0.050 23 ... SPO 2008 01 29 381.790 0.060 23 ... SPO 2008 01 30 381.770 0.040 22 ... SPO 2008 01 31 381.720 0.070 19 ... SPO 2008 02 01 381.700 0.020 23 ... SPO 2008 02 02 381.760 0.050 23 ... SPO 2008 02 03 381.780 0.070 23 ... SPO 2008 02 04 381.720 0.040 23 ... SPO 2008 02 05 381.830 0.030 21 ... SPO 2008 02 06 381.840 0.030 23 ... SPO 2008 02 07 381.870 0.020 23 ... SPO 2008 02 08 381.860 0.050 23 ... SPO 2008 02 09 381.870 0.050 23 ... SPO 2008 02 10 381.750 0.030 23 ... SPO 2008 02 11 381.710 0.060 23 ... SPO 2008 02 12 381.610 0.080 23 ... SPO 2008 02 13 381.640 0.040 22 ... SPO 2008 02 14 381.670 0.050 23 ... SPO 2008 02 15 381.700 0.040 23 ... SPO 2008 02 16 381.710 0.030 22 ... SPO 2008 02 17 381.720 0.060 23 ... SPO 2008 02 18 381.740 0.040 23 ... SPO 2008 02 19 381.760 0.040 23 ... SPO 2008 02 20 381.870 0.030 23 ... SPO 2008 02 21 381.820 0.050 23 ... SPO 2008 02 22 381.660 0.070 23 ... SPO 2008 02 23 381.680 0.100 23 ... SPO 2008 02 24 381.800 0.140 24 ... SPO 2008 02 25 381.570 0.090 23 ... SPO 2008 02 26 381.770 0.030 23 ... SPO 2008 02 27 381.710 0.050 23 ... SPO 2008 02 28 381.720 0.030 23 ... SPO 2008 02 29 381.740 0.040 23 ... SPO 2008 03 01 381.670 0.030 23 ... SPO 2008 03 02 381.700 0.050 23 ... SPO 2008 03 03 381.820 0.030 23 ... SPO 2008 03 04 381.920 0.020 23 ... SPO 2008 03 05 381.960 0.030 23 ... SPO 2008 03 06 382.010 0.050 23 ... SPO 2008 03 07 381.860 0.040 23 ... SPO 2008 03 08 381.990 0.030 23 ... SPO 2008 03 09 382.010 0.030 23 ... SPO 2008 03 10 381.900 0.040 23 ... SPO 2008 03 11 381.860 0.040 23 ... SPO 2008 03 12 381.960 0.030 23 ... SPO 2008 03 13 381.900 0.020 23 ... SPO 2008 03 14 381.910 0.030 23 ... SPO 2008 03 15 381.910 0.050 23 ... SPO 2008 03 16 381.930 0.040 19 ... SPO 2008 03 17 381.920 0.040 23 ... SPO 2008 03 18 381.840 0.030 23 ... SPO 2008 03 19 381.940 0.040 24 ... SPO 2008 03 20 381.920 0.030 23 ... SPO 2008 03 21 381.900 0.030 23 ... SPO 2008 03 22 381.870 0.040 21 ... SPO 2008 03 23 381.800 0.020 23 ... SPO 2008 03 24 381.830 0.020 23 ... SPO 2008 03 25 381.810 0.020 23 ... SPO 2008 03 26 381.790 0.020 23 ... SPO 2008 03 27 381.800 0.030 23 ... SPO 2008 03 28 381.830 0.020 23 ... SPO 2008 03 29 381.850 0.020 23 ... SPO 2008 03 30 381.870 0.020 23 ... SPO 2008 03 31 381.890 0.020 23 ... SPO 2008 04 01 381.880 0.020 23 ... SPO 2008 04 02 381.890 0.030 23 ... SPO 2008 04 03 381.900 0.020 23 ... SPO 2008 04 04 381.900 0.020 23 ... SPO 2008 04 05 381.900 0.030 23 ... SPO 2008 04 06 381.910 0.060 23 ... SPO 2008 04 07 382.010 0.020 23 ... SPO 2008 04 08 381.940 0.020 23 ... SPO 2008 04 09 382.010 0.030 23 ... SPO 2008 04 10 381.970 0.020 23 ... SPO 2008 04 11 382.000 0.040 23 ... SPO 2008 04 12 382.090 0.030 23 ... SPO 2008 04 13 382.080 0.030 24 ... SPO 2008 04 14 382.050 0.020 23 ... SPO 2008 04 15 382.070 0.030 23 ... SPO 2008 04 16 381.980 0.050 23 ... SPO 2008 04 17 382.010 0.040 23 ... SPO 2008 04 18 381.990 0.020 23 ... SPO 2008 04 19 381.990 0.020 23 ... SPO 2008 04 20 382.020 0.030 23 ... SPO 2008 04 21 381.970 0.050 23 ... SPO 2008 04 22 381.940 0.010 23 ... SPO 2008 04 23 382.010 0.030 23 ... SPO 2008 04 24 381.960 0.030 23 ... SPO 2008 04 25 382.000 0.040 23 ... SPO 2008 04 26 382.010 0.030 23 ... SPO 2008 04 27 382.020 0.020 23 ... SPO 2008 04 28 382.020 0.030 23 ... SPO 2008 04 29 382.040 0.020 23 ... SPO 2008 04 30 382.060 0.020 23 ... SPO 2008 05 01 382.070 0.010 23 ... SPO 2008 05 02 382.050 0.020 23 ... SPO 2008 05 03 382.010 0.020 23 ... SPO 2008 05 04 382.020 0.020 23 ... SPO 2008 05 05 382.030 0.010 23 ... SPO 2008 05 06 382.030 0.030 23 ... SPO 2008 05 07 382.000 0.040 23 ... SPO 2008 05 08 382.040 0.020 24 ... SPO 2008 05 09 382.040 0.010 23 ... SPO 2008 05 10 382.050 0.030 23 ... SPO 2008 05 11 382.050 0.020 23 ... SPO 2008 05 12 382.040 0.020 23 ... SPO 2008 05 13 382.040 0.020 23 ... SPO 2008 05 14 382.070 0.020 23 ... SPO 2008 05 15 382.070 0.020 23 ... SPO 2008 05 16 382.070 0.020 23 ... SPO 2008 05 17 382.100 0.030 23 ... SPO 2008 05 18 382.140 0.030 23 ... SPO 2008 05 19 382.120 0.050 23 ... SPO 2008 05 20 382.080 0.030 23 ... SPO 2008 05 21 382.100 0.020 23 ... SPO 2008 05 22 382.110 0.020 23 ... SPO 2008 05 23 382.110 0.030 23 ... SPO 2008 05 24 382.170 0.020 23 ... SPO 2008 05 25 382.160 0.020 23 ... SPO 2008 05 26 382.150 0.010 23 ... SPO 2008 05 27 382.160 0.020 23 ... SPO 2008 05 28 382.150 0.020 23 ... SPO 2008 05 29 382.160 0.010 23 ... SPO 2008 05 30 382.170 0.030 23 ... SPO 2008 05 31 382.220 0.020 23 ... SPO 2008 06 01 382.230 0.030 23 ... SPO 2008 06 02 382.230 0.020 24 ... SPO 2008 06 03 382.220 0.020 23 ... SPO 2008 06 04 382.270 0.020 23 ... SPO 2008 06 05 382.250 0.020 23 ... SPO 2008 06 06 382.240 0.030 23 ... SPO 2008 06 07 382.240 0.010 23 ... SPO 2008 06 08 382.250 0.030 23 ... SPO 2008 06 09 382.270 0.020 23 ... SPO 2008 06 10 382.270 0.030 23 ... SPO 2008 06 11 382.310 0.070 23 ... SPO 2008 06 12 382.330 0.020 23 ... SPO 2008 06 13 382.420 0.030 23 ... SPO 2008 06 14 382.360 0.020 23 ... SPO 2008 06 15 382.370 0.020 23 ... SPO 2008 06 16 382.380 0.020 23 ... SPO 2008 06 17 382.360 0.030 23 ... SPO 2008 06 18 382.350 0.020 23 ... SPO 2008 06 19 382.400 0.060 23 ... SPO 2008 06 20 382.520 0.040 23 ... SPO 2008 06 21 382.550 0.020 23 ... SPO 2008 06 22 382.570 0.020 23 ... SPO 2008 06 23 382.560 0.020 23 ... SPO 2008 06 24 382.550 0.020 23 ... SPO 2008 06 25 382.550 0.020 23 ... SPO 2008 06 26 382.530 0.030 23 ... SPO 2008 06 27 382.530 0.020 24 ... SPO 2008 06 28 382.520 0.020 23 ... SPO 2008 06 29 382.520 0.020 23 ... SPO 2008 06 30 382.550 0.020 23 ... SPO 2008 07 01 382.640 0.030 23 ... SPO 2008 07 02 382.620 0.030 23 ... SPO 2008 07 03 382.660 0.040 23 ... SPO 2008 07 04 382.740 0.070 23 ... SPO 2008 07 05 382.810 0.050 23 ... SPO 2008 07 06 382.700 0.030 23 ... SPO 2008 07 07 382.770 0.030 23 ... SPO 2008 07 08 382.800 0.010 23 ... SPO 2008 07 09 382.800 0.020 23 ... SPO 2008 07 10 382.830 0.020 23 ... SPO 2008 07 11 382.850 0.030 23 ... SPO 2008 07 12 382.840 0.030 23 ... SPO 2008 07 13 382.860 0.030 23 ... SPO 2008 07 14 382.890 0.030 23 ... SPO 2008 07 15 382.890 0.020 23 ... SPO 2008 07 16 382.950 0.020 23 ... SPO 2008 07 17 382.930 0.030 23 ... SPO 2008 07 18 382.960 0.020 23 ... SPO 2008 07 19 382.970 0.020 23 ... SPO 2008 07 20 383.000 0.020 23 ... SPO 2008 07 21 383.020 0.020 23 ... SPO 2008 07 22 383.080 0.030 24 ... SPO 2008 07 23 383.060 0.020 23 ... SPO 2008 07 24 383.070 0.020 23 ... SPO 2008 07 25 383.070 0.020 23 ... SPO 2008 07 26 383.090 0.020 23 ... SPO 2008 07 27 383.120 0.050 23 ... SPO 2008 07 28 383.310 0.030 23 ... SPO 2008 07 29 383.280 0.020 23 ... SPO 2008 07 30 383.200 0.020 23 ... SPO 2008 07 31 383.180 0.030 23 ... SPO 2008 08 01 383.240 0.030 23 ... SPO 2008 08 02 383.200 0.030 23 ... SPO 2008 08 03 383.170 0.020 23 ... SPO 2008 08 04 383.160 0.020 23 ... SPO 2008 08 05 383.170 0.020 23 ... SPO 2008 08 06 383.200 0.020 23 ... SPO 2008 08 07 383.210 0.020 23 ... SPO 2008 08 08 383.230 0.100 23 ... SPO 2008 08 09 383.360 0.020 23 ... SPO 2008 08 10 383.360 0.020 23 ... SPO 2008 08 11 383.380 0.020 23 ... SPO 2008 08 12 383.360 0.050 23 ... SPO 2008 08 13 383.330 0.030 23 ... SPO 2008 08 14 383.280 0.020 23 ... SPO 2008 08 15 383.290 0.020 23 ... SPO 2008 08 16 383.280 0.040 24 ... SPO 2008 08 17 383.330 0.050 23 ... SPO 2008 08 18 383.370 0.030 23 ... SPO 2008 08 19 383.390 0.030 23 ... SPO 2008 08 20 383.400 0.010 23 ... SPO 2008 08 21 383.420 0.020 23 ... SPO 2008 08 22 383.400 0.020 23 ... SPO 2008 08 23 383.420 0.030 23 ... SPO 2008 08 24 383.420 0.020 23 ... SPO 2008 08 25 383.400 0.020 23 ... SPO 2008 08 26 383.400 0.050 23 ... SPO 2008 08 27 383.460 0.020 23 ... SPO 2008 08 28 383.450 0.020 23 ... SPO 2008 08 29 383.420 0.020 23 ... SPO 2008 08 30 383.450 0.030 23 ... SPO 2008 08 31 383.470 0.020 23 ... SPO 2008 09 01 383.450 0.030 23 ... SPO 2008 09 02 383.430 0.030 23 ... SPO 2008 09 03 383.440 0.030 23 ... SPO 2008 09 04 383.480 0.020 23 ... SPO 2008 09 05 383.480 0.030 23 ... SPO 2008 09 06 383.500 0.020 23 ... SPO 2008 09 07 383.500 0.020 23 ... SPO 2008 09 08 383.510 0.030 23 ... SPO 2008 09 09 383.540 0.020 23 ... SPO 2008 09 10 383.560 0.030 24 ... SPO 2008 09 11 383.660 0.050 18 ... SPO 2008 09 12 383.630 0.030 22 ... SPO 2008 09 13 383.630 0.030 23 ... SPO 2008 09 14 383.650 0.020 23 ... SPO 2008 09 15 383.630 0.010 23 ... SPO 2008 09 16 383.640 0.030 23 ... SPO 2008 09 17 383.630 0.030 23 ... SPO 2008 09 18 383.620 0.020 23 ... SPO 2008 09 19 383.640 0.030 23 ... SPO 2008 09 20 383.640 0.030 23 ... SPO 2008 09 21 383.630 0.040 23 ... SPO 2008 09 22 383.610 0.030 23 ... SPO 2008 09 23 383.570 0.010 23 ... SPO 2008 09 24 383.610 0.030 23 ... SPO 2008 09 25 383.680 0.030 23 ... SPO 2008 09 26 383.640 0.030 23 ... SPO 2008 09 27 383.670 0.020 23 ... SPO 2008 09 28 383.590 0.030 23 ... SPO 2008 09 29 383.650 0.060 23 ... SPO 2008 09 30 383.710 0.040 23 ... SPO 2008 10 01 383.760 0.040 23 ... SPO 2008 10 02 383.790 0.050 23 ... SPO 2008 10 03 383.750 0.060 23 ... SPO 2008 10 04 383.730 0.030 23 ... SPO 2008 10 05 383.720 0.030 24 ... SPO 2008 10 06 383.660 0.050 23 ... SPO 2008 10 07 383.690 0.020 23 ... SPO 2008 10 08 383.690 0.030 23 ... SPO 2008 10 09 383.660 0.020 23 ... SPO 2008 10 10 383.690 0.030 23 ... SPO 2008 10 11 383.730 0.010 23 ... SPO 2008 10 12 383.680 0.020 23 ... SPO 2008 10 13 383.620 0.030 23 ... SPO 2008 10 14 383.600 0.030 23 ... SPO 2008 10 15 383.590 0.040 23 ... SPO 2008 10 16 383.570 0.030 23 ... SPO 2008 10 17 383.680 0.130 23 ... SPO 2008 10 18 383.560 0.030 23 ... SPO 2008 10 19 383.630 0.040 23 ... SPO 2008 10 20 383.730 0.040 23 ... SPO 2008 10 21 383.740 0.020 23 ... SPO 2008 10 22 383.740 0.030 23 ... SPO 2008 10 23 383.730 0.020 23 ... SPO 2008 10 24 383.690 0.020 23 ... SPO 2008 10 25 383.710 0.020 23 ... SPO 2008 10 26 383.720 0.030 19 ... SPO 2008 10 27 383.760 0.020 23 ... SPO 2008 10 28 383.740 0.030 23 ... SPO 2008 10 29 383.770 0.020 23 ... SPO 2008 10 30 383.750 0.020 24 ... SPO 2008 10 31 383.740 0.020 23 ... SPO 2008 11 01 383.730 0.050 23 ... SPO 2008 11 02 383.720 0.050 23 ... SPO 2008 11 03 383.650 0.050 23 ... SPO 2008 11 04 383.620 0.030 23 ... SPO 2008 11 05 383.850 0.120 23 ... SPO 2008 11 06 383.690 0.030 23 ... SPO 2008 11 07 383.830 0.070 23 ... SPO 2008 11 08 383.740 0.040 23 ... SPO 2008 11 09 383.660 0.030 23 ... SPO 2008 11 10 383.670 0.050 23 ... SPO 2008 11 11 383.570 0.040 23 ... SPO 2008 11 12 383.430 0.050 23 ... SPO 2008 11 13 383.470 0.040 23 ... SPO 2008 11 14 383.600 0.070 23 ... SPO 2008 11 15 383.650 0.040 23 ... SPO 2008 11 16 383.580 0.030 23 ... SPO 2008 11 17 383.600 0.020 23 ... SPO 2008 11 18 383.630 0.020 23 ... SPO 2008 11 19 383.620 0.020 23 ... SPO 2008 11 20 383.610 0.030 22 ... SPO 2008 11 21 383.610 0.030 23 ... SPO 2008 11 22 383.620 0.020 23 ... SPO 2008 11 23 383.590 0.020 23 ... SPO 2008 11 24 383.610 0.030 24 ... SPO 2008 11 25 383.560 0.030 23 ... SPO 2008 11 26 383.570 0.020 23 ... SPO 2008 11 27 383.590 0.050 23 ... SPO 2008 11 28 383.560 0.020 23 ... SPO 2008 11 29 383.560 0.020 23 ... SPO 2008 11 30 383.590 0.020 23 ... SPO 2008 12 01 383.600 0.030 23 ... SPO 2008 12 02 383.600 0.020 23 ... SPO 2008 12 03 383.550 0.030 23 ... SPO 2008 12 04 383.510 0.020 23 ... SPO 2008 12 05 383.550 0.020 23 ... SPO 2008 12 06 383.520 0.020 23 ... SPO 2008 12 07 383.480 0.030 23 ... SPO 2008 12 08 383.510 0.040 23 ... SPO 2008 12 09 383.390 0.030 23 ... SPO 2008 12 10 383.480 0.060 23 ... SPO 2008 12 11 383.520 0.030 23 ... SPO 2008 12 12 383.440 0.030 23 ... SPO 2008 12 13 383.460 0.040 23 ... SPO 2008 12 14 383.510 0.020 22 ... SPO 2008 12 15 383.520 0.040 20 ... SPO 2008 12 16 383.480 0.050 23 ... SPO 2008 12 17 383.500 0.040 23 ... SPO 2008 12 18 383.470 0.020 23 ... SPO 2008 12 19 383.480 0.020 24 ... SPO 2008 12 20 383.460 0.040 23 ... SPO 2008 12 21 383.540 0.030 23 ... SPO 2008 12 22 383.490 0.040 23 ... SPO 2008 12 23 383.510 0.020 23 ... SPO 2008 12 24 383.400 0.080 23 ... SPO 2008 12 25 383.500 0.040 23 ... SPO 2008 12 26 383.640 0.040 21 ... SPO 2008 12 27 383.610 0.050 23 ... SPO 2008 12 28 383.570 0.080 23 ... SPO 2008 12 29 383.550 0.050 23 ... SPO 2008 12 30 383.520 0.040 23 ... SPO 2008 12 31 383.110 0.120 23 ... SPO 2009 01 01 383.370 0.170 23 ... SPO 2009 01 02 383.690 0.050 23 ... SPO 2009 01 03 383.470 0.140 23 ... SPO 2009 01 04 383.490 0.050 23 ... SPO 2009 01 05 383.710 0.150 19 ... SPO 2009 01 06 383.680 0.020 23 ... SPO 2009 01 07 383.720 0.020 23 ... SPO 2009 01 08 383.740 0.020 23 ... SPO 2009 01 09 383.710 0.070 23 ... SPO 2009 01 10 383.440 0.030 23 ... SPO 2009 01 11 383.510 0.060 23 ... SPO 2009 01 12 383.560 0.120 23 ... SPO 2009 01 13 383.550 0.050 24 ... SPO 2009 01 14 383.500 0.050 23 ... SPO 2009 01 15 383.550 0.030 22 ... SPO 2009 01 16 383.530 0.060 23 ... SPO 2009 01 17 383.490 0.060 23 ... SPO 2009 01 18 383.360 0.060 23 ... SPO 2009 01 19 383.160 0.200 23 ... SPO 2009 01 20 383.120 0.070 23 ... SPO 2009 01 21 383.190 0.100 22 ... SPO 2009 01 22 383.740 0.100 23 ... SPO 2009 01 23 383.650 0.130 23 ... SPO 2009 01 24 383.570 0.120 23 ... SPO 2009 01 25 383.580 0.070 23 ... SPO 2009 01 26 383.490 0.060 23 ... SPO 2009 01 27 383.330 0.210 22 ... SPO 2009 01 28 383.160 0.190 19 ... SPO 2009 01 29 383.410 0.240 23 ... SPO 2009 01 30 383.430 0.080 23 ... SPO 2009 01 31 383.300 0.120 23 ... SPO 2009 02 01 383.330 0.090 23 ... SPO 2009 02 02 383.280 0.180 21 ... SPO 2009 02 03 383.220 0.020 23 ... SPO 2009 02 04 383.300 0.060 23 ... SPO 2009 02 05 383.410 0.030 23 ... SPO 2009 02 06 383.380 0.040 22 ... SPO 2009 02 07 383.290 0.070 24 ... SPO 2009 02 08 383.270 0.030 23 ... SPO 2009 02 09 383.330 0.030 23 ... SPO 2009 02 10 383.300 0.030 23 ... SPO 2009 02 11 383.320 0.030 23 ... SPO 2009 02 12 383.250 0.040 23 ... SPO 2009 02 13 383.280 0.040 23 ... SPO 2009 02 14 383.380 0.040 23 ... SPO 2009 02 15 383.320 0.050 23 ... SPO 2009 02 16 383.270 0.030 23 ... SPO 2009 02 17 383.220 0.030 23 ... SPO 2009 02 18 383.100 0.080 23 ... SPO 2009 02 19 383.100 0.040 23 ... SPO 2009 02 20 383.190 0.020 23 ... SPO 2009 02 21 383.130 0.090 23 ... SPO 2009 02 22 383.410 0.060 23 ... SPO 2009 02 23 383.230 0.140 23 ... SPO 2009 02 24 383.180 0.090 23 ... SPO 2009 02 25 383.310 0.080 23 ... SPO 2009 02 26 383.160 0.030 23 ... SPO 2009 02 27 383.410 0.140 23 ... SPO 2009 02 28 383.630 0.070 23 ... SPO 2009 03 01 383.470 0.100 23 ... SPO 2009 03 02 383.270 0.040 23 ... SPO 2009 03 03 383.300 0.050 23 ... SPO 2009 03 04 383.290 0.030 24 ... SPO 2009 03 05 383.330 0.030 23 ... SPO 2009 03 06 383.330 0.070 21 ... SPO 2009 03 07 383.260 0.120 22 ... SPO 2009 03 08 383.260 0.040 22 ... SPO 2009 03 09 383.290 0.070 23 ... SPO 2009 03 10 383.130 0.130 23 ... SPO 2009 03 11 382.950 0.050 23 ... SPO 2009 03 12 383.170 0.050 23 ... SPO 2009 03 13 383.290 0.020 23 ... SPO 2009 03 14 383.320 0.030 23 ... SPO 2009 03 15 383.260 0.050 23 ... SPO 2009 03 16 383.330 0.060 23 ... SPO 2009 03 17 383.390 0.030 23 ... SPO 2009 03 18 383.200 0.050 23 ... SPO 2009 03 19 383.220 0.030 23 ... SPO 2009 03 20 383.210 0.030 23 ... SPO 2009 03 21 383.250 0.030 23 ... SPO 2009 03 22 383.340 0.030 23 ... SPO 2009 03 23 383.310 0.030 23 ... SPO 2009 03 24 383.430 0.050 23 ... SPO 2009 03 25 383.400 0.020 23 ... SPO 2009 03 26 383.360 0.020 23 ... SPO 2009 03 27 383.400 0.020 23 ... SPO 2009 03 28 383.440 0.020 23 ... SPO 2009 03 29 383.450 0.020 24 ... SPO 2009 03 30 383.470 0.020 23 ... SPO 2009 03 31 383.490 0.010 23 ... SPO 2009 04 01 383.610 0.050 23 ... SPO 2009 04 02 383.570 0.020 23 ... SPO 2009 04 03 383.560 0.040 23 ... SPO 2009 04 04 383.440 0.050 23 ... SPO 2009 04 05 383.400 0.060 23 ... SPO 2009 04 06 383.430 0.020 23 ... SPO 2009 04 07 383.380 0.040 23 ... SPO 2009 04 08 383.350 0.020 23 ... SPO 2009 04 09 383.370 0.020 23 ... SPO 2009 04 10 383.390 0.060 23 ... SPO 2009 04 11 383.440 0.040 23 ... SPO 2009 04 12 383.380 0.080 23 ... SPO 2009 04 13 383.430 0.030 23 ... SPO 2009 04 14 383.410 0.030 23 ... SPO 2009 04 15 383.410 0.030 23 ... SPO 2009 04 16 383.430 0.020 23 ... SPO 2009 04 17 383.400 0.020 23 ... SPO 2009 04 18 383.420 0.020 9 ... SPO 2009 04 19 -999.990 -99.990 0 *.. SPO 2009 04 20 -999.990 -99.990 0 *.. SPO 2009 04 21 383.460 0.020 21 ... SPO 2009 04 22 383.460 0.030 23 ... SPO 2009 04 23 383.480 0.030 23 ... SPO 2009 04 24 383.540 0.020 23 ... SPO 2009 04 25 383.520 0.020 23 ... SPO 2009 04 26 383.490 0.030 23 ... SPO 2009 04 27 383.520 0.020 23 ... SPO 2009 04 28 383.530 0.020 23 ... SPO 2009 04 29 383.540 0.030 23 ... SPO 2009 04 30 383.450 0.050 8 ... SPO 2009 05 01 383.450 0.070 23 ... SPO 2009 05 02 383.520 0.030 23 ... SPO 2009 05 03 383.520 0.030 23 ... SPO 2009 05 04 383.530 0.020 23 ... SPO 2009 05 05 383.510 0.020 23 ... SPO 2009 05 06 383.580 0.030 23 ... SPO 2009 05 07 383.620 0.020 23 ... SPO 2009 05 08 383.600 0.040 23 ... SPO 2009 05 09 383.540 0.020 23 ... SPO 2009 05 10 383.580 0.020 23 ... SPO 2009 05 11 383.620 0.030 23 ... SPO 2009 05 12 383.690 0.050 23 ... SPO 2009 05 13 383.700 0.030 23 ... SPO 2009 05 14 383.710 0.020 23 ... SPO 2009 05 15 383.670 0.020 23 ... SPO 2009 05 16 383.690 0.020 23 ... SPO 2009 05 17 383.690 0.050 23 ... SPO 2009 05 18 383.650 0.030 23 ... SPO 2009 05 19 383.700 0.020 23 ... SPO 2009 05 20 383.660 0.030 23 ... SPO 2009 05 21 383.680 0.010 23 ... SPO 2009 05 22 383.670 0.030 23 ... SPO 2009 05 23 383.680 0.030 23 ... SPO 2009 05 24 383.660 0.010 23 ... SPO 2009 05 25 383.670 0.030 23 ... SPO 2009 05 26 383.630 0.060 23 ... SPO 2009 05 27 383.660 0.040 23 ... SPO 2009 05 28 383.710 0.030 23 ... SPO 2009 05 29 383.710 0.020 23 ... SPO 2009 05 30 383.750 0.030 23 ... SPO 2009 05 31 383.760 0.030 23 ... SPO 2009 06 01 383.770 0.020 23 ... SPO 2009 06 02 383.800 0.020 23 ... SPO 2009 06 03 383.780 0.030 23 ... SPO 2009 06 04 383.810 0.030 23 ... SPO 2009 06 05 383.830 0.020 23 ... SPO 2009 06 06 383.800 0.020 24 ... SPO 2009 06 07 383.800 0.030 23 ... SPO 2009 06 08 383.820 0.020 23 ... SPO 2009 06 09 383.790 0.020 23 ... SPO 2009 06 10 383.820 0.020 23 ... SPO 2009 06 11 383.780 0.020 23 ... SPO 2009 06 12 383.790 0.020 23 ... SPO 2009 06 13 383.810 0.020 23 ... SPO 2009 06 14 383.860 0.040 23 ... SPO 2009 06 15 383.840 0.030 23 ... SPO 2009 06 16 383.880 0.080 23 ... SPO 2009 06 17 383.960 0.020 23 ... SPO 2009 06 18 383.930 0.040 23 ... SPO 2009 06 19 384.000 0.020 23 ... SPO 2009 06 20 383.970 0.030 23 ... SPO 2009 06 21 383.980 0.030 23 ... SPO 2009 06 22 383.980 0.020 23 ... SPO 2009 06 23 384.010 0.030 23 ... SPO 2009 06 24 384.040 0.030 23 ... SPO 2009 06 25 384.000 0.020 23 ... SPO 2009 06 26 384.040 0.040 23 ... SPO 2009 06 27 384.080 0.020 23 ... SPO 2009 06 28 384.070 0.030 23 ... SPO 2009 06 29 384.100 0.050 23 ... SPO 2009 06 30 384.180 0.020 23 ... SPO 2009 07 01 384.170 0.030 24 ... SPO 2009 07 02 384.130 0.030 23 ... SPO 2009 07 03 384.130 0.020 23 ... SPO 2009 07 04 384.140 0.030 23 ... SPO 2009 07 05 384.130 0.020 23 ... SPO 2009 07 06 384.200 0.040 23 ... SPO 2009 07 07 384.180 0.020 23 ... SPO 2009 07 08 384.170 0.020 23 ... SPO 2009 07 09 384.190 0.020 23 ... SPO 2009 07 10 384.210 0.020 23 ... SPO 2009 07 11 384.250 0.060 23 ... SPO 2009 07 12 384.350 0.050 23 ... SPO 2009 07 13 384.300 0.020 23 ... SPO 2009 07 14 384.330 0.020 23 ... SPO 2009 07 15 384.300 0.020 23 ... SPO 2009 07 16 384.280 0.020 23 ... SPO 2009 07 17 384.290 0.020 23 ... SPO 2009 07 18 384.310 0.020 23 ... SPO 2009 07 19 384.350 0.020 23 ... SPO 2009 07 20 384.360 0.030 23 ... SPO 2009 07 21 384.470 0.030 23 ... SPO 2009 07 22 384.430 0.050 22 ... SPO 2009 07 23 384.410 0.030 23 ... SPO 2009 07 24 384.430 0.020 23 ... SPO 2009 07 25 384.430 0.020 23 ... SPO 2009 07 26 384.440 0.020 24 ... SPO 2009 07 27 384.410 0.010 23 ... SPO 2009 07 28 384.420 0.010 23 ... SPO 2009 07 29 384.410 0.010 23 ... SPO 2009 07 30 384.430 0.020 9 ... SPO 2009 07 31 384.450 0.050 23 ... SPO 2009 08 01 384.520 0.020 23 ... SPO 2009 08 02 384.500 0.020 23 ... SPO 2009 08 03 384.590 0.050 23 ... SPO 2009 08 04 384.570 0.030 23 ... SPO 2009 08 05 384.530 0.040 23 ... SPO 2009 08 06 384.530 0.050 23 ... SPO 2009 08 07 384.550 0.010 23 ... SPO 2009 08 08 384.570 0.030 23 ... SPO 2009 08 09 384.550 0.020 23 ... SPO 2009 08 10 384.600 0.040 23 ... SPO 2009 08 11 384.620 0.020 23 ... SPO 2009 08 12 384.610 0.020 23 ... SPO 2009 08 13 384.640 0.020 23 ... SPO 2009 08 14 384.700 0.060 23 ... SPO 2009 08 15 384.710 0.020 23 ... SPO 2009 08 16 384.710 0.020 23 ... SPO 2009 08 17 384.710 0.020 23 ... SPO 2009 08 18 384.710 0.020 23 ... SPO 2009 08 19 384.750 0.010 23 ... SPO 2009 08 20 384.780 0.030 24 ... SPO 2009 08 21 384.760 0.020 23 ... SPO 2009 08 22 384.760 0.040 23 ... SPO 2009 08 23 384.790 0.030 23 ... SPO 2009 08 24 384.800 0.010 23 ... SPO 2009 08 25 384.790 0.030 23 ... SPO 2009 08 26 384.810 0.020 23 ... SPO 2009 08 27 384.840 0.030 23 ... SPO 2009 08 28 384.880 0.030 23 ... SPO 2009 08 29 384.860 0.020 23 ... SPO 2009 08 30 384.910 0.020 23 ... SPO 2009 08 31 384.930 0.010 23 ... SPO 2009 09 01 384.890 0.020 23 ... SPO 2009 09 02 384.910 0.020 23 ... SPO 2009 09 03 384.910 0.030 23 ... SPO 2009 09 04 384.930 0.020 23 ... SPO 2009 09 05 384.950 0.020 23 ... SPO 2009 09 06 384.930 0.020 23 ... SPO 2009 09 07 384.920 0.010 23 ... SPO 2009 09 08 384.930 0.020 23 ... SPO 2009 09 09 384.960 0.030 23 ... SPO 2009 09 10 385.000 0.030 23 ... SPO 2009 09 11 385.020 0.020 23 ... SPO 2009 09 12 384.990 0.050 23 ... SPO 2009 09 13 385.000 0.030 23 ... SPO 2009 09 14 385.020 0.020 24 ... SPO 2009 09 15 384.970 0.030 23 ... SPO 2009 09 16 384.970 0.020 23 ... SPO 2009 09 17 384.960 0.030 23 ... SPO 2009 09 18 385.000 0.020 23 ... SPO 2009 09 19 385.040 0.030 23 ... SPO 2009 09 20 385.050 0.040 23 ... SPO 2009 09 21 385.080 0.040 23 ... SPO 2009 09 22 385.110 0.020 23 ... SPO 2009 09 23 385.100 0.020 23 ... SPO 2009 09 24 385.140 0.040 22 ... SPO 2009 09 25 385.160 0.070 23 ... SPO 2009 09 26 385.100 0.060 23 ... SPO 2009 09 27 385.070 0.020 23 ... SPO 2009 09 28 385.130 0.020 23 ... SPO 2009 09 29 385.110 0.030 23 ... SPO 2009 09 30 385.120 0.020 23 ... SPO 2009 10 01 385.110 0.020 23 ... SPO 2009 10 02 385.130 0.020 23 ... SPO 2009 10 03 385.120 0.020 23 ... SPO 2009 10 04 385.130 0.020 23 ... SPO 2009 10 05 385.180 0.040 23 ... SPO 2009 10 06 385.130 0.030 23 ... SPO 2009 10 07 385.140 0.020 23 ... SPO 2009 10 08 385.190 0.030 23 ... SPO 2009 10 09 385.170 0.020 24 ... SPO 2009 10 10 385.170 0.020 23 ... SPO 2009 10 11 385.230 0.020 23 ... SPO 2009 10 12 385.210 0.030 23 ... SPO 2009 10 13 385.220 0.020 23 ... SPO 2009 10 14 385.250 0.020 23 ... SPO 2009 10 15 385.250 0.020 23 ... SPO 2009 10 16 385.210 0.030 23 ... SPO 2009 10 17 385.190 0.030 23 ... SPO 2009 10 18 385.220 0.040 23 ... SPO 2009 10 19 385.160 0.090 23 ... SPO 2009 10 20 385.100 0.030 23 ... SPO 2009 10 21 385.180 0.060 23 ... SPO 2009 10 22 385.200 0.020 23 ... SPO 2009 10 23 385.190 0.020 23 ... SPO 2009 10 24 385.240 0.030 23 ... SPO 2009 10 25 385.240 0.030 23 ... SPO 2009 10 26 385.230 0.020 23 ... SPO 2009 10 27 385.240 0.030 23 ... SPO 2009 10 28 385.240 0.010 23 ... SPO 2009 10 29 385.230 0.020 23 ... SPO 2009 10 30 385.250 0.020 23 ... SPO 2009 10 31 385.260 0.030 23 ... SPO 2009 11 01 385.260 0.030 23 ... SPO 2009 11 02 385.260 0.020 23 ... SPO 2009 11 03 385.280 0.020 24 ... SPO 2009 11 04 385.260 0.030 23 ... SPO 2009 11 05 385.230 0.030 23 ... SPO 2009 11 06 385.170 0.020 23 ... SPO 2009 11 07 385.170 0.030 23 ... SPO 2009 11 08 385.160 0.040 23 ... SPO 2009 11 09 385.180 0.040 23 ... SPO 2009 11 10 385.220 0.020 23 ... SPO 2009 11 11 385.190 0.040 23 ... SPO 2009 11 12 385.190 0.030 19 ... SPO 2009 11 13 385.170 0.030 16 ... SPO 2009 11 14 385.160 0.030 23 ... SPO 2009 11 15 385.200 0.020 23 ... SPO 2009 11 16 385.160 0.030 23 ... SPO 2009 11 17 385.150 0.010 23 ... SPO 2009 11 18 385.150 0.030 23 ... SPO 2009 11 19 385.190 0.040 23 ... SPO 2009 11 20 385.210 0.020 23 ... SPO 2009 11 21 385.190 0.010 23 ... SPO 2009 11 22 385.140 0.020 23 ... SPO 2009 11 23 385.170 0.020 23 ... SPO 2009 11 24 385.160 0.030 23 ... SPO 2009 11 25 385.150 0.020 23 ... SPO 2009 11 26 385.160 0.020 23 ... SPO 2009 11 27 385.180 0.020 19 ... SPO 2009 11 28 -999.990 -99.990 0 *.. SPO 2009 11 29 -999.990 -99.990 0 *.. SPO 2009 11 30 -999.990 -99.990 0 *.. SPO 2009 12 01 385.130 0.010 3 ... SPO 2009 12 02 385.090 0.030 23 ... SPO 2009 12 03 385.120 0.020 23 ... SPO 2009 12 04 385.180 0.030 23 ... SPO 2009 12 05 385.190 0.030 23 ... SPO 2009 12 06 385.160 0.060 24 ... SPO 2009 12 07 385.080 0.030 23 ... SPO 2009 12 08 385.100 0.070 23 ... SPO 2009 12 09 385.140 0.050 22 ... SPO 2009 12 10 385.090 0.030 23 ... SPO 2009 12 11 385.130 0.050 22 ... SPO 2009 12 12 385.130 0.010 22 ... SPO 2009 12 13 385.100 0.040 23 ... SPO 2009 12 14 385.150 0.020 22 ... SPO 2009 12 15 385.190 0.030 23 ... SPO 2009 12 16 385.170 0.020 23 ... SPO 2009 12 17 385.140 0.030 21 ... SPO 2009 12 18 385.180 0.040 23 ... SPO 2009 12 19 385.190 0.020 23 ... SPO 2009 12 20 385.180 0.020 23 ... SPO 2009 12 21 385.120 0.020 23 ... SPO 2009 12 22 385.150 0.020 23 ... SPO 2009 12 23 385.170 0.020 23 ... SPO 2009 12 24 385.130 0.040 23 ... SPO 2009 12 25 385.070 0.020 23 ... SPO 2009 12 26 385.090 0.040 23 ... SPO 2009 12 27 385.090 0.020 23 ... SPO 2009 12 28 385.110 0.020 23 ... SPO 2009 12 29 385.120 0.030 23 ... SPO 2009 12 30 385.140 0.030 23 ... SPO 2009 12 31 385.130 0.020 24 ... SPO 2010 01 01 385.120 0.040 23 ... SPO 2010 01 02 385.100 0.040 23 ... SPO 2010 01 03 384.850 0.090 23 ... SPO 2010 01 04 385.020 0.120 23 ... SPO 2010 01 05 385.140 0.070 23 ... SPO 2010 01 06 385.070 0.030 23 ... SPO 2010 01 07 385.140 0.060 23 ... SPO 2010 01 08 385.280 0.070 23 ... SPO 2010 01 09 385.320 0.020 23 ... SPO 2010 01 10 385.270 0.070 23 ... SPO 2010 01 11 385.240 0.030 23 ... SPO 2010 01 12 385.170 0.020 23 ... SPO 2010 01 13 385.260 0.060 23 ... SPO 2010 01 14 385.270 0.050 23 ... SPO 2010 01 15 385.210 0.010 23 ... SPO 2010 01 16 385.080 0.060 23 ... SPO 2010 01 17 385.000 0.030 23 ... SPO 2010 01 18 385.030 0.140 23 ... SPO 2010 01 19 384.820 0.210 23 ... SPO 2010 01 20 385.130 0.230 23 ... SPO 2010 01 21 384.850 0.180 23 ... SPO 2010 01 22 384.910 0.080 23 ... SPO 2010 01 23 385.070 0.130 23 ... SPO 2010 01 24 385.040 0.040 23 ... SPO 2010 01 25 385.020 0.030 24 ... SPO 2010 01 26 384.850 0.090 23 ... SPO 2010 01 27 384.870 0.060 23 ... SPO 2010 01 28 384.930 0.030 23 ... SPO 2010 01 29 384.940 0.040 23 ... SPO 2010 01 30 385.000 0.050 23 ... SPO 2010 01 31 385.050 0.030 23 ... SPO 2010 02 01 385.000 0.080 23 ... SPO 2010 02 02 385.000 0.060 23 ... SPO 2010 02 03 385.060 0.100 23 ... SPO 2010 02 04 384.530 0.080 14 ... SPO 2010 02 05 384.620 0.290 11 ... SPO 2010 02 06 384.940 0.040 22 ... SPO 2010 02 07 384.660 0.300 23 ... SPO 2010 02 08 384.670 0.210 23 ... SPO 2010 02 09 384.390 0.140 23 ... SPO 2010 02 10 384.460 0.190 23 ... SPO 2010 02 11 384.100 0.210 23 ... SPO 2010 02 12 384.150 0.030 23 ... SPO 2010 02 13 384.560 0.160 23 ... SPO 2010 02 14 384.750 0.150 23 ... SPO 2010 02 15 384.640 0.090 23 ... SPO 2010 02 16 384.700 0.120 23 ... SPO 2010 02 17 384.700 0.060 23 ... SPO 2010 02 18 384.650 0.080 23 ... SPO 2010 02 19 384.760 0.060 24 ... SPO 2010 02 20 384.820 0.040 23 ... SPO 2010 02 21 384.800 0.070 23 ... SPO 2010 02 22 384.820 0.030 23 ... SPO 2010 02 23 384.820 0.060 22 ... SPO 2010 02 24 384.800 0.090 21 ... SPO 2010 02 25 385.020 0.160 23 ... SPO 2010 02 26 385.150 0.040 23 ... SPO 2010 02 27 385.070 0.090 23 ... SPO 2010 02 28 384.640 0.180 23 ... SPO 2010 03 01 385.080 0.160 23 ... SPO 2010 03 02 385.040 0.110 23 ... SPO 2010 03 03 384.730 0.050 23 ... SPO 2010 03 04 384.460 0.140 23 ... SPO 2010 03 05 384.630 0.060 23 ... SPO 2010 03 06 384.810 0.090 23 ... SPO 2010 03 07 384.830 0.060 23 ... SPO 2010 03 08 384.860 0.030 23 ... SPO 2010 03 09 384.730 0.090 23 ... SPO 2010 03 10 384.960 0.110 18 ... SPO 2010 03 11 384.510 0.080 23 ... SPO 2010 03 12 384.370 0.030 23 ... SPO 2010 03 13 384.690 0.100 23 ... SPO 2010 03 14 384.630 0.040 23 ... SPO 2010 03 15 384.680 0.060 23 ... SPO 2010 03 16 384.600 0.070 24 ... SPO 2010 03 17 384.500 0.040 23 ... SPO 2010 03 18 384.470 0.070 23 ... SPO 2010 03 19 384.630 0.080 23 ... SPO 2010 03 20 384.630 0.030 23 ... SPO 2010 03 21 384.650 0.050 23 ... SPO 2010 03 22 384.740 0.130 23 ... SPO 2010 03 23 384.880 0.020 23 ... SPO 2010 03 24 384.890 0.040 23 ... SPO 2010 03 25 384.820 0.080 23 ... SPO 2010 03 26 385.050 0.060 23 ... SPO 2010 03 27 384.980 0.060 23 ... SPO 2010 03 28 385.060 0.030 23 ... SPO 2010 03 29 385.050 0.050 23 ... SPO 2010 03 30 385.090 0.090 23 ... SPO 2010 03 31 384.910 0.040 23 ... SPO 2010 04 01 384.850 0.050 23 ... SPO 2010 04 02 384.860 0.090 23 ... SPO 2010 04 03 384.790 0.060 23 ... SPO 2010 04 04 384.880 0.100 23 ... SPO 2010 04 05 385.010 0.030 23 ... SPO 2010 04 06 385.050 0.020 23 ... SPO 2010 04 07 384.970 0.040 23 ... SPO 2010 04 08 384.880 0.060 23 ... SPO 2010 04 09 384.840 0.050 23 ... SPO 2010 04 10 384.790 0.040 24 ... SPO 2010 04 11 384.700 0.030 23 ... SPO 2010 04 12 384.720 0.060 23 ... SPO 2010 04 13 384.830 0.030 23 ... SPO 2010 04 14 384.880 0.040 23 ... SPO 2010 04 15 384.870 0.030 23 ... SPO 2010 04 16 384.810 0.030 23 ... SPO 2010 04 17 384.900 0.030 23 ... SPO 2010 04 18 384.900 0.030 23 ... SPO 2010 04 19 384.860 0.020 23 ... SPO 2010 04 20 384.830 0.020 23 ... SPO 2010 04 21 384.940 0.050 23 ... SPO 2010 04 22 384.930 0.070 23 ... SPO 2010 04 23 384.920 0.110 23 ... SPO 2010 04 24 385.120 0.020 23 ... SPO 2010 04 25 384.980 0.060 23 ... SPO 2010 04 26 384.980 0.030 23 ... SPO 2010 04 27 384.910 0.020 23 ... SPO 2010 04 28 384.920 0.030 23 ... SPO 2010 04 29 384.910 0.020 23 ... SPO 2010 04 30 384.950 0.040 23 ... SPO 2010 05 01 384.970 0.040 23 ... SPO 2010 05 02 385.060 0.080 23 ... SPO 2010 05 03 384.990 0.020 22 ... SPO 2010 05 04 385.030 0.040 18 ... SPO 2010 05 05 385.020 0.040 24 ... SPO 2010 05 06 385.070 0.020 23 ... SPO 2010 05 07 385.080 0.030 23 ... SPO 2010 05 08 385.120 0.070 23 ... SPO 2010 05 09 385.120 0.050 23 ... SPO 2010 05 10 385.090 0.040 23 ... SPO 2010 05 11 385.020 0.050 23 ... SPO 2010 05 12 385.100 0.060 23 ... SPO 2010 05 13 385.040 0.040 23 ... SPO 2010 05 14 385.100 0.050 23 ... SPO 2010 05 15 385.160 0.060 21 ... SPO 2010 05 16 385.250 0.020 23 ... SPO 2010 05 17 385.230 0.030 23 ... SPO 2010 05 18 385.230 0.020 23 ... SPO 2010 05 19 385.270 0.020 23 ... SPO 2010 05 20 385.310 0.040 23 ... SPO 2010 05 21 385.310 0.020 23 ... SPO 2010 05 22 385.320 0.030 23 ... SPO 2010 05 23 385.330 0.010 23 ... SPO 2010 05 24 385.330 0.030 23 ... SPO 2010 05 25 385.320 0.020 23 ... SPO 2010 05 26 385.320 0.020 23 ... SPO 2010 05 27 385.350 0.030 23 ... SPO 2010 05 28 385.380 0.040 23 ... SPO 2010 05 29 385.420 0.060 23 ... SPO 2010 05 30 385.430 0.030 24 ... SPO 2010 05 31 385.450 0.030 23 ... SPO 2010 06 01 385.450 0.040 23 ... SPO 2010 06 02 385.410 0.010 23 ... SPO 2010 06 03 385.400 0.020 23 ... SPO 2010 06 04 385.390 0.040 23 ... SPO 2010 06 05 385.340 0.030 23 ... SPO 2010 06 06 385.320 0.050 23 ... SPO 2010 06 07 385.520 0.030 23 ... SPO 2010 06 08 385.520 0.020 23 ... SPO 2010 06 09 385.530 0.020 23 ... SPO 2010 06 10 385.550 0.030 23 ... SPO 2010 06 11 385.600 0.020 23 ... SPO 2010 06 12 385.620 0.030 23 ... SPO 2010 06 13 385.640 0.030 23 ... SPO 2010 06 14 385.670 0.020 23 ... SPO 2010 06 15 385.760 0.030 23 ... SPO 2010 06 16 385.790 0.020 23 ... SPO 2010 06 17 385.770 0.020 23 ... SPO 2010 06 18 385.770 0.020 23 ... SPO 2010 06 19 385.790 0.050 23 ... SPO 2010 06 20 385.910 0.040 23 ... SPO 2010 06 21 385.860 0.060 23 ... SPO 2010 06 22 385.780 0.030 23 ... SPO 2010 06 23 385.790 0.020 23 ... SPO 2010 06 24 385.810 0.020 24 ... SPO 2010 06 25 385.810 0.030 23 ... SPO 2010 06 26 385.860 0.030 23 ... SPO 2010 06 27 385.920 0.020 23 ... SPO 2010 06 28 385.940 0.020 23 ... SPO 2010 06 29 385.930 0.020 23 ... SPO 2010 06 30 385.970 0.040 23 ... SPO 2010 07 01 386.000 0.020 23 ... SPO 2010 07 02 386.040 0.030 23 ... SPO 2010 07 03 386.070 0.020 23 ... SPO 2010 07 04 386.030 0.020 23 ... SPO 2010 07 05 386.070 0.080 23 ... SPO 2010 07 06 386.130 0.050 16 ... SPO 2010 07 07 386.110 0.020 23 ... SPO 2010 07 08 386.110 0.020 23 ... SPO 2010 07 09 386.130 0.020 23 ... SPO 2010 07 10 386.160 0.020 23 ... SPO 2010 07 11 386.230 0.020 23 ... SPO 2010 07 12 386.240 0.030 23 ... SPO 2010 07 13 386.240 0.020 23 ... SPO 2010 07 14 386.250 0.020 23 ... SPO 2010 07 15 386.310 0.040 23 ... SPO 2010 07 16 386.340 0.030 23 ... SPO 2010 07 17 386.350 0.030 23 ... SPO 2010 07 18 386.320 0.020 23 ... SPO 2010 07 19 386.370 0.040 24 ... SPO 2010 07 20 386.410 0.020 23 ... SPO 2010 07 21 386.390 0.030 23 ... SPO 2010 07 22 386.420 0.060 23 ... SPO 2010 07 23 386.450 0.030 23 ... SPO 2010 07 24 386.470 0.040 23 ... SPO 2010 07 25 386.500 0.030 23 ... SPO 2010 07 26 386.520 0.030 23 ... SPO 2010 07 27 386.520 0.030 23 ... SPO 2010 07 28 386.500 0.030 23 ... SPO 2010 07 29 386.780 0.160 23 ... SPO 2010 07 30 386.910 0.120 23 ... SPO 2010 07 31 386.770 0.090 19 ... SPO 2010 08 01 386.710 0.020 23 ... SPO 2010 08 02 386.760 0.050 23 ... SPO 2010 08 03 386.780 0.020 23 ... SPO 2010 08 04 386.740 0.020 23 ... SPO 2010 08 05 386.780 0.020 23 ... SPO 2010 08 06 386.800 0.020 23 ... SPO 2010 08 07 386.850 0.030 23 ... SPO 2010 08 08 386.880 0.020 23 ... SPO 2010 08 09 386.860 0.040 23 ... SPO 2010 08 10 386.850 0.020 23 ... SPO 2010 08 11 386.870 0.020 23 ... SPO 2010 08 12 386.900 0.040 23 ... SPO 2010 08 13 386.990 0.060 23 ... SPO 2010 08 14 387.040 0.040 23 ... SPO 2010 08 15 387.040 0.020 23 ... SPO 2010 08 16 387.040 0.030 23 ... SPO 2010 08 17 387.060 0.040 23 ... SPO 2010 08 18 387.120 0.060 23 ... SPO 2010 08 19 387.100 0.020 23 ... SPO 2010 08 20 387.140 0.020 23 ... SPO 2010 08 21 387.160 0.030 23 ... SPO 2010 08 22 387.180 0.020 23 ... SPO 2010 08 23 387.190 0.020 23 ... SPO 2010 08 24 387.230 0.020 23 ... SPO 2010 08 25 387.290 0.030 23 ... SPO 2010 08 26 387.270 0.020 23 ... SPO 2010 08 27 387.380 0.040 23 ... SPO 2010 08 28 387.320 0.060 23 ... SPO 2010 08 29 387.290 0.020 23 ... SPO 2010 08 30 387.270 0.010 23 ... SPO 2010 08 31 387.290 0.030 23 ... SPO 2010 09 01 387.330 0.030 23 ... SPO 2010 09 02 387.400 0.050 23 ... SPO 2010 09 03 387.440 0.020 23 ... SPO 2010 09 04 387.410 0.030 23 ... SPO 2010 09 05 387.450 0.020 23 ... SPO 2010 09 06 387.430 0.030 23 ... SPO 2010 09 07 387.430 0.020 24 ... SPO 2010 09 08 387.350 0.020 23 ... SPO 2010 09 09 387.320 0.020 23 ... SPO 2010 09 10 387.360 0.030 23 ... SPO 2010 09 11 387.400 0.040 23 ... SPO 2010 09 12 387.370 0.020 23 ... SPO 2010 09 13 387.370 0.040 23 ... SPO 2010 09 14 387.390 0.030 23 ... SPO 2010 09 15 387.400 0.020 23 ... SPO 2010 09 16 387.420 0.020 23 ... SPO 2010 09 17 387.360 0.060 23 ... SPO 2010 09 18 387.290 0.010 23 ... SPO 2010 09 19 387.270 0.020 23 ... SPO 2010 09 20 387.300 0.020 21 ... SPO 2010 09 21 387.320 0.020 23 ... SPO 2010 09 22 387.360 0.030 23 ... SPO 2010 09 23 387.340 0.040 23 ... SPO 2010 09 24 387.380 0.030 23 ... SPO 2010 09 25 387.370 0.030 23 ... SPO 2010 09 26 387.350 0.020 23 ... SPO 2010 09 27 387.300 0.020 23 ... SPO 2010 09 28 387.320 0.030 23 ... SPO 2010 09 29 387.330 0.020 23 ... SPO 2010 09 30 387.370 0.020 23 ... SPO 2010 10 01 387.380 0.020 23 ... SPO 2010 10 02 387.360 0.020 24 ... SPO 2010 10 03 387.400 0.020 23 ... SPO 2010 10 04 387.350 0.030 23 ... SPO 2010 10 05 387.410 0.020 23 ... SPO 2010 10 06 387.430 0.020 23 ... SPO 2010 10 07 387.430 0.030 23 ... SPO 2010 10 08 387.420 0.020 23 ... SPO 2010 10 09 387.430 0.040 23 ... SPO 2010 10 10 387.460 0.020 23 ... SPO 2010 10 11 387.450 0.030 23 ... SPO 2010 10 12 387.420 0.020 23 ... SPO 2010 10 13 387.440 0.030 23 ... SPO 2010 10 14 387.430 0.020 23 ... SPO 2010 10 15 387.440 0.020 23 ... SPO 2010 10 16 387.460 0.030 23 ... SPO 2010 10 17 387.450 0.030 23 ... SPO 2010 10 18 387.450 0.020 23 ... SPO 2010 10 19 387.460 0.020 23 ... SPO 2010 10 20 387.440 0.020 23 ... SPO 2010 10 21 387.420 0.030 23 ... SPO 2010 10 22 387.460 0.050 21 ... SPO 2010 10 23 387.420 0.040 16 ... SPO 2010 10 24 387.420 0.060 23 ... SPO 2010 10 25 387.600 0.110 20 ... SPO 2010 10 26 387.460 0.030 23 ... SPO 2010 10 27 387.450 0.040 24 ... SPO 2010 10 28 387.460 0.020 23 ... SPO 2010 10 29 387.480 0.040 23 ... SPO 2010 10 30 387.500 0.020 23 ... SPO 2010 10 31 387.460 0.040 23 ... SPO 2010 11 01 387.360 0.050 23 ... SPO 2010 11 02 387.510 0.020 23 ... SPO 2010 11 03 387.530 0.020 23 ... SPO 2010 11 04 387.520 0.020 23 ... SPO 2010 11 05 387.480 0.030 23 ... SPO 2010 11 06 387.420 0.030 23 ... SPO 2010 11 07 387.380 0.030 23 ... SPO 2010 11 08 387.350 0.040 23 ... SPO 2010 11 09 387.370 0.030 23 ... SPO 2010 11 10 387.330 0.070 23 ... SPO 2010 11 11 387.350 0.110 23 ... SPO 2010 11 12 387.410 0.020 23 ... SPO 2010 11 13 387.420 0.040 16 ... SPO 2010 11 14 387.410 0.030 23 ... SPO 2010 11 15 387.420 0.040 23 ... SPO 2010 11 16 387.470 0.030 23 ... SPO 2010 11 17 387.460 0.040 23 ... SPO 2010 11 18 387.400 0.030 23 ... SPO 2010 11 19 387.400 0.020 23 ... SPO 2010 11 20 387.410 0.020 23 ... SPO 2010 11 21 387.440 0.030 24 ... SPO 2010 11 22 387.440 0.030 23 ... SPO 2010 11 23 387.470 0.020 23 ... SPO 2010 11 24 387.440 0.030 23 ... SPO 2010 11 25 387.440 0.060 14 ... SPO 2010 11 26 387.520 0.090 23 ... SPO 2010 11 27 387.460 0.020 23 ... SPO 2010 11 28 387.470 0.030 23 ... SPO 2010 11 29 387.530 0.080 23 ... SPO 2010 11 30 387.560 0.110 17 ... SPO 2010 12 01 387.480 0.030 22 ... SPO 2010 12 02 387.500 0.060 23 ... SPO 2010 12 03 387.570 0.100 9 ... SPO 2010 12 04 387.440 0.020 17 ... SPO 2010 12 05 387.320 0.150 22 ... SPO 2010 12 06 387.460 0.020 23 ... SPO 2010 12 07 387.430 0.060 23 ... SPO 2010 12 08 387.430 0.050 23 ... SPO 2010 12 09 387.350 0.080 23 ... SPO 2010 12 10 387.160 0.070 23 ... SPO 2010 12 11 387.280 0.050 23 ... SPO 2010 12 12 387.180 0.040 23 ... SPO 2010 12 13 387.190 0.030 23 ... SPO 2010 12 14 387.220 0.050 23 ... SPO 2010 12 15 387.180 0.050 23 ... SPO 2010 12 16 387.290 0.080 24 ... SPO 2010 12 17 387.220 0.040 23 ... SPO 2010 12 18 387.340 0.030 23 ... SPO 2010 12 19 387.300 0.040 23 ... SPO 2010 12 20 387.340 0.050 23 ... SPO 2010 12 21 387.330 0.040 23 ... SPO 2010 12 22 387.290 0.060 23 ... SPO 2010 12 23 387.150 0.090 23 ... SPO 2010 12 24 387.290 0.050 23 ... SPO 2010 12 25 387.320 0.040 18 ... SPO 2010 12 26 387.290 0.080 21 ... SPO 2010 12 27 387.320 0.040 23 ... SPO 2010 12 28 387.380 0.040 23 ... SPO 2010 12 29 387.400 0.030 23 ... SPO 2010 12 30 387.300 0.020 23 ... SPO 2010 12 31 387.310 0.030 23 ... SPO 2011 01 01 387.310 0.030 23 ... SPO 2011 01 02 387.280 0.030 23 ... SPO 2011 01 03 387.270 0.060 23 ... SPO 2011 01 04 387.190 0.040 23 ... SPO 2011 01 05 387.300 0.090 23 ... SPO 2011 01 06 386.940 0.120 23 ... SPO 2011 01 07 387.120 0.110 23 ... SPO 2011 01 08 387.160 0.080 23 ... SPO 2011 01 09 386.980 0.160 23 ... SPO 2011 01 10 386.790 0.060 23 ... SPO 2011 01 11 386.810 0.120 23 ... SPO 2011 01 12 387.250 0.190 23 ... SPO 2011 01 13 387.290 0.090 23 ... SPO 2011 01 14 387.230 0.030 23 ... SPO 2011 01 15 387.320 0.050 23 ... SPO 2011 01 16 387.310 0.030 23 ... SPO 2011 01 17 387.300 0.020 23 ... SPO 2011 01 18 387.230 0.060 23 ... SPO 2011 01 19 387.300 0.060 23 ... SPO 2011 01 20 387.310 0.070 23 ... SPO 2011 01 21 387.190 0.120 23 ... SPO 2011 01 22 387.140 0.090 23 ... SPO 2011 01 23 387.390 0.040 23 ... SPO 2011 01 24 387.450 0.080 23 ... SPO 2011 01 25 387.510 0.040 23 ... SPO 2011 01 26 387.250 0.080 23 ... SPO 2011 01 27 387.350 0.100 23 ... SPO 2011 01 28 387.270 0.180 23 ... SPO 2011 01 29 386.980 0.040 23 ... SPO 2011 01 30 387.120 0.240 22 ... SPO 2011 01 31 387.530 0.090 23 ... SPO 2011 02 01 387.370 0.060 23 ... SPO 2011 02 02 387.440 0.040 23 ... SPO 2011 02 03 387.200 0.150 23 ... SPO 2011 02 04 387.130 0.050 24 ... SPO 2011 02 05 387.180 0.080 23 ... SPO 2011 02 06 387.210 0.140 23 ... SPO 2011 02 07 387.300 0.080 23 ... SPO 2011 02 08 387.050 0.050 23 ... SPO 2011 02 09 387.060 0.170 23 ... SPO 2011 02 10 386.890 0.190 23 ... SPO 2011 02 11 386.840 0.130 15 ... SPO 2011 02 12 387.320 0.130 23 ... SPO 2011 02 13 387.450 0.030 23 ... SPO 2011 02 14 387.280 0.060 23 ... SPO 2011 02 15 387.350 0.040 23 ... SPO 2011 02 16 387.230 0.050 23 ... SPO 2011 02 17 386.920 0.300 23 ... SPO 2011 02 18 386.530 0.090 23 ... SPO 2011 02 19 386.650 0.030 23 ... SPO 2011 02 20 386.990 0.230 23 ... SPO 2011 02 21 386.830 0.150 23 ... SPO 2011 02 22 386.640 0.060 23 ... SPO 2011 02 23 386.670 0.110 23 ... SPO 2011 02 24 386.690 0.080 23 ... SPO 2011 02 25 386.700 0.050 23 ... SPO 2011 02 26 386.770 0.050 23 ... SPO 2011 02 27 386.810 0.050 23 ... SPO 2011 02 28 386.730 0.030 23 ... SPO 2011 03 01 386.700 0.040 24 ... SPO 2011 03 02 386.710 0.070 23 ... SPO 2011 03 03 386.700 0.090 23 ... SPO 2011 03 04 386.690 0.050 23 ... SPO 2011 03 05 386.880 0.100 23 ... SPO 2011 03 06 387.040 0.040 23 ... SPO 2011 03 07 387.060 0.080 23 ... SPO 2011 03 08 386.910 0.120 23 ... SPO 2011 03 09 386.520 0.110 23 ... SPO 2011 03 10 386.790 0.080 23 ... SPO 2011 03 11 386.880 0.070 23 ... SPO 2011 03 12 387.100 0.060 23 ... SPO 2011 03 13 387.030 0.090 23 ... SPO 2011 03 14 387.010 0.050 23 ... SPO 2011 03 15 386.870 0.030 23 ... SPO 2011 03 16 386.860 0.070 23 ... SPO 2011 03 17 386.900 0.170 23 ... SPO 2011 03 18 387.040 0.140 23 ... SPO 2011 03 19 386.890 0.030 23 ... SPO 2011 03 20 386.860 0.030 23 ... SPO 2011 03 21 386.910 0.070 23 ... SPO 2011 03 22 387.020 0.030 23 ... SPO 2011 03 23 386.960 0.040 23 ... SPO 2011 03 24 386.990 0.040 23 ... SPO 2011 03 25 386.920 0.020 23 ... SPO 2011 03 26 386.940 0.020 24 ... SPO 2011 03 27 386.960 0.030 23 ... SPO 2011 03 28 386.970 0.040 23 ... SPO 2011 03 29 387.010 0.020 23 ... SPO 2011 03 30 387.000 0.030 23 ... SPO 2011 03 31 387.020 0.040 23 ... SPO 2011 04 01 387.060 0.030 23 ... SPO 2011 04 02 387.090 0.010 23 ... SPO 2011 04 03 387.100 0.020 23 ... SPO 2011 04 04 387.070 0.030 23 ... SPO 2011 04 05 386.990 0.060 23 ... SPO 2011 04 06 386.840 0.070 23 ... SPO 2011 04 07 386.800 0.040 23 ... SPO 2011 04 08 387.010 0.120 23 ... SPO 2011 04 09 387.100 0.020 23 ... SPO 2011 04 10 387.080 0.030 23 ... SPO 2011 04 11 387.030 0.040 23 ... SPO 2011 04 12 387.120 0.030 23 ... SPO 2011 04 13 387.070 0.020 23 ... SPO 2011 04 14 387.070 0.050 23 ... SPO 2011 04 15 386.940 0.030 23 ... SPO 2011 04 16 387.000 0.060 23 ... SPO 2011 04 17 387.030 0.080 23 ... SPO 2011 04 18 387.120 0.030 23 ... SPO 2011 04 19 387.050 0.050 23 ... SPO 2011 04 20 387.020 0.020 24 ... SPO 2011 04 21 387.100 0.030 23 ... SPO 2011 04 22 387.140 0.020 23 ... SPO 2011 04 23 387.120 0.030 23 ... SPO 2011 04 24 387.110 0.020 23 ... SPO 2011 04 25 387.130 0.020 23 ... SPO 2011 04 26 387.140 0.030 23 ... SPO 2011 04 27 387.110 0.020 23 ... SPO 2011 04 28 387.110 0.030 23 ... SPO 2011 04 29 387.140 0.030 23 ... SPO 2011 04 30 387.180 0.040 23 ... SPO 2011 05 01 387.240 0.040 23 ... SPO 2011 05 02 387.190 0.030 23 ... SPO 2011 05 03 387.150 0.060 23 ... SPO 2011 05 04 387.230 0.030 23 ... SPO 2011 05 05 387.210 0.030 23 ... SPO 2011 05 06 387.230 0.030 23 ... SPO 2011 05 07 387.190 0.030 23 ... SPO 2011 05 08 387.210 0.020 23 ... SPO 2011 05 09 387.220 0.020 23 ... SPO 2011 05 10 387.290 0.050 23 ... SPO 2011 05 11 387.280 0.020 23 ... SPO 2011 05 12 387.280 0.010 23 ... SPO 2011 05 13 387.280 0.010 23 ... SPO 2011 05 14 387.260 0.020 23 ... SPO 2011 05 15 387.290 0.020 24 ... SPO 2011 05 16 387.280 0.050 23 ... SPO 2011 05 17 387.330 0.020 23 ... SPO 2011 05 18 387.330 0.040 23 ... SPO 2011 05 19 387.280 0.030 23 ... SPO 2011 05 20 387.280 0.030 23 ... SPO 2011 05 21 387.300 0.030 23 ... SPO 2011 05 22 387.400 0.040 23 ... SPO 2011 05 23 387.370 0.020 23 ... SPO 2011 05 24 387.410 0.020 23 ... SPO 2011 05 25 387.440 0.050 23 ... SPO 2011 05 26 387.500 0.130 23 ... SPO 2011 05 27 387.500 0.020 23 ... SPO 2011 05 28 387.480 0.020 23 ... SPO 2011 05 29 387.480 0.040 23 ... SPO 2011 05 30 387.410 0.030 23 ... SPO 2011 05 31 387.450 0.020 23 ... SPO 2011 06 01 387.440 0.040 23 ... SPO 2011 06 02 387.420 0.020 23 ... SPO 2011 06 03 387.390 0.030 23 ... SPO 2011 06 04 387.400 0.020 23 ... SPO 2011 06 05 387.440 0.040 23 ... SPO 2011 06 06 387.510 0.040 23 ... SPO 2011 06 07 387.530 0.030 23 ... SPO 2011 06 08 387.550 0.040 23 ... SPO 2011 06 09 387.510 0.020 24 ... SPO 2011 06 10 387.530 0.030 23 ... SPO 2011 06 11 387.550 0.020 23 ... SPO 2011 06 12 387.520 0.020 23 ... SPO 2011 06 13 387.540 0.030 23 ... SPO 2011 06 14 387.570 0.020 23 ... SPO 2011 06 15 387.580 0.020 23 ... SPO 2011 06 16 387.580 0.030 23 ... SPO 2011 06 17 387.570 0.020 23 ... SPO 2011 06 18 387.590 0.020 23 ... SPO 2011 06 19 387.630 0.020 23 ... SPO 2011 06 20 387.630 0.020 23 ... SPO 2011 06 21 387.650 0.040 23 ... SPO 2011 06 22 387.640 0.020 23 ... SPO 2011 06 23 387.670 0.030 23 ... SPO 2011 06 24 387.690 0.020 23 ... SPO 2011 06 25 387.680 0.050 23 ... SPO 2011 06 26 387.700 0.030 23 ... SPO 2011 06 27 387.670 0.030 23 ... SPO 2011 06 28 387.620 0.030 23 ... SPO 2011 06 29 387.680 0.020 23 ... SPO 2011 06 30 387.690 0.020 23 ... SPO 2011 07 01 387.750 0.020 23 ... SPO 2011 07 02 387.770 0.010 23 ... SPO 2011 07 03 387.710 0.040 23 ... SPO 2011 07 04 387.790 0.040 24 ... SPO 2011 07 05 387.820 0.020 23 ... SPO 2011 07 06 387.820 0.020 23 ... SPO 2011 07 07 387.820 0.020 23 ... SPO 2011 07 08 387.830 0.020 23 ... SPO 2011 07 09 387.860 0.030 23 ... SPO 2011 07 10 387.910 0.030 23 ... SPO 2011 07 11 387.890 0.030 23 ... SPO 2011 07 12 387.920 0.030 23 ... SPO 2011 07 13 387.920 0.020 23 ... SPO 2011 07 14 387.940 0.040 23 ... SPO 2011 07 15 387.990 0.040 17 ... SPO 2011 07 16 388.030 0.030 23 ... SPO 2011 07 17 388.020 0.020 23 ... SPO 2011 07 18 388.070 0.030 23 ... SPO 2011 07 19 388.130 0.050 23 ... SPO 2011 07 20 388.080 0.020 23 ... SPO 2011 07 21 388.090 0.020 23 ... SPO 2011 07 22 388.140 0.030 23 ... SPO 2011 07 23 388.150 0.030 23 ... SPO 2011 07 24 388.200 0.020 23 ... SPO 2011 07 25 388.190 0.030 23 ... SPO 2011 07 26 388.320 0.050 23 ... SPO 2011 07 27 388.320 0.030 23 ... SPO 2011 07 28 388.300 0.030 23 ... SPO 2011 07 29 388.330 0.030 24 ... SPO 2011 07 30 388.270 0.030 23 ... SPO 2011 07 31 388.260 0.020 23 ... SPO 2011 08 01 388.270 0.020 23 ... SPO 2011 08 02 388.320 0.040 23 ... SPO 2011 08 03 388.380 0.020 23 ... SPO 2011 08 04 388.390 0.030 23 ... SPO 2011 08 05 388.390 0.040 23 ... SPO 2011 08 06 388.480 0.030 23 ... SPO 2011 08 07 388.410 0.020 23 ... SPO 2011 08 08 388.440 0.030 23 ... SPO 2011 08 09 388.480 0.030 23 ... SPO 2011 08 10 388.480 0.020 23 ... SPO 2011 08 11 388.510 0.020 23 ... SPO 2011 08 12 388.510 0.030 23 ... SPO 2011 08 13 388.500 0.020 23 ... SPO 2011 08 14 388.510 0.020 23 ... SPO 2011 08 15 388.540 0.050 23 ... SPO 2011 08 16 388.530 0.020 23 ... SPO 2011 08 17 388.550 0.020 23 ... SPO 2011 08 18 388.540 0.030 23 ... SPO 2011 08 19 388.570 0.020 23 ... SPO 2011 08 20 388.590 0.030 23 ... SPO 2011 08 21 388.660 0.150 23 ... SPO 2011 08 22 388.720 0.190 22 ... SPO 2011 08 23 388.600 0.020 24 ... SPO 2011 08 24 388.600 0.030 23 ... SPO 2011 08 25 388.630 0.020 23 ... SPO 2011 08 26 388.670 0.030 23 ... SPO 2011 08 27 388.620 0.020 23 ... SPO 2011 08 28 388.640 0.020 23 ... SPO 2011 08 29 388.660 0.030 23 ... SPO 2011 08 30 388.710 0.050 23 ... SPO 2011 08 31 388.790 0.030 23 ... SPO 2011 09 01 388.730 0.020 23 ... SPO 2011 09 02 388.780 0.040 23 ... SPO 2011 09 03 388.820 0.020 23 ... SPO 2011 09 04 388.850 0.020 23 ... SPO 2011 09 05 388.850 0.040 23 ... SPO 2011 09 06 388.820 0.030 23 ... SPO 2011 09 07 388.820 0.040 23 ... SPO 2011 09 08 388.830 0.020 23 ... SPO 2011 09 09 388.820 0.030 23 ... SPO 2011 09 10 388.860 0.040 23 ... SPO 2011 09 11 388.840 0.020 23 ... SPO 2011 09 12 388.830 0.040 23 ... SPO 2011 09 13 388.860 0.020 23 ... SPO 2011 09 14 388.870 0.030 23 ... SPO 2011 09 15 388.870 0.030 23 ... SPO 2011 09 16 388.920 0.020 23 ... SPO 2011 09 17 388.970 0.030 24 ... SPO 2011 09 18 388.870 0.040 23 ... SPO 2011 09 19 388.900 0.040 23 ... SPO 2011 09 20 388.910 0.010 23 ... SPO 2011 09 21 388.910 0.040 23 ... SPO 2011 09 22 388.920 0.020 23 ... SPO 2011 09 23 388.950 0.030 23 ... SPO 2011 09 24 388.970 0.020 23 ... SPO 2011 09 25 388.990 0.020 23 ... SPO 2011 09 26 389.000 0.020 23 ... SPO 2011 09 27 389.000 0.020 23 ... SPO 2011 09 28 389.010 0.020 23 ... SPO 2011 09 29 389.000 0.020 23 ... SPO 2011 09 30 388.980 0.020 23 ... SPO 2011 10 01 389.020 0.060 20 ... SPO 2011 10 02 389.010 0.070 23 ... SPO 2011 10 03 389.070 0.140 23 ... SPO 2011 10 04 389.090 0.040 23 ... SPO 2011 10 05 389.100 0.020 23 ... SPO 2011 10 06 389.100 0.020 23 ... SPO 2011 10 07 389.090 0.020 23 ... SPO 2011 10 08 389.090 0.020 23 ... SPO 2011 10 09 389.080 0.030 21 ... SPO 2011 10 10 389.100 0.020 23 ... SPO 2011 10 11 389.080 0.030 23 ... SPO 2011 10 12 389.130 0.030 24 ... SPO 2011 10 13 389.110 0.030 23 ... SPO 2011 10 14 389.120 0.020 23 ... SPO 2011 10 15 389.090 0.040 23 ... SPO 2011 10 16 389.080 0.040 23 ... SPO 2011 10 17 389.080 0.020 23 ... SPO 2011 10 18 389.070 0.030 23 ... SPO 2011 10 19 389.070 0.020 23 ... SPO 2011 10 20 389.070 0.030 23 ... SPO 2011 10 21 389.090 0.040 23 ... SPO 2011 10 22 389.150 0.060 2 ... SPO 2011 10 23 389.070 0.020 20 ... SPO 2011 10 24 389.120 0.030 23 ... SPO 2011 10 25 389.090 0.030 23 ... SPO 2011 10 26 389.140 0.040 23 ... SPO 2011 10 27 389.150 0.030 23 ... SPO 2011 10 28 389.120 0.040 23 ... SPO 2011 10 29 389.100 0.030 22 ... SPO 2011 10 30 389.170 0.070 17 ... SPO 2011 10 31 389.120 0.050 10 ... SPO 2011 11 01 389.070 0.050 23 ... SPO 2011 11 02 388.980 0.030 23 ... SPO 2011 11 03 388.990 0.030 23 ... SPO 2011 11 04 388.950 0.090 23 ... SPO 2011 11 05 388.980 0.090 23 ... SPO 2011 11 06 389.100 0.030 24 ... SPO 2011 11 07 389.090 0.050 23 ... SPO 2011 11 08 389.000 0.070 23 ... SPO 2011 11 09 389.030 0.030 23 ... SPO 2011 11 10 389.040 0.050 23 ... SPO 2011 11 11 389.070 0.030 23 ... SPO 2011 11 12 389.100 0.030 23 ... SPO 2011 11 13 389.100 0.080 23 ... SPO 2011 11 14 389.220 0.040 23 ... SPO 2011 11 15 389.230 0.060 23 ... SPO 2011 11 16 389.110 0.020 23 ... SPO 2011 11 17 389.160 0.040 23 ... SPO 2011 11 18 389.140 0.030 23 ... SPO 2011 11 19 389.130 0.030 23 ... SPO 2011 11 20 389.170 0.020 23 ... SPO 2011 11 21 389.190 0.030 23 ... SPO 2011 11 22 389.180 0.040 23 ... SPO 2011 11 23 389.260 0.030 23 ... SPO 2011 11 24 389.250 0.080 23 ... SPO 2011 11 25 389.230 0.090 23 ... SPO 2011 11 26 389.290 0.040 23 ... SPO 2011 11 27 389.260 0.040 23 ... SPO 2011 11 28 389.220 0.030 23 ... SPO 2011 11 29 389.220 0.030 23 ... SPO 2011 11 30 389.240 0.020 23 ... SPO 2011 12 01 389.290 0.040 24 ... SPO 2011 12 02 389.270 0.040 23 ... SPO 2011 12 03 389.220 0.010 23 ... SPO 2011 12 04 389.240 0.030 23 ... SPO 2011 12 05 389.220 0.040 23 ... SPO 2011 12 06 389.220 0.060 22 ... SPO 2011 12 07 389.260 0.170 21 ... SPO 2011 12 08 389.180 0.050 23 ... SPO 2011 12 09 389.270 0.050 23 ... SPO 2011 12 10 389.190 0.020 23 ... SPO 2011 12 11 389.140 0.070 23 ... SPO 2011 12 12 389.050 0.050 23 ... SPO 2011 12 13 389.070 0.030 23 ... SPO 2011 12 14 389.140 0.030 23 ... SPO 2011 12 15 389.080 0.060 23 ... SPO 2011 12 16 388.860 0.090 23 ... SPO 2011 12 17 388.970 0.150 23 ... SPO 2011 12 18 388.760 0.060 23 ... SPO 2011 12 19 388.770 0.080 23 ... SPO 2011 12 20 388.930 0.220 20 ... SPO 2011 12 21 389.020 0.140 23 ... SPO 2011 12 22 389.040 0.070 23 ... SPO 2011 12 23 389.080 0.140 23 ... SPO 2011 12 24 389.040 0.120 16 ... SPO 2011 12 25 389.340 0.160 18 ... SPO 2011 12 26 388.980 0.040 24 ... SPO 2011 12 27 388.880 0.030 23 ... SPO 2011 12 28 388.970 0.030 23 ... SPO 2011 12 29 389.050 0.060 23 ... SPO 2011 12 30 388.930 0.050 23 ... SPO 2011 12 31 388.940 0.060 23 ... SPO 2012 01 01 388.860 0.080 20 ... SPO 2012 01 02 388.980 0.190 20 ... SPO 2012 01 03 388.940 0.090 23 ... SPO 2012 01 04 389.000 0.060 23 ... SPO 2012 01 05 388.940 0.070 23 ... SPO 2012 01 06 389.040 0.070 23 ... SPO 2012 01 07 389.030 0.050 23 ... SPO 2012 01 08 388.920 0.030 23 ... SPO 2012 01 09 389.010 0.140 23 ... SPO 2012 01 10 389.080 0.070 23 ... SPO 2012 01 11 389.050 0.130 21 ... SPO 2012 01 12 389.160 0.080 23 ... SPO 2012 01 13 389.040 0.130 23 ... SPO 2012 01 14 388.940 0.060 23 ... SPO 2012 01 15 389.070 0.050 23 ... SPO 2012 01 16 389.110 0.020 23 ... SPO 2012 01 17 389.070 0.040 23 ... SPO 2012 01 18 389.020 0.080 23 ... SPO 2012 01 19 389.000 0.070 23 ... SPO 2012 01 20 388.940 0.080 24 ... SPO 2012 01 21 388.920 0.030 23 ... SPO 2012 01 22 388.910 0.020 23 ... SPO 2012 01 23 388.880 0.050 23 ... SPO 2012 01 24 388.830 0.150 23 ... SPO 2012 01 25 388.790 0.110 23 ... SPO 2012 01 26 388.690 0.240 23 ... SPO 2012 01 27 388.920 0.050 23 ... SPO 2012 01 28 388.890 0.040 23 ... SPO 2012 01 29 388.750 0.130 23 ... SPO 2012 01 30 388.610 0.110 23 ... SPO 2012 01 31 388.820 0.060 23 ... SPO 2012 02 01 388.920 0.060 23 ... SPO 2012 02 02 388.880 0.060 23 ... SPO 2012 02 03 388.690 0.080 23 ... SPO 2012 02 04 388.590 0.030 23 ... SPO 2012 02 05 388.600 0.030 23 ... SPO 2012 02 06 388.620 0.030 22 ... SPO 2012 02 07 388.830 0.140 23 ... SPO 2012 02 08 388.550 0.270 23 ... SPO 2012 02 09 388.920 0.040 23 ... SPO 2012 02 10 388.830 0.040 23 ... SPO 2012 02 11 388.430 0.250 23 ... SPO 2012 02 12 388.120 0.060 23 ... SPO 2012 02 13 388.160 0.100 21 ... SPO 2012 02 14 388.230 0.110 24 ... SPO 2012 02 15 387.860 0.130 14 ... SPO 2012 02 16 387.940 0.110 18 ... SPO 2012 02 17 388.300 0.080 23 ... SPO 2012 02 18 388.410 0.170 19 ... SPO 2012 02 19 388.850 0.160 21 ... SPO 2012 02 20 388.520 0.060 23 ... SPO 2012 02 21 388.590 0.060 23 ... SPO 2012 02 22 388.660 0.050 22 ... SPO 2012 02 23 388.660 0.040 19 ... SPO 2012 02 24 388.560 0.150 20 ... SPO 2012 02 25 388.580 0.100 22 ... SPO 2012 02 26 388.620 0.050 23 ... SPO 2012 02 27 388.590 0.060 23 ... SPO 2012 02 28 388.750 0.140 23 ... SPO 2012 02 29 389.010 0.050 23 ... SPO 2012 03 01 388.940 0.030 23 ... SPO 2012 03 02 388.950 0.090 23 ... SPO 2012 03 03 388.810 0.050 23 ... SPO 2012 03 04 388.890 0.040 23 ... SPO 2012 03 05 388.830 0.040 23 ... SPO 2012 03 06 388.800 0.040 23 ... SPO 2012 03 07 388.750 0.040 23 ... SPO 2012 03 08 388.740 0.060 23 ... SPO 2012 03 09 388.810 0.050 21 ... SPO 2012 03 10 388.700 0.060 24 ... SPO 2012 03 11 388.750 0.050 23 ... SPO 2012 03 12 388.750 0.040 23 ... SPO 2012 03 13 388.810 0.070 23 ... SPO 2012 03 14 388.780 0.200 23 ... SPO 2012 03 15 388.720 0.070 23 ... SPO 2012 03 16 388.750 0.020 23 ... SPO 2012 03 17 388.740 0.030 23 ... SPO 2012 03 18 388.700 0.030 23 ... SPO 2012 03 19 388.830 0.100 23 ... SPO 2012 03 20 388.660 0.220 4 ... SPO 2012 03 21 388.730 0.200 23 ... SPO 2012 03 22 388.880 0.100 23 ... SPO 2012 03 23 388.530 0.080 23 ... SPO 2012 03 24 388.540 0.050 23 ... SPO 2012 03 25 388.680 0.070 23 ... SPO 2012 03 26 388.710 0.040 23 ... SPO 2012 03 27 388.700 0.040 23 ... SPO 2012 03 28 388.750 0.040 23 ... SPO 2012 03 29 388.770 0.020 23 ... SPO 2012 03 30 388.760 0.050 23 ... SPO 2012 03 31 388.890 0.050 23 ... SPO 2012 04 01 388.740 0.070 23 ... SPO 2012 04 02 388.790 0.080 23 ... SPO 2012 04 03 388.890 0.030 23 ... SPO 2012 04 04 388.910 0.030 24 ... SPO 2012 04 05 388.890 0.050 23 ... SPO 2012 04 06 388.930 0.030 23 ... SPO 2012 04 07 388.970 0.040 23 ... SPO 2012 04 08 389.020 0.020 23 ... SPO 2012 04 09 388.990 0.030 23 ... SPO 2012 04 10 388.950 0.050 23 ... SPO 2012 04 11 388.950 0.040 23 ... SPO 2012 04 12 389.000 0.020 23 ... SPO 2012 04 13 389.010 0.020 23 ... SPO 2012 04 14 389.030 0.050 23 ... SPO 2012 04 15 389.010 0.030 23 ... SPO 2012 04 16 389.040 0.040 23 ... SPO 2012 04 17 388.970 0.030 23 ... SPO 2012 04 18 389.030 0.040 23 ... SPO 2012 04 19 389.010 0.050 23 ... SPO 2012 04 20 389.060 0.050 23 ... SPO 2012 04 21 389.110 0.030 23 ... SPO 2012 04 22 389.120 0.020 23 ... SPO 2012 04 23 389.060 0.040 23 ... SPO 2012 04 24 389.050 0.020 23 ... SPO 2012 04 25 389.030 0.030 23 ... SPO 2012 04 26 389.030 0.030 23 ... SPO 2012 04 27 389.000 0.030 23 ... SPO 2012 04 28 389.080 0.040 23 ... SPO 2012 04 29 388.990 0.040 24 ... SPO 2012 04 30 389.020 0.020 23 ... SPO 2012 05 01 389.060 0.050 23 ... SPO 2012 05 02 389.130 0.050 23 ... SPO 2012 05 03 389.080 0.040 23 ... SPO 2012 05 04 389.030 0.020 23 ... SPO 2012 05 05 389.070 0.020 23 ... SPO 2012 05 06 389.120 0.020 23 ... SPO 2012 05 07 389.090 0.030 23 ... SPO 2012 05 08 389.090 0.030 23 ... SPO 2012 05 09 389.110 0.020 23 ... SPO 2012 05 10 389.150 0.050 19 ... SPO 2012 05 11 389.160 0.040 23 ... SPO 2012 05 12 389.170 0.040 23 ... SPO 2012 05 13 389.140 0.030 23 ... SPO 2012 05 14 389.160 0.030 23 ... SPO 2012 05 15 389.260 0.050 23 ... SPO 2012 05 16 389.330 0.050 23 ... SPO 2012 05 17 389.290 0.050 23 ... SPO 2012 05 18 389.300 0.020 23 ... SPO 2012 05 19 389.340 0.030 23 ... SPO 2012 05 20 389.390 0.020 23 ... SPO 2012 05 21 389.360 0.040 23 ... SPO 2012 05 22 389.350 0.040 23 ... SPO 2012 05 23 389.360 0.030 23 ... SPO 2012 05 24 389.380 0.030 24 ... SPO 2012 05 25 389.380 0.020 23 ... SPO 2012 05 26 389.360 0.040 23 ... SPO 2012 05 27 389.400 0.020 23 ... SPO 2012 05 28 389.420 0.030 23 ... SPO 2012 05 29 389.400 0.020 23 ... SPO 2012 05 30 389.380 0.030 23 ... SPO 2012 05 31 389.350 0.030 23 ... SPO 2012 06 01 389.370 0.040 23 ... SPO 2012 06 02 389.380 0.020 23 ... SPO 2012 06 03 389.400 0.020 23 ... SPO 2012 06 04 389.400 0.030 23 ... SPO 2012 06 05 389.400 0.040 23 ... SPO 2012 06 06 389.380 0.020 23 ... SPO 2012 06 07 389.450 0.030 23 ... SPO 2012 06 08 389.420 0.020 23 ... SPO 2012 06 09 389.490 0.040 23 ... SPO 2012 06 10 389.530 0.020 23 ... SPO 2012 06 11 389.530 0.040 23 ... SPO 2012 06 12 389.490 0.030 23 ... SPO 2012 06 13 389.540 0.030 23 ... SPO 2012 06 14 389.560 0.040 23 ... SPO 2012 06 15 389.510 0.030 23 ... SPO 2012 06 16 389.550 0.050 23 ... SPO 2012 06 17 389.540 0.030 23 ... SPO 2012 06 18 389.630 0.060 24 ... SPO 2012 06 19 389.660 0.050 23 ... SPO 2012 06 20 389.730 0.020 23 ... SPO 2012 06 21 389.760 0.040 23 ... SPO 2012 06 22 389.700 0.050 23 ... SPO 2012 06 23 389.760 0.050 23 ... SPO 2012 06 24 389.740 0.030 23 ... SPO 2012 06 25 389.760 0.020 23 ... SPO 2012 06 26 389.790 0.020 23 ... SPO 2012 06 27 389.800 0.030 23 ... SPO 2012 06 28 389.860 0.040 23 ... SPO 2012 06 29 389.870 0.030 23 ... SPO 2012 06 30 389.880 0.060 23 ... SPO 2012 07 01 389.930 0.030 23 ... SPO 2012 07 02 389.990 0.020 23 ... SPO 2012 07 03 389.990 0.020 23 ... SPO 2012 07 04 389.970 0.030 23 ... SPO 2012 07 05 390.000 0.030 23 ... SPO 2012 07 06 390.070 0.050 23 ... SPO 2012 07 07 390.090 0.030 23 ... SPO 2012 07 08 390.120 0.030 23 ... SPO 2012 07 09 390.130 0.010 23 ... SPO 2012 07 10 390.090 0.030 23 ... SPO 2012 07 11 390.080 0.030 23 ... SPO 2012 07 12 390.080 0.010 23 ... SPO 2012 07 13 390.140 0.050 24 ... SPO 2012 07 14 390.270 0.030 23 ... SPO 2012 07 15 390.260 0.030 23 ... SPO 2012 07 16 390.200 0.020 23 ... SPO 2012 07 17 390.240 0.030 23 ... SPO 2012 07 18 390.280 0.020 23 ... SPO 2012 07 19 390.230 0.030 23 ... SPO 2012 07 20 390.230 0.040 23 ... SPO 2012 07 21 390.290 0.040 23 ... SPO 2012 07 22 390.290 0.030 23 ... SPO 2012 07 23 390.340 0.020 23 ... SPO 2012 07 24 390.360 0.030 23 ... SPO 2012 07 25 390.350 0.040 23 ... SPO 2012 07 26 390.430 0.040 23 ... SPO 2012 07 27 390.500 0.040 23 ... SPO 2012 07 28 390.530 0.040 23 ... SPO 2012 07 29 390.520 0.020 23 ... SPO 2012 07 30 390.510 0.030 23 ... SPO 2012 07 31 390.540 0.020 23 ... SPO 2012 08 01 390.540 0.030 23 ... SPO 2012 08 02 390.560 0.050 23 ... SPO 2012 08 03 390.630 0.030 23 ... SPO 2012 08 04 390.600 0.020 23 ... SPO 2012 08 05 390.630 0.020 23 ... SPO 2012 08 06 390.640 0.030 23 ... SPO 2012 08 07 390.690 0.070 24 ... SPO 2012 08 08 390.770 0.020 23 ... SPO 2012 08 09 390.780 0.030 23 ... SPO 2012 08 10 390.780 0.030 23 ... SPO 2012 08 11 390.790 0.040 23 ... SPO 2012 08 12 390.840 0.040 23 ... SPO 2012 08 13 390.830 0.020 23 ... SPO 2012 08 14 390.830 0.040 23 ... SPO 2012 08 15 391.010 0.050 23 ... SPO 2012 08 16 390.950 0.080 22 ... SPO 2012 08 17 391.010 0.020 23 ... SPO 2012 08 18 390.980 0.030 23 ... SPO 2012 08 19 390.980 0.020 23 ... SPO 2012 08 20 390.990 0.030 23 ... SPO 2012 08 21 391.020 0.030 23 ... SPO 2012 08 22 391.070 0.030 23 ... SPO 2012 08 23 391.070 0.030 23 ... SPO 2012 08 24 391.080 0.030 23 ... SPO 2012 08 25 391.110 0.030 23 ... SPO 2012 08 26 391.120 0.030 23 ... SPO 2012 08 27 391.120 0.020 23 ... SPO 2012 08 28 391.150 0.030 23 ... SPO 2012 08 29 391.180 0.040 23 ... SPO 2012 08 30 391.130 0.030 23 ... SPO 2012 08 31 391.120 0.020 23 ... SPO 2012 09 01 391.130 0.030 24 ... SPO 2012 09 02 391.210 0.040 23 ... SPO 2012 09 03 391.210 0.020 23 ... SPO 2012 09 04 391.210 0.030 23 ... SPO 2012 09 05 391.260 0.040 23 ... SPO 2012 09 06 391.310 0.020 23 ... SPO 2012 09 07 391.210 0.040 23 ... SPO 2012 09 08 391.240 0.050 23 ... SPO 2012 09 09 391.320 0.030 23 ... SPO 2012 09 10 391.300 0.040 23 ... SPO 2012 09 11 391.270 0.030 23 ... SPO 2012 09 12 391.310 0.040 23 ... SPO 2012 09 13 391.270 0.030 23 ... SPO 2012 09 14 391.280 0.020 23 ... SPO 2012 09 15 391.310 0.020 23 ... SPO 2012 09 16 391.290 0.040 23 ... SPO 2012 09 17 391.330 0.030 23 ... SPO 2012 09 18 391.280 0.020 23 ... SPO 2012 09 19 391.330 0.050 23 ... SPO 2012 09 20 391.370 0.030 23 ... SPO 2012 09 21 391.370 0.010 23 ... SPO 2012 09 22 391.370 0.030 23 ... SPO 2012 09 23 391.350 0.030 23 ... SPO 2012 09 24 391.400 0.030 23 ... SPO 2012 09 25 391.390 0.040 23 ... SPO 2012 09 26 391.370 0.030 24 ... SPO 2012 09 27 391.360 0.030 23 ... SPO 2012 09 28 391.310 0.040 23 ... SPO 2012 09 29 391.300 0.020 23 ... SPO 2012 09 30 391.310 0.030 23 ... SPO 2012 10 01 391.320 0.030 23 ... SPO 2012 10 02 391.340 0.040 23 ... SPO 2012 10 03 391.500 0.050 23 ... SPO 2012 10 04 391.540 0.050 23 ... SPO 2012 10 05 391.460 0.050 23 ... SPO 2012 10 06 391.480 0.050 23 ... SPO 2012 10 07 391.480 0.060 23 ... SPO 2012 10 08 391.380 0.030 23 ... SPO 2012 10 09 391.390 0.020 23 ... SPO 2012 10 10 391.360 0.030 23 ... SPO 2012 10 11 391.340 0.020 23 ... SPO 2012 10 12 391.340 0.040 23 ... SPO 2012 10 13 391.310 0.030 23 ... SPO 2012 10 14 391.350 0.030 23 ... SPO 2012 10 15 391.340 0.030 23 ... SPO 2012 10 16 391.360 0.030 23 ... SPO 2012 10 17 391.330 0.040 23 ... SPO 2012 10 18 391.370 0.040 23 ... SPO 2012 10 19 391.400 0.040 23 ... SPO 2012 10 20 391.390 0.030 23 ... SPO 2012 10 21 391.360 0.020 24 ... SPO 2012 10 22 391.360 0.030 23 ... SPO 2012 10 23 391.370 0.030 23 ... SPO 2012 10 24 391.370 0.020 23 ... SPO 2012 10 25 391.360 0.030 23 ... SPO 2012 10 26 391.340 0.030 23 ... SPO 2012 10 27 391.320 0.030 23 ... SPO 2012 10 28 391.330 0.020 23 ... SPO 2012 10 29 391.340 0.030 23 ... SPO 2012 10 30 391.320 0.030 23 ... SPO 2012 10 31 391.320 0.030 23 ... SPO 2012 11 01 391.320 0.020 23 ... SPO 2012 11 02 391.330 0.020 23 ... SPO 2012 11 03 391.330 0.020 23 ... SPO 2012 11 04 391.320 0.020 23 ... SPO 2012 11 05 391.310 0.040 23 ... SPO 2012 11 06 391.300 0.020 23 ... SPO 2012 11 07 391.310 0.040 23 ... SPO 2012 11 08 391.250 0.030 21 ... SPO 2012 11 09 391.270 0.020 3 ... SPO 2012 11 10 391.290 0.030 23 ... SPO 2012 11 11 391.310 0.030 23 ... SPO 2012 11 12 391.300 0.050 23 ... SPO 2012 11 13 391.300 0.030 24 ... SPO 2012 11 14 391.370 0.030 23 ... SPO 2012 11 15 391.400 0.030 23 ... SPO 2012 11 16 391.400 0.030 23 ... SPO 2012 11 17 391.350 0.030 23 ... SPO 2012 11 18 391.350 0.020 23 ... SPO 2012 11 19 391.340 0.040 23 ... SPO 2012 11 20 391.310 0.040 23 ... SPO 2012 11 21 391.300 0.040 23 ... SPO 2012 11 22 391.290 0.020 23 ... SPO 2012 11 23 391.350 0.050 23 ... SPO 2012 11 24 391.330 0.020 23 ... SPO 2012 11 25 391.380 0.030 23 ... SPO 2012 11 26 391.440 0.030 23 ... SPO 2012 11 27 391.400 0.040 23 ... SPO 2012 11 28 391.430 0.030 22 ... SPO 2012 11 29 391.440 0.040 23 ... SPO 2012 11 30 391.430 0.030 23 ... SPO 2012 12 01 391.410 0.050 23 ... SPO 2012 12 02 391.400 0.050 23 ... SPO 2012 12 03 391.490 0.040 23 ... SPO 2012 12 04 391.540 0.040 23 ... SPO 2012 12 05 391.550 0.040 23 ... SPO 2012 12 06 391.570 0.110 20 ... SPO 2012 12 07 391.530 0.050 18 ... SPO 2012 12 08 391.530 0.030 24 ... SPO 2012 12 09 391.430 0.050 23 ... SPO 2012 12 10 391.440 0.040 23 ... SPO 2012 12 11 391.530 0.030 23 ... SPO 2012 12 12 391.450 0.040 23 ... SPO 2012 12 13 391.450 0.060 23 ... SPO 2012 12 14 391.380 0.040 23 ... SPO 2012 12 15 391.370 0.030 22 ... SPO 2012 12 16 391.480 0.040 23 ... SPO 2012 12 17 391.480 0.030 23 ... SPO 2012 12 18 391.500 0.040 23 ... SPO 2012 12 19 391.470 0.020 23 ... SPO 2012 12 20 391.470 0.030 19 ... SPO 2012 12 21 391.490 0.100 22 ... SPO 2012 12 22 391.480 0.090 23 ... SPO 2012 12 23 391.460 0.030 23 ... SPO 2012 12 24 391.440 0.060 23 ... SPO 2012 12 25 391.390 0.050 23 ... SPO 2012 12 26 391.520 0.060 23 ... SPO 2012 12 27 391.540 0.040 22 ... SPO 2012 12 28 391.520 0.040 23 ... SPO 2012 12 29 391.520 0.020 23 ... SPO 2012 12 30 391.510 0.020 19 ... SPO 2012 12 31 391.450 0.030 22 ...